This document summarizes an infection control risk assessment plan for renovations on the second floor of a Veterans Affairs medical center. The plan requires contractors to install sticky mats at entrances to work areas, 6 mil fire-retardant plastic sheeting with zipper openings, and negative air pressure machines to run continuously. Dust barriers must extend above ceilings and seal to overhead structures to meet one-hour fire barrier standards. Air quality monitoring must occur before, during, and after construction. The related federal contract opportunity is for renovations to Ward 1B at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee under solicitation number 36C24923R0114.

View the file

Other files

File Type Posted
36C24923R0114 0003.docx DOCX document
E-EI-01 - PARTIAL ELECTRICAL RISER DIAGRAM - DEMOLITION.pdf PDF
119437-Alvin C. York VAMC Renovate Ward 1B - Revision 1 - Electrical Narrative.pdf PDF
Government Answers to Industry Questions.pdf PDF
283100.pdf PDF
275223.pdf PDF
Bradley_GrabBar_8370-107.pdf PDF
Ward 1B - Revision 1.pdf PDF
Renovate Ward 1B Pre-Proposal Sign in Sheet - 07-06-2023.pdf PDF
E-EI-02 - PARTIAL ELECTRICAL RISER DIAGRAM - NEW WORK.pdf PDF
Bradley_GrabBar_8370-108.pdf PDF
General Decision Number TN20230187 06-30-2023 Rutherford County TN.pdf PDF
ASI 3413-25.pdf PDF
36C24923R0114 0002.docx DOCX document
GAMCO 125SwingUpTP.pdf PDF
Interior Wall Type Legend.pdf PDF
SUBCONTRACTOR INFORMATION AND CONSENT FORM.docx DOCX document
36C24923R0114 0001.docx DOCX document
MECH BINDER.pdf PDF
Ward 1B - Specs - Vol. 2.pdf PDF
GD Number TN20230187 05-12-2023.pdf PDF
GI 01-02 - CONSTRUCTION STAGING PLAN.pdf PDF
GI 05-01 - PHASING PLANS.pdf PDF
GI 00-01 - COVER SHEET.pdf PDF
GI 01-10 - WALL TYPE DETAILS.pdf PDF
Price Schedule Project 626A4-19-101 Renovate Ward 1B.xlsx XLSX spreadsheet
GI 04-02 - LEAD PAINT AND TRANSITE PANELS.pdf PDF
36C24923R0114.docx DOCX document
General Conditions Breakout.xlsx XLSX spreadsheet
WARD 1B - ARCH BINDER.pdf PDF
GI 01-20 - ACCESSIBILITY DETAILS.pdf PDF
RFI Form.docx DOCX document
GI 04-01 - ACM DUCT WORK AND ACM PIPE INSULATION.pdf PDF
Performance Relevancy Survey Form - 626A4-19-101 Renovate Ward 1B.docx DOCX document
Ward 1B - Specs - Vol. 1.pdf PDF
VN 01-00 - PATIENT LIFT VENDOR DRAWINGS.pdf PDF
ELECTRICAL BINDER.pdf PDF
PLUMBING BINDER.pdf PDF
GI 01-01 - GENERAL DATA.pdf PDF
TECH BINDER.pdf PDF
WARD 1B - GENERAL.pdf PDF
WARD 1B - INTERIORS .pdf PDF
Calculation of Self Performed Work.docx DOCX document
GI 02-01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL.pdf PDF
AD 01-01 - THIRD FLOOR DEMOLITION PLAN - OVERALL.pdf PDF
Contractor EMR Certification Form.docx DOCX document
FP BINDER.pdf PDF
GI 03-02 - THIRD FLOOR ICRA PLAN.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GI 03.01

PROVIDE STICKY MATS AT

ENTRANCE TO ANY ROOM WITH

WORK BEING DONE. TYPICAL TO

ALL WORK ON SECOND FLOOR

PROVIDE STICKY MATS AT

ENTRANCE TO ANY ROOM WITH

WORK BEING DONE. TYPICAL TO

ALL WORK ON SECOND FLOOR

SUPPLY AND INSTALL 6 MIL HEAVY

DUTY, REINFORCED,

FIRE-RETARDANT POLY SHEETING

(VISQUEEN). PLASTIC SHEET SHALL

BE FULLY SEALED AT PERIMETER.

PROVIDE ZIPPER OPENING FOR

AREAS AFFECTED BY WORK.

SUPPLY AND INSTALL 6 MIL HEAVY

DUTY, REINFORCED,

FIRE-RETARDANT POLY SHEETING

(VISQUEEN). PLASTIC SHEET SHALL

BE FULLY SEALED AT PERIMETER.

PROVIDE ZIPPER OPENING FOR

AREAS AFFECTED BY WORK.

REFER TO

NOTE 1 BELOW

12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554

©Copyright 2019

TLC No.:

www.tlc-engineers.com

118626

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

PROJECT TEAM:

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

KEYPLAN

MURFREESBORO, TN

615.370.8500

615.370.8530 hfrdesign.com

214 Centerview Drive Suite 300 Brentwood, TN 37027

BLDG 2

BLDG 1

BLDG 9

Phase

FULLY SPRINKLERED

C U s e rs \a tr a y lo r\ D o c u m e n ts

\M b o ro V

A W a rd b

R e n o a tr a y lo r2 X

N D

H .r v t

/1

/2

:2

:2

P

M

04-14-2023

626A4-19-101

GI 03.01

AE RENOVATE WARD 1BSECOND FLOOR ICRA PLAN

AT

HFR Project No: 2019056

100% CONSTRUCTION

DOCUMENTS

1 SECOND FLOOR ICRA PLAN

ICRA NOTES:

1. WHEN PREFORMING DEMO AND NEW WORK IN EXISTING CORRIDORS AND

ROOMS, PROTECT ALL FURNITURE AND EQUIPMENT WITH STRING

REINFORCED 6 MIL PLASTIC SHEET COVERING. CAREFULLY REMOVE

EXISTING ACOUSTICAL CEILING TILES AS REQUIRED FOR NEW WORK. ALL

OTHER ITEMS ARE TO REMAIN IN PLACE AND PROTECTED FROM

CONSTRUCTION REQUIRED FOR ITEMS THAT PENETRATE THE SLAB. AFTER

INSTALLATION OF THESE ITEMS , GC TO INSTALL NEW ACOUSTICAL CEILING

TILES THAT MATCH ORIGINAL CEILING TILE. AFTER REPLACEMENT OF ALL

DAMAGED CEILING, GRID AND ALL OTHER EXISTING ITEMS INSTALLED IN

EXISTING CEILING SUCH AS LIGHT FIXTURES, I.T. DEVICES, FIRE ALARM

DEVICES, SPRINKLER HEADS, ETC. WHEN WORK IS COMPLETED, INSTALL

NEW ACOUSTICAL CEILING TILES. IF THERE IS ANY DAMAGE IN OR ABOVE,

CEILING NEEDS TO BE REPLACED. AREA OF WORK TO BE COMPLETELY

SWEPT AND CLEANED PRIOR TO LEAVING THE SITE FOR THE DAY. WORK IN

EXISTING ROOMS AND CORRIDORS SHALL BE OFF-SHIFT AND WILL REQUIRE

AN INFECTION CONTROL PLAN TO BE SUBMITTED FOR COR APPROVAL.

WHEN PERFORMING DEMOLITION AND NEW WORK THRU ANY AREA OF

WORK, CAREFULLY REMOVE THE AMOUNT OF EXISTING ACOUSTICAL

CEILING TILES AND GRIDS AS REQUIRED FOR NEW WORK. AT THE END OF

THE SHIFT INSTALL THE ACOUSTICAL CEILING TILES AND GRIDS BACK TO

ITS ORIGINAL STATE. AREA OF WORK TO BE COMPLETELY SWEPT AND

CLEANED PRIOR TO LEAVING THE SITE FOR THE DAY.

2. COORDINATE WORK WITH ZONES ON AE 01.00. COORDINATE FINAL

SCHEDULE WITH COR

3. PROVIDE STICKY MATS INTO ANY ROOM THAT REQUIRES WORK

4. SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT

POLY SHEETING (VISQUEEN). PLASTIC SHEET SHALL BE FULLY SEALED AT

PERIMETER. PROVIDE ZIPPER OPENING FOR AREAS AFFECTED BY WORK.

2 SECOND FLOOR TYPICAL ICRA LAYOUT

0 5' 10'

0 2' 4' 6'

10. ALL DEMOLITION, RENOVATION AND CONSTRUCTION AREAS ADJACENT TO OCCUPIED AREAS OR OTHERWISE CONNECTED TO OCCUPIED AREAS ARE TO BE MAINTAINED AT A RELATIVE NEGATIVE AIR PRESSURE SO AIRBORNE DUST, PARTICLES, FUMES, SMALLS, MOLD SPORES, ETC. DO NOT FLOW INTO OCCUPIED AREAS. NEGATIVE AIR PRESSURE SHALL BE MAINTAINED CONTINUOUS FROM BEGINNING OF DEMOLITION, RENOVATION AND CONSTRUCTION UNTIL COMPLETION OF WORK AND FINAL CLEANING.

NEGATIVE PRESSURE IS NOT TO BE SHUT OFF DURING NON-WORKING HOURS. NEGATIVE AIR PRESSURE MACHINES ARE NOT TO BE SHUT OFF FOR MAINTENANCE OR OTHER REASONS UNTIL A REPLACEMENT

MACHINE IS RUNNING TO ALLOW A QUICK SWITCH OVER.

9. DUST BARRIERS BETWEEN DEMOLITION / CONSTRUCTION ZONE AND OCCUPIED AREAS ARE TO EXTEND

ABOVE CEILING AND SEALED TO UNDERSIDE OF STRUCTURE ABOVE. RESULTING TEMPORARY

CONSTRUCTION SHALL MEET 1HR FIRE BARRIER REQUIREMENTS U.N.O.

8. PROVIDE STICKY MATS AT ALL CONSTRUCTION ENTRANCES AND REPLACE ON REGULAR BASIS TO

ENSURE DEBRIS IS NOT TRANSFERRED FROM CONSTRUCTION SIDE OF BARRIER TO CLEAN

(NON-CONSTRUCTION) SIDE OF BARRIER.

7. SITE SHALL BE INSPECTED BY OWNER'S INFECTION CONTROL OFFICER UPON COMPLETION OF

BARRIERS AND PRIOR TO START OF CONSTRUCTION.

6. PROVIDE REQUIRED TEMPORARY DUST BARRIERS, BARRICADES, INFECTION CONTROL MEASURES PER

THE COMPLETED RISK ASSESSMENT, ETC. TO PROTECT PERSONNEL AND ADJACENT SPACES.

5. WET MOP WORK AREA THOROUGHLY WITH DISINFECTANT UPON COMPLETION OF PROJECT.

4. INSTALL HEPA FILTERED NEGATIVE AIR MACHINE TO RUN 24 HOURS PER DAY UNTIL CONSTRUCTION IS

COMPLETED.

3. CONSTRUCTION DEBRIS SHALL BE TRANSPORTED IN A WHEELED TILT TRUCK WITH DOME LID AT A MIN.

2. AIR QUALITY MONITOR TESTING SHALL BE PERFORMED BEFORE THE START OF CONSTRUCTION, PERIODICALLY DURING THE CONSTRUCTION PROCESS, AND AT COMPLETION OF CONSTRUCTION.

1. REFER TO INFECTION CONTROL RISK ASSESSMENT PERFORMED BY FACILITIES INFECTION CONTROL

OFFICER FOR SPECIFIC ICRA LEVEL & REQUIREMENTS

GENERAL ICRA NOTES

No. Date Description

Sheets
AD 01.01 - THIRD FLOOR DEMOLITION PLAN - OVERALL
AE 01.00 - SECOND FLOOR PLAN AND REFLECTED CEILING PLAN
AE 01.01 - FOURTH FLOOR/ATTIC PLAN
AE 01.03 - THIRD FLOOR OVERALL PLAN
AE 01.11 - PARTIAL THIRD FLOOR PLAN - PART A NOTED
AE 01.12 - PARTIAL THIRD FLOOR PLAN - PART B NOTED
AE 01.13 - PARTIAL THIRD FLOOR PLAN - PART C NOTED
AE 01.14 - PARTIAL THIRD FLOOR PLAN - PART A DIMENSIONED
AE 01.15 - PARTIAL THIRD FLOOR PLAN - PART B DIMENSIONED
AE 01.16 - PARTIAL THIRD FLOOR PLAN - PART C DIMENSIONED
AE 02.01 - ENLARGED PLANS AND REFLECTED CEILING PLANS
AE 02.02 - ENLARGED PLANS AND REFLECTED CEILING PLANS
AE 02.03 - ENLARGED TOILET PLANS AND ELEVATIONS
AE 03.01 - DOOR ELEVATIONS, SCHEDULE, & NOTES
AE 03.02 - DOOR DETAILS
AE 03.03 - WINDOW DETAILS
AE 08.01 - MISC. DETAILS
AE 08.02 - MISC. DETAILS
AE 08.03 - MISC. DETAILS
AE 08.04 - MISC. DETAILS
AE 08.05 - MISC. INTERIOR DETAILS
AE 08.06 - MISC CEILING DETAILS
AE 09.01 - INTERIOR ELEVATIONS
AE 09.02 - INTERIOR ELEVATIONS
AE 09.03 - CORRIDOR ELEVATIONS
AE 09.04 - CORRIDOR ELEVATIONS
AE 09.05 - 3D VIEWS
AE 10.01 - CASEWORK SECTIONS AND DETAILS
AE 10.02 - CASEWORK SECTIONS AND DETAILS
AE 11.01 - THIRD FLOOR REFLECTED CEILING PLAN - OVERALL
AE 11.10 - THIRD FLOOR RCP - PART A
AE 11.11 - THIRD FLOOR RCP - PART B
AE 11.12 - THIRD FLOOR RCP - PART C
AE 12.01A - EQUIPMENT PLANS
AE 12.01B - EQUIPMENT PLANS
AE 12.01C - EQUIPMENT PLANS
AE 12.02 - EQUIPMENT PLANS - PATIENT ROOMS AREA B
AE 12.02B - EQUIPMENT PLANS - PATIENT ROOMS AREA C
GI 00.01 - COVER SHEET
GI 01.01 - GENERAL DATA
GI 01.02 - CONSTRUCTION STAGING PLAN
GI 01.10 - WALL TYPE DETAILS
GI 01.20 - ACCESSIBILITY DETAILS
GI 02.01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL
GI 03.01 - SECOND FLOOR ICRA PLAN
GI 03.02 - THIRD FLOOR ICRA PLAN
GI 04.01 - ACM DUCT WORK AND ACM PIPE INSULATION
GI 04.02 - LEAD PAINT AND TRANSITE PANELS
GI 05.01 - PHASING PLANS
IN 01.00 - THIRD FLOOR FINISH LEGEND
IN 01.02 - PARTIAL THIRD FLOOR FINISH PLAN - PART A
IN 01.03 - PARTIAL THIRD FLOOR FINISH PLAN - PART B
IN 01.04 - PARTIAL THIRD FLOOR FINISH PLAN - PART C
IN 01.05 - THIRD FLOOR PATTERN PLAN OVERALL
IN 01.06 - PARTIAL THIRD FLOOR PATTERN - PART A
IN 01.07 - PARTIAL THIRD FLOOR PATTERN - PART B
IN 01.08 - PARTIAL THIRD FLOOR PATTERN - PART C
IN 02.00 - THIRD FLOOR SIGNAGE LEGEND
IN 02.01 - THIRD FLOOR SIGNAGE SCHEDULE
IN 02.02 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART A
IN 02.03 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART B
IN 02.04 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART C
VN 01.00 - PATIENT LIFT VENDOR DRAWINGS