119437-Alvin C. York VAMC Renovate Ward 1B - Revision 1 - Electrical Narrative.pdf

PDF 142 KB Posted

Attached to
Z2DA--626A4-19-101 - Renovate Ward 1B at the Alvin C. York VA Medical Center, Murfreesboro, TN 37129
Solicitation number
36C24923R0114
Issued by

About this file

This document contains a revision to construction plans and specifications for renovating Ward 1B at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The revision adds two new specification sections for nurse call and code blue systems and fire detection and alarm systems. It also revises two electrical drawings to show existing infrastructure and equipment in halftone and clarify which items are to remain and which are new as part of the project. The related federal contract opportunity is solicitation number 36C24923R0114 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 to renovate Ward 1B at the specified medical center location. The renovation work will include electrical system upgrades and installation of nurse call, code blue, and fire alarm systems as indicated in the revised construction documents.

View the file

Other files

File Type Posted
36C24923R0114 0003.docx DOCX document
E-EI-01 - PARTIAL ELECTRICAL RISER DIAGRAM - DEMOLITION.pdf PDF
Government Answers to Industry Questions.pdf PDF
283100.pdf PDF
275223.pdf PDF
Bradley_GrabBar_8370-107.pdf PDF
Ward 1B - Revision 1.pdf PDF
Renovate Ward 1B Pre-Proposal Sign in Sheet - 07-06-2023.pdf PDF
E-EI-02 - PARTIAL ELECTRICAL RISER DIAGRAM - NEW WORK.pdf PDF
Bradley_GrabBar_8370-108.pdf PDF
General Decision Number TN20230187 06-30-2023 Rutherford County TN.pdf PDF
ASI 3413-25.pdf PDF
36C24923R0114 0002.docx DOCX document
GAMCO 125SwingUpTP.pdf PDF
Interior Wall Type Legend.pdf PDF
SUBCONTRACTOR INFORMATION AND CONSENT FORM.docx DOCX document
36C24923R0114 0001.docx DOCX document
MECH BINDER.pdf PDF
Ward 1B - Specs - Vol. 2.pdf PDF
GD Number TN20230187 05-12-2023.pdf PDF
GI 01-02 - CONSTRUCTION STAGING PLAN.pdf PDF
GI 03-01 - SECOND FLOOR ICRA PLAN.pdf PDF
GI 05-01 - PHASING PLANS.pdf PDF
GI 00-01 - COVER SHEET.pdf PDF
GI 01-10 - WALL TYPE DETAILS.pdf PDF
Price Schedule Project 626A4-19-101 Renovate Ward 1B.xlsx XLSX spreadsheet
GI 04-02 - LEAD PAINT AND TRANSITE PANELS.pdf PDF
36C24923R0114.docx DOCX document
General Conditions Breakout.xlsx XLSX spreadsheet
WARD 1B - ARCH BINDER.pdf PDF
GI 01-20 - ACCESSIBILITY DETAILS.pdf PDF
RFI Form.docx DOCX document
GI 04-01 - ACM DUCT WORK AND ACM PIPE INSULATION.pdf PDF
Performance Relevancy Survey Form - 626A4-19-101 Renovate Ward 1B.docx DOCX document
Ward 1B - Specs - Vol. 1.pdf PDF
VN 01-00 - PATIENT LIFT VENDOR DRAWINGS.pdf PDF
ELECTRICAL BINDER.pdf PDF
PLUMBING BINDER.pdf PDF
GI 01-01 - GENERAL DATA.pdf PDF
TECH BINDER.pdf PDF
WARD 1B - GENERAL.pdf PDF
WARD 1B - INTERIORS .pdf PDF
Calculation of Self Performed Work.docx DOCX document
GI 02-01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL.pdf PDF
AD 01-01 - THIRD FLOOR DEMOLITION PLAN - OVERALL.pdf PDF
Contractor EMR Certification Form.docx DOCX document
FP BINDER.pdf PDF
GI 03-02 - THIRD FLOOR ICRA PLAN.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TVHS ACY VAMC – Renovate Ward 1B TLC Project No. 119437

Revision No. 1 08/03/2023

REVISION NO. 1

AUGUST 3, 2023

ELECTRICAL

SPECIFICATION SECTION 27 52 23 (Nurse Call and Code Blue Systems)

• Added this section in its entirety.

SPECIFICATION SECTION 28 31 00 (Fire Detection and Alarm)

• Added this section in its entirety.

DRAWING E-EI-01:

• At Electrical Room, 336, corrected name of existing panel “2C1Z”.

• Revised entire drawing to show all existing to remain items (feeders, panels, transformers, etc.) as halftone, and noted this in the revised “Phase Legend” at top of sheet.

DRAWING E-EI-02:

• Revised entire drawing to show all existing to remain items (feeders, panels, transformers, etc.) as halftone, and noted this in the revised “Phase Legend” at top of sheet.

• Continued to show new feeders, panels, and transformers as darker lines, in accordance with the revised “Phase Legend” at top of sheet.

File details come from the government source that posted it. Updated .