About this file

This package includes construction documents and specifications for the renovation of Ward 1B at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The project scope involves demolishing and renovating the third floor of Building 1, including architectural, mechanical, plumbing and electrical systems. Drawings cover existing conditions, demolition plans, new construction plans, schedules, details and specifications. Renovations include updating patient rooms, corridors, support spaces and building systems to current code and accessibility standards. The work will be completed in phases to maintain medical operations. The related federal solicitation is for contractors to bid on the Z2DA--626A4-19-101 project to renovate Ward 1B at the specified location, issued by the Department of Veterans Affairs Veterans Health Administration.

View the file

Other files

File Type Posted
36C24923R0114 0003.docx DOCX document
E-EI-01 - PARTIAL ELECTRICAL RISER DIAGRAM - DEMOLITION.pdf PDF
119437-Alvin C. York VAMC Renovate Ward 1B - Revision 1 - Electrical Narrative.pdf PDF
Government Answers to Industry Questions.pdf PDF
283100.pdf PDF
275223.pdf PDF
Bradley_GrabBar_8370-107.pdf PDF
Ward 1B - Revision 1.pdf PDF
Renovate Ward 1B Pre-Proposal Sign in Sheet - 07-06-2023.pdf PDF
E-EI-02 - PARTIAL ELECTRICAL RISER DIAGRAM - NEW WORK.pdf PDF
Bradley_GrabBar_8370-108.pdf PDF
General Decision Number TN20230187 06-30-2023 Rutherford County TN.pdf PDF
ASI 3413-25.pdf PDF
36C24923R0114 0002.docx DOCX document
GAMCO 125SwingUpTP.pdf PDF
Interior Wall Type Legend.pdf PDF
SUBCONTRACTOR INFORMATION AND CONSENT FORM.docx DOCX document
36C24923R0114 0001.docx DOCX document
MECH BINDER.pdf PDF
Ward 1B - Specs - Vol. 2.pdf PDF
GD Number TN20230187 05-12-2023.pdf PDF
GI 01-02 - CONSTRUCTION STAGING PLAN.pdf PDF
GI 03-01 - SECOND FLOOR ICRA PLAN.pdf PDF
GI 05-01 - PHASING PLANS.pdf PDF
GI 00-01 - COVER SHEET.pdf PDF
GI 01-10 - WALL TYPE DETAILS.pdf PDF
Price Schedule Project 626A4-19-101 Renovate Ward 1B.xlsx XLSX spreadsheet
GI 04-02 - LEAD PAINT AND TRANSITE PANELS.pdf PDF
36C24923R0114.docx DOCX document
General Conditions Breakout.xlsx XLSX spreadsheet
WARD 1B - ARCH BINDER.pdf PDF
GI 01-20 - ACCESSIBILITY DETAILS.pdf PDF
RFI Form.docx DOCX document
GI 04-01 - ACM DUCT WORK AND ACM PIPE INSULATION.pdf PDF
Performance Relevancy Survey Form - 626A4-19-101 Renovate Ward 1B.docx DOCX document
Ward 1B - Specs - Vol. 1.pdf PDF
VN 01-00 - PATIENT LIFT VENDOR DRAWINGS.pdf PDF
ELECTRICAL BINDER.pdf PDF
PLUMBING BINDER.pdf PDF
TECH BINDER.pdf PDF
WARD 1B - GENERAL.pdf PDF
WARD 1B - INTERIORS .pdf PDF
Calculation of Self Performed Work.docx DOCX document
GI 02-01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL.pdf PDF
AD 01-01 - THIRD FLOOR DEMOLITION PLAN - OVERALL.pdf PDF
Contractor EMR Certification Form.docx DOCX document
FP BINDER.pdf PDF
GI 03-02 - THIRD FLOOR ICRA PLAN.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WINDOW TAG

ELEVATION TAG

GYPSUM BOARD

EARTH

CONCRETE

CONC. MASONRY UNITS

STEEL SECTION

FINISH WOOD

BATT INSULATION

GRAVEL FILL

DOOR TAG

HANDICAP ACCESSIBLE

SECTION INDICATOR

SHEET NUMBER

ENLARGED PLAN NUMBER

NOTE: THE DIRECTION OF THE SECTION INDICATOR'S

FLAG MAY REFLECT AN "OPPOSITE HAND" OR

"MIRRORED VIEW" OF BUILDING AND WALL SECTIONS

EQUIPMENT TAG

AA

CALLOUT

# / A ##.##

EIFS INSULATION BOARD

# / A ##.##

# / A ##.##

0000-000

EXIST DEMO NEW

PROJECT SITE

PROJECT LOCATION

12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554

©Copyright 2019

TLC No.:

www.tlc-engineers.com

118626

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

PROJECT TEAM:

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

MURFREESBORO, TN

615.370.8500

615.370.8530 hfrdesign.com

214 Centerview Drive Suite 300 Brentwood, TN 37027

Phase

FULLY SPRINKLERED

C U s e rs \a tr a y lo r\ D o c u m e n ts

\M b o ro V

A W a rd b

R e n o a tr a y lo r2 X

N D

H .r v t

/1

/2

:2

:0

P

M

04-14-2023

626A4-19-101

GI 01.01

AE RENOVATE WARD 1BGENERAL DATA

AT

HFR Project No: 2019056

100% CONSTRUCTION

DOCUMENTS

SYMBOL LEGEND

MECH. MECHANICAL

MED. MEDICAL

MED. CAB. MEDICAL CABINET

MFR. MANUFACTURER

MGMT. MANAGEMENT

MH MANHOLE

MIN. MINIMUM

MIR. MIRROR

MISC. MISCELLANEOUS

MR/S MIRROR WITH SHELF

MTD. MOUNTED

MTL. METAL

N.I.C. NOT IN CONTRACT

NOM. NOMINAL

O.C. ON CENTER

O.D. OVERFLOW DRAIN

O.F.O.I. OWNER FURNISHED / OWNER

INSTALLED

OPER. OPERATIONS

OPNG. OPENING

OPP. OPPOSITE

P.P.G. POLISHED PLATE GLASS

P.R.V. POWER ROOF VENTILATOR

P.T. PRESSURE TREATED

PART'N(S) PARTITION(S)

PLAS. PLASTER

PLAS. LAM. PLASTIC LAMINATE

PLYWD. PLYWOOD

PREP. PREPARATION

PREV. PREVENTIVE

PROF. PROFESSIONAL

PTD PAPER TOWEL DISPENSER

Q.T. QUARRY TILE

R. RADIUS

R.D. ROOF DRAIN

R.O. ROUGH OPENING

RECEPT. RECEPTION

RECOV. RECOVERY

REF. REFRIGERATOR

REF. REFER, REFERENCE

REINF. REINFORCING, REINFORCED

REQ'D REQUIRED

RM. ROOM

S SEALANT

S.&R. SHELF AND ROD

SAN. SANITARY

SB SPLASHBLOCK

SCHED. SCHEDULE

SD SOAP DISPENSER

SEC. SECTION, SECRETARY

SGNL. SIGNAL

SHLVG. SHELVING

SIM. SIMILAR

SPECS. SPECIFICATIONS

SS STAINLESS STEEL

STD. STANDARD

STL. STEEL

STO. STORAGE

STRUCT. STRUCTURAL

SYS. SYSTEM

T./TOIL./TL

T.

TOILET

T.O.S. TOP OF STEEL

T.O.W. TOP OF WALL

TB TOWEL BAR

TBL. TABLE

TECH. TECHNICIAN

TEL. TELEPHONE

THK. THICK

THKNS. THICKNESS

TPD TOILET PAPER DISPENSER

TRAIN. TRAINING

TRANS. TRANSFORMER

TREAT. TREATMENT

TYP. TYPICAL

U.N.O. UNLESS NOTED OTHERWISE

UNEXP. UNEXPOSED

VC VA FURNISHED/CONTRACTOR

INSTALLED

VEST. VESTIBULE

VV VA FURNISHED/VA INSTALLED

W.H.F.E. WALL HUNG FIRE

EXTINGUISHER

W/ WITH

WC/W.C. WATER CLOSET

WD. WOOD

WP WATERPROOF(ING)

WP WALL PROTECTION

A.F.F. ABOVE FINISHED FLOOR

A.F.S. AT FINISHED SLAB

ACT ACOUSTICAL CEILING TILE

ADD'L ADDITIONAL

ADJ. ADJUSTABLE

ADMIN. ADMINISTRATION

ALUM. ALUMINUM

APPROX. APPROXIMATE

ASST. ASSISTANT

B.W. BOTTOM OF THE WALL

B/B BALLED & BURLAPPED

BR. BARE ROOT

BRKT. BRACKET

BRKTS. BRACKETS

C CALK

C'SNK. COUNTERSUNK

C.B. CATCH BASIN

C.J. CONTROL JOINT

C.M.U. CONCRETE MASONRY UNIT

CAB. CABINET

CC CONTRACTOR FURNISHED /

CONTRACTOR INSTALLED

CLG. CEILING

CLO. CLOSET

CNTR. COUNTER

COL. COLUMN

COMP. COMPUTER

CONC. CONCRETE

CONF. CONFERENCE

CONST. CONSTRUCTION

CONT. CONTINUOUS

CORR. CORRIDOR

DIA. DIAMETER

DIAG. DIAGONAL

DIM. DIMENSION

DIR. DIRECTOR

DISP. DISPENSER

DS DOWNSPOUT

DTL. DETAIL

DWGS. DRAWINGS

EA. EACH

ELEC. ELECTRICAL

ELEV. ELEVATION

ENCL. ENCLOSURE

EQ EQUAL

EQUIP. EQUIPMENT

EXIST. EXISTING

EXP. JT. EXPANSION JOINT

EXT. EXTERIOR

F.D. FLOOR DRAIN

F.E.C. FIRE EXTINGUISHER CABINET

F.F.E. FINISH FLOOR ELEVATION

FDS FOLD DOWN SEAT

FH FIRE HYDRANT

FIN. FINISH

FL. FLOOR

FOB FACE OF BRICK

FTG. FOOTING

FZR. FREEZER

G.B. GRAB BAR

GA. GAUGE

GAL. GALLON

GALV. GALVANIZED

GEN. GENERAL

GYP. GYPSUM

GYP. BD. GYPSUM BOARD

H.B. HOSE BIBB

H.M. HOLLOW METAL

HD. HEAD

HRDBD HARDBOARD

I.D. INSIDE DIAMETER

INFO. INFORMATION

INSUL. INSULATION

INT. INTERIOR

INV. INVERT

JT. JOINT

KIT. KITCHEN

LAB. LABORATORY

LAV. LAVATORY

LKR. LOCKER

M.O. MASONRY OPENING

MACH. MACHINE

MAINT. MAINTENANCE

MAT'L MATERIAL

MAX. MAXIMUM

GENERAL ABBREVIATIONS

● ALL OTHER NON-STRUCTURAL COMPONENTS WITHIN THE HVAC, MECHANICAL, PLUMBING, AND

ELECTRICAL SYSTEMS ARE ASSIGNED AN IMPORTANCE FACTOR OF 1.0 AND ARE ELIGIBLE FOR THE LATERAL BRACING EXEMPTIONS LISTED IN ASCE 7 SECTION 9.6. THE EXEMPTIONS APPLY TO SPECIFIC SMALLER SIZES OF PIPING AND DUCTWORK AND LESS HEAVY EQUIPMENT. NON-EXEMPT PORTIONS OF THESE SYSTEMS SHALL STILL BE LATERALLY BRACED. SYSTEMS WITH AN IMPORTANCE FACTOR OF 1.0

ARE CONSIDERED BY THE CODE TO BE NOT CRITICAL FOR THE CONTINUED OPERATION OF THE

FACILITY.

COMPONENTS WITH AN IMPORTANCE FACTOR OF 1.0:

● STORM SEWER SERVING CRITICAL CARE AREAS.

● SANITARY SEWER SERVING CRITICAL CARE AREAS.

● STEAM SYSTEM.

● HEATING HOT WATER SYSTEM.

● DOMESTIC HOT WATER SYSTEM.

● FIRE ALARM SYSTEM.

● EMERGENCY POWER DISTRIBUTION SYSTEMS INCLUDING ASSOCIATED GENERATOR, TRANSFER

SWITCHES, BUS DUCTS, SWITCHBOARDS, CONDUIT, AND TRANSFORMERS.

● GENERATOR ENGINE EXHAUST.

● DUCTWORK CARRYING RADIOACTIVE AGENTS AND INFECTIOUS ISOLATION AIR.

● MEDICAL GAS PIPING AND EQUIPMENT.

● FIRE SPRINKLERS AND EQUIPMENT.

● NATURAL GAS PIPING.

● FUEL OIL PIPING AND EQUIPMENT.

COMPONENTS WITH AN IMPORTANCE FACTOR OF 1.5:

3. ASSIGNED SEISMIC USE GROUP OR BUILDING DESIGN CATEGORY AS DEFINED IN THE IBC:

2. THE TERM "WITHSTAND" MEANS "THE SYSTEM WILL REMAIN IN PLACE WITHOUT SEPARATION OF ANY PARTS WHEN SUBJECTED TO THE SEISMIC FORCES SPECIFIED AND THE SYSTEM WILL BE FULLY OPERATIONAL

AFTER THE SEISMIC EVENT."

1. COMPONENTS SHALL WITHSTAND THE EFFECTS OF EARTHQUAKE MOTIONS DETERMINED ACCORDING TO

ASCE/SEI 7.

NON-STRUCTURAL SEISMIC NOTES

14. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE CONSTRUCTION PERMITS.

13. CONTRACTOR SHALL NOT DISRUPT OR LIMIT THE FACILITY'S LIFE SAFETY PLAN AND SYSTEM.

12. SEISMIC: NON-STRUCTURAL COMPONENTS SHALL WITHSTAND THE EFFECTS OF EARTHQUAKE MOTIONS

DETERMINED ACCORDING TO ASCE/SEI 7. PROVIDE ENGINEERED SUPPORTS PER SEISMIC

CLASSIFICATION AND ASCE/SEI 7 REQUIRMENTS.

11. CODES: COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES.

10. SUPPORT / BLOCKING: PROVIDE SUPPORT FOR NEW WORK. IF HANGERS, BACKERS, OR OTHER SUPPORTS ARE NOT DETAILED, NOTED, OR SPECIFIED, CONTRACTOR SHALL SUBMIT A VIABLE SUPPORT DETAIL TO THE ARCHITECT FOR APPROVAL. ALL BLOCKING SHALL BE METAL (U.N.O.) ALL WOOD

BLOCKING, WHERE SPECIFIED, SHALL BE FIRE RETARDANT (U.N.O.)

9. MAINTAIN RATINGS: MAINTAIN FIRE / SMOKE RATINGS OF EXISTING PARTITIONS AND BARRIERS.

8. SHUTDOWNS / DOWNTIME: CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE DOWNTIME

ASSOCIATED WITH SCHEDULED SHUTDOWNS. COORDINATE WITH COR.

7. COORDINATE TRADES: GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION BETWEEN

TRADES. MECHANICAL DUCTWORK & EQUIPMENT SHALL HAVE PRIORITY OVER OTHER DISCIPLINES (FOR INSTALLATION & ROUTING). COORDINATE UTILITIES, SO THEY ARE INSTALLED IN AN ORDERLY AND

UNIFORM MANNER.

6. PROTECT / RESTORE: PROTECT EXISTING ITEMS, EQUIPMENT, FINISHES, ETC., TO REMAIN. REPAIR / REPLACE / RESTORE CONDITIONS THAT ARE DAMAGED OR DISTURBED AS A RESULT OF DEMOLITION OR

NEW WORK.

5. UTILITIES: UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).

4. COORDINATE NEW ITEMS: EXACT LOCATIONS OF ALL EQUIPMENT, DEVICES / OUTLETS, FIXTURES, CASEWORK, MOUNTS, AND ROUTING OF UTILITIES SHALL BE COORDINATED WITH AND APPROVED BY THE

COR.

3. DO NOT SCALE DRAWINGS.

2. VERIFY CONDITIONS: INVESTIGATE THE SITE AND VERIFY EXISTING CONDITIONS (BOTH EXPOSED AND

CONCEALED) PRIOR TO PRICING THE JOB.

1. DIAGRAMMATIC DRAWINGS: THE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE DRAWINGS

REPRESENT THE INTENT OF THE PROJECT WORK.

GENERAL PROJECT NOTES

ACCESSIBILITY: ALL PUBLIC AREAS AND EMPLOYEE COMMON AREAS - ADAAG, ANSI (SEE ADA CLINICAL

SUITE EXAMPLE DRAWING, SHEET G101.20

J. HANDICAPPED ACCESSIBILITY REQUIREMENTS:

ROOF CONSTRUCTION: 1 HR

FLOOR CONSTRUCTION: 1 HR

NON-BEARING WALLS & PARTITIONS (INTERIOR): 0 HR

NON-BEARING WALLS & PARTITIONS (EXTERIOR) TABLE 602 (IBC) NFPA 5000 SEC 7.2

BEARING WALLS (INTERIOR): 1 HR

BEARING WALLS (EXTERIOR): 1 HR

STRUCTURAL FRAME: 1 HR

I. FIRE PROTECTION REQUIREMENTS (IBC TABLE 601 & NFPA A.8.2.1.2):

COMMON PATH OF EGRESS TRAVEL = 75 FT. MAX.

TRAVEL DISTANCE TO ACCESS DOOR OF ADJACENT SMOKE COMPARTMENT = 200 FT. MAX.

8'-0" MIN WHERE BEDS/STRETCHERS ARE BEING MOVED

CORRIDORS: WIDTH 44 IN

MAX EGRESS: DISTANCE: 200 FT (SPRINKLERED)

EGRESS WIDTH: 0.2 PER OCCUPANT

H. TRAVEL DISTANCE REQUIREMENTS:

NOTE: REFER TO PLAN FOR INDIVIDUAL SPACE OCCUPANCY LOADS

COMMERCIAL KITCHEN 100 GSF / OCCUPANT (NFPA)

LOCKER ROOMS 50 GSF / OCCUPANT

SLEEPING AREAS 120 GSF / OCCUPANT

ACCESSORY STORAGE &

MECH SPACES

300 GSF / OCCUPANT

OP TREATMENT AREAS 100 GSF / OCCUPANT

IP TREATMENT AREAS 240 GSF / OCCUPANT

WAITING, CONF., & SEMINAR

AREAS

15 NSF / OCCUPANT

OFFICE AREAS 100 GSF / OCCUPANT

AREA DESCRIPTION LOAD FACTOR

G. OCCUPANT LOAD:

ACTUAL NUMBER OF STORIES: 4 STORIES

THIRD FLOOR RENOVATION: 19,252 SF FOR STORIES 1-3

45,000 SF + 11,250 SF = 56,250 SF MAX

AREA W/ FRONTAGE INCREASE AT 100% OF PERIMETER 30' OR MORE OF CLEAR =

AREA W/ SPRINKLER INCREASE: 15,000SF + 15,000 SF X 2 = 45,000SF

ALLOWED HEIGHT AND AREA:

(IBC 2012 AND 2018)

2 STORIES, 65'-0" HIGH, 15,000 SF, MAX. - W/ SPRINKLER INCREASE -

3 STORIES, 85'-0" HIGH.

F. BUILDING HEIGHT & AREA:

ZONE D

E. SEISMIC ZONE:

NFPA 2018: TYPE II (1,1,1) - FULLY SPRINKLED

IBC 2012: TYPE II-A - FULLY SPRINKLED

D. CONSTRUCTION TYPE:

NFPA 2018: EXISTING HEALTHCARE OCCUPANCY - CHAPTER 19

IBC 2012: INSTITUTIONAL HEALTHCARE OCCUPANCY - I-2

C. OCCUPANACY:

BRENT ROWLAND - BROWLAND@MURFREESBOROTN.GOV

PH: 615-893-3750 FAX: 615-217-3016

MURFREESBORO, TN 37133-1139

111 W. VINE STREET - PO BOX 1139

CITY OF MURFREESBORO - BUILDING AND CODES DEPT.

PH: 615-741-6998 FAX: 615-253-1868

NASHVILLE, TN 37243

665 MAINSTREAM DRIVE, SECOND FLOOR

OFFICE OF HEALTHCARE FACILITIES PLAN REVIEW

STATE OF TENNESSEE DEPARTMENT OF HEALTH - DIV. OF LICENSING AND REGULATION

PHONE: 615-741-7190

NASHVILLE, TN 37243-1162

500 JAMES ROBERTSON PARKWAY

TENNESSEE STATE FIRE MARSHAL

B. AUTHORITIES HAVING JURISDICTION (AHJ):

VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL

2018 NFPA 101 LIFE SAFETY CODE

DEPARTMENT OF VETERANS AFFAIRS - OFFICE OF CONSTRUCTION AND FACILITY MANAGEMENT

2009 ICC ANSI 117.1 - ACCESSIBLE AND USABLE BUILDING AND FACILITIES

2017 NATIONAL ELECTRIC CODE (NEC)

2018 INTERNATIONAL FUEL AND GAS CODE

2018 INTERNATIONAL MECHANICAL CODE (IMC)

2018 INTERNATIONAL PLUMBING CODE (IPC)

2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

2018 INTERNATIONAL FIRE CODE (IFC)

2018 INTERNATIONAL BUILDING CODE (IBC)

CITY OF MURFREESBORO

2018 FGI GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND HEALTH CARE FACILITIES

2010 ADA ACCESSIBILITY GUIDELINES W/ AMENDMENTS

2012 INTERNATIONAL FUEL AND GAS CODE

2012 NATIONAL ELECTRIC CODE (NEC)

2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

2012 INTERNATIONAL MECHANICAL CODE (IMC)

2012 INTERNATIONAL PLUMBING CODE (IPC)

2012 NFPA-1, EXCLUDING NFPA 5000

2012 LSC - NFPA - 101 LIFE SAFETY CODE

2012 INTERNATIONAL BUILDING CODE (IBC)

STATE OF TENNESSEE DEPARTMENT OF HEALTH

A. APPLICABLE STATUTES:

DESCRIPTION: This project proposes to completely renovate the third floor of building 1 on the Alvin C. York VA medical center campus.

Murfreesboro, TN

LOCATION: Alvin C. York VA Medical Center

PROJECT: AE RENOVATE WARD 1B

PLAN REVIEW DATA

VACINITY MAP CAMPUS MAP

No. Date Description

DRAWING INDEX

SHEET # SHEET NAME

SUBMISSIONS

45% 65% 95% 100% BID

M-MP-02 PARTIAL THIRD FLOOR PLAN - PART B - PIPE NEW WORK ● ● ● ● ●

M-MP-03 PARTIAL THIRD FLOOR PLAN - PART C - PIPE NEW WORK ● ● ● ● ●

M-MH-07 SCHEDULES ● ● ● ● ●

M-MH-08 SCHEDULES ● ● ● ● ●

M-MH-09 MECHANICAL DETAILS ● ● ● ● ●

M-MH-10 MECHANICAL DETAILS ● ● ● ●

M-MH-11 MECHANICAL DETAILS ● ● ● ●

M-MH-12 MECHANICAL DETAILS ● ● ● ●

M-MI-01 MECHANICAL CONTROLS ● ● ● ● ●

M-MI-02 MECHANICAL CONTROLS ● ● ●

08 - PLUMBING

P-PI-01 PLUMBING LEGENDS AND NOTES ● ● ● ● ●

P-PI-02 PLUMBING SCHEDULES ● ● ● ● ●

P-PD-01 PARTIAL THIRD FLOOR - PART A - PLUMBING - DEMO ● ● ● ● ●

P-PD-02 PARTIAL THIRD FLOOR - PART B - PLUMBING - DEMO ● ● ● ● ●

P-PD-03 PARTIAL THIRD FLOOR - PART C - PLUMBING - DEMO ● ● ● ● ●

P-PD-04 PARTIAL THIRD FLOOR - PART A - MED GAS - DEMO ● ● ● ● ●

P-PD-05 PARTIAL THIRD FLOOR - PART B - MED GAS - DEMO ● ● ● ● ●

P-PD-06 PARTIAL THIRD FLOOR - PART C - MED GAS - DEMO ● ● ● ● ●

P-PD-07 FOURTH FLOOR - PLUMBING - DEMO ● ● ● ● ●

P-PP-01 PLUMBING - SECOND FLOOR ZONE PLAN ● ● ● ● ●

P-PP-02 PARTIAL THIRD FLOOR - PART A - GRAVITY - NEW WORK ● ● ● ● ●

P-PP-03 PARTIAL THIRD FLOOR - PART B - GRAVITY - NEW WORK ● ● ● ● ●

P-PP-04 PARTIAL THIRD FLOOR - PART C - GRAVITY - NEW WORK ● ● ● ●

P-PP-05 PARTIAL FOURTH FLOOR - PART A - GRAVITY - NEW WORK ● ● ● ● ●

P-PP-06 PARTIAL FOURTH FLOOR - PART B - GRAVITY - NEW WORK ● ● ● ● ●

P-PP-07 PARTIAL FOURTH FLOOR - PART C - GRAVITY - NEW WORK ● ● ● ● ●

P-PP-08 PARTIAL THIRD FLOOR - PART A - PRESSURE - NEW WORK ● ● ● ●

P-PP-09 PARTIAL THIRD FLOOR - PART B - PRESSURE - NEW WORK ● ● ● ●

P-PP-10 PARTIAL THIRD FLOOR - PART C - PRESSURE - NEW WORK ● ● ● ●

P-PG-01 PARTIAL THIRD FLOOR - PART A - MED GAS - NEW WORK ● ● ● ● ●

P-PG-02 PARTIAL THIRD FLOOR - PART B - MED GAS - NEW WORK ● ● ● ● ●

P-PG-03 PARTIAL THIRD FLOOR - PART C - MED GAS - NEW WORK ● ● ● ● ●

P-PW-01 PLUMBING RISERS PART A - PRESSURE ● ● ● ●

P-PW-02 PLUMBING RISERS PART B - PRESSURE ● ● ● ●

P-PW-03 PLUMBING RISERS PART C - PRESSURE ● ● ● ●

P-PW-04 PLUMBING RISERS PART A - GRAVITY ● ● ●

P-PW-05 PLUMBING RISERS PART B - GRAVITY ● ● ●

P-PW-06 PLUMBING RISERS PART C - GRAVITY ● ● ●

P-PI-03 PLUMBING DETAILS ● ● ● ● ●

P-PI-04 PLUMBING DETAILS ● ● ● ● ●

09 - FIRE PROTECTION

F-FI-01 FIRE PROTECTION LEGENDS, DETAILS AND NOTES ● ● ● ● ●

F-FD-01 PARTIAL THIRD FLOOR - PART A - FIRE PROTECTION - DEMO ● ● ● ● ●

F-FD-02 PARTIAL THIRD FLOOR - PART B - FIRE PROTECTION - DEMO ● ● ● ● ●

F-FD-03 PARTIAL THIRD FLOOR - PART C - FIRE PROTECTION - DEMO ● ● ● ● ●

F-FX-01 PARTIAL THIRD FLOOR - PART A - FIRE PROTECTION - NEW WORK ● ● ● ● ●

F-FX-02 PARTIAL THIRD FLOOR - PART B - FIRE PROTECTION - NEW WORK ● ● ● ● ●

F-FX-03 PARTIAL THIRD FLOOR - PART C - FIRE PROTECTION - NEW WORK ● ● ● ● ●

10 - ELECTRICAL

E-EI-00 ELECTRICAL SYMBOLS LEGEND, LIGHTING FIXTURE SCHEDULE

AND GENERAL NOTES

E-EI-01 PARTIAL ELECTRICAL ONE LINE DIAGRAM - DEMOLITION ● ● ● ● ●

E-EI-02 PARTIAL ELECTRICAL ONE LINE DIAGRAM - NEW WORK ● ● ● ● ●

E-EI-03 ELECTRICAL PANEL SCHEDULES ● ● ● ●

E-EI-04 ELECTRICAL PANEL SCHEDULES ● ● ● ●

E-EI-05 ELECTRICAL DETAILS ● ● ● ●

E-EI-06 ELECTRICAL DETAILS ● ● ● ●

E-ED-00 3RD FLOOR - DEMOLITION PLAN - ELECTRICAL - OVERALL ● ● ● ●

E-ED-01 3RD FLOOR - DEMOLITION PLAN - ELECTRICAL - PART A ● ● ● ●

E-ED-02 3RD FLOOR - DEMOLITION PLAN - ELECTRICAL - PART B ● ● ● ●

E-ED-03 3RD FLOOR - DEMOLITION PLAN - ELECTRICAL - PART C ● ● ● ●

E-EP-01 3RD FLOOR - NEW WORK PLAN - POWER - PART A ● ● ● ●

E-EP-02 3RD FLOOR - NEW WORK PLAN - POWER - PART B ● ● ● ●

E-EP-03 3RD FLOOR - NEW WORK PLAN - POWER - PART C ● ● ● ●

E-EP-04 3RD FLOOR ROOF - NEW WORK PLAN - POWER - PART A ● ●

E-EL-01 3RD FLOOR - NEW WORK PLAN - LIGHTING - PART A ● ● ● ●

E-EL-02 3RD FLOOR - NEW WORK PLAN - LIGHTING - PART B ● ● ● ●

E-EL-03 3RD FLOOR - NEW WORK PLAN - LIGHTING - PART C ● ● ● ●

E-EY-01 3RD FLOOR - NEW WORK PLAN - SYSTEMS - PART A ● ● ● ●

E-EY-02 3RD FLOOR - NEW WORK PLAN - SYSTEMS - PART B ● ● ● ●

E-EY-03 3RD FLOOR - NEW WORK PLAN - SYSTEMS - PART C ● ● ● ●

11 - TECHNOLOGY

T-TJ-00 GENERAL TECHNOLOGY INFORMATION ● ● ● ● ●

T-TD-01 PARTIAL THRID FLOOR PLAN - PART A - TECHNOLOGY DEMO ● ● ● ● ●

T-TD-02 PARTIAL THIRD FLOOR PLAN - PART B - TECHNOLOGY DEMO ● ● ● ●

T-TD-03 PARTIAL THIRD FLOOR PLAN - PART C TECHNOLOGY DEMO ● ● ● ●

T-TJ-01 PARTIAL THIRD FLOOR - PART A - TECHNOLOGY NEW WORK ● ● ● ● ●

T-TJ-02 PARTIAL THIRD FLOOR - PART B - TECHNOLOGY NEW WORK ● ● ● ● ●

T-TJ-03 PARTIAL THIRD FLOOR - PART C - TECHNOLOGY NEW WORK ● ● ● ● ●

T-TJ-04 TECHNOLOGY - ENLARGED ROOMS ● ● ● ● ●

T-TJ-06 TECHNOLOGY DETAILS ● ● ●

T-TJ-07 TECHNOLOGY DETAILS ● ● ●

T-TJ-08 TECHNOLOGY RISER ● ● ●

DRAWING INDEX

SHEET # SHEET NAME

SUBMISSIONS

45% 65% 95% 100% BID

00 - GENERAL

GI 00.01 COVER SHEET ● ● ● ● ●

GI 01.01 GENERAL DATA ● ● ● ● ●

GI 01.02 CONSTRUCTION STAGING PLAN ● ● ●

GI 01.10 WALL TYPE DETAILS ● ● ● ●

GI 01.20 ACCESSIBILITY DETAILS ● ● ● ● ●

GI 02.01 THIRD FLOOR LIFE SAFETY PLAN - OVERALL ● ● ● ● ●

GI 03.01 SECOND FLOOR ICRA PLAN ● ●

GI 03.02 THIRD FLOOR ICRA PLAN ● ●

GI 04.01 ACM DUCT WORK AND ACM PIPE INSULATION ● ●

GI 04.02 LEAD PAINT AND TRANSITE PANELS ● ●

GI 05.01 PHASING PLANS

03 - DEMOLITION

AD 01.01 THIRD FLOOR DEMOLITION PLAN - OVERALL ● ● ● ● ●

AD 01.02 PARTIAL THIRD FLOOR DEMO PLAN - AREA A ●

AD 01.03 PARTIAL THIRD FLOOR DEMO PLAN - AREA B ●

AD 01.04 PARTIAL THIRD FLOOR DEMO PLAN - AREA C ●

04 - ARCHITECTURAL

AE 01.00 SECOND FLOOR PLAN AND REFLECTED CEILING PLAN ● ● ●

AE 01.01 FOURTH FLOOR/ATTIC PLAN ● ● ●

AE 01.03 THIRD FLOOR OVERALL PLAN ● ● ● ● ●

AE 01.11 PARTIAL THIRD FLOOR PLAN - PART A NOTED ● ● ● ● ●

AE 01.12 PARTIAL THIRD FLOOR PLAN - PART B NOTED ● ● ● ● ●

AE 01.13 PARTIAL THIRD FLOOR PLAN - PART C NOTED ● ● ● ● ●

AE 01.14 PARTIAL THIRD FLOOR PLAN - PART A DIMENSIONED ● ● ● ●

AE 01.15 PARTIAL THIRD FLOOR PLAN - PART B DIMENSIONED ● ● ● ●

AE 01.16 PARTIAL THIRD FLOOR PLAN - PART C DIMENSIONED ● ● ● ●

AE 02.01 ENLARGED PLANS AND REFLECTED CEILING PLANS ● ● ● ● ●

AE 02.02 ENLARGED PLANS AND REFLECTED CEILING PLANS ● ● ● ● ●

AE 02.03 ENLARGED TOILET PLANS AND ELEVATIONS ● ● ●

AE 03.01 DOOR ELEVATIONS, SCHEDULE, & NOTES ● ● ● ●

AE 03.02 DOOR DETAILS ● ● ● ●

AE 03.03 WINDOW DETAILS ● ● ●

AE 08.01 MISC. DETAILS ● ● ● ●

AE 08.02 MISC. DETAILS ● ● ● ●

AE 08.03 MISC. DETAILS ● ● ● ●

AE 08.04 MISC. DETAILS ● ● ●

AE 08.05 MISC. INTERIOR DETAILS ● ● ●

AE 08.06 MISC CEILING DETAILS ● ● ●

AE 09.01 INTERIOR ELEVATIONS ● ● ● ● ●

AE 09.02 INTERIOR ELEVATIONS ● ● ● ● ●

AE 09.03 CORRIDOR ELEVATIONS ● ● ●

AE 09.04 CORRIDOR ELEVATIONS ● ● ●

AE 09.05 3D VIEWS ● ● ● ● ●

AE 10.01 CASEWORK SECTIONS AND DETAILS ● ● ● ●

AE 10.02 CASEWORK SECTIONS AND DETAILS ●

AE 11.01 THIRD FLOOR REFLECTED CEILING PLAN - OVERALL ● ● ● ● ●

AE 11.10 THIRD FLOOR RCP - PART A ● ● ● ● ●

AE 11.11 THIRD FLOOR RCP - PART B ● ● ● ● ●

AE 11.12 THIRD FLOOR RCP - PART C ● ● ● ● ●

AE 12.01A EQUIPMENT PLANS ● ● ● ●

AE 12.01B EQUIPMENT PLANS ● ● ● ●

AE 12.01C EQUIPMENT PLANS ● ● ● ●

AE 12.02 EQUIPMENT PLANS - PATIENT ROOMS AREA B ● ● ● ●

AE 12.02B EQUIPMENT PLANS - PATIENT ROOMS AREA C ● ● ● ●

VN 01.00 PATIENT LIFT VENDOR DRAWINGS ● ● ●

05 - INTERIOR DESIGN

IN 01.00 THIRD FLOOR FINISH LEGEND ● ● ● ● ●

IN 01.02 PARTIAL THIRD FLOOR FINISH PLAN - PART A ● ● ● ●

IN 01.03 PARTIAL THIRD FLOOR FINISH PLAN - PART B ● ● ● ●

IN 01.04 PARTIAL THIRD FLOOR FINISH PLAN - PART C ● ● ● ●

IN 01.05 THIRD FLOOR PATTERN PLAN OVERALL ● ● ● ●

IN 01.06 PARTIAL THIRD FLOOR PATTERN - PART A ● ● ● ●

IN 01.07 PARTIAL THIRD FLOOR PATTERN - PART B ● ● ● ●

IN 01.08 PARTIAL THIRD FLOOR PATTERN - PART C ● ● ● ●

IN 02.00 THIRD FLOOR SIGNAGE LEGEND ● ● ●

IN 02.01 THIRD FLOOR SIGNAGE SCHEDULE ● ● ●

IN 02.02 PARTIAL THIRD FLOOR SIGNAGE PLAN - PART A ● ● ●

IN 02.03 PARTIAL THIRD FLOOR SIGNAGE PLAN - PART B ● ● ●

IN 02.04 PARTIAL THIRD FLOOR SIGNAGE PLAN - PART C ● ● ●

07 - MECHANICAL

M-MH-01 LEGENDS, NOTES, AND SYMBOLS ● ● ● ● ●

M-MD-01 PARTIAL THIRD FLOOR PLAN - PART A - DUCT DEMO ● ● ● ● ●

M-MD-02 PARTIAL THIRD FLOOR PLAN - PART B - DUCT DEMO ● ● ● ● ●

M-MD-03 PARTIAL THIRD FLOOR PLAN - PART C - DUCT DEMO ● ● ● ● ●

M-MD-04 PARTIAL THIRD FLOOR PLAN - PART A - PIPE DEMO ● ● ● ● ●

M-MD-05 PARTIAL THIRD FLOOR PLAN - PART B - PIPE DEMO ● ● ● ● ●

M-MD-06 PARTIAL THIRD FLOOR PLAN - PART C - PIPE DEMO ● ● ● ● ●

M-MH-13 PARTIAL ATTIC PLAN - PART B - DUCT DEMO ● ● ● ●

M-MH-14 PARTIAL ATTIC PLAN - PART C - DUCT DEMO ● ● ● ●

M-MH-02 PARTIAL THIRD FLOOR PLAN - PART A - DUCT NEW WORK ● ● ● ● ●

M-MH-03 PARTIAL THIRD FLOOR PLAN - PART B - DUCT NEW WORK ● ● ● ● ●

M-MH-04 PARTIAL THIRD FLOOR PLAN - PART C - DUCT NEW WORK ● ● ● ● ●

M-MH-05 PARTIAL ATTIC PLAN - PART B - DUCT NEW WORK ● ● ● ● ●

M-MH-06 PARTIAL ATTIC PLAN - PART C - DUCT NEW WORK ● ● ● ● ●

M-MP-01 PARTIAL THIRD FLOOR PLAN - PART A - PIPE NEW WORK ● ● ● ● ●

Sheets
AD 01.01 - THIRD FLOOR DEMOLITION PLAN - OVERALL
AE 01.00 - SECOND FLOOR PLAN AND REFLECTED CEILING PLAN
AE 01.01 - FOURTH FLOOR/ATTIC PLAN
AE 01.03 - THIRD FLOOR OVERALL PLAN
AE 01.11 - PARTIAL THIRD FLOOR PLAN - PART A NOTED
AE 01.12 - PARTIAL THIRD FLOOR PLAN - PART B NOTED
AE 01.13 - PARTIAL THIRD FLOOR PLAN - PART C NOTED
AE 01.14 - PARTIAL THIRD FLOOR PLAN - PART A DIMENSIONED
AE 01.15 - PARTIAL THIRD FLOOR PLAN - PART B DIMENSIONED
AE 01.16 - PARTIAL THIRD FLOOR PLAN - PART C DIMENSIONED
AE 02.01 - ENLARGED PLANS AND REFLECTED CEILING PLANS
AE 02.02 - ENLARGED PLANS AND REFLECTED CEILING PLANS
AE 02.03 - ENLARGED TOILET PLANS AND ELEVATIONS
AE 03.01 - DOOR ELEVATIONS, SCHEDULE, & NOTES
AE 03.02 - DOOR DETAILS
AE 03.03 - WINDOW DETAILS
AE 08.01 - MISC. DETAILS
AE 08.02 - MISC. DETAILS
AE 08.03 - MISC. DETAILS
AE 08.04 - MISC. DETAILS
AE 08.05 - MISC. INTERIOR DETAILS
AE 08.06 - MISC CEILING DETAILS
AE 09.01 - INTERIOR ELEVATIONS
AE 09.02 - INTERIOR ELEVATIONS
AE 09.03 - CORRIDOR ELEVATIONS
AE 09.04 - CORRIDOR ELEVATIONS
AE 09.05 - 3D VIEWS
AE 10.01 - CASEWORK SECTIONS AND DETAILS
AE 10.02 - CASEWORK SECTIONS AND DETAILS
AE 11.01 - THIRD FLOOR REFLECTED CEILING PLAN - OVERALL
AE 11.10 - THIRD FLOOR RCP - PART A
AE 11.11 - THIRD FLOOR RCP - PART B
AE 11.12 - THIRD FLOOR RCP - PART C
AE 12.01A - EQUIPMENT PLANS
AE 12.01B - EQUIPMENT PLANS
AE 12.01C - EQUIPMENT PLANS
AE 12.02 - EQUIPMENT PLANS - PATIENT ROOMS AREA B
AE 12.02B - EQUIPMENT PLANS - PATIENT ROOMS AREA C
GI 00.01 - COVER SHEET
GI 01.01 - GENERAL DATA
GI 01.02 - CONSTRUCTION STAGING PLAN
GI 01.10 - WALL TYPE DETAILS
GI 01.20 - ACCESSIBILITY DETAILS
GI 02.01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL
GI 03.01 - SECOND FLOOR ICRA PLAN
GI 03.02 - THIRD FLOOR ICRA PLAN
GI 04.01 - ACM DUCT WORK AND ACM PIPE INSULATION
GI 04.02 - LEAD PAINT AND TRANSITE PANELS
GI 05.01 - PHASING PLANS
IN 01.00 - THIRD FLOOR FINISH LEGEND
IN 01.02 - PARTIAL THIRD FLOOR FINISH PLAN - PART A
IN 01.03 - PARTIAL THIRD FLOOR FINISH PLAN - PART B
IN 01.04 - PARTIAL THIRD FLOOR FINISH PLAN - PART C
IN 01.05 - THIRD FLOOR PATTERN PLAN OVERALL
IN 01.06 - PARTIAL THIRD FLOOR PATTERN - PART A
IN 01.07 - PARTIAL THIRD FLOOR PATTERN - PART B
IN 01.08 - PARTIAL THIRD FLOOR PATTERN - PART C
IN 02.00 - THIRD FLOOR SIGNAGE LEGEND
IN 02.01 - THIRD FLOOR SIGNAGE SCHEDULE
IN 02.02 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART A
IN 02.03 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART B
IN 02.04 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART C
VN 01.00 - PATIENT LIFT VENDOR DRAWINGS

File details come from the government source that posted it. Updated .