GI 01-01 - GENERAL DATA.pdf
PDF 1 MB Posted
- Attached to
- Z2DA--626A4-19-101 - Renovate Ward 1B at the Alvin C. York VA Medical Center, Murfreesboro, TN 37129
- Solicitation number
- 36C24923R0114
About this file
This package includes construction documents and specifications for the renovation of Ward 1B at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The project scope involves demolishing and renovating the third floor of Building 1, including architectural, mechanical, plumbing and electrical systems. Drawings cover existing conditions, demolition plans, new construction plans, schedules, details and specifications. Renovations include updating patient rooms, corridors, support spaces and building systems to current code and accessibility standards. The work will be completed in phases to maintain medical operations. The related federal solicitation is for contractors to bid on the Z2DA--626A4-19-101 project to renovate Ward 1B at the specified location, issued by the Department of Veterans Affairs Veterans Health Administration.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WINDOW TAG
ELEVATION TAG
GYPSUM BOARD
EARTH
CONCRETE
CONC. MASONRY UNITS
STEEL SECTION
FINISH WOOD
BATT INSULATION
GRAVEL FILL
DOOR TAG
HANDICAP ACCESSIBLE
SECTION INDICATOR
SHEET NUMBER
ENLARGED PLAN NUMBER
NOTE: THE DIRECTION OF THE SECTION INDICATOR'S
FLAG MAY REFLECT AN "OPPOSITE HAND" OR
"MIRRORED VIEW" OF BUILDING AND WALL SECTIONS
EQUIPMENT TAG
AA
CALLOUT
# / A ##.##
EIFS INSULATION BOARD
# / A ##.##
# / A ##.##
0000-000
EXIST DEMO NEW
PROJECT SITE
PROJECT LOCATION
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2019
TLC No.:
www.tlc-engineers.com
118626
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.
PROJECT TEAM:
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
MURFREESBORO, TN
615.370.8500
615.370.8530 hfrdesign.com
214 Centerview Drive Suite 300 Brentwood, TN 37027
Phase
FULLY SPRINKLERED
C U s e rs \a tr a y lo r\ D o c u m e n ts
\M b o ro V
A W a rd b
R e n o a tr a y lo r2 X
N D
H .r v t
/1
/2
:2
:0
P
M
04-14-2023
626A4-19-101
GI 01.01
AE RENOVATE WARD 1BGENERAL DATA
AT
HFR Project No: 2019056
100% CONSTRUCTION
DOCUMENTS
SYMBOL LEGEND
MECH. MECHANICAL
MED. MEDICAL
MED. CAB. MEDICAL CABINET
MFR. MANUFACTURER
MGMT. MANAGEMENT
MH MANHOLE
MIN. MINIMUM
MIR. MIRROR
MISC. MISCELLANEOUS
MR/S MIRROR WITH SHELF
MTD. MOUNTED
MTL. METAL
N.I.C. NOT IN CONTRACT
NOM. NOMINAL
O.C. ON CENTER
O.D. OVERFLOW DRAIN
O.F.O.I. OWNER FURNISHED / OWNER
INSTALLED
OPER. OPERATIONS
OPNG. OPENING
OPP. OPPOSITE
P.P.G. POLISHED PLATE GLASS
P.R.V. POWER ROOF VENTILATOR
P.T. PRESSURE TREATED
PART'N(S) PARTITION(S)
PLAS. PLASTER
PLAS. LAM. PLASTIC LAMINATE
PLYWD. PLYWOOD
PREP. PREPARATION
PREV. PREVENTIVE
PROF. PROFESSIONAL
PTD PAPER TOWEL DISPENSER
Q.T. QUARRY TILE
R. RADIUS
R.D. ROOF DRAIN
R.O. ROUGH OPENING
RECEPT. RECEPTION
RECOV. RECOVERY
REF. REFRIGERATOR
REF. REFER, REFERENCE
REINF. REINFORCING, REINFORCED
REQ'D REQUIRED
RM. ROOM
S SEALANT
S.&R. SHELF AND ROD
SAN. SANITARY
SB SPLASHBLOCK
SCHED. SCHEDULE
SD SOAP DISPENSER
SEC. SECTION, SECRETARY
SGNL. SIGNAL
SHLVG. SHELVING
SIM. SIMILAR
SPECS. SPECIFICATIONS
SS STAINLESS STEEL
STD. STANDARD
STL. STEEL
STO. STORAGE
STRUCT. STRUCTURAL
SYS. SYSTEM
T./TOIL./TL
T.
TOILET
T.O.S. TOP OF STEEL
T.O.W. TOP OF WALL
TB TOWEL BAR
TBL. TABLE
TECH. TECHNICIAN
TEL. TELEPHONE
THK. THICK
THKNS. THICKNESS
TPD TOILET PAPER DISPENSER
TRAIN. TRAINING
TRANS. TRANSFORMER
TREAT. TREATMENT
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
UNEXP. UNEXPOSED
VC VA FURNISHED/CONTRACTOR
INSTALLED
VEST. VESTIBULE
VV VA FURNISHED/VA INSTALLED
W.H.F.E. WALL HUNG FIRE
EXTINGUISHER
W/ WITH
WC/W.C. WATER CLOSET
WD. WOOD
WP WATERPROOF(ING)
WP WALL PROTECTION
A.F.F. ABOVE FINISHED FLOOR
A.F.S. AT FINISHED SLAB
ACT ACOUSTICAL CEILING TILE
ADD'L ADDITIONAL
ADJ. ADJUSTABLE
ADMIN. ADMINISTRATION
ALUM. ALUMINUM
APPROX. APPROXIMATE
ASST. ASSISTANT
B.W. BOTTOM OF THE WALL
B/B BALLED & BURLAPPED
BR. BARE ROOT
BRKT. BRACKET
BRKTS. BRACKETS
C CALK
C'SNK. COUNTERSUNK
C.B. CATCH BASIN
C.J. CONTROL JOINT
C.M.U. CONCRETE MASONRY UNIT
CAB. CABINET
CC CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CLG. CEILING
CLO. CLOSET
CNTR. COUNTER
COL. COLUMN
COMP. COMPUTER
CONC. CONCRETE
CONF. CONFERENCE
CONST. CONSTRUCTION
CONT. CONTINUOUS
CORR. CORRIDOR
DIA. DIAMETER
DIAG. DIAGONAL
DIM. DIMENSION
DIR. DIRECTOR
DISP. DISPENSER
DS DOWNSPOUT
DTL. DETAIL
DWGS. DRAWINGS
EA. EACH
ELEC. ELECTRICAL
ELEV. ELEVATION
ENCL. ENCLOSURE
EQ EQUAL
EQUIP. EQUIPMENT
EXIST. EXISTING
EXP. JT. EXPANSION JOINT
EXT. EXTERIOR
F.D. FLOOR DRAIN
F.E.C. FIRE EXTINGUISHER CABINET
F.F.E. FINISH FLOOR ELEVATION
FDS FOLD DOWN SEAT
FH FIRE HYDRANT
FIN. FINISH
FL. FLOOR
FOB FACE OF BRICK
FTG. FOOTING
FZR. FREEZER
G.B. GRAB BAR
GA. GAUGE
GAL. GALLON
GALV. GALVANIZED
GEN. GENERAL
GYP. GYPSUM
GYP. BD. GYPSUM BOARD
H.B. HOSE BIBB
H.M. HOLLOW METAL
HD. HEAD
HRDBD HARDBOARD
I.D. INSIDE DIAMETER
INFO. INFORMATION
INSUL. INSULATION
INT. INTERIOR
INV. INVERT
JT. JOINT
KIT. KITCHEN
LAB. LABORATORY
LAV. LAVATORY
LKR. LOCKER
M.O. MASONRY OPENING
MACH. MACHINE
MAINT. MAINTENANCE
MAT'L MATERIAL
MAX. MAXIMUM
GENERAL ABBREVIATIONS
● ALL OTHER NON-STRUCTURAL COMPONENTS WITHIN THE HVAC, MECHANICAL, PLUMBING, AND
ELECTRICAL SYSTEMS ARE ASSIGNED AN IMPORTANCE FACTOR OF 1.0 AND ARE ELIGIBLE FOR THE LATERAL BRACING EXEMPTIONS LISTED IN ASCE 7 SECTION 9.6. THE EXEMPTIONS APPLY TO SPECIFIC SMALLER SIZES OF PIPING AND DUCTWORK AND LESS HEAVY EQUIPMENT. NON-EXEMPT PORTIONS OF THESE SYSTEMS SHALL STILL BE LATERALLY BRACED. SYSTEMS WITH AN IMPORTANCE FACTOR OF 1.0
ARE CONSIDERED BY THE CODE TO BE NOT CRITICAL FOR THE CONTINUED OPERATION OF THE
FACILITY.
COMPONENTS WITH AN IMPORTANCE FACTOR OF 1.0:
● STORM SEWER SERVING CRITICAL CARE AREAS.
● SANITARY SEWER SERVING CRITICAL CARE AREAS.
● STEAM SYSTEM.
● HEATING HOT WATER SYSTEM.
● DOMESTIC HOT WATER SYSTEM.
● FIRE ALARM SYSTEM.
● EMERGENCY POWER DISTRIBUTION SYSTEMS INCLUDING ASSOCIATED GENERATOR, TRANSFER
SWITCHES, BUS DUCTS, SWITCHBOARDS, CONDUIT, AND TRANSFORMERS.
● GENERATOR ENGINE EXHAUST.
● DUCTWORK CARRYING RADIOACTIVE AGENTS AND INFECTIOUS ISOLATION AIR.
● MEDICAL GAS PIPING AND EQUIPMENT.
● FIRE SPRINKLERS AND EQUIPMENT.
● NATURAL GAS PIPING.
● FUEL OIL PIPING AND EQUIPMENT.
COMPONENTS WITH AN IMPORTANCE FACTOR OF 1.5:
3. ASSIGNED SEISMIC USE GROUP OR BUILDING DESIGN CATEGORY AS DEFINED IN THE IBC:
2. THE TERM "WITHSTAND" MEANS "THE SYSTEM WILL REMAIN IN PLACE WITHOUT SEPARATION OF ANY PARTS WHEN SUBJECTED TO THE SEISMIC FORCES SPECIFIED AND THE SYSTEM WILL BE FULLY OPERATIONAL
AFTER THE SEISMIC EVENT."
1. COMPONENTS SHALL WITHSTAND THE EFFECTS OF EARTHQUAKE MOTIONS DETERMINED ACCORDING TO
ASCE/SEI 7.
NON-STRUCTURAL SEISMIC NOTES
14. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE CONSTRUCTION PERMITS.
13. CONTRACTOR SHALL NOT DISRUPT OR LIMIT THE FACILITY'S LIFE SAFETY PLAN AND SYSTEM.
12. SEISMIC: NON-STRUCTURAL COMPONENTS SHALL WITHSTAND THE EFFECTS OF EARTHQUAKE MOTIONS
DETERMINED ACCORDING TO ASCE/SEI 7. PROVIDE ENGINEERED SUPPORTS PER SEISMIC
CLASSIFICATION AND ASCE/SEI 7 REQUIRMENTS.
11. CODES: COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES.
10. SUPPORT / BLOCKING: PROVIDE SUPPORT FOR NEW WORK. IF HANGERS, BACKERS, OR OTHER SUPPORTS ARE NOT DETAILED, NOTED, OR SPECIFIED, CONTRACTOR SHALL SUBMIT A VIABLE SUPPORT DETAIL TO THE ARCHITECT FOR APPROVAL. ALL BLOCKING SHALL BE METAL (U.N.O.) ALL WOOD
BLOCKING, WHERE SPECIFIED, SHALL BE FIRE RETARDANT (U.N.O.)
9. MAINTAIN RATINGS: MAINTAIN FIRE / SMOKE RATINGS OF EXISTING PARTITIONS AND BARRIERS.
8. SHUTDOWNS / DOWNTIME: CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE DOWNTIME
ASSOCIATED WITH SCHEDULED SHUTDOWNS. COORDINATE WITH COR.
7. COORDINATE TRADES: GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION BETWEEN
TRADES. MECHANICAL DUCTWORK & EQUIPMENT SHALL HAVE PRIORITY OVER OTHER DISCIPLINES (FOR INSTALLATION & ROUTING). COORDINATE UTILITIES, SO THEY ARE INSTALLED IN AN ORDERLY AND
UNIFORM MANNER.
6. PROTECT / RESTORE: PROTECT EXISTING ITEMS, EQUIPMENT, FINISHES, ETC., TO REMAIN. REPAIR / REPLACE / RESTORE CONDITIONS THAT ARE DAMAGED OR DISTURBED AS A RESULT OF DEMOLITION OR
NEW WORK.
5. UTILITIES: UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).
4. COORDINATE NEW ITEMS: EXACT LOCATIONS OF ALL EQUIPMENT, DEVICES / OUTLETS, FIXTURES, CASEWORK, MOUNTS, AND ROUTING OF UTILITIES SHALL BE COORDINATED WITH AND APPROVED BY THE
COR.
3. DO NOT SCALE DRAWINGS.
2. VERIFY CONDITIONS: INVESTIGATE THE SITE AND VERIFY EXISTING CONDITIONS (BOTH EXPOSED AND
CONCEALED) PRIOR TO PRICING THE JOB.
1. DIAGRAMMATIC DRAWINGS: THE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE DRAWINGS
REPRESENT THE INTENT OF THE PROJECT WORK.
GENERAL PROJECT NOTES
ACCESSIBILITY: ALL PUBLIC AREAS AND EMPLOYEE COMMON AREAS - ADAAG, ANSI (SEE ADA CLINICAL
SUITE EXAMPLE DRAWING, SHEET G101.20
J. HANDICAPPED ACCESSIBILITY REQUIREMENTS:
ROOF CONSTRUCTION: 1 HR
FLOOR CONSTRUCTION: 1 HR
NON-BEARING WALLS & PARTITIONS (INTERIOR): 0 HR
NON-BEARING WALLS & PARTITIONS (EXTERIOR) TABLE 602 (IBC) NFPA 5000 SEC 7.2
BEARING WALLS (INTERIOR): 1 HR
BEARING WALLS (EXTERIOR): 1 HR
STRUCTURAL FRAME: 1 HR
I. FIRE PROTECTION REQUIREMENTS (IBC TABLE 601 & NFPA A.8.2.1.2):
COMMON PATH OF EGRESS TRAVEL = 75 FT. MAX.
TRAVEL DISTANCE TO ACCESS DOOR OF ADJACENT SMOKE COMPARTMENT = 200 FT. MAX.
8'-0" MIN WHERE BEDS/STRETCHERS ARE BEING MOVED
CORRIDORS: WIDTH 44 IN
MAX EGRESS: DISTANCE: 200 FT (SPRINKLERED)
EGRESS WIDTH: 0.2 PER OCCUPANT
H. TRAVEL DISTANCE REQUIREMENTS:
NOTE: REFER TO PLAN FOR INDIVIDUAL SPACE OCCUPANCY LOADS
COMMERCIAL KITCHEN 100 GSF / OCCUPANT (NFPA)
LOCKER ROOMS 50 GSF / OCCUPANT
SLEEPING AREAS 120 GSF / OCCUPANT
ACCESSORY STORAGE &
MECH SPACES
300 GSF / OCCUPANT
OP TREATMENT AREAS 100 GSF / OCCUPANT
IP TREATMENT AREAS 240 GSF / OCCUPANT
WAITING, CONF., & SEMINAR
AREAS
15 NSF / OCCUPANT
OFFICE AREAS 100 GSF / OCCUPANT
AREA DESCRIPTION LOAD FACTOR
G. OCCUPANT LOAD:
ACTUAL NUMBER OF STORIES: 4 STORIES
THIRD FLOOR RENOVATION: 19,252 SF FOR STORIES 1-3
45,000 SF + 11,250 SF = 56,250 SF MAX
AREA W/ FRONTAGE INCREASE AT 100% OF PERIMETER 30' OR MORE OF CLEAR =
AREA W/ SPRINKLER INCREASE: 15,000SF + 15,000 SF X 2 = 45,000SF
ALLOWED HEIGHT AND AREA:
(IBC 2012 AND 2018)
2 STORIES, 65'-0" HIGH, 15,000 SF, MAX. - W/ SPRINKLER INCREASE -
3 STORIES, 85'-0" HIGH.
F. BUILDING HEIGHT & AREA:
ZONE D
E. SEISMIC ZONE:
NFPA 2018: TYPE II (1,1,1) - FULLY SPRINKLED
IBC 2012: TYPE II-A - FULLY SPRINKLED
D. CONSTRUCTION TYPE:
NFPA 2018: EXISTING HEALTHCARE OCCUPANCY - CHAPTER 19
IBC 2012: INSTITUTIONAL HEALTHCARE OCCUPANCY - I-2
C. OCCUPANACY:
BRENT ROWLAND - BROWLAND@MURFREESBOROTN.GOV
PH: 615-893-3750 FAX: 615-217-3016
MURFREESBORO, TN 37133-1139
111 W. VINE STREET - PO BOX 1139
CITY OF MURFREESBORO - BUILDING AND CODES DEPT.
PH: 615-741-6998 FAX: 615-253-1868
NASHVILLE, TN 37243
665 MAINSTREAM DRIVE, SECOND FLOOR
OFFICE OF HEALTHCARE FACILITIES PLAN REVIEW
STATE OF TENNESSEE DEPARTMENT OF HEALTH - DIV. OF LICENSING AND REGULATION
PHONE: 615-741-7190
NASHVILLE, TN 37243-1162
500 JAMES ROBERTSON PARKWAY
TENNESSEE STATE FIRE MARSHAL
B. AUTHORITIES HAVING JURISDICTION (AHJ):
VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL
2018 NFPA 101 LIFE SAFETY CODE
DEPARTMENT OF VETERANS AFFAIRS - OFFICE OF CONSTRUCTION AND FACILITY MANAGEMENT
2009 ICC ANSI 117.1 - ACCESSIBLE AND USABLE BUILDING AND FACILITIES
2017 NATIONAL ELECTRIC CODE (NEC)
2018 INTERNATIONAL FUEL AND GAS CODE
2018 INTERNATIONAL MECHANICAL CODE (IMC)
2018 INTERNATIONAL PLUMBING CODE (IPC)
2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2018 INTERNATIONAL FIRE CODE (IFC)
2018 INTERNATIONAL BUILDING CODE (IBC)
CITY OF MURFREESBORO
2018 FGI GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND HEALTH CARE FACILITIES
2010 ADA ACCESSIBILITY GUIDELINES W/ AMENDMENTS
2012 INTERNATIONAL FUEL AND GAS CODE
2012 NATIONAL ELECTRIC CODE (NEC)
2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2012 INTERNATIONAL MECHANICAL CODE (IMC)
2012 INTERNATIONAL PLUMBING CODE (IPC)
2012 NFPA-1, EXCLUDING NFPA 5000
2012 LSC - NFPA - 101 LIFE SAFETY CODE
2012 INTERNATIONAL BUILDING CODE (IBC)
STATE OF TENNESSEE DEPARTMENT OF HEALTH
A. APPLICABLE STATUTES:
DESCRIPTION: This project proposes to completely renovate the third floor of building 1 on the Alvin C. York VA medical center campus.
Murfreesboro, TN
LOCATION: Alvin C. York VA Medical Center
PROJECT: AE RENOVATE WARD 1B
PLAN REVIEW DATA
VACINITY MAP CAMPUS MAP
No. Date Description
DRAWING INDEX
SHEET # SHEET NAME
SUBMISSIONS
45% 65% 95% 100% BID
M-MP-02 PARTIAL THIRD FLOOR PLAN - PART B - PIPE NEW WORK ● ● ● ● ●
M-MP-03 PARTIAL THIRD FLOOR PLAN - PART C - PIPE NEW WORK ● ● ● ● ●
M-MH-07 SCHEDULES ● ● ● ● ●
M-MH-08 SCHEDULES ● ● ● ● ●
M-MH-09 MECHANICAL DETAILS ● ● ● ● ●
M-MH-10 MECHANICAL DETAILS ● ● ● ●
M-MH-11 MECHANICAL DETAILS ● ● ● ●
M-MH-12 MECHANICAL DETAILS ● ● ● ●
M-MI-01 MECHANICAL CONTROLS ● ● ● ● ●
M-MI-02 MECHANICAL CONTROLS ● ● ●
08 - PLUMBING
P-PI-01 PLUMBING LEGENDS AND NOTES ● ● ● ● ●
P-PI-02 PLUMBING SCHEDULES ● ● ● ● ●
P-PD-01 PARTIAL THIRD FLOOR - PART A - PLUMBING - DEMO ● ● ● ● ●
P-PD-02 PARTIAL THIRD FLOOR - PART B - PLUMBING - DEMO ● ● ● ● ●
P-PD-03 PARTIAL THIRD FLOOR - PART C - PLUMBING - DEMO ● ● ● ● ●
P-PD-04 PARTIAL THIRD FLOOR - PART A - MED GAS - DEMO ● ● ● ● ●
P-PD-05 PARTIAL THIRD FLOOR - PART B - MED GAS - DEMO ● ● ● ● ●
P-PD-06 PARTIAL THIRD FLOOR - PART C - MED GAS - DEMO ● ● ● ● ●
P-PD-07 FOURTH FLOOR - PLUMBING - DEMO ● ● ● ● ●
P-PP-01 PLUMBING - SECOND FLOOR ZONE PLAN ● ● ● ● ●
P-PP-02 PARTIAL THIRD FLOOR - PART A - GRAVITY - NEW WORK ● ● ● ● ●
P-PP-03 PARTIAL THIRD FLOOR - PART B - GRAVITY - NEW WORK ● ● ● ● ●
P-PP-04 PARTIAL THIRD FLOOR - PART C - GRAVITY - NEW WORK ● ● ● ●
P-PP-05 PARTIAL FOURTH FLOOR - PART A - GRAVITY - NEW WORK ● ● ● ● ●
P-PP-06 PARTIAL FOURTH FLOOR - PART B - GRAVITY - NEW WORK ● ● ● ● ●
P-PP-07 PARTIAL FOURTH FLOOR - PART C - GRAVITY - NEW WORK ● ● ● ● ●
P-PP-08 PARTIAL THIRD FLOOR - PART A - PRESSURE - NEW WORK ● ● ● ●
P-PP-09 PARTIAL THIRD FLOOR - PART B - PRESSURE - NEW WORK ● ● ● ●
P-PP-10 PARTIAL THIRD FLOOR - PART C - PRESSURE - NEW WORK ● ● ● ●
P-PG-01 PARTIAL THIRD FLOOR - PART A - MED GAS - NEW WORK ● ● ● ● ●
P-PG-02 PARTIAL THIRD FLOOR - PART B - MED GAS - NEW WORK ● ● ● ● ●
P-PG-03 PARTIAL THIRD FLOOR - PART C - MED GAS - NEW WORK ● ● ● ● ●
P-PW-01 PLUMBING RISERS PART A - PRESSURE ● ● ● ●
P-PW-02 PLUMBING RISERS PART B - PRESSURE ● ● ● ●
P-PW-03 PLUMBING RISERS PART C - PRESSURE ● ● ● ●
P-PW-04 PLUMBING RISERS PART A - GRAVITY ● ● ●
P-PW-05 PLUMBING RISERS PART B - GRAVITY ● ● ●
P-PW-06 PLUMBING RISERS PART C - GRAVITY ● ● ●
P-PI-03 PLUMBING DETAILS ● ● ● ● ●
P-PI-04 PLUMBING DETAILS ● ● ● ● ●
09 - FIRE PROTECTION
F-FI-01 FIRE PROTECTION LEGENDS, DETAILS AND NOTES ● ● ● ● ●
F-FD-01 PARTIAL THIRD FLOOR - PART A - FIRE PROTECTION - DEMO ● ● ● ● ●
F-FD-02 PARTIAL THIRD FLOOR - PART B - FIRE PROTECTION - DEMO ● ● ● ● ●
F-FD-03 PARTIAL THIRD FLOOR - PART C - FIRE PROTECTION - DEMO ● ● ● ● ●
F-FX-01 PARTIAL THIRD FLOOR - PART A - FIRE PROTECTION - NEW WORK ● ● ● ● ●
F-FX-02 PARTIAL THIRD FLOOR - PART B - FIRE PROTECTION - NEW WORK ● ● ● ● ●
F-FX-03 PARTIAL THIRD FLOOR - PART C - FIRE PROTECTION - NEW WORK ● ● ● ● ●
10 - ELECTRICAL
E-EI-00 ELECTRICAL SYMBOLS LEGEND, LIGHTING FIXTURE SCHEDULE
AND GENERAL NOTES
E-EI-01 PARTIAL ELECTRICAL ONE LINE DIAGRAM - DEMOLITION ● ● ● ● ●
E-EI-02 PARTIAL ELECTRICAL ONE LINE DIAGRAM - NEW WORK ● ● ● ● ●
E-EI-03 ELECTRICAL PANEL SCHEDULES ● ● ● ●
E-EI-04 ELECTRICAL PANEL SCHEDULES ● ● ● ●
E-EI-05 ELECTRICAL DETAILS ● ● ● ●
E-EI-06 ELECTRICAL DETAILS ● ● ● ●
E-ED-00 3RD FLOOR - DEMOLITION PLAN - ELECTRICAL - OVERALL ● ● ● ●
E-ED-01 3RD FLOOR - DEMOLITION PLAN - ELECTRICAL - PART A ● ● ● ●
E-ED-02 3RD FLOOR - DEMOLITION PLAN - ELECTRICAL - PART B ● ● ● ●
E-ED-03 3RD FLOOR - DEMOLITION PLAN - ELECTRICAL - PART C ● ● ● ●
E-EP-01 3RD FLOOR - NEW WORK PLAN - POWER - PART A ● ● ● ●
E-EP-02 3RD FLOOR - NEW WORK PLAN - POWER - PART B ● ● ● ●
E-EP-03 3RD FLOOR - NEW WORK PLAN - POWER - PART C ● ● ● ●
E-EP-04 3RD FLOOR ROOF - NEW WORK PLAN - POWER - PART A ● ●
E-EL-01 3RD FLOOR - NEW WORK PLAN - LIGHTING - PART A ● ● ● ●
E-EL-02 3RD FLOOR - NEW WORK PLAN - LIGHTING - PART B ● ● ● ●
E-EL-03 3RD FLOOR - NEW WORK PLAN - LIGHTING - PART C ● ● ● ●
E-EY-01 3RD FLOOR - NEW WORK PLAN - SYSTEMS - PART A ● ● ● ●
E-EY-02 3RD FLOOR - NEW WORK PLAN - SYSTEMS - PART B ● ● ● ●
E-EY-03 3RD FLOOR - NEW WORK PLAN - SYSTEMS - PART C ● ● ● ●
11 - TECHNOLOGY
T-TJ-00 GENERAL TECHNOLOGY INFORMATION ● ● ● ● ●
T-TD-01 PARTIAL THRID FLOOR PLAN - PART A - TECHNOLOGY DEMO ● ● ● ● ●
T-TD-02 PARTIAL THIRD FLOOR PLAN - PART B - TECHNOLOGY DEMO ● ● ● ●
T-TD-03 PARTIAL THIRD FLOOR PLAN - PART C TECHNOLOGY DEMO ● ● ● ●
T-TJ-01 PARTIAL THIRD FLOOR - PART A - TECHNOLOGY NEW WORK ● ● ● ● ●
T-TJ-02 PARTIAL THIRD FLOOR - PART B - TECHNOLOGY NEW WORK ● ● ● ● ●
T-TJ-03 PARTIAL THIRD FLOOR - PART C - TECHNOLOGY NEW WORK ● ● ● ● ●
T-TJ-04 TECHNOLOGY - ENLARGED ROOMS ● ● ● ● ●
T-TJ-06 TECHNOLOGY DETAILS ● ● ●
T-TJ-07 TECHNOLOGY DETAILS ● ● ●
T-TJ-08 TECHNOLOGY RISER ● ● ●
DRAWING INDEX
SHEET # SHEET NAME
SUBMISSIONS
45% 65% 95% 100% BID
00 - GENERAL
GI 00.01 COVER SHEET ● ● ● ● ●
GI 01.01 GENERAL DATA ● ● ● ● ●
GI 01.02 CONSTRUCTION STAGING PLAN ● ● ●
GI 01.10 WALL TYPE DETAILS ● ● ● ●
GI 01.20 ACCESSIBILITY DETAILS ● ● ● ● ●
GI 02.01 THIRD FLOOR LIFE SAFETY PLAN - OVERALL ● ● ● ● ●
GI 03.01 SECOND FLOOR ICRA PLAN ● ●
GI 03.02 THIRD FLOOR ICRA PLAN ● ●
GI 04.01 ACM DUCT WORK AND ACM PIPE INSULATION ● ●
GI 04.02 LEAD PAINT AND TRANSITE PANELS ● ●
GI 05.01 PHASING PLANS
03 - DEMOLITION
AD 01.01 THIRD FLOOR DEMOLITION PLAN - OVERALL ● ● ● ● ●
AD 01.02 PARTIAL THIRD FLOOR DEMO PLAN - AREA A ●
AD 01.03 PARTIAL THIRD FLOOR DEMO PLAN - AREA B ●
AD 01.04 PARTIAL THIRD FLOOR DEMO PLAN - AREA C ●
04 - ARCHITECTURAL
AE 01.00 SECOND FLOOR PLAN AND REFLECTED CEILING PLAN ● ● ●
AE 01.01 FOURTH FLOOR/ATTIC PLAN ● ● ●
AE 01.03 THIRD FLOOR OVERALL PLAN ● ● ● ● ●
AE 01.11 PARTIAL THIRD FLOOR PLAN - PART A NOTED ● ● ● ● ●
AE 01.12 PARTIAL THIRD FLOOR PLAN - PART B NOTED ● ● ● ● ●
AE 01.13 PARTIAL THIRD FLOOR PLAN - PART C NOTED ● ● ● ● ●
AE 01.14 PARTIAL THIRD FLOOR PLAN - PART A DIMENSIONED ● ● ● ●
AE 01.15 PARTIAL THIRD FLOOR PLAN - PART B DIMENSIONED ● ● ● ●
AE 01.16 PARTIAL THIRD FLOOR PLAN - PART C DIMENSIONED ● ● ● ●
AE 02.01 ENLARGED PLANS AND REFLECTED CEILING PLANS ● ● ● ● ●
AE 02.02 ENLARGED PLANS AND REFLECTED CEILING PLANS ● ● ● ● ●
AE 02.03 ENLARGED TOILET PLANS AND ELEVATIONS ● ● ●
AE 03.01 DOOR ELEVATIONS, SCHEDULE, & NOTES ● ● ● ●
AE 03.02 DOOR DETAILS ● ● ● ●
AE 03.03 WINDOW DETAILS ● ● ●
AE 08.01 MISC. DETAILS ● ● ● ●
AE 08.02 MISC. DETAILS ● ● ● ●
AE 08.03 MISC. DETAILS ● ● ● ●
AE 08.04 MISC. DETAILS ● ● ●
AE 08.05 MISC. INTERIOR DETAILS ● ● ●
AE 08.06 MISC CEILING DETAILS ● ● ●
AE 09.01 INTERIOR ELEVATIONS ● ● ● ● ●
AE 09.02 INTERIOR ELEVATIONS ● ● ● ● ●
AE 09.03 CORRIDOR ELEVATIONS ● ● ●
AE 09.04 CORRIDOR ELEVATIONS ● ● ●
AE 09.05 3D VIEWS ● ● ● ● ●
AE 10.01 CASEWORK SECTIONS AND DETAILS ● ● ● ●
AE 10.02 CASEWORK SECTIONS AND DETAILS ●
AE 11.01 THIRD FLOOR REFLECTED CEILING PLAN - OVERALL ● ● ● ● ●
AE 11.10 THIRD FLOOR RCP - PART A ● ● ● ● ●
AE 11.11 THIRD FLOOR RCP - PART B ● ● ● ● ●
AE 11.12 THIRD FLOOR RCP - PART C ● ● ● ● ●
AE 12.01A EQUIPMENT PLANS ● ● ● ●
AE 12.01B EQUIPMENT PLANS ● ● ● ●
AE 12.01C EQUIPMENT PLANS ● ● ● ●
AE 12.02 EQUIPMENT PLANS - PATIENT ROOMS AREA B ● ● ● ●
AE 12.02B EQUIPMENT PLANS - PATIENT ROOMS AREA C ● ● ● ●
VN 01.00 PATIENT LIFT VENDOR DRAWINGS ● ● ●
05 - INTERIOR DESIGN
IN 01.00 THIRD FLOOR FINISH LEGEND ● ● ● ● ●
IN 01.02 PARTIAL THIRD FLOOR FINISH PLAN - PART A ● ● ● ●
IN 01.03 PARTIAL THIRD FLOOR FINISH PLAN - PART B ● ● ● ●
IN 01.04 PARTIAL THIRD FLOOR FINISH PLAN - PART C ● ● ● ●
IN 01.05 THIRD FLOOR PATTERN PLAN OVERALL ● ● ● ●
IN 01.06 PARTIAL THIRD FLOOR PATTERN - PART A ● ● ● ●
IN 01.07 PARTIAL THIRD FLOOR PATTERN - PART B ● ● ● ●
IN 01.08 PARTIAL THIRD FLOOR PATTERN - PART C ● ● ● ●
IN 02.00 THIRD FLOOR SIGNAGE LEGEND ● ● ●
IN 02.01 THIRD FLOOR SIGNAGE SCHEDULE ● ● ●
IN 02.02 PARTIAL THIRD FLOOR SIGNAGE PLAN - PART A ● ● ●
IN 02.03 PARTIAL THIRD FLOOR SIGNAGE PLAN - PART B ● ● ●
IN 02.04 PARTIAL THIRD FLOOR SIGNAGE PLAN - PART C ● ● ●
07 - MECHANICAL
M-MH-01 LEGENDS, NOTES, AND SYMBOLS ● ● ● ● ●
M-MD-01 PARTIAL THIRD FLOOR PLAN - PART A - DUCT DEMO ● ● ● ● ●
M-MD-02 PARTIAL THIRD FLOOR PLAN - PART B - DUCT DEMO ● ● ● ● ●
M-MD-03 PARTIAL THIRD FLOOR PLAN - PART C - DUCT DEMO ● ● ● ● ●
M-MD-04 PARTIAL THIRD FLOOR PLAN - PART A - PIPE DEMO ● ● ● ● ●
M-MD-05 PARTIAL THIRD FLOOR PLAN - PART B - PIPE DEMO ● ● ● ● ●
M-MD-06 PARTIAL THIRD FLOOR PLAN - PART C - PIPE DEMO ● ● ● ● ●
M-MH-13 PARTIAL ATTIC PLAN - PART B - DUCT DEMO ● ● ● ●
M-MH-14 PARTIAL ATTIC PLAN - PART C - DUCT DEMO ● ● ● ●
M-MH-02 PARTIAL THIRD FLOOR PLAN - PART A - DUCT NEW WORK ● ● ● ● ●
M-MH-03 PARTIAL THIRD FLOOR PLAN - PART B - DUCT NEW WORK ● ● ● ● ●
M-MH-04 PARTIAL THIRD FLOOR PLAN - PART C - DUCT NEW WORK ● ● ● ● ●
M-MH-05 PARTIAL ATTIC PLAN - PART B - DUCT NEW WORK ● ● ● ● ●
M-MH-06 PARTIAL ATTIC PLAN - PART C - DUCT NEW WORK ● ● ● ● ●
M-MP-01 PARTIAL THIRD FLOOR PLAN - PART A - PIPE NEW WORK ● ● ● ● ●
| Sheets |
| AD 01.01 - THIRD FLOOR DEMOLITION PLAN - OVERALL |
| AE 01.00 - SECOND FLOOR PLAN AND REFLECTED CEILING PLAN |
| AE 01.01 - FOURTH FLOOR/ATTIC PLAN |
| AE 01.03 - THIRD FLOOR OVERALL PLAN |
| AE 01.11 - PARTIAL THIRD FLOOR PLAN - PART A NOTED |
| AE 01.12 - PARTIAL THIRD FLOOR PLAN - PART B NOTED |
| AE 01.13 - PARTIAL THIRD FLOOR PLAN - PART C NOTED |
| AE 01.14 - PARTIAL THIRD FLOOR PLAN - PART A DIMENSIONED |
| AE 01.15 - PARTIAL THIRD FLOOR PLAN - PART B DIMENSIONED |
| AE 01.16 - PARTIAL THIRD FLOOR PLAN - PART C DIMENSIONED |
| AE 02.01 - ENLARGED PLANS AND REFLECTED CEILING PLANS |
| AE 02.02 - ENLARGED PLANS AND REFLECTED CEILING PLANS |
| AE 02.03 - ENLARGED TOILET PLANS AND ELEVATIONS |
| AE 03.01 - DOOR ELEVATIONS, SCHEDULE, & NOTES |
| AE 03.02 - DOOR DETAILS |
| AE 03.03 - WINDOW DETAILS |
| AE 08.01 - MISC. DETAILS |
| AE 08.02 - MISC. DETAILS |
| AE 08.03 - MISC. DETAILS |
| AE 08.04 - MISC. DETAILS |
| AE 08.05 - MISC. INTERIOR DETAILS |
| AE 08.06 - MISC CEILING DETAILS |
| AE 09.01 - INTERIOR ELEVATIONS |
| AE 09.02 - INTERIOR ELEVATIONS |
| AE 09.03 - CORRIDOR ELEVATIONS |
| AE 09.04 - CORRIDOR ELEVATIONS |
| AE 09.05 - 3D VIEWS |
| AE 10.01 - CASEWORK SECTIONS AND DETAILS |
| AE 10.02 - CASEWORK SECTIONS AND DETAILS |
| AE 11.01 - THIRD FLOOR REFLECTED CEILING PLAN - OVERALL |
| AE 11.10 - THIRD FLOOR RCP - PART A |
| AE 11.11 - THIRD FLOOR RCP - PART B |
| AE 11.12 - THIRD FLOOR RCP - PART C |
| AE 12.01A - EQUIPMENT PLANS |
| AE 12.01B - EQUIPMENT PLANS |
| AE 12.01C - EQUIPMENT PLANS |
| AE 12.02 - EQUIPMENT PLANS - PATIENT ROOMS AREA B |
| AE 12.02B - EQUIPMENT PLANS - PATIENT ROOMS AREA C |
| GI 00.01 - COVER SHEET |
| GI 01.01 - GENERAL DATA |
| GI 01.02 - CONSTRUCTION STAGING PLAN |
| GI 01.10 - WALL TYPE DETAILS |
| GI 01.20 - ACCESSIBILITY DETAILS |
| GI 02.01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL |
| GI 03.01 - SECOND FLOOR ICRA PLAN |
| GI 03.02 - THIRD FLOOR ICRA PLAN |
| GI 04.01 - ACM DUCT WORK AND ACM PIPE INSULATION |
| GI 04.02 - LEAD PAINT AND TRANSITE PANELS |
| GI 05.01 - PHASING PLANS |
| IN 01.00 - THIRD FLOOR FINISH LEGEND |
| IN 01.02 - PARTIAL THIRD FLOOR FINISH PLAN - PART A |
| IN 01.03 - PARTIAL THIRD FLOOR FINISH PLAN - PART B |
| IN 01.04 - PARTIAL THIRD FLOOR FINISH PLAN - PART C |
| IN 01.05 - THIRD FLOOR PATTERN PLAN OVERALL |
| IN 01.06 - PARTIAL THIRD FLOOR PATTERN - PART A |
| IN 01.07 - PARTIAL THIRD FLOOR PATTERN - PART B |
| IN 01.08 - PARTIAL THIRD FLOOR PATTERN - PART C |
| IN 02.00 - THIRD FLOOR SIGNAGE LEGEND |
| IN 02.01 - THIRD FLOOR SIGNAGE SCHEDULE |
| IN 02.02 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART A |
| IN 02.03 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART B |
| IN 02.04 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART C |
| VN 01.00 - PATIENT LIFT VENDOR DRAWINGS |
File details come from the government source that posted it. Updated .