GI 00-01 - COVER SHEET.pdf
PDF 469 KB Posted
- Attached to
- Z2DA--626A4-19-101 - Renovate Ward 1B at the Alvin C. York VA Medical Center, Murfreesboro, TN 37129
- Solicitation number
- 36C24923R0114
About this file
This document package includes construction documents and specifications for a renovation project at a Department of Veterans Affairs medical center. The project involves renovations to Ward 1B at the Alvin C. York VA Medical Center located in Murfreesboro, Tennessee, including demolition, renovations to patient rooms and support spaces on the second and third floors, installation of new finishes, fixtures and equipment. The construction documents were prepared by HFR Design and include plans, elevations, sections, details, schedules and specifications for architectural, mechanical, electrical and technology scope. TLC Engineers provided supporting mechanical, electrical and plumbing documents. The solicitation for the project is identified as number 36C24923R0114 with an opportunity type of solicitation.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HFR DESIGN, INC.
VA PROJECT # 626A4-19-101
AE RENOVATE WARD 1B
ALVIN C. YORK VAMC
3400 LEBANON PIKE
MURFREESBORO, TN 37129
04-14-2023
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
-1
-2
100% CONSTRUCTION DOCUMENTS
WEB: www.woldae.com
FAX: 612.237.3151
PHONE: 651.227.7773
CITY/STATE/ZIP: SAINT PAUL, MINNESOTA 55101
ADDRESS: 332 MINNESOTA STREET, SUITE W2000
EMAIL: jquam@woldae.com
DESIGNER: JILL QUAM
INTERIOR
DESIGNER:
HFR DESIGN
WEB: www.atriaxgroup.com
PHONE: 828.315.9962
CITY/STATE/ZIP: HICKORY, NC 28601
ADDRESS: 102 3RD AVENUE NE
EMAIL: ed.henson@atriaxgroup.com
PROJ. ARCHITECT: ED HENSON
ARCHITECT: ATRIAX, PLLC.
PROJECT NUMBER: 2019056
WEB: www.woldae.com
FAX: 615.370.8530
PHONE: 615.370.8500
CITY/STATE/ZIP: BRENTWOOD, TN 37027
ADDRESS: 214 CENTERVIEW DRIVE, STE 300
EMAIL: Atraylor@woldae.com
PROJ. MANAGER: ANTHONY TRAYLOR
EMAIL: rfranks@woldae.com
PROJ. ARCHITECT: RON FRANKS
ARCHITECT: HFR DESIGN
PROJECT NUMBER: 626A4-19-101
WEB: www.tennesseevalley.va.gov
PHONE: 615.8676000
CITY/STATE/ZIP: Murfreesboro, TN 37129
ADDRESS: 3400 Lebanon Road
EMAIL: hansjohnson2@va.gov
CONTACT PERSON: HANS JOHNSON
OWNER: VAMC MURFREESBORO - ALVIN C. YORK CAMPUS
PROJECT CONTACT LIST
WEB: www.tlc-engineers.com
FAX: 615.297.4554
PHONE: 615.297.4554
CITY/STATE/ZIP: Brentwood, TN 37027
ADDRESS: 12 Cadillac Drive, Suite 150
EMAIL: deron.mcintosh@tlc-eng.com
ELECTRICAL: DERON MCINTOSH
EMAIL: ted.hood@tlc-eng.com
TECHNOLOGY: TED HOOD
EMAIL: danny.thomas@tlc-eng.com
PLUMBING: DANNY THOMAS
EMAIL: steve.kemp@tlc-eng.com
MECHANICAL: STEVE KEMP
MECHANICAL,
PLUMBING, &
ELECTRICAL
ENGINEERS:
TLC
PROJECT CONTACTS (CONT)
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2019
TLC No.:
www.tlc-engineers.com
118626
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.
PROJECT TEAM:
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
MURFREESBORO, TN
615.370.8500
615.370.8530 hfrdesign.com
214 Centerview Drive Suite 300 Brentwood, TN 37027
Phase
FULLY SPRINKLERED
C U s e rs \a tr a y lo r\ D o c u m e n ts
\M b o ro V
A W a rd b
R e n o a tr a y lo r2 X
N D
H .r v t
/1
/2
:2
:0
P
M
04-14-2023
626A4-19-101
GI 00.01
AE RENOVATE WARD 1BCOVER SHEET
AT
HFR Project No: 2019056
100% CONSTRUCTION
DOCUMENTS
No. Date Description
| Sheets |
| AD 01.01 - THIRD FLOOR DEMOLITION PLAN - OVERALL |
| AE 01.00 - SECOND FLOOR PLAN AND REFLECTED CEILING PLAN |
| AE 01.01 - FOURTH FLOOR/ATTIC PLAN |
| AE 01.03 - THIRD FLOOR OVERALL PLAN |
| AE 01.11 - PARTIAL THIRD FLOOR PLAN - PART A NOTED |
| AE 01.12 - PARTIAL THIRD FLOOR PLAN - PART B NOTED |
| AE 01.13 - PARTIAL THIRD FLOOR PLAN - PART C NOTED |
| AE 01.14 - PARTIAL THIRD FLOOR PLAN - PART A DIMENSIONED |
| AE 01.15 - PARTIAL THIRD FLOOR PLAN - PART B DIMENSIONED |
| AE 01.16 - PARTIAL THIRD FLOOR PLAN - PART C DIMENSIONED |
| AE 02.01 - ENLARGED PLANS AND REFLECTED CEILING PLANS |
| AE 02.02 - ENLARGED PLANS AND REFLECTED CEILING PLANS |
| AE 02.03 - ENLARGED TOILET PLANS AND ELEVATIONS |
| AE 03.01 - DOOR ELEVATIONS, SCHEDULE, & NOTES |
| AE 03.02 - DOOR DETAILS |
| AE 03.03 - WINDOW DETAILS |
| AE 08.01 - MISC. DETAILS |
| AE 08.02 - MISC. DETAILS |
| AE 08.03 - MISC. DETAILS |
| AE 08.04 - MISC. DETAILS |
| AE 08.05 - MISC. INTERIOR DETAILS |
| AE 08.06 - MISC CEILING DETAILS |
| AE 09.01 - INTERIOR ELEVATIONS |
| AE 09.02 - INTERIOR ELEVATIONS |
| AE 09.03 - CORRIDOR ELEVATIONS |
| AE 09.04 - CORRIDOR ELEVATIONS |
| AE 09.05 - 3D VIEWS |
| AE 10.01 - CASEWORK SECTIONS AND DETAILS |
| AE 10.02 - CASEWORK SECTIONS AND DETAILS |
| AE 11.01 - THIRD FLOOR REFLECTED CEILING PLAN - OVERALL |
| AE 11.10 - THIRD FLOOR RCP - PART A |
| AE 11.11 - THIRD FLOOR RCP - PART B |
| AE 11.12 - THIRD FLOOR RCP - PART C |
| AE 12.01A - EQUIPMENT PLANS |
| AE 12.01B - EQUIPMENT PLANS |
| AE 12.01C - EQUIPMENT PLANS |
| AE 12.02 - EQUIPMENT PLANS - PATIENT ROOMS AREA B |
| AE 12.02B - EQUIPMENT PLANS - PATIENT ROOMS AREA C |
| GI 00.01 - COVER SHEET |
| GI 01.01 - GENERAL DATA |
| GI 01.02 - CONSTRUCTION STAGING PLAN |
| GI 01.10 - WALL TYPE DETAILS |
| GI 01.20 - ACCESSIBILITY DETAILS |
| GI 02.01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL |
| GI 03.01 - SECOND FLOOR ICRA PLAN |
| GI 03.02 - THIRD FLOOR ICRA PLAN |
| GI 04.01 - ACM DUCT WORK AND ACM PIPE INSULATION |
| GI 04.02 - LEAD PAINT AND TRANSITE PANELS |
| GI 05.01 - PHASING PLANS |
| IN 01.00 - THIRD FLOOR FINISH LEGEND |
| IN 01.02 - PARTIAL THIRD FLOOR FINISH PLAN - PART A |
| IN 01.03 - PARTIAL THIRD FLOOR FINISH PLAN - PART B |
| IN 01.04 - PARTIAL THIRD FLOOR FINISH PLAN - PART C |
| IN 01.05 - THIRD FLOOR PATTERN PLAN OVERALL |
| IN 01.06 - PARTIAL THIRD FLOOR PATTERN - PART A |
| IN 01.07 - PARTIAL THIRD FLOOR PATTERN - PART B |
| IN 01.08 - PARTIAL THIRD FLOOR PATTERN - PART C |
| IN 02.00 - THIRD FLOOR SIGNAGE LEGEND |
| IN 02.01 - THIRD FLOOR SIGNAGE SCHEDULE |
| IN 02.02 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART A |
| IN 02.03 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART B |
| IN 02.04 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART C |
| VN 01.00 - PATIENT LIFT VENDOR DRAWINGS |
File details come from the government source that posted it. Updated .