AD 01-01 - THIRD FLOOR DEMOLITION PLAN - OVERALL.pdf

PDF 957 KB Posted

Attached to
Z2DA--626A4-19-101 - Renovate Ward 1B at the Alvin C. York VA Medical Center, Murfreesboro, TN 37129
Solicitation number
36C24923R0114
Issued by

About this file

This document contains a demolition plan and notes for renovating the third floor of Ward 1B at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. Key details include demolishing existing walls, ceilings, flooring, plumbing fixtures, casework, and doors as indicated on the plan in order to install new finishes and accommodate renovations. Hazardous materials abatement is required. The scope also involves removing obsolete equipment, preserving historic ceiling tiles, patching surfaces, and preparing various areas for new construction. The related federal contract opportunity is solicitation number 36C24923R0114 for project 626A4-19-101 to complete the renovations at the Murfreesboro VAMC under the Department of Veterans Affairs Veterans Health Administration VISN 9.

View the file

Other files

File Type Posted
36C24923R0114 0003.docx DOCX document
E-EI-01 - PARTIAL ELECTRICAL RISER DIAGRAM - DEMOLITION.pdf PDF
119437-Alvin C. York VAMC Renovate Ward 1B - Revision 1 - Electrical Narrative.pdf PDF
Government Answers to Industry Questions.pdf PDF
283100.pdf PDF
275223.pdf PDF
Bradley_GrabBar_8370-107.pdf PDF
Ward 1B - Revision 1.pdf PDF
Renovate Ward 1B Pre-Proposal Sign in Sheet - 07-06-2023.pdf PDF
E-EI-02 - PARTIAL ELECTRICAL RISER DIAGRAM - NEW WORK.pdf PDF
Bradley_GrabBar_8370-108.pdf PDF
General Decision Number TN20230187 06-30-2023 Rutherford County TN.pdf PDF
ASI 3413-25.pdf PDF
36C24923R0114 0002.docx DOCX document
GAMCO 125SwingUpTP.pdf PDF
Interior Wall Type Legend.pdf PDF
SUBCONTRACTOR INFORMATION AND CONSENT FORM.docx DOCX document
36C24923R0114 0001.docx DOCX document
MECH BINDER.pdf PDF
Ward 1B - Specs - Vol. 2.pdf PDF
GD Number TN20230187 05-12-2023.pdf PDF
GI 01-02 - CONSTRUCTION STAGING PLAN.pdf PDF
GI 03-01 - SECOND FLOOR ICRA PLAN.pdf PDF
GI 05-01 - PHASING PLANS.pdf PDF
GI 00-01 - COVER SHEET.pdf PDF
GI 01-10 - WALL TYPE DETAILS.pdf PDF
Price Schedule Project 626A4-19-101 Renovate Ward 1B.xlsx XLSX spreadsheet
GI 04-02 - LEAD PAINT AND TRANSITE PANELS.pdf PDF
36C24923R0114.docx DOCX document
General Conditions Breakout.xlsx XLSX spreadsheet
WARD 1B - ARCH BINDER.pdf PDF
GI 01-20 - ACCESSIBILITY DETAILS.pdf PDF
RFI Form.docx DOCX document
GI 04-01 - ACM DUCT WORK AND ACM PIPE INSULATION.pdf PDF
Performance Relevancy Survey Form - 626A4-19-101 Renovate Ward 1B.docx DOCX document
Ward 1B - Specs - Vol. 1.pdf PDF
VN 01-00 - PATIENT LIFT VENDOR DRAWINGS.pdf PDF
ELECTRICAL BINDER.pdf PDF
PLUMBING BINDER.pdf PDF
GI 01-01 - GENERAL DATA.pdf PDF
TECH BINDER.pdf PDF
WARD 1B - GENERAL.pdf PDF
WARD 1B - INTERIORS .pdf PDF
Calculation of Self Performed Work.docx DOCX document
GI 02-01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL.pdf PDF
Contractor EMR Certification Form.docx DOCX document
FP BINDER.pdf PDF
GI 03-02 - THIRD FLOOR ICRA PLAN.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X1X1

X2 X2

X3 X3

X4

X9

X10

X11

X12

X13

X14

X0 X0

XB XC XD XE XF XG XH XI XJ

XK

XL XM XN XO

XP

XQ XR XS XT XU XV XW XX XY

X6.1

X7.1

X12.1

X12.2 X12.3

XZ

X8

XA

X5

X6

X7

M A

T C

H

LI

N E

P

A R

T A

M A

T C

H

LI

N E

P

A R

T A

M A

T C

H

LI

N E

P

A R

T B

M A

T C

H

LI

N E

P

A R

T B

M A

T C

H

LI

N E

P

A R

T C

M A

T C

H

LI

N E

P

A R

T A

M A

T C

H

LI

N E

P

A R

T C

M A

T C

H

LI

N E

P

A R

T A

DEMOLITION NOTE: NOTES BELOW APPLY TO ENTIREITY OF FLOOR, ALSO COORDINATE DEMOLITION WITH MEP

1. PREPARE FOR AND ABATE ASBESTOS AND LEAD PAINT. REFERENCE HAZARDOUS MATERIALS SHEETS.

2. REMOVE EXSITING GYP. BD/PLASTER/ AND FURR WALLS ON ALL EXTERIOR WALLS TO EXISTING BLOCK.

PREP BLOCK TO RECEIVE NEW WALL

3. REMOVE PARTITIONS AS INDICATED BY DASHED LINES ENTIRELY FROM FLOOR TO HIGHEST POINT.

REMOVE ALL APPURTENANCES AND DISCONNECT ALL MOUNTED SERVICES. TYPICAL AT ALL RED

DASHED LINES

4. REMOVED ALL PLUMBING FIXTURES, FAUCETS, FITTINGS, TOILET PARTITIONS, AND ACCESSORIES AS

INDICATED. CAP UTILITIES PER MEP REQUIREMENTS (SEE PLUMBING)

5. REMOVE EXISTING ACOUSTICAL AND HARD CEILING, INCLUDING FRAMING, DRYWALL, SUSPENSION GRID, TILES, WALL ANGLES, SUSPENSION WIRES, LIGHTS, FIXTURES, EXIT SIGNS, AIR DIFFUSERS, GRILLES, SPEAKERS, SMOKE DETECTORS, TRACKS, EQUIPMENT, ETC. COORDINATE WITH RELATED TRADES FOR SCOPE OF DEMOLITION. PREPARE AREA TO RECEIVE NEW CEILING WHERE APPLICABLE.

REF RCP AND FINISH PLAN. TYPICAL TO ALL CEILINGS THROUGHOUT FLOOR

6. PRESERVE AND PROTECT ANY PAINTED CEILING TILES, TURN TILES OVER TO THE VA.

7. REMOVE EXISTING FLOOR FINISHES COMPLETELY TO EXISTING CONCRETE FLOOR SLAB, INCLUDING MASTIC, ADHESIVE AND WALL BASE. PATCH AND LEVEL SLAB AS REQUIRED TO RECEIVE NEW FLOOR

FINISHES. TYPICAL THROUGHOUT FLOOR

8. REMOVE EXISTING FLOOR TILE AND CHIP OUT GROUT. PATCH AND LEVEL SLAB AS REQUIRED TO

RECEIVE NEW FLOOR FINISHES.

9. REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED. INCLUDING LEAVES, FRAME AND HARDWARE.

TYPICAL THROUGHOUT FLOOR

10. REMOVE EXISTING WALL COVERINGS, ADHESIVES, AND FINISHES.

11. REMOVE EXISTING WINDOW ASSEMBLY. TYPICAL TO ALL WINDOWS

12. REMOVE EXISTING CASEWORK AS INDICATED ON PLAN. TYPICAL THROUGHOUT FLOOR.

13. REMOVE 1" TOPPING FLOOR SLAB IN NEW PATIENT TOILET ROOMS. COORDINATE LOCATIONS WITH

NEW WORK FLOOR PLANS.

14. PREP ANY EXPOSED EXISTING WALL TO REMAIN FOR NEW PAINT.

DEMO LEGEND

WALL TO BE DEMOLISHED

DOOR/FRAME TO BE DEMOLISHED

EXISTING PARTITION TO REMAIN

CASEWORK TO BE DEMOLISHED

WINDOWS TO BE REMOVED AND REPLACED

WITH NEW WINDOWS

PLUMBING FIXTURES TO BE DEMOLISHED

12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554

©Copyright 2019

TLC No.:

www.tlc-engineers.com

118626

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

PROJECT TEAM:

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

KEYPLAN

MURFREESBORO, TN

615.370.8500

615.370.8530 hfrdesign.com

214 Centerview Drive Suite 300 Brentwood, TN 37027

BLDG 2

BLDG 1

BLDG 9

Phase

FULLY SPRINKLERED

C U s e rs \a tr a y lo r\ D o c u m e n ts

\M b o ro V

A W a rd b

R e n o a tr a y lo r2 X

N D

H .r v t

/1

/2

:3

:2

P

M

04-14-2023

626A4-19-101

AD 01.01

AE RENOVATE WARD 1B

THIRD FLOOR DEMOLITION PLAN -

OVERALL

AT

HFR Project No: 2019056

100% CONSTRUCTION

DOCUMENTS

7. COORDINATE WITH COR & REMOVE ALL OBSOLETE, UNNECESSARY, OR ABANDONED ITEMS IN DEMOLITION AREAS THAT

ARE NOT APPROPRIATE TO REMAIN FOR NEW WORK.

6. EXISTING CONDITIONS TO REMAIN: DAMAGED COMPONENTS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE VA. THIS INCLUDES DAMAGE DONE TO EXISTING SPACES ABOVE, BELOW, AND ADJACENT TO, AS REQUIRED TO

COMPLETE NEW WORK.

5. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED

DRAWINGS AND PRECONSTRUCTION PHOTOGRAPHS.

4. CEASE OPERATIONS IMMEDIATELY IF STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY COR. DO NOT RESUME

OPERATIONS UNTIL DIRECTED.

3. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING

SELECTIVE DEMOLITION OPERATIONS.

2. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH VA'S NORMAL OPERATIONS AND WITH ADJACENT BUILDING

AREAS.

1. PROVIDE TEMPORARY DUST PARTITIONS, SECURITY DEVICES, AND OTHER MEANS NECESSARY FOR THE PROTECTION OF OCCUPANTS WHERE TRAFFIC IN CORRIDORS AND SPACES ADJACENT TO DEMOLITION / RENOVATION WORK ARE IMPACTED. COORDINATE WITH FACILITY'S INFECTION CONTROL OR COMPLIANCE OFFICER TO MEET ALL FACILITY OR

REGULATORY REQUIREMENTS RELATED TO PROTECTION OF OCCUPANTS.

EXISTING CONDITIONS

9. GRIDING AND FLOOR LEVELING IS REQUIRED BEFORE ANY NEW WORK BEGINS.

8. MITIGATE DEMOLITION NOISE AS MUCH AS POSSIBLE. COORDINATE WITH VAMC FOR THE BEST TIMES OF DAY AND BEST

DAYS OF THE WEEK TO CONDUCT DEMOLITION ACTIVITY.

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND VENDOR (IF APPLICABLE) DRAWINGS AND

SPECIFICATIONS FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.

6. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.

5. REMOVED & REINSTALLED ITEMS: CLEAN & REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACK OR CRATE AFTER CLEANING / REPAIR AND IDENTIFY CONTENTS OF CONTAINERS, PROTECT ITEMS FROM DAMAGE

DURING TRANSPORT / STORAGE, REINSTALL ITEMS IN LOCATIONS INDICATED.

4. REMOVED & SALVAGED ITEMS: CLEAN ITEMS, PACK OR CRATE AFTER CLEANING AND IDENTIFY CONTENTS OF

CONTAINERS, PROTECT AND TRANSPORT ITEMS TO COR STORAGE AREA ON-SITE.

3. REMOVE CONSTRUCTION SHOWN DASHED ON DEMOLITION PLAN. REFERENCE LEGEND FOR MORE SPECIFIC

INFORMATION.

2. PRIOR TO START, HOLD A PRE-DEMOLITION CONFERENCE AT THE PROJECT SITE TO REVIEW METHODS AND PROCEDURES RELATED TO DEMOLITION. COORDINATE WITH COR REGARDING CONSTRUCTION ACCESS, TRANSPORTATION AND DISPOSAL OF DEBRIS, AND OTHER FACILITY REQUIREMENTS RELATED TO CONSTRUCTION.

1. COORDINATE SCOPE OF DEMOLITION WORK TO INSTALL NEW WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS. (FOR EXAMPLE, IF NEW FINISHES ARE SCHEDULED FOR AN EXISTING AREA TO REMAIN, REMOVE EXISTING FINISHES PRIOR TO INSTALLATION OF NEW FINISHES EVEN IF NOT EXPLICITLY IDENTIFIED ON DEMOLITION

PLAN.)

GENERAL

GENERAL DEMOLITION NOTES

3/32" = 1'-0"

1 WARD 1B OVERALL - DEMOLITION PLAN

4. COMPLY WITH REQUIREMENTS OF EPA, CODE OF FEDERAL REGULATIONS, NATIONAL EMISSIONS STANDARDS AND OSHA REGULATIONS ON HAZARDOUS MATERIALS AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL GOVERNMENT

REGULATIONS WHICH ARE INCORPORATED BY REFERENCE.

3. CONTRACTOR SHALL COORDINATE WITH COR ON RESPONSIBILITY OF REMOVAL OF HAZARDOUS MATERIALS (KNOWN OR

UNKNOWN) PRIOR TO SUBMISSION OF BID.

1. IF HAZARDOUS MATERIALS ARE ENCOUNTERED, IMMEDIATELY SUSPEND WORK IN SUSPECTED AREA OF CONTAMINATION, WITHDRAW FROM AREA AND NOTIFY COR AND OWNER IN WRITING.

HAZARDOUS MATERIALS

2. DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY SYSTEMS WITHOUT PRIOR WRITTEN NOTICE TO OWNER AND LOCAL AUTHORITY HAVING JURISDICTION (AHJ). PROVIDE A MINIMUM OF 3 DAYS NOTICE TO COR PRIOR TO DISRUPTION.

COORDINATE WITH LOCAL AHJ REGARDING NOTICE REQUIREMENTS.

1. ALL NECESSARY PATHS OF EGRESS AND EXITS SHALL BE MAINTAINED 'PROTECTED AND CLEAR' UNLESS ALTERNATE METHODS OF EGRESS ARE PROVIDED THAT ARE ACCEPTABLE TO BUILDING CODE OFFICIALS. RELOCATE SECURITY DEVICES, FIRE ALARM ITEMS, EXIT SIGNS, AND EMERGENCY LIGHTING AS REQUIRED DUE TO DEMOLITION OR

OBSTRUCTION BY TEMPORARY PARTITIONS.

REGULATORY

2. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH AND REPAIR ADJOINING SURFACES TO MATCH EXISTING AND PROVIDE IMPERCEPTIBLE

TRANSITION, (U.N.O.)

● CEILINGS: REMOVE ENTIRE CEILING SYSTEM AND CEILING MOUNTED ITEMS. STORE DEVICES INTENDED FOR

RE-USE.

● WALLS: REMOVE WALL COVERING SYSTEMS SUCH AS PANELING AND VINYL WALL COVERINGS. PATCH / REPAIR

HOLES OR DAMAGED AREAS AND SKIM-COAT ENTIRE SURFACE.

● FLOORS: REMOVE FINISH TO SUB-FLOOR, CLEAN ADHESIVES AND GLUES FROM SUBSTRATE, AND PREPARE

SUBSTRATE (LEVEL AND FILL AND GRIND AS NEEDED).

1. WHERE NEW FINISHES ARE SCHEDULED IN EXISTING SPACES:

ARCHITECTURAL / INTERIORS

2. COORDINATE SCOPE OF DEMOLITION WITH THAT REQUIRED TO INSTALL EQUIPMENT PER VENDOR / COR SPECIFICATIONS.

1. COORDINATE WITH COR ON EQUIPMENT TO BE REMOVED, DISPOSED OF, OR SALVAGED.

EQUIPMENT

3. REPAIR EXISTING SPRAY APPLIED FIRE PROOFING DISTURBED AND/OR DAMAGED DURING CONSTRUCTION.

2. THE INTEGRITY OF RELEVANT STRUCTURAL ELEMENTS SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT DEMOLITION.

1. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO

DEMOLITION.

STRUCTURAL

6. REMOVE DEAD END PIPING AND CONDUIT (FOR EXAMPLE: RISERS WITH NO FLOW, BRANCHES WITH NO FIXTURE). EMPTY

RISERS, MAINS, AND BRANCHES FOR FUTURE USE SHALL REMAIN.

5. VOIDS RESULTING FROM MPE DEMOLITION IN WALL, FLOOR, OR CEILING ASSEMBLIES TO REMAIN SHALL BE PATCHED WITH

SOLID MATERIALS MATCHING ADJACENT CONSTRUCTION.

4. REPAIR EXISTING PIPE AND DUCT INSULATION DAMAGED DURING DEMOLITION.

3. UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).

2. WHERE SMOKE DETECTORS AND/OR DAMPERS LOCATED IN RATED ASSEMBLIES TO REMAIN ARE REMOVED DURING DEMOLITION, NEW SMOKE DAMPERS AND/OR DETECTORS, INCLUDING ALL ELECTRICAL WIRING, SHALL BE RE-INSTALLED AT

NO COST.

1. COORDINATE REQUIRED SHUTDOWNS OF BUILDING SYSTEMS WITH THE COR. SHUTDOWNS SHALL BE DONE AT TIMES MOST CONVENIENT TO THE BUILDING OPERATION, SOME OF WHICH MAY BE DURING NIGHTS OR WEEKENDS. ALL SHUTDOWNS ARE TO BE SCHEDULED A MINIMUM TWO WEEKS IN ADVANCE. PROVIDE TEMPORARY SERVICES DURING INTERUPTIONSTOF

EXISTING UTILITIES.

MPE SYSTEMS

0 5' 10'

No. Date Description

Sheets
AD 01.01 - THIRD FLOOR DEMOLITION PLAN - OVERALL

File details come from the government source that posted it. Updated .