GI 03-02 - THIRD FLOOR ICRA PLAN.pdf
PDF 474 KB Posted
- Attached to
- Z2DA--626A4-19-101 - Renovate Ward 1B at the Alvin C. York VA Medical Center, Murfreesboro, TN 37129
- Solicitation number
- 36C24923R0114
About this file
This document package includes construction plans and specifications for renovating the third floor of Ward 1B at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee, as well as the related federal contract opportunity notice.
The construction plans detail requirements for infection control risk assessment measures, including installing temporary negative air pressure machines, barriers, and sticky mats. Products specified include metal stud and gypsum board partitions to create temporary barriers. The renovation work involves demolition, new construction, and finishing in patient care areas.
The federal contract opportunity is solicitation number 36C24923R0114 to perform the renovations. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. No pricing, response dates, or other contract award details are provided in the opportunity notice. The documents focus on outlining the construction requirements and scope of work rather than transactional aspects of the procurement.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEGATIVE AIR PRESSURE MACHINE NOTES:
1. PROVIDE A TEMPORARY NEGATIVE AIR MACHINE FOR CONSTRUCTION
AREA. MAINTAIN A NEGATIVE PRESSURE IN THE AREA RELATIVE TO THE
ADJACENT SPACES AT A MINIMUM OF -0.03" W.C. PROVIDE TEMPORARY
DUCT BARRIER PARTITIONS.
FAN CRITERIA:
MODEL: HEPA-AIRE PAS1200HC
CFM: 800 CFM
HP/V/P: .25/120/1
2. PROVIDE TEMPORARY EXHAUST FROM HEPA UNIT TO DISCHARGE OUT
EXISTING WINDOW, PROVIDE PLYWOOD OVER WINDOW OPENING WITH
OPENING AND DUCT COLLAR FOR CONNECTION TO FLEX DUCT FROM
NEGATIVE AIR MACHINE. PROVIDE WITH DISCONNECTIVE MEANS AND FAN
GUARDS. PROVIDE AS MANY TEMPORARY NEGATIVE AIR MACHINES AS
REQUIRED TO MAINTAIN MINIMUM NEGATIVE PRESSURE REQUIREMENT.
3. PROVIDE INCLINED MANOMETER GAGE WITH RANGE FROM 0.00" TO 0.1"
W.C. MAINTAIN A MINIMUM OF -0.03" W.C. IN CONSTRUCTION AREA.
REFERENCE FACILITY ICRA PLAN FOR ADDITIONAL INFORMATION.
12" METAL FLEX
DUCT (TYP.)
MANOMETER
(SEE NOTE 3) NEGATIVE AIR PRESSURE
MACHINE (SEE NOTE 1)
REMOVE EXISTING WINDOW
AND INSTALL TEMPORARY
PLYWOOD WITH OPENING AND
DUCT COLLAR FOR FLEX DUCT
CONNECTION. PROVIDE
WEATHER TIGHT SEAL.
DEMOLITION WORK SPACE OUTSIDE
DN DN
DN UP
02.06
02.06
02.04
02.07
02.07
02.07
02.07
02.06
02.06
02.04
TEMPORARY ICRA PARTITION
LINE OF ICRA BARRIER
TEMPORARY ICRA DOOR
ICRA PHASE CONSTRUCTION
PROTECTION ZONE
STICKY MAT
INTERIM EXIT EGRESS DURING CONSTRUCTION
4 7/8"
5/8" TYPE "X" GYPBOARD
3-5/8" METAL STUD @ 16" O.C.
(PLAN VIEW)
NOTE: TAPE AND
SECURE TO STRUCTURE
ABOVE
LEVEL
CONSTRUCTION ACTIVITY TYPES
CONSTRUCTION ACTIVITY TYPE
TYPE DTYPE CTYPE B
IC RISK
GROUP 4
ICRA MATRIX
GROUP 1
GROUP 2
GROUP 3
TYPE A
INFECTION CONTROL RISK LEVELS
GROUP 1 GROUP 3 GROUP 4
HIGHESTMEDIUM HIGHLOWEST MEDIUM
ICRA CLASSIFICATION SCHEDULEINFECTION CONTROL RISK ASSESSMENT (ICRA)
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE
WORK SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM, AND NEW CONSTRUCTION.
ANY WORK WHICH GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED
BUILDING COMPONENTS OR ASSEMBLIES.INCLUDES, BUT IS NOT LIMITED TO, SANDING OF WALL FOR PAINTING OR WALL COVERING, REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL
WORK ABOVE CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE
WORKSHIFT.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF
TELEPHONE AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED.
TYPE D
TYPE C
TYPE B
TYPE A
CLASS IVCLASS III/IVCLASS III/IVCLASS III
CLASS IVCLASS IIICLASS IICLASS I
CLASS I CLASS II CLASS II CLASS III/IV
CLASS IVCLASS III/IVCLASS IIICLASS I
INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT IS NOT LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING (BUT NOT SANDING) WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL
INSPECTION.
GROUP 2
PUBLIC BATHROOMS ROCP RECOVERY ROOMS
CONFERENCE ROOMS
TRANSPLANT CLINICEMERGENCY ROOMALL PATIENT CARE UNITSOFFICE AREAS
WAITING ROOMS RADIOLOGY AREAS SURGERY SUITES
WAITING ROOMS LABOR AND DELIVERY LABOR & DELIVERY ORs*
* DEPENDENT ON LOCATION
NURSERIES
DIALYSIS AND TRANSPLANTALL INTENSIVE CARE AREAS
CVICUPEDIATRICS
CARDIAC CATH / ANGIO
OUTPATIENT UNITSRIO SURGERY
PHYSICAL THERAPY TANK AREA HYPERBARIC MEDICINE
ONCOLOGY / BONE MARROW
ADMISSION / DISCHARGE AREA CARDIOLOGY
CAFETERIA ENDOSCOPY
NUCLEAR MEDICINE
PHARMACY
LABORATORIES
PHARMACY ADMIXTUREECHOCARDIOGRAPHY
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION
OPERATIONS.
2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION.
3. MINOR DEMOLITION FOR REMODELING.
CLASS I
CLASS II
CLASS III
CLASS IV
1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. WIPE SURFACES WITH DISINFECTANT.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
9. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR
WITH
MAGNEHELIC GAUGES.
5. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY
ENVIRONMENTAL
SERVICES DEPARTMENT.
6. VACUUM WORK WITH HEPA FILTERED VACUUMS.
7. WET MOP WITH DISINFECTANT.
8. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
10. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
11. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH
MAGNEHELIC GAUGES.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A
HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME
THEY LEAVE THE WORK SITE.
7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
8. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED BY THE
ENVIRONMENTAL
SERVICES DEPARTMENT AND RELEASED BY SAFETY AND INFECTION CONTROL.
9. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
10. WET MOP WITH DISINFECTANT.
11. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
13. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
14. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE CONSTRUCTION IS BEING DONE.
ALL WORK SHALL CONFORM WITH THE OWNER'S INFECTION CONTROL AND
CONSTRUCTION POLICIES, PROCESSES AND OWNER'S PROJECT-SPECIFIC
INFECTION CONTROL RISK ASSESSMENT PLAN.
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2019
TLC No.:
www.tlc-engineers.com
118626
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.
PROJECT TEAM:
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
KEYPLAN
MURFREESBORO, TN
615.370.8500
615.370.8530 hfrdesign.com
214 Centerview Drive Suite 300 Brentwood, TN 37027
BLDG 2
BLDG 1
BLDG 9
Phase
FULLY SPRINKLERED
C U s e rs \a tr a y lo r\ D o c u m e n ts
\M b o ro V
A W a rd b
R e n o a tr a y lo r2 X
N D
H .r v t
/1
/2
:2
:2
P
M
04-14-2023
626A4-19-101
GI 03.02
AE RENOVATE WARD 1BTHIRD FLOOR ICRA PLAN
AT
HFR Project No: 2019056
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
1 THIRD FLOOR ICRA PLAN
DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.
ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.
KEYNOTE SCHEDULE
02.04 TEMPORARY HARD PARTITION BARRIER
02.06 STICKY MAT
02.07 ICRA - ENTRY TO CONSTRUCTION ZONE: TAKE PRECAUTIONS TO SEAL AND SECURE DOOR
WHEN NOT ENTERING AND EXITING. KEEP DOOR CLOSED AT ALL TIMES. PLACE STICKY
MAT AT DOOR EXIT (CONSTRUCTION SIDE). IF EXISTING DOOR TO REMAIN IS BEING USED,
REPAIR AND FINISH IN ACCORDANCE WITH FINISH PLAN.
NOT TO SCALE
TEMP ICRA PARTITION
ICRA DESCRIPTION BY CLASS
3 ICRA NEGATIVE AIR MACHINE
0 5' 10'
10. ALL DEMOLITION, RENOVATION AND CONSTRUCTION AREAS ADJACENT TO OCCUPIED AREAS OR OTHERWISE CONNECTED TO OCCUPIED AREAS ARE TO BE MAINTAINED AT A RELATIVE NEGATIVE AIR PRESSURE SO AIRBORNE DUST, PARTICLES, FUMES, SMALLS, MOLD SPORES, ETC. DO NOT FLOW INTO OCCUPIED AREAS. NEGATIVE AIR PRESSURE SHALL BE MAINTAINED CONTINUOUS FROM BEGINNING OF DEMOLITION, RENOVATION AND CONSTRUCTION UNTIL COMPLETION OF WORK AND FINAL CLEANING.
NEGATIVE PRESSURE IS NOT TO BE SHUT OFF DURING NON-WORKING HOURS. NEGATIVE AIR PRESSURE MACHINES ARE NOT TO BE SHUT OFF FOR MAINTENANCE OR OTHER REASONS UNTIL A REPLACEMENT
MACHINE IS RUNNING TO ALLOW A QUICK SWITCH OVER.
9. DUST BARRIERS BETWEEN DEMOLITION / CONSTRUCTION ZONE AND OCCUPIED AREAS ARE TO EXTEND
ABOVE CEILING AND SEALED TO UNDERSIDE OF STRUCTURE ABOVE. RESULTING TEMPORARY
CONSTRUCTION SHALL MEET 1HR FIRE BARRIER REQUIREMENTS U.N.O.
8. PROVIDE STICKY MATS AT ALL CONSTRUCTION ENTRANCES AND REPLACE ON REGULAR BASIS TO
ENSURE DEBRIS IS NOT TRANSFERRED FROM CONSTRUCTION SIDE OF BARRIER TO CLEAN
(NON-CONSTRUCTION) SIDE OF BARRIER.
7. SITE SHALL BE INSPECTED BY OWNER'S INFECTION CONTROL OFFICER UPON COMPLETION OF
BARRIERS AND PRIOR TO START OF CONSTRUCTION.
6. PROVIDE REQUIRED TEMPORARY DUST BARRIERS, BARRICADES, INFECTION CONTROL MEASURES PER
THE COMPLETED RISK ASSESSMENT, ETC. TO PROTECT PERSONNEL AND ADJACENT SPACES.
5. WET MOP WORK AREA THOROUGHLY WITH DISINFECTANT UPON COMPLETION OF PROJECT.
4. INSTALL HEPA FILTERED NEGATIVE AIR MACHINE TO RUN 24 HOURS PER DAY UNTIL CONSTRUCTION IS
COMPLETED.
3. CONSTRUCTION DEBRIS SHALL BE TRANSPORTED IN A WHEELED TILT TRUCK WITH DOME LID AT A MIN.
2. AIR QUALITY MONITOR TESTING SHALL BE PERFORMED BEFORE THE START OF CONSTRUCTION, PERIODICALLY DURING THE CONSTRUCTION PROCESS, AND AT COMPLETION OF CONSTRUCTION.
1. REFER TO INFECTION CONTROL RISK ASSESSMENT PERFORMED BY FACILITIES INFECTION CONTROL
OFFICER FOR SPECIFIC ICRA LEVEL & REQUIREMENTS
GENERAL ICRA NOTES
No. Date Description
| Sheets |
| AD 01.01 - THIRD FLOOR DEMOLITION PLAN - OVERALL |
| AE 01.00 - SECOND FLOOR PLAN AND REFLECTED CEILING PLAN |
| AE 01.01 - FOURTH FLOOR/ATTIC PLAN |
| AE 01.03 - THIRD FLOOR OVERALL PLAN |
| AE 01.11 - PARTIAL THIRD FLOOR PLAN - PART A NOTED |
| AE 01.12 - PARTIAL THIRD FLOOR PLAN - PART B NOTED |
| AE 01.13 - PARTIAL THIRD FLOOR PLAN - PART C NOTED |
| AE 01.14 - PARTIAL THIRD FLOOR PLAN - PART A DIMENSIONED |
| AE 01.15 - PARTIAL THIRD FLOOR PLAN - PART B DIMENSIONED |
| AE 01.16 - PARTIAL THIRD FLOOR PLAN - PART C DIMENSIONED |
| AE 02.01 - ENLARGED PLANS AND REFLECTED CEILING PLANS |
| AE 02.02 - ENLARGED PLANS AND REFLECTED CEILING PLANS |
| AE 02.03 - ENLARGED TOILET PLANS AND ELEVATIONS |
| AE 03.01 - DOOR ELEVATIONS, SCHEDULE, & NOTES |
| AE 03.02 - DOOR DETAILS |
| AE 03.03 - WINDOW DETAILS |
| AE 08.01 - MISC. DETAILS |
| AE 08.02 - MISC. DETAILS |
| AE 08.03 - MISC. DETAILS |
| AE 08.04 - MISC. DETAILS |
| AE 08.05 - MISC. INTERIOR DETAILS |
| AE 08.06 - MISC CEILING DETAILS |
| AE 09.01 - INTERIOR ELEVATIONS |
| AE 09.02 - INTERIOR ELEVATIONS |
| AE 09.03 - CORRIDOR ELEVATIONS |
| AE 09.04 - CORRIDOR ELEVATIONS |
| AE 09.05 - 3D VIEWS |
| AE 10.01 - CASEWORK SECTIONS AND DETAILS |
| AE 10.02 - CASEWORK SECTIONS AND DETAILS |
| AE 11.01 - THIRD FLOOR REFLECTED CEILING PLAN - OVERALL |
| AE 11.10 - THIRD FLOOR RCP - PART A |
| AE 11.11 - THIRD FLOOR RCP - PART B |
| AE 11.12 - THIRD FLOOR RCP - PART C |
| AE 12.01A - EQUIPMENT PLANS |
| AE 12.01B - EQUIPMENT PLANS |
| AE 12.01C - EQUIPMENT PLANS |
| AE 12.02 - EQUIPMENT PLANS - PATIENT ROOMS AREA B |
| AE 12.02B - EQUIPMENT PLANS - PATIENT ROOMS AREA C |
| GI 00.01 - COVER SHEET |
| GI 01.01 - GENERAL DATA |
| GI 01.02 - CONSTRUCTION STAGING PLAN |
| GI 01.10 - WALL TYPE DETAILS |
| GI 01.20 - ACCESSIBILITY DETAILS |
| GI 02.01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL |
| GI 03.01 - SECOND FLOOR ICRA PLAN |
| GI 03.02 - THIRD FLOOR ICRA PLAN |
| GI 04.01 - ACM DUCT WORK AND ACM PIPE INSULATION |
| GI 04.02 - LEAD PAINT AND TRANSITE PANELS |
| GI 05.01 - PHASING PLANS |
| IN 01.00 - THIRD FLOOR FINISH LEGEND |
| IN 01.02 - PARTIAL THIRD FLOOR FINISH PLAN - PART A |
| IN 01.03 - PARTIAL THIRD FLOOR FINISH PLAN - PART B |
| IN 01.04 - PARTIAL THIRD FLOOR FINISH PLAN - PART C |
| IN 01.05 - THIRD FLOOR PATTERN PLAN OVERALL |
| IN 01.06 - PARTIAL THIRD FLOOR PATTERN - PART A |
| IN 01.07 - PARTIAL THIRD FLOOR PATTERN - PART B |
| IN 01.08 - PARTIAL THIRD FLOOR PATTERN - PART C |
| IN 02.00 - THIRD FLOOR SIGNAGE LEGEND |
| IN 02.01 - THIRD FLOOR SIGNAGE SCHEDULE |
| IN 02.02 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART A |
| IN 02.03 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART B |
| IN 02.04 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART C |
| VN 01.00 - PATIENT LIFT VENDOR DRAWINGS |
File details come from the government source that posted it. Updated .