Attachment_4_Pricing_Matrix_10Feb23-PROTECTED_Rev2.xlsx
XLSX spreadsheet 55 KB Posted
- Attached to
- T-6A Avionics Replacement Program Federal contract opportunity
- Solicitation number
- FA8106-23-R-0001
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Calculation Methodology T-6A Avionics Replacement Program (ARP)
| BASIC | |||
| CLIN | Description | Calculation Methodology | |
| 0001 | Technology Maturation Risk Reduction (TMRR) 1: Aircraft System Functional Review (SFR) | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for these CLINs. | |
| 0002 | Software Development Kit | ||
| 0003 | TMRR 2: Aircraft Preliminary Design Review (PDR) | ||
| 0004 | Virtual Prototype Delivery (Aircraft System) | Not Evaluated | |
| 0005 | Aircraft Delivery Incentives, Preliminary Design Review (PDR) | Not Evaluated | |
| 0006 | Software - Virtual Crew Station | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for these CLINs. | |
| 0007 | Aircraft Training Devices (ATD) TMRR | ||
| 0008 | ATD Delivery Incentives, Preliminary Design Review (PDR) | Not Evaluated | |
| 0009 | Virtual Prototype Delivery (ATD) | Not Evaluated | |
| 0010 | Long Lead Parts/Material - Production Lot 1 (Insert Total Prices from Tab CLIN 0010 Long Lead Prod Lot 1) | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for these CLINs. | |
| 0011 | Engineering and Manufacturing Development (EMD) 1: Critical Design Review (CDR) and Integration Testing (Aircraft) | ||
| 0012 | Avionics System Integration Lab (ASIL) Software Package | ||
| 0013 | Physical Prototype and PT-406 Mock-up Delivery (Aircraft) | Not Evaluated | |
| 0014 | Aircraft Delivery Incentives, Critical Design Review (CDR) | Not Evaluated | |
| 0015 | Avionics System Integration Lab (ASIL) Delivery and Government Acceptance Support (Aircraft) | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for these CLINs. | |
| 0016 | EMD 2: Aircraft Installations and Contractor Testing, Development/Operational Testing Support and Program Systems Model Delivery | ||
| 0017 | Kit Proof, Val/Ver, & Spare Kit Buy (Aircraft) | ||
| 0018 | Aircraft Delivery Incentives, Technical Readiness Review (TRR) | Not Evaluated | |
| 0019 | ATD Engineering and Manufacturing Development (EMD) | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for these CLINs/SubCLINs. | |
| 0020 | Physical Prototype, Cadre, & Spare Kit Buy (ATD) | ||
| 0020AA | Physical Prototype Kit Buy (ATD) | ||
| 0020AB | Cadre & Spare Kit Buy (ATD) | ||
| 0021 | ATD Delivery Incentives, Critical Design Review (CDR) | Not Evaluated | |
| 0022 | Aircraft Production Kit Buy | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for these CLINs. | |
| 0023 | ATD Production Kit Buy | ||
| 0024 | Aircraft Production Kit Installation | ||
| 0025 | ATD Production Kit Installation | ||
| 0026 | Travel G&A (See Note 1 Below) | The proposed travel G&A rate per Ordering Period is multiplied by the Evaluation Travel Dollars per Ordering Period to establish the extended price for this CLIN. | |
| 0027 | Software - Ground Support Maintenance Computer | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for this CLIN. | |
| 0028 | Data (Contract Data Requirements List) | ||
| 0028AA | CDRL A018 System Engineering Management Plan (SEMP) | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for these SubCLINs. | |
| 0028AB | CDRL A019 System/Subsystem Specification (SSS) | ||
| 0028AC | CDRL A023 Airworthiness Specification, Certification Basis | ||
| 0028AD | CDRL A035 Technical Data Package (TDP) | ||
| 0028AE | CDRL A049 Management Plan, Airworthiness | ||
| 0028AF | CDRL A051 Commercial Derivative Aircraft (CDS) Airworthiness Certification | ||
| 0028AG | CDRL A052 Airworthiness Certification Criteria Report, Compliance Report | ||
| 0028AH | CDRL A060 Spectrum Certification Spectral Characteristics Data | ||
| 0028AJ | CDRL A087 Digital System Model | ||
| 00328AK | CDRL A088 Acquisition and Sustainment Data Package (ASDP) Product Engineering Design Data and Associated Lists (EDDAL) | ||
| 0028AL | CDRL A089 Reliability and Maintainability (R&M) Block Diagrams and Mathematical Models Report | ||
| 0028AM | CDRL A091 Reliability and Maintainability Predictions Report | ||
| 0028AN | CDRL A093 Technical Report – Study/Services, Primary Flight Reference (PFR) Endorsement – Display Information Package | ||
| 0028AP | CDRL A097 Open Systems Management Plan (OSMP). | ||
| 0028AQ | CDRL A101 As Built Configuration List (ABCL) Bill of Material (BOM) List | ||
| 0028AR | CDRL A105 Human Systems Integration Report | ||
| 0028AS | CDRL A108 Training Materials | ||
| 0028AT | CDRL A109 Department of Defense (DOD) Modeling and Simulation (M&S) Verification and Validation (V&V) Plan | ||
| 0028AU | CDRL A110 Department of Defense (DOD) Modeling and Simulation (M&S) Verification and Validation (V&V) Report | ||
| 0028AV | CDRL A117 Technical Manual Contract Requirements (TMCR) | ||
| 0029 | Engineering Change Orders (ECO) - Engineering Labor Rate (See Note 2 Below) | The proposed Hourly Labor Rate per Ordering Period is multiplied by the Evaluation Labor Dollars per Ordering Period as applicable to establish the extended price for this CLIN. | |
| 0030 | Shipping & Transportation PT-406 & Unit Training Devices (UTD) 003 (G&A Rate) (See Note 1 Below) | The proposed Shipping/Transportation G&A Rate per Ordering Period is multiplied by the Evaluation Shipping/Transportation Dollars per Ordering Period as applicable to establish the extended price for this CLIN. | |
| 0031 | Modification PT-406 | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for these CLINs. | |
| 0032 | Aircraft Spare Kits | ||
| 0033 | ATD Spare Kits | ||
| 0036 | Over & Above - Parts & Materials - Material Handling Rate | ||
| (See Note 1 below) | The proposed Material Handling Rate per Ordering Period is multiplied by the Material Handling Dollars per Ordering Period as applicable to establish the extended price for this CLIN. | ||
| 0037 | Over & Above - Labor Rates | The proposed Hourly Labor Rate per Ordering Period is multiplied by the Evaluation Labor Dollars per Ordering Period as applicable to establish the extended price for this CLIN. | |
| Engineering Fixed Hourly Rate (See Note 2 below) | |||
| Engineering Overtime Rate (See Note 2 below) | |||
| Tech Repair Fixed Hourly Rate (See Note 2 below) | |||
| Tech Repair Overtime Rate (See Note 2 below) | |||
| TOTAL PRICE BASIC PERIOD | The extended total of the CLINs/SubCLINs listed above equals the total price for the Basic Period for all ordering periods. |
| OPTION I | ||
| CLIN | Description | Calculation Methodology |
| 1022 | Aircraft Production Kit Buy | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for these CLINs. |
| 1023 | ATD Production Kit Buy | |
| 1024 | Aircraft Production Kit Installation | |
| 1025 | ATD Production Kit Installation | |
| 1026 | Travel G&A (See Note 1 Below) | The proposed travel G&A rate per Ordering Period is multiplied by the Evaluation Travel Dollars per Ordering Period to establish the extended price for this CLIN. |
| 1028 | Data (Contract Data Requirements List) | |
| 1028AB | CDRL A019 System/Subsystem Specification (SSS) | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for these SubCLINs. |
| 1028AV | CDRL A117 Technical Manual Contract Requirements (TMCR) | |
| 1029 | Engineering Change Orders (ECO) - Engineering Labor Rate (See Note 2 Below) | The proposed Hourly Labor Rate per Ordering Period is multiplied by the Evaluation Labor Dollars per Ordering Period as applicable to establish the extended price for this CLIN. |
| 1030 | Shipping & Transportation (G&A Rate) (See Note 1 Below) | The proposed Shipping/Transportation G&A Rate per Ordering Period is multiplied by the Evaluation Shipping/Transportation Dollars per Ordering Period as applicable to establish the extended price for this CLIN. |
| 1032 | Aircraft Spare Kits | The proposed unit price per Ordering Period is multiplied by the evaluation quantity per Ordering Period as applicable to establish the extended price for this CLIN. |
| 1033 | ATD Spare Kits | |
| 1034 | ATD Egress Procedure Trainers (EPT) / Ejection Seat Trainers (EST) Kits | |
| 1035 | ATD EPT/EST Kits Installation | |
| 1036 | Over & Above - Parts & Materials - Material Handling Rate | The proposed Material Handling Rate per Ordering Period is multiplied by the Material Handling Dollars per Ordering Period as applicable to establish the extended price for this CLIN. |
| 1037 | Over & Above - Labor Rates | The proposed Hourly Labor Rate per Ordering Period is multiplied by the Evaluation Labor Dollars per Ordering Period as applicable to establish the extended price for this CLIN. |
| Engineering Fixed Hourly Rate (See Note 2 below) | ||
| Engineering Overtime Rate (See Note 2 below) | ||
| Tech Repair Fixed Hourly Rate (See Note 2 below) | ||
| Tech Repair Overtime Rate (See Note 2 below) | ||
| TOTAL OPTION I AND 6 MONTH EXTENSION | The extended total of the CLINs/SubCLINs listed in Option I above equals the total price for Option I for all ordering periods to include the 6 month extension as applicable. |
TOTAL EVALUATED PRICE (TEP) The sum of all CLINs/SubCLINs listed above for the Basic, Option I, and the 6 month extension equals the Total Evaluated Price.
RFP FA8106-23-R-0001 ATTACHMENT 4
| &A | SOURCE SELECTION INFORMATION |
| SEE FAR 2.101 & 3.104 | &P |
T-6A ARP Pricing Matrix Instructions: Input proposed unit prices and rates in the yellow highlighted cells (Columns E-H). The Pricing Matrix must be completely filled out to be acceptable. Any proposed zero dollars or zero rates must be fully explained in the Price Volume. The proposed pricing for the 6 month extension (Column I) shall equal the proposed price in Option I Period 4 (Column H).
| Offeror: | Insert Offeror Name | Note: The quantities listed below are Best Estimated Quantities (BEQs) for evaluation purposes only. The Government has provided quantities in the optimal years based on the expected schedule. However, for some CLINs the total evaluation quantity may exceed the BEQ to ensure a price is proposed in all years for evaluation purposes and in case the expected schedule should change. | ||||||||||||||||||||||
| Date: | Insert Date | |||||||||||||||||||||||
| Reference RFP FA8106-23-R-0001 CLIN Description for BEQ totals. | ||||||||||||||||||||||||
| PRICING MATRIX FINAL 10 FEB 2023 (Revised) | ||||||||||||||||||||||||
| Proposed Unit Prices | Evaluation - Best Estimated Quantity (BEQ) | Extended Totals | ||||||||||||||||||||||
| T-6A Avionics Replacement Program (ARP) | Basic Period 1 | Basic Period 2 | Basic Period 3 | Basic Period 4 | Basic Period 1 | Basic Period 2 | Basic Period 3 | Basic Period 4 | Basic Period 1 | Basic Period 2 | Basic Period 3 | Basic Period 4 | Total Evaluated Price | |||||||||||
| CLIN | Description | Contract Type | Unit of Issue | 2 Nov 23 - | ||||||||||||||||||||
| 1 Nov 24 | 2 Nov 24 - | |||||||||||||||||||||||
| 1 Nov 25 | 2 Nov 25 - | |||||||||||||||||||||||
| 1 Nov 26 | 2 Nov 26 - | |||||||||||||||||||||||
| 1 Nov 27 | 2 Nov 23 - | |||||||||||||||||||||||
| 1 Nov 24 | 2 Nov 24 - | |||||||||||||||||||||||
| 1 Nov 25 | 2 Nov 25 - | |||||||||||||||||||||||
| 1 Nov 26 | 2 Nov 26 - | |||||||||||||||||||||||
| 1 Nov 27 | 2 Nov 23 - | |||||||||||||||||||||||
| 1 Nov 24 | 2 Nov 24 - | |||||||||||||||||||||||
| 1 Nov 25 | 2 Nov 25 - | |||||||||||||||||||||||
| 1 Nov 26 | 2 Nov 26 - | |||||||||||||||||||||||
| 1 Nov 27 | CLIN | |||||||||||||||||||||||
| 0001 | Technology Maturation Risk Reduction (TMRR) 1: Aircraft System Functional Review (SFR) | FFP | EA | 1 | $ - 0 | $ - 0 | 0001 | |||||||||||||||||
| 0002 | Software Development Kit | FFP | EA | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | 0002 | |||||||||||||||
| 0003 | TMRR 2: Aircraft Preliminary Design Review (PDR) | FFP | EA | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | 0003 | |||||||||||||||
| 0004 | Virtual Prototype Delivery (Aircraft System) | NSP | 0004 | |||||||||||||||||||||
| 0005 | Aircraft Delivery Incentives, Preliminary Design Review (PDR) | FFP | 0005 | |||||||||||||||||||||
| 0006 | Software - Virtual Crew Station | FFP | EA | 8 | 8 | $ - 0 | $ - 0 | $ - 0 | 0006 | |||||||||||||||
| 0007 | Aircraft Training Devices (ATD) TMRR | FFP | EA | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0007 | |||||||||||||
| 0008 | ATD Delivery Incentives, Preliminary Design Review (PDR) | FFP | 0008 | |||||||||||||||||||||
| 0009 | Virtual Prototype Delivery (ATD) | NSP | 0009 | |||||||||||||||||||||
| 0010 | Long Lead Parts/Material - Production Lot 1 (Insert Total Prices from Tab CLIN 0010 Long Lead Prod Lot 1) | FFP | LO | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | 0010 | |||||||||||||||
| 0011 | Engineering and Manufacturing Development (EMD) 1: Critical Design Review (CDR) and Integration Testing (Aircraft) | FFP | EA | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0011 | |||||||||||||
| 0012 | Avionics System Integration Lab (ASIL) Software Package | FFP | EA | 2 | 2 | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0012 | |||||||||||||
| 0013 | Physical Prototype and PT-406 Mock-up Delivery (Aircraft) | NSP | 0013 | |||||||||||||||||||||
| 0014 | Aircraft Delivery Incentives, Critical Design Review (CDR) | FFP | 0014 | |||||||||||||||||||||
| 0015 | Avionics System Integration Lab (ASIL) Delivery and Government Acceptance Support (Aircraft) | FFP | EA | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0015 | |||||||||||||
| 0016 | EMD 2: Aircraft Installations and Contractor Testing, Development/Operational Testing Support and Program Systems Model Delivery | FFP | EA | 1 | 1 | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0016 | ||||||||||
| 0017 | Kit Proof, Val/Ver, & Spare Kit Buy (Aircraft) | FFP | EA | 3 | 3 | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0017 | |||||||||||||
| 0018 | Aircraft Delivery Incentives, Technical Readiness Review (TRR) | FFP | 0018 | |||||||||||||||||||||
| 0019 | ATD Engineering and Manufacturing Development (EMD) | FFP | EA | 1 | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0019 | |||||||||||
| 0020 | Physical Prototype, Cadre, & Spare Kit Buy (ATD) | 0020 | ||||||||||||||||||||||
| 0020AA | Physical Prototype Kit Buy (ATD) | FFP | EA | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0020AA | |||||||||||||
| 0020AB | Cadre & Spare Kit Buy (ATD) | FFP | EA | 2 | 2 | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0020AB | |||||||||||||
| 0021 | ATD Delivery Incentives, Critical Design Review (CDR) | FFP | 0021 | |||||||||||||||||||||
| 0022 | Aircraft Production Kit Buy | FFP | EA | 1 | 119 | 119 | 121 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0022 | ||||||||||||
| 0023 | ATD Production Kit Buy | FFP | EA | 20 | 20 | 20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0023 | |||||||||||||
| 0024 | Aircraft Production Kit Installation | FFP | EA | 1 | 106 | 106 | 124 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0024 | ||||||||||||
| 0025 | ATD Production Kit Installation | FFP | EA | 20 | 20 | 20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0025 | |||||||||||||
| 0026 | Travel G&A (See Note 1 Below) | FFP-TBN | % | $ 10,000 | $ 10,000 | $ 10,000 | $ 10,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0026 | |||||||||||
| 0027 | Software - Ground Support Maintenance Computer | FFP | EA | 100 | 100 | 100 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0027 | |||||||||||||
| 0028 | Data (Contract Data Requirements List) | 0028 | ||||||||||||||||||||||
| 0028AA | CDRL A018 System Engineering Management Plan (SEMP) | FFP | EA | 2 | 2 | 2 | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AA | |||||||||||
| 0028AB | CDRL A019 System/Subsystem Specification (SSS) | FFP | EA | 2 | 2 | 2 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AB | |||||||||||
| 0028AC | CDRL A023 Airworthiness Specification, Certification Basis | FFP | EA | 2 | 2 | $ - 0 | $ - 0 | $ - 0 | 0028AC | |||||||||||||||
| 0028AD | CDRL A035 Technical Data Package (TDP) | FFP | EA | 3 | 8 | 8 | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AD | |||||||||||
| 0028AE | CDRL A049 Management Plan, Airworthiness | FFP | EA | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | 0028AE | |||||||||||||||
| 0028AF | CDRL A051 Commercial Derivative Aircraft (CDS) Airworthiness Certification | FFP | EA | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AF | |||||||||||||
| 0028AG | CDRL A052 Airworthiness Certification Criteria Report, Compliance Report | FFP | EA | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AG | |||||||||||||
| 0028AH | CDRL A060 Spectrum Certification Spectral Characteristics Data | FFP | EA | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | 0028AH | |||||||||||||||
| 0028AJ | CDRL A087 Digital System Model | FFP | EA | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AJ | |||||||||||||
| 00328AK | CDRL A088 Acquisition and Sustainment Data Package (ASDP) Product Engineering Design Data and Associated Lists (EDDAL) | FFP | EA | 2 | 2 | 2 | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 00328AK | |||||||||||
| 0028AL | CDRL A089 Reliability and Maintainability (R&M) Block Diagrams and Mathematical Models Report | FFP | EA | 2 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AL | |||||||||||||
| 0028AM | CDRL A091 Reliability and Maintainability Predictions Report | FFP | EA | 2 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AM | |||||||||||||
| 0028AN | CDRL A093 Technical Report – Study/Services, Primary Flight Reference (PFR) Endorsement – Display Information Package | FFP | EA | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AN | |||||||||||||
| 0028AP | CDRL A097 Open Systems Management Plan (OSMP). | FFP | EA | 1 | $ - 0 | $ - 0 | 0028AP | |||||||||||||||||
| 0028AQ | CDRL A101 As Built Configuration List (ABCL) Bill of Material (BOM) List | FFP | EA | 2 | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AQ | |||||||||||
| 0028AR | CDRL A105 Human Systems Integration Report | FFP | EA | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | 0028AR | |||||||||||||||
| 0028AS | CDRL A108 Training Materials | FFP | EA | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AS | |||||||||||||
| 0028AT | CDRL A109 Department of Defense (DOD) Modeling and Simulation (M&S) Verification and Validation (V&V) Plan | FFP | EA | 1 | $ - 0 | $ - 0 | 0028AT | |||||||||||||||||
| 0028AU | CDRL A110 Department of Defense (DOD) Modeling and Simulation (M&S) Verification and Validation (V&V) Report | FFP | EA | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | 0028AU | |||||||||||||||
| 0028AV | CDRL A117 Technical Manual Contract Requirements (TMCR) | FFP | EA | 1 | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0028AV | |||||||||||
| 0029 | Engineering Change Orders (ECO) - Engineering Labor Rate (See Note 2 Below) | FP | Hourly | 500 | 500 | 500 | 500 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0029 | |||||||||||
| 0030 | Shipping & Transportation PT-406 & Unit Training Devices (UTD) 003 (G&A Rate) (See Note 1 Below) | FP | % | $ 50,000 | $ 50,000 | $ 50,000 | $ 50,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0030 | |||||||||||
| 0031 | Modification PT-406 | FFP | EA | 1 | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0031 | |||||||||||
| 0032 | Aircraft Spare Kits | FFP | EA | 22 | 22 | $ - 0 | $ - 0 | $ - 0 | 0032 | |||||||||||||||
| 0033 | ATD Spare Kits | FFP | EA | 3 | 3 | $ - 0 | $ - 0 | $ - 0 | 0033 | |||||||||||||||
| 0036 | Over & Above - Parts & Materials - Material Handling Rate | |||||||||||||||||||||||
| (See Note 1 below) | FP | % | $ 20,000 | $ 20,000 | $ 20,000 | $ 20,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0036 | ||||||||||||
| 0037 | Over & Above - Labor Rates | 0037 | ||||||||||||||||||||||
| Engineering Fixed Hourly Rate (See Note 2 below) | FP | Hourly | 100 | 100 | 100 | 100 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0037 | ||||||||||||
| Engineering Overtime Rate (See Note 2 below) | FP | Hourly | 50 | 50 | 50 | 50 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0037 | ||||||||||||
| Tech Repair Fixed Hourly Rate (See Note 2 below) | FP | Hourly | 100 | 100 | 100 | 100 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0037 | ||||||||||||
| Tech Repair Overtime Rate (See Note 2 below) | FP | Hourly | 50 | 50 | 50 | 50 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0037 | ||||||||||||
| TOTAL PRICE BASIC PERIOD | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | crosscheck |
| Proposed Unit Prices | Evaluation - Best Estimated Quantity (BEQ) | Extended Totals | |||||||||||||||||||
| OPTION I | Option I Period 1 | Option I Period 2 | Option I Period 3 | Option I Period 4 | Six Month Extension | Option I Period 1 | Option I Period 2 | Option I Period 3 | Option I Period 4 | Six Month Extension | Option I Period 1 | Option I Period 2 | Option I Period 3 | Option I Period 4 | Six Month Extension | Total Evaluated Price | |||||
| CLIN | Description | Contract Type | Unit of Issue | 2 Nov 27 - 1 Nov 28 | 2 Nov 28 - 1 Nov 29 | 2 Nov 29 - 1 Nov 30 | 2 Nov 30 - 1 Nov 31 | 2 Nov 31 - 1 May 32 (See Note 3 Below) | 2 Nov 27 - 1 Nov 28 | 2 Nov 28 - 1 Nov 29 | 2 Nov 29 - 1 Nov 30 | 2 Nov 30 - 1 Nov 31 | 2 Nov 31 - 1 May 32 (See Note 3 Below) | 2 Nov 27 - 1 Nov 28 | 2 Nov 28 - 1 Nov 29 | 2 Nov 29 - 1 Nov 30 | 2 Nov 30 - 1 Nov 31 | 2 Nov 31 - 1 May 32 (See Note 3 Below) | CLIN | ||
| 1022 | Aircraft Production Kit Buy | FFP | EA | 124 | 120 | 82 | 82 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1022 | ||||||||
| 1023 | ATD Production Kit Buy | FFP | EA | 20 | 20 | 20 | 20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1023 | ||||||||
| 1024 | Aircraft Production Kit Installation | FFP | EA | 120 | 120 | 95 | 95 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1024 | ||||||||
| 1025 | ATD Production Kit Installation | FFP | EA | 20 | 20 | 20 | 20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1025 | ||||||||
| 1026 | Travel G&A (See Note 1 Below) | FP-TBN | % | 0.0000 | $ 10,000 | $ 10,000 | $ 10,000 | $ 10,000 | $ 5,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1026 | |||||
| 1028 | Data (Contract Data Requirements List) | NSP | 1028 | ||||||||||||||||||
| 1028AB | CDRL A019 System/Subsystem Specification (SSS) | FFP | EA | 2 | 2 | 2 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1028AB | ||||||||
| 1028AV | CDRL A117 Technical Manual Contract Requirements (TMCR) | FFP | EA | 1 | 1 | 1 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1028AV | ||||||||
| 1029 | Engineering Change Orders (ECO) - Engineering Labor Rate (See Note 2 Below) | FP | Hourly | $ - 0 | 500 | 500 | 500 | 500 | 250 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1029 | |||||
| 1030 | Shipping & Transportation (G&A Rate) (See Note 1 Below) | FP | % | 0.0000 | $ 50,000 | $ 50,000 | $ 50,000 | $ 50,000 | $ 25,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1030 | |||||
| 1032 | Aircraft Spare Kits | FFP | EA | 11 | 11 | 11 | 11 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1032 | ||||||||
| 1033 | ATD Spare Kits | FFP | EA | 2 | 2 | 2 | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1033 | ||||||||
| 1034 | ATD Egress Procedure Trainers (EPT) / Ejection Seat Trainers (EST) Kits | FFP | EA | 6 | 6 | 6 | 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1034 | ||||||||
| 1035 | ATD EPT/EST Kits Installation | FFP | EA | 6 | 6 | 6 | 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1035 | ||||||||
| 1036 | Over & Above - Parts & Materials - Material Handling Rate | FP | % | 0.0000 | $ 20,000 | $ 20,000 | $ 20,000 | $ 20,000 | $ 10,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1036 | |||||
| 1037 | Over & Above - Labor Rates | 1037 | |||||||||||||||||||
| Engineering Fixed Hourly Rate (See Note 2 below) | FP | Hourly | $ - 0 | 100 | 100 | 100 | 100 | 50 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1037 | ||||||
| Engineering Overtime Rate (See Note 2 below) | FP | Hourly | $ - 0 | 50 | 50 | 50 | 50 | 25 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1037 | ||||||
| Tech Repair Fixed Hourly Rate (See Note 2 below) | FP | Hourly | $ - 0 | 100 | 100 | 100 | 100 | 50 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1037 | ||||||
| Tech Repair Overtime Rate (See Note 2 below) | FP | Hourly | $ - 0 | 50 | 50 | 50 | 50 | 25 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1037 | ||||||
| TOTAL OPTION I AND 6 MONTH EXTENSION | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | crosscheck |
| Note 1: | All percentages (Travel G&A, Material Handling, and Shipping/Transportation G&A) shall be entered as 1 plus the percentage amount. For example 8.25% should be entered as 1.0825. | Total Price - Basic Period | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | crosscheck | ||
| Note 2: | All labor rates should be proposed sufficiently to ensure adequate coverage of all labor costs, all indirect costs, including G&A, COM, and so forth as well as prime and subcontractor profit in every contract out-year. | TOTAL OPTION I & 6 MO. EXT PRICE | Total Price Option I and 6 Month Extension | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | crosscheck |
| Note 3: | The proposed prices for the 6 month extension shall equal the proposed prices for Option I Period 4 as applicable. | TOTAL EVALUATED PRICE (TEP) | $ - 0 |
$ - 0 crosscheck
RFP FA8106-23-R-0001 &"-,Bold"&UT-6A ARP ATTACHMENT 4
| &A | SOURCE SELECTION INFORMATION |
| SEE FAR 2.101 & 3.104 | &P |
CLIN 0010 Long Lead Prod Lot 1
| Offeror: | Insert Offeror Name | PRICING MATRIX FINAL 10 FEB 2023 (Revised) |
| INSTRUCTIONS - Fill in the yellow highlighted cells as follows: | ||
| Insert Description of Long Lead Parts/Materials Production Lot 1 items in Column C, insert Proposed Unit Price for Basic Period 1 in Column E and Basic Period 2 in Column F; insert the Proposed Quantity for Basic Period 1 in Column H and Proposed Quantity for Basic Period 2 in Column I. There are pre-populated formulas in Columns K-L to calculate the extended totals for each item per Ordering Period (proposed unit price x proposed quantity). | ||
| The Total Price for the Basic Period 1 is calculated in Column K, Row 64 and Column L, Row 64 (this cell reference could change based on the number of items proposed and priced by the Offeror). |
Insert the Total Price for Basic Period 1 from Column K, Row 64 on the "T-6A ARP Pricing Matrix" Tab, Column E, Row 19.
Insert the Total Price for Basic Period 2 from Column L, Row 64 on the "T-6A ARP Pricing Matrix" Tab, Column F, Row 19.
| The dollar value proposed for CLIN 0010 shall not exceed $2M. Any long lead material over the dollar value of $2M shall be incorporated in the pricing for CLIN 0022. Material priced under CLIN 0010 shall not be duplicated in CLIN 0022. | ||||||||
| Provide the long lead parts/materials to support Production Lot 1 for the full contract IAW SOW Paragraph 4.11.1 Long Lead Procurement | Basic Period 1 | Basic Period 2 | Basic Period 1 | Basic Period 2 | Basic Period 1 | Basic Period 2 | ||
| 2 Nov 23 - | ||||||||
| 1 Nov 24 | 2 Nov 24 - | |||||||
| 1 Nov 25 | 2 Nov 23 - | |||||||
| 1 Nov 24 | 2 Nov 24 - | |||||||
| 1 Nov 25 | 2 Nov 23 - | |||||||
| 1 Nov 24 | 2 Nov 24 - |
1 Nov 25
| CLIN | Contract Type | Description | Unit of Issue | Proposed Unit Price | Proposed Unit Price | Proposed Quantity | Proposed Quantity | Extended Total | Extended Total | Total Price | |
| 0010 | FFP | Long Lead Parts/Material - Production Lot 1 | LO | ||||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| 0010 | FFP | $0.00 | $0.00 | $0.00 | |||||||
| Total CLIN 0010 Long Lead Parts/Materials Production Lot 1 | $ - 0 | $ - 0 | $0.00 | ||||||||
| $ - 0 | crosscheck |
FA8106-23-R-0001 &"-,Bold"&UT-6A ARP ATTACHMENT 4
| &A | SOURCE SELECTION INFORMATION |
| SEE FAR 2.101 & 3.104 | &P |
File details come from the government source that posted it. Updated .