FA810623R0001_______0003.pdf
PDF 24 KB Posted
- Attached to
- T-6A Avionics Replacement Program Federal contract opportunity
- Solicitation number
- FA8106-23-R-0001
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1
2. AMENDMENT/MODIFICATION NO.
FA8106-23-R-0001-0003
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFLCMC WLK
3001 STAFF DR STE 1AG1 104A
TINKER AFB OK 73145-3303
BUYER: Stephanie Tinnin/AFLCMC/WLK stephanie.tinnin.1@us.af.mil Phone: (405) 739- 3459
7. ADMINISTERED BY (If other than item 6) CODEFA8106
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA810623R0001
9B. DATED (SEE ITEM 11)
23-NOV-2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 22-FEB-2023 3:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Routine ISSUED PURSUANT TO SMALL BUSINESS COMPETITIVENESS DEMONSTRATION PROGRAM
The purpose of this amendment is to extend the proposal due date, correct the below CLINs required deliveries to align with the updated SOW schedule, incorporate Revision 1 of the CDRLs/DIDs, Revision 2 of the SOW, Revision 1 of the Incentive Plan, Revision 003 of the SRD, add Technical Manuals and drawings to the Bidder’s Library, incorporate Revision 1 of the PPI Tool Instructions, and move the CSDR Plan to Attachment 21.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to extend the proposal due date, correct the below CLINs required deliveries to align with the updated SOW schedule, incorporate Revision 1 of the CDRLs/DIDs, Revision 2 of the SOW, Revision 1 of the Incentive Plan, Revision 003 of the SRD, add Technical Manuals and drawings to the Bidder’s Library, incorporate Revision 1 of the PPI Tool Instructions, and move the CSDR Plan to Attachment 21.
FIRST: The proposal due date is hereby extended from 1 Feb 2023 at 3:00PM CST to 22 Feb 2023 at 3:00PM
CST.
SECOND: Section B, CLIN 0011 required delivery is hereby corrected as follows:
FROM: 197 Calendar Days ARO Funded task order or completion of PDR, whichever is later.
TO: 190 Calendar Days ARO Funded task order or completion of PDR, whichever is later.
THIRD: Section B, CLIN 0012 required delivery is hereby corrected as follows:
FROM: 197 Calendar Days ARO Funded task order or completion of PDR, whichever is later.
TO: 190 Calendar Days ARO Funded task order or completion of PDR, whichever is later.
FOURTH: Section J, Attachment 1 – CDRLs_DIDs_Rev1, dated 20 Jan 2023, hereby updates, and replaces Section J, Attachment 1 – CDRLs_DIDs, dated 8 Nov 2022. Revision 1 corrects the tailoring of CDRL A008, Integrated Program Management Data and Analysis Report.
FIFTH: Section J, Attachment 2 – SOW_Rev2, dated 19 Jan 2023, hereby updates, and replaces Section J, Attachment 2 – SOW_Rev1, dated 20 Dec 2022. The Revision Log on pages 6-7 of Attachment 2 – SOW_Rev2 summarizes updates to the SOW.
SIXTH: Section J, Attachment 3 – Incentive Plan_Rev1, dated 18 Jan 2023, hereby updates, and replaces Section J, Attachment 3 – Incentive Plan, dated 21 Oct 2022. The Revision Log on page 1 of Attachment 3 – Incentive Plan_Rev1 summarizes updates to the Incentive Plan.
SEVENTH: Section J, Attachment 8 – T-6A_ARP_SRD_Rev003, dated 19 Jan 2023, hereby updates, and replaces Section J, Attachment 8 – T-6A_ARP_SRD_Rev002b, dated 04 Oct 2022. The Revision Log on page 7 of Attachment 8 – T-6A_ARP_SRD_Rev003 summarizes updates to the T-6A ARP SRD.
EIGHTH: The documents below are hereby added to Section J, Attachment 17 – Bidders Library_Aircraft_ATD.
Document # Document Name Pages
00-5-1 AF Technical Order System 170
00-5-3 AF Technical Order Life Cycle Management 184
00-5-15 AF Time Compliance Technical Order Process 144
Amendment/Modification FA8106-23-R-0001-0003
00-25-06-2-1 Work Unit Code Manual 132
00-25-172 Ground Servicing of Aircraft and Static Grounding/Bonding 102
00-25-234
General Shop Practice Requirements for the Repair, Maintenance, and Test of Electrical Equipment 226
00-25-245 Testing and Inspection Procedures for Personnel Safety and Rescue Equipment 48
00-35D-54 USAF Deficiency Reporting, Investigation, and Resolution 106
00-85B-3 How to Package Air Force Spares 56
1-1-8 Application and Removal of Organic Coatings, Aerospace and Non-Aerospace Equipment 218
1-1-300 Maintenance Operational Checks and Check Flights 4
1-1-691 Cleaning and Corrosion Prevention and Control, Aerospace and Non-Aerospace Equipment 404
1-1B-50 Aircraft Weight and Balance 100
42C2-1-7
Electrodeposition of Metals and Metal Surface Treatments to Meet AF Maintenance Requirements 456
42E1-1-1 Identifying Technical Publication Sheet for Commercial Manual 444
NINTH: The documents below are hereby added to Section J, Attachment 18 – Bidders Library_Aircraft_CONTROLLED.
Document # Document Name Pages
133-5034_R11 ABOS - Automatic Backup Oxygen System 133-5034 7
Kit-133-5600 SureStream - OBOGS Concentrator 2
- SSC Model-Based Systems Engineering Style Guide 71
1T-6A-6CF-1
Acceptance and Functional Check Flight Procedures Manual 28
1T-6A-6CL-1 Acceptance and/or Functional Check Flight Checklist 36
1T-6ABD-2-8 Maintenance Manual Leveling and Weighing 32
1T-6ABD-2-12 Maintenance Manual Servicing 104
1T-6ABD-2-20 Maintenance Manual Standard Practices 112
1T-6ABD-2-25 Maintenance Manual Equipment and Furnishings 268
1T-6ABD-2-33 Maintenance Manual Lights 198
1T-6ABD-2-35 Maintenance Manual Oxygen 310
1T-6ABD-2-52 Maintenance Manual Doors 72
Amendment/Modification FA8106-23-R-0001-0003
1T-6ABD-2-53 Maintenance Manual Fuselage 102
1T-6ABD-2-71 Maintenance Manual Power Plant 478
1T-6ABD-2-73 Maintenance Manual Engine Fuel and Control 118
1T-6ABD-2-76 Maintenance Manual Engine Controls 118
1T-6ABD-2-78 Maintenance Manual Exhaust 18
1T-6ABD-2-79 Maintenance Manual Oil 144
1T-6ABD-5-2 Technical Manual Loading Data 32
1T-6ABD-23 Technical Manual Corrosion Control Manual 204
00-25-06-2-2 Work Unit Code Manual-Munitions, Test and General Support Equipment 210
8D2-1-31 Aircraft Storage Batteries (Lead Acid Batteries) 110
N710-100 N710 CSR Production Drawings 41
TENTH: Section J, Attachment 20 – PPI Tool Download Instructions_Rev1, dated 23 Jan 2023, hereby updates, and replaces Section J, Attachment 20 – PPI Tool Download Instructions, dated 20 Dec 2022. This revision administratively corrects fill-ins to the instructions.
ELEVENTH: Attachment 21 – DD2794 Avionics CSDR Plan, dated 21 Nov 2022, is hereby added to Section J. This document was previously located in Attachment 2 – SOW, Rev1, Appendix I.
TWELFTH: All other terms and conditions remain unchanged and in full force and effect.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) 1
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
Engineering and Manufacturing Development (EMD) 1: Aircraft Integration Testing and Critical Design Review (CDR) in accordance with SOW paragraph(s) 1.0, 1.1, 1.1.2, 1.1.2.1, 1.2, 2.0, 3.0, 3.1, 3.1.1, 3.1.2, 3.1.3, 3.2, 3.2.1, 3.2.2, 3.2.3, 3.2.4, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8, 3.9, 3.10, 3.11, 3.12, 3.13, 3.13.1, 3.14, 3.14.1, 3.14.4, 3.14.10, 3.14.11, 3.14.13, 3.14.14, 3.14.15, 3.14.16, 3.15, 3.16, 3.17, 3.18, 3.19, 3.20, 3.21, 4.1, 4.2, 4.3, 4.4, 4.5, 4.7, 4.8, 4.9, 4.10, 4.11, 4.12, 4.13, 4.14, 4.15, 4.16, 5.0, 5.1, 5.1.1, 5.1.2, 5.1.3, 5.1.4, 5.1.5, 5.1.6.2, 5.1.6.3, 5.1.10, 5.4, 5.8, 5.9, 5.10.1, 5.10.4, 5.11, 5.11.1, 5.11.2.2, 5.11.2.5, 5.11.2.6, 5.11.3, 5.11.4, 5.11.5, 5.12.1, 5.12.2, 5.12.3, 5.12.4.1, 5.12.5, 5.12.6, 5.12.6.1, 5.12.6.2, 5.13, 5.14, 5.15, 5.16, 5.16.1, 5.17, 6.4.1, 8.0, 9.0, 9.2, 9.3, 9.4, 10.0, 11.1, 11.2, 11.3, 11.4.1, 11.4.3, 12.0, 13.0, Appendix D, and Appendix E. This CLIN may be ordered in conjunction with CLINs 0012, 0013, 0014, and 0015.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) *ARO Funded task order or completion of PDR, whichever is later.
_ Req No / Pri
Required Period of Performance
1 EA *190 Calendar Days
Proposed Period of Performance
1 EA
AVIONICS SYSTEM INTEGRATION LAB (ASIL) SOFTWARE PACKAGE
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
AVIONICS SYSTEM INTEGRATION LAB (ASIL) SOFTWARE PACKAGE
Avionics System Integration Lab (ASIL) Software Package in accordance with SOW paragraph(s) 1.0, 1.1, 1.2, 2.0, 3.0, 3.1, 3.1.1, 3.1.2, 3.1.3, 3.2, 3.2.1, 3.2.2, 3.2.3, 3.2.4, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8, 3.9, 3.10, 3.11, 3.12, 3.13, 3.13.1, 3.14, 3.14.1, 3.14.3, 3.14.4, 3.14.10, 3.14.11, 3.14.13, 3.14.14, 3.14.15, 3.14.16, 3.15, 3.16, 3.17, 3.18, 3.19, 3.20, 3.21, 4.1, 4.2, 4.3, 4.4, 4.5, 4.7, 4.8, 4.9, 4.10, 4.11, 4.12, 4.13, 4.14, 4.15, 4.16, 5.0, 5.1, 5.1.1, 5.1.2, 5.1.3, 5.1.4, 5.1.5, 5.1.6.2, 5.1.6.3, 5.10.4, 5.11, 5.11.1, 5.11.3, 5.11.4, 5.12.2, 5.12.5, 5.12.6, 5.13, 5.14, 5.16, 5.16.1, 5.17, 6.4.1, 8.0, 9.3, 10.0, 12.0, 13.0, Appendix D, and Appendix E. This CLIN may be ordered in conjunction with CLIN 0011.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Buy American Act/Balance of Payments Program Type / Ship To Quantity (U/I) *ARO Funded task order or completion of
PDR.
_ Req No / Pri
Required Delivery
2 EA *190 Calendar Days
Proposed Delivery
2 EA
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages Attachment_1_CDRLs_DIDs_Rev1 20JAN2023 663
Attachment_2_SOW_Rev2 19JAN2023 202
Attachment_3_Incentive_Plan_Rev1 18JAN2023 9
Attachment_4_Pricing_Matrix_Rev1 13DEC2022 3
Attachment_5_GFP 01NOV2022 2
Attachment_6_Section_L_Rev1 20DEC2022 49
Attachment_7_Section_M_Rev1 13DEC2022 17
Attachment_8_T-6A_ARP_SRD_Rev003_CONTROL
LED
19JAN2023 83
Attachment_9_Section_L_EN_Tables_CONTROLLE D
07NOV2022 6
Attachment_10_PIPFS_CONTROLLED 13DEC2012 134
Attachment_11_ORD_CONTROLLED 07NOV2022 76
Attachment_12_HQ_AFFSA_White_Paper_CONTR
OLLED
24JUN2020 31
Attachment_13_Crew_Station_Working_Group_C harter_CONTROLLED
25AUG2021 18
Attachment_14_MIL-HDBK-516C_Airworthiness_C ertification_Criteria_v2_CONTROLLED
01JUN2022 5
Attachment_14a_MIL-HDBK-516CertBasisARP_Loc ked_CONTROLLED
01JUN2022 24
Attachment_15_SEP_CONTROLLED 26MAY2017 81
Attachment_16_GFI 09NOV2022 1
Attachment_17_Bidders_Library_Aircraft_ATD 24JAN2023 5338
Attachment_18_Bidders_Library_Aircraft_CONTRO
LLED
24JAN2023 10645
Attachment_19_Bidders_Library_ATD_CONTROLLE D
23NOV2022 1831
Attachment_20_PPI_Tool_Download_Instructions _Rev1
23JAN2023 1
Attachment_21_DD2794_Avionics_CSDR_Plan 21NOV2022 8
File details come from the government source that posted it. Updated .