Attachment_5_-_Cost_Breakdown_AF_Form_3052.xls

Air Force Form XLS spreadsheet 60 KB Posted

Attached to
Repair MFH Avenues F and G
Solicitation number
FA5575-15-B-0009
Issued by

About this file

Attachment 5 - Cost Breakdown AF Form 3052

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pages 1 - Penultimate

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICE
RPR MFH ROADS, F & G AVENUES / REPARAR VIALES DE VIVIENDAS FAMILIARES, AVENIDAS F Y G€
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 13-1001MORÓN AIR BASE, SPAIN
LINE
NO.ITEMUNIT OF
MEASUREMATERIAL COSTLABOR COSTSOTHER

DIRECT

COSTS LINE

TOTAL

QUANTITYUNITTOTALMANDAYSAVERAGE
RATETOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Pavement milling including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
3Grading of the surface of the aggregate base course.
Nivelación de la supericie de la capa base de zahorra.m2
4Placing and compaction to 98% Modified Proctor of graded-crushed aggregate at speed humps.
Extensión y compactación al 98% Proctor Modificado de zahorra en reductores trapezoidales de velocidad.m3
5Compaction of 15 cm of aggregate base course to 98% Modified Proctor.
Compactación de 15 cm de capa base de zahorra al 98% Proctor Modificado.m3
6Application of prime coat C50BF5 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C50BF5 IMP, incluyendo barrido y preparación de superficie.t
7Placing and compaction of 6 cm thick hot mix asphalt AC22 BIN 35/50 D type.
Extendido y compactación de 6 cm de espesor de asfalto en caliente tipo AC22 BIN 35/50 D.t
8Application of tack coat C60B4 ADH type.
Aplicación de riego de adherencia tipo C60B4 ADH.t
9Placing and compaction of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
10Joint sealing.
Sellado de juntas.m
11Installation of #120.5 hollow square steel section for speed hump drainage.
Instalación de perfil de acero hueco cuadrado #120.5 para drenaje de reductor trapezoidal de velocidad.kg
12Installation of P-20 and P-15a triangle traffic sign, 135 cm, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical triangular de tráfico P-20 y P-15a de 135 cm, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
13Installation of P-20 and P-15a triangle traffic sign, 90 cm, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical triangular de tráfico P-20 y P-15a de 90 cm, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
14Installation of R-301 circular traffic sign, 90 cm, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular de tráfico R-301 de 90 cm, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
15Installation of R-301 circular traffic sign, 60 cm, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical circular de tráfico R-301 de 60 cm, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
16Installation of S-13 traffic sign 90 x 90 cm, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical de tráfico S-13 de 90 x 90, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
17Installation of S-13 traffic sign 60 x 60 cm, retrorreflective, RA3 class and galvanized and painted post.
Instalación de señal vertical de tráfico S-13 de 60 x 60, retrorreflectiva, clase RA3 y poste galvanizado y pintado.u
18Painting of centerline marking, 10 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje, 10 cm, blanca. tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
19Painting of centerline marking, 15 cm white, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje, 15 cm, blanca, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
20Painting of centerline marking, 15 cm yellow, type II (RR), reflective, acrylic, including surface preparation and premarking.
Pintado de señal de eje, 15 cm, yellow, tipo II (RR), reflectante, acrilica, incluyendo preparación de superficie y premarcajem
Total

Total

TOTAL MATERIAL COSTS€
TOTAL LABOR COSTS€
TOTAL OTHER DIRECT COSTS€
TOTAL DIRECT COSTS€
OVERHEAD%€
SUBTOTAL€
PROFIT%€
TOTAL PRICE€
DATE:FIRM NAME:
TITLE:BY:
(Signature)

&R&"Times New Roman,Regular"Page &P of &N

Last Page

INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Col. 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col. 2 Units of Measure. Description of the unit in which each item is to be estimated (examples: square meters - m2, cubic meters - m3, linear meters - m, unit - u, kilograms - kg, ton - t).
Col. 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (Column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col. 4 and 5 Material Costs. Enter unit cost (Column 4) of the material to be supplied and total cost (Column 5) for item listed in Column 1. Cost must be in euros.
Col. 6, 7 and 8 Labor Costs. Enter in Column 6 the estimated number of mandays needed to perform the work listed in Column 1. Costs must be in euros.
Col. 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in Column 1) which are special to the contract and of significant euro value. Cost must be in euros.
Col 10 Line Total. Self-explanatory. Cost must be in euros.
NOTE: In addition to other totals derived on various pages, the grand total of Column 10, plus overhead and profit will be shown on the last page. Overhead and profit must be applied over the total direct cost.
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror may be required to submit a certificate of current cost or pricing data.
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer, or his authorized representative, upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

&R&"Times New Roman,Regular"Page 5 of 5

File details come from the government source that posted it. Updated .