06_-_AF_Form_3052_(Blank).xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Site Prep to Tension Fabric Structure Federal contract opportunity
Solicitation number
FA487719RA004
Issued by
Department of the Air Force Air Combat Command

About this file

AF Form 3052

View the file

Other files for this federal contract opportunity

Other files attached to Site Prep to Tension Fabric Structure, newest first.
File Type Posted
Site_Visit_Meeting_Minutes.pdf PDF
Solicitation_-_FA487719RA004.pdf PDF
Template_of_Contractor_EAL__2017.xls XLS spreadsheet
02_-_Project_Specifications.pdf PDF
Wage_Determination_AZ190018_4_Jan_19_AZ18.pdf PDF
01_-_Project_Drawings.pdf PDF
04_-_Schedule_of_Items_(Blank).docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Form 3052

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)Structural Support for Tension Fabric Structure AMARGPROPOSED TOTAL CONTRACT PRICE0
PURCHASE REQUEST NUMBERPROJECT NUMBERFBNV170507WORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1SUBTOTAL DIVISION 01 GENERAL CONDITIONS
2SUBTOTAL DIVISION 31 EARTHWORK
LINE TOTALS OVERALL
OVERHEAD TOTAL OVERALL (___%)
SUBTOTAL OVERALL W/ OVERHEAD
PROFIT TOTAL OVERALL (___%)
SUBTOTAL OVERALL W/ OVERHEAD AND PROFIT
TAX OVERALL ____%
BOND OVERALL (____)
TOTAL OVERALL PROJECT PRICE
DATE:FIRM NAME:
TITLE:BY:
DIVISION 01 GENERAL CONDITIONS
101 21 53.60 0140Security Factors, Physical Search at EntryLS
201 31 13.20 0200Project ManagerWk
301 31 13.20 0260SuperintendentWk
501 41 26.50 0020PermitsLS
60 45 23.50 4720Testing, Density & ClassificationEA
701 45 23.50 4735Testing, Soil Density, Sand Cone MethodEA
82 45 23.50 4740Testing, Moisture ContentEA
93 45 23.50 4750Mobilization/Demobilization - Equipment hauled on 20-ton capacity towed trailerEA
1001 45 23.50 4950Mobilization/Demobilization - Equipment hauled on 40-ton capacity towed trailerEA
1101 54 36.50 1300Mobilization/Demobilization - Equipment hauled on 50-ton capacity towed trailerEA
1201 56 26.50 0200Surveyor, 2 person crewDay
1301 71 23.13 1400Surveyor Stakes, 2" x 2" x 18" longC

SUBTOTAL DIVISION 01 GENERAL CONDITIONS 0.00 0.00 0.00 0.00 0.00

DIVISION 31 EARTHWORK
131 14 13.23 1420Topsoil, Remove and Stockpile on siteCY
231 22 13.20 0280Rough Grading, open sitesEA
331 22 16.10 0200Finish Grading, Foundation "Pads"SY
431 23 23.15 5070Excavating, ExcavatorBCY
531 23 16.50 0300Excavating, Front End LoaderBCY
631 23 23.17 0170Excavation, ScraperBCY
731 23 23.20 1052Spread fill, from stockpileLCY
831 23 23.23 5000Hauling, 12 CY Truck, 30 MPH avg, cycle 6 milesLCY
9Compaction, Vibrating rollerECY

SUBTOTAL DIVISION 31 EARTHWORK 0.00 0.00 0.00 0.00 0.00