Base Civil Engineering Work Clearance Request

View the file

Other versions and copies of AF Form 103

File Revision Posted Attached to
Attachment 3 AF Form 103 FA309925Q0006 Version 2.pdf Version 2 Tree Removal BPA
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf Aug 1, 1994 SABER IDIQ
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf Aug 1, 1994 SABER IDIQ
Attachment 3 AF Form 103.pdf Revision not stated Tree Trimming and Removal BPA
Appendix A - AF Form 103 - Work Clearance Request.pdf Revision not stated Right of Way Vegetation Clearing - Joint Base Charleston
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf Revision not stated Nellis AFB Paving IDIQ
Atch 47-AF Form 103 - Outage Request.pdf Revision not stated Nellis AFB Paving IDIQ
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf Revision not stated Nellis AFB Paving IDIQ
08 FA489725B0008 AF Form 103 Work Clearance Request.pdf Revision not stated Repair Building 1330 Main Sewage Line
13 AF Form 103 Work Clearance Request.pdf Revision not stated Construct T-1A Static Display
ATT 10_AF Form 103.pdf Same revision and size as this file Revision not stated Indefinite Delivery/Indefinite Quantity (IDIQ) Western-Range Operational Ordering Contract for Infrastructure Enhancement (WOOKIE) Multiple Award Construction Contract (MACC) at Vandenberg Space Force Base, California
SOW Attach 8 - AF Form 103.pdf Revision not stated Peterson SFB Bldg 3 Soil Erosion Repair
Attachment 24 AF FORM 103 Work Clearance.pdf Revision not stated Fiber Optic Cable Install - Qty 6
K. AF IMT 103 Base Civil Engineering Work Clearance Request.pdf Revision not stated Repair_Replace Liner, Wastewater Lagoon One
3ac. Appendix C - AF Form 103.pdf Same revision and size as this file Revision not stated Tree Removal and Trimming at Yokota and GSUs, Japan
Attachment 6 - Blank AF Form 103 Dig Permit.pdf Revision not stated Laughlin AFB Tree Removal Blanket Purchase Agreement
14. AF Form 103 Base Civil Engineering Work Clearance Request (2 pages) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Atch 22 APPENDIX 17 AF Form 103 Work Clearance Request.pdf Same revision and size as this file Revision not stated IDIQ Paving
Atch 34 AF Form 103 Base Civil Engineering Work Clearance Request.pdf Same revision and size as this file Revision not stated IDIQ Paving
Atch 21 APPENDIX 17 AF Form 103 Work Clearance Request Guidance.docx Revision not stated IDIQ Paving
Show all 20

Who attaches AF Form 103

Other files

File Type Posted
190918_Synopsis_of_Award.pdf PDF
FA309919RA0030001_SF_30.pdf PDF
Attendance_Sheet_Redacted.pdf PDF
T-1_Sunshade_Questions_and_Answers.docx DOCX document
Atch_1r_AF_Form_3952__ChemicalHazardous_Material_Request.pdf PDF
Atch_1b_Allied_Support_T-1_Sunshades_Project_Specifications.pdf PDF
05_LAFB_Asbestos_Management_and_Operation_Plan_(2019).pdf PDF
Atch_5_Past_Performance_Questionnaire.pdf PDF
MFR_Atch_1g_ASCE_Minimum_Design_Loads_for_Buildings_and_Other_Structures.pdf PDF
5. EM 385-1 U.S. Army Corps of Engineers Safety and Health Requirements Manual.pdf PDF
Atch_1a_Allied_Support_T-1_Sunshades_100__Design_Submittal.pdf PDF
Atch_1s_DD_1354,_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
02_Uniform_Hazardous_Waste_Manifest.pdf PDF
Solicitation_-_FA309919RA003.pdf PDF
Atch_1q_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
10._DD_1354.pdf PDF
9._FAR_52.236-21.pdf PDF
Atch_1l_UFC_3-535-01,_Visual_Air_Navigation_Facilities_13.zip ZIP file
Atch_1e_ETL_04_Standard_Airfield_Pavement_Marking_Schemes,_with_Change_2.pdf PDF
8._AETC_600.pdf PDF
08_Hazmat_Usage_Log.pdf PDF
7._AF_3065.pdf PDF
Atch_1j_AETC_Installation_Excellence_Guide.pdf PDF
Atch_1_Statement_of_Work.pdf PDF
Atch_1u_UFC_4-010-01,_DoD_Minimum_Antiterrorism_Standards_for_Buildings.pdf PDF
2._AF_3000_(Example).pdf PDF
Atch_6_Notification_of_Compliance_with_Contract_Insurance_Requirements.pdf PDF
Atch_1d_Security_Requirements_for_SOW.pdf PDF
Atch_1c_Allied_Support_T-1_Sunshades_Design_Report.pdf PDF
3._OSHA_29_CFR_1910.pdf PDF
06_TCEQ_Multi_Sector_General_Permit_(TXR050000).pdf PDF
Atch_1n_FAA_Form_7460-1_Notice_of_Construction_permit.pdf PDF
Atch_1m_AF_Form_103,_Work_Clearance_Request.pdf PDF
Atch_1h_UFC_3-310-04,_Seismic_Design_for_Buildings.pdf PDF
Atch_2_Wage_Determinatinon_TX20190186.pdf PDF
Atch_3_AETC_Form_47.pdf PDF
Atch_1t_FAR_52.246-21.pdf PDF
MFR__Environment_Requirements_Atch_07_LAFP_SWPPP.pdf PDF
Atch_1f_Fire_Hydrants_Picture.pdf PDF
Atch_4_Financial_Institution_Reference_Sheet.pdf PDF
04_TCEQ_Construction_General_Permit_(TXR150000).pdf PDF
Atch_1i_Federal_Specification_L-S-300C,_Sheeting_and_Tape,_Reflective_Non-exposed_Lens.pdf PDF
Atch_1o_LAFB_Environmental_Requirements_(CEIE).pdf PDF
Atch_1p_Division_01_Specifications.pdf PDF
01_AF_Form_3952_Chemical_Hazardous_Material_Request_Authorization_Form.pdf PDF
Atch 1l UFC 3-535-01, Visual Air Navigation Facilities 13.pdf PDF
Atch_1v_UFC_4-010-02,_DoD_Minimum_Antiterrorism_Standoff_Distances_forBuildings.pdf PDF
4._OSHA_29_CFR_1926.pdf PDF
6._FAR_52.236-15.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The document you are trying to load requires Adobe Reader 8 or higher. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader.

For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.com/go/pdf_forms_configure.

DATE PREPARED

BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST

(See Instructions on Reverse)

1. Clearance is requested to proceed with work at on Work Order No.

, Contract No.

, involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF FACILITY/WORK INVOLVED

G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW

A. PAVEMENTS

D. FIRE DETECTION & PROTECTION SYSTEMS

H. SECURITY

B. DRAINAGE SYSTEMS

E. UTILITY

OVERHEAD

UNDERGROUND

I. OTHER

C. RAILROAD TRACKS

F. COMM

OVERHEAD

UNDERGROUND

4. DATE OF CLEARANCE

3. DATE CLEARANCE REQUIRED

5. SIGNATURE OF REQUESTING OFFICIAL

6. TELEPHONE NO.

7. ORGANIZATION

REMARKS

(Use Reverse for additional comments)

REVIEWER'S NAME AND INITIALS

ORGANIZATION

8.

A. ELECTRICAL DISTRIBUTION

B A S

B. STEAM DISTRIBUTION

E

C. WATER DISTRIBUTION

C I

D. POL DISTRIBUTION

V I L

E. SEWER DISTRIBUTION

E N

F. ENVIRONMENTAL

G I

G. PAVEMENTS/ GROUNDS

N E E

H. FIRE PROTECTION

R I

I. ZONE

N G J. OTHER (Specify)

9. SECURITY POLICE

10. SAFETY

11. COMMUNICATIONS

12. BASE OPERATIONS

13. CABLE TV

14. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

15. OTHER (Specify)

APPROVED

DISAPPROVED

16. REQUESTED CLEARANCE

17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED

PREVIOUS EDITIONS ARE OBSOLETE.

AF IMT 103, 19940801, V3

Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign

INSTRUCTIONS

The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.

18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)

AF IMT 103, 19940801, V3

(REVERSE)

8.2.1.3158.1.475346.466429

HAS:
HASNOT:
APPRVD:
DAPPRVD:
Entery date as YYYYMMDD.:
LOCA:
WONO:
CTRNO:
ABC:
ABC_2:
ABC_3:
D:
E:
F:
OVHA:
OVHB:
UNDGA:
UNDGB:
GHI:
GHI_2:
GHI_3:
OTH:
Enter date as YYYYMMDD.:
ReqOffclSig:
TELE:
ORGN:
REMKA:
SIGNATURE1:
REMKA_2:
SIGNATURE2:
REMKA_3:
SIGNATURE3:
REMKA_4:
SIGNATURE4:
REMKA_5:
SIGNATURE5:
REMKA_6:
SIGNATURE6:
REMKA_7:
SIGNATURE7:
REMKA_8:
SIGNATURE8:
ZONE:
REMKB:
SIGNATURE9:
OTHB:
REMKC:
SIGNATURE10:
REMKD:
SIGNATURE11:
REMKD_2:
SIGNATURE12:
REMKD_3:
SIGNATURE13:
REMKD_4:
SIGNATURE14:
REMKD_5:
OTHC:
REMKE:
COMUTIL:
COMUTIL_2:
COMUTIL_3:
AppOffcrSig:
SIGNATURE16:
SIGNATUREfor13:
EF_1:
EF_2:
REMKSF:
SignatureStyle1:
SignatureStyle2:

File details come from the government source that posted it.