Atch_5_Past_Performance_Questionnaire.pdf

PDF 102 KB Posted

Attached to
T-1 Sunshades
Solicitation number
F2R3C18348AW01
Issued by

About this file

Past Performance Questionnaire

View the file

Other files

File Type Posted
190918_Synopsis_of_Award.pdf PDF
FA309919RA0030001_SF_30.pdf PDF
Attendance_Sheet_Redacted.pdf PDF
T-1_Sunshade_Questions_and_Answers.docx DOCX document
Atch_1r_AF_Form_3952__ChemicalHazardous_Material_Request.pdf PDF
Atch_1b_Allied_Support_T-1_Sunshades_Project_Specifications.pdf PDF
05_LAFB_Asbestos_Management_and_Operation_Plan_(2019).pdf PDF
MFR_Atch_1g_ASCE_Minimum_Design_Loads_for_Buildings_and_Other_Structures.pdf PDF
5. EM 385-1 U.S. Army Corps of Engineers Safety and Health Requirements Manual.pdf PDF
Atch_1a_Allied_Support_T-1_Sunshades_100__Design_Submittal.pdf PDF
Atch_1s_DD_1354,_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
02_Uniform_Hazardous_Waste_Manifest.pdf PDF
Solicitation_-_FA309919RA003.pdf PDF
Atch_1q_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
10._DD_1354.pdf PDF
9._FAR_52.236-21.pdf PDF
Atch_1l_UFC_3-535-01,_Visual_Air_Navigation_Facilities_13.zip ZIP file
Atch_1e_ETL_04_Standard_Airfield_Pavement_Marking_Schemes,_with_Change_2.pdf PDF
8._AETC_600.pdf PDF
08_Hazmat_Usage_Log.pdf PDF
7._AF_3065.pdf PDF
Atch_1j_AETC_Installation_Excellence_Guide.pdf PDF
Atch_1_Statement_of_Work.pdf PDF
Atch_1u_UFC_4-010-01,_DoD_Minimum_Antiterrorism_Standards_for_Buildings.pdf PDF
2._AF_3000_(Example).pdf PDF
Atch_6_Notification_of_Compliance_with_Contract_Insurance_Requirements.pdf PDF
Atch_1d_Security_Requirements_for_SOW.pdf PDF
Atch_1c_Allied_Support_T-1_Sunshades_Design_Report.pdf PDF
3._OSHA_29_CFR_1910.pdf PDF
06_TCEQ_Multi_Sector_General_Permit_(TXR050000).pdf PDF
03_AF_Form_103_Base_Civil_Engineering_Work_Clearance_Request.pdf PDF
Atch_1n_FAA_Form_7460-1_Notice_of_Construction_permit.pdf PDF
Atch_1m_AF_Form_103,_Work_Clearance_Request.pdf PDF
Atch_1h_UFC_3-310-04,_Seismic_Design_for_Buildings.pdf PDF
Atch_2_Wage_Determinatinon_TX20190186.pdf PDF
Atch_3_AETC_Form_47.pdf PDF
Atch_1t_FAR_52.246-21.pdf PDF
MFR__Environment_Requirements_Atch_07_LAFP_SWPPP.pdf PDF
Atch_1f_Fire_Hydrants_Picture.pdf PDF
Atch_4_Financial_Institution_Reference_Sheet.pdf PDF
04_TCEQ_Construction_General_Permit_(TXR150000).pdf PDF
Atch_1i_Federal_Specification_L-S-300C,_Sheeting_and_Tape,_Reflective_Non-exposed_Lens.pdf PDF
Atch_1o_LAFB_Environmental_Requirements_(CEIE).pdf PDF
Atch_1p_Division_01_Specifications.pdf PDF
01_AF_Form_3952_Chemical_Hazardous_Material_Request_Authorization_Form.pdf PDF
Atch 1l UFC 3-535-01, Visual Air Navigation Facilities 13.pdf PDF
Atch_1v_UFC_4-010-02,_DoD_Minimum_Antiterrorism_Standoff_Distances_forBuildings.pdf PDF
4._OSHA_29_CFR_1926.pdf PDF
6._FAR_52.236-15.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST/PRESENT PERFORMANCE QUESTIONNAIRE

SECTION A: CONTRACTOR INFORMATION

1. Contractor’s Name and Address:

2. Point of Contact:

3. Phone Number:

4. Contract Number: Contract Type:

5. Project Title:

6. Period of Performance:

SECTION B: RESPONDENT INFORMATION (To Be Completed By Evaluation Respondent)

1. Respondent’s Company Name & Address:

2. Respondent’s Name:

3. Phone Number: Fax Number:

E-Mail:

4. Contract Number: Contract Type:

5. Award Amount: Final Amount:

6. Project Title:

7. Period of Performance:

C. Email COMPLETED QUESTIONNAIRE FORM TO: SrA Gary J. Spillane at gary.spillane@us.af.mil or to Mr. Kurt C.

Armbruster at kurt.armbruster@us.af.mil.

THIS FORM MUST BE RETURNED NO LATER THAN: 25 July 2019 at 0730 Central Standard Time.

D. PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 6 that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 1 OR 2.

1 2 3 4 5 6 Unsatisfactory Marginal None Satisfactory Very Good Exceptional

Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.

Performance did not meet some contractual requirements.

There were problems, some of a serious nature, for which corrective action was only marginally effective.

No record of past performance or the record is inconclusive.

Performance met contract requirements.

There were some minor problems and corrective actions taken by the contractor were satisfactory.

Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems which the contractor resolved in a timely, effective manner.

Performance met all contract requirements and exceeded many to the government’s benefit. Problems, if any, were negligible and were resolved in a timely, highly effective manner

1. Developed realistic progress schedules and completed the project within 1 2 3 4 5 6 N/A the established schedule.

COMMENTS/REMARKS:________________________________________________________________________

2. Provided experienced superintendent, managers, and supervisors, with 1 2 3 4 5 6 N/A the technical and administrative abilities to meet requirements.

COMMENTS/REMARKS:________________________________________________________________________

3. Adequately controlled performance of subcontractors. 1 2 3 4 5 6 N/A COMMENTS/REMARKS:________________________________________________________________________

4. Provided effective quality control which resulted in a quality finished product. 1 2 3 4 5 6 N/A COMMENTS/REMARKS:________________________________________________________________________

5. Provided submittals in a timely manner. Submittals were 1 2 3 4 5 6 N/A well researched and clearly identified the proposed item.

COMMENTS/REMARKS:________________________________________________________________________

6. Identified problems as they occurred. Suggested approaches to resolving problems. 1 2 3 4 5 6 N/A Displayed initiative and cooperation in solving problems. Provided adequate information and pricing for change orders and negotiated them in good faith.

COMMENTS/REMARKS:________________________________________________________________________

7. Provided timely resolution of punch list items and closeout documentation. 1 2 3 4 5 6 N/A COMMENTS/REMARKS:________________________________________________________________________

8. Was the contractor assessed liquidated damages? YES NO (If Yes, briefly explain the circumstances)

9. Based on the contractor’s overall performance, would you rehire this contractor? YES NO

OVERALL PERFORMANCE RATING ___________________________________________________

Signature of Rater: ________________________________________________________ Date: ________________

File details come from the government source that posted it.