190918_Synopsis_of_Award.pdf

PDF 36 KB Posted

Attached to
T-1 Sunshades
Solicitation number
F2R3C18348AW01
Issued by

About this file

Synopsis of Award FA3099-19-RA003, Sunshades (T-1).

View the file

Other files

File Type Posted
FA309919RA0030001_SF_30.pdf PDF
Attendance_Sheet_Redacted.pdf PDF
T-1_Sunshade_Questions_and_Answers.docx DOCX document
Atch_1r_AF_Form_3952__ChemicalHazardous_Material_Request.pdf PDF
Atch_1b_Allied_Support_T-1_Sunshades_Project_Specifications.pdf PDF
05_LAFB_Asbestos_Management_and_Operation_Plan_(2019).pdf PDF
Atch_5_Past_Performance_Questionnaire.pdf PDF
MFR_Atch_1g_ASCE_Minimum_Design_Loads_for_Buildings_and_Other_Structures.pdf PDF
5. EM 385-1 U.S. Army Corps of Engineers Safety and Health Requirements Manual.pdf PDF
Atch_1a_Allied_Support_T-1_Sunshades_100__Design_Submittal.pdf PDF
Atch_1s_DD_1354,_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
02_Uniform_Hazardous_Waste_Manifest.pdf PDF
Solicitation_-_FA309919RA003.pdf PDF
Atch_1q_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
10._DD_1354.pdf PDF
9._FAR_52.236-21.pdf PDF
Atch_1l_UFC_3-535-01,_Visual_Air_Navigation_Facilities_13.zip ZIP file
Atch_1e_ETL_04_Standard_Airfield_Pavement_Marking_Schemes,_with_Change_2.pdf PDF
8._AETC_600.pdf PDF
08_Hazmat_Usage_Log.pdf PDF
7._AF_3065.pdf PDF
Atch_1j_AETC_Installation_Excellence_Guide.pdf PDF
Atch_1_Statement_of_Work.pdf PDF
Atch_1u_UFC_4-010-01,_DoD_Minimum_Antiterrorism_Standards_for_Buildings.pdf PDF
2._AF_3000_(Example).pdf PDF
Atch_6_Notification_of_Compliance_with_Contract_Insurance_Requirements.pdf PDF
Atch_1d_Security_Requirements_for_SOW.pdf PDF
Atch_1c_Allied_Support_T-1_Sunshades_Design_Report.pdf PDF
3._OSHA_29_CFR_1910.pdf PDF
06_TCEQ_Multi_Sector_General_Permit_(TXR050000).pdf PDF
03_AF_Form_103_Base_Civil_Engineering_Work_Clearance_Request.pdf PDF
Atch_1n_FAA_Form_7460-1_Notice_of_Construction_permit.pdf PDF
Atch_1m_AF_Form_103,_Work_Clearance_Request.pdf PDF
Atch_1h_UFC_3-310-04,_Seismic_Design_for_Buildings.pdf PDF
Atch_2_Wage_Determinatinon_TX20190186.pdf PDF
Atch_3_AETC_Form_47.pdf PDF
Atch_1t_FAR_52.246-21.pdf PDF
MFR__Environment_Requirements_Atch_07_LAFP_SWPPP.pdf PDF
Atch_1f_Fire_Hydrants_Picture.pdf PDF
Atch_4_Financial_Institution_Reference_Sheet.pdf PDF
04_TCEQ_Construction_General_Permit_(TXR150000).pdf PDF
Atch_1i_Federal_Specification_L-S-300C,_Sheeting_and_Tape,_Reflective_Non-exposed_Lens.pdf PDF
Atch_1o_LAFB_Environmental_Requirements_(CEIE).pdf PDF
Atch_1p_Division_01_Specifications.pdf PDF
01_AF_Form_3952_Chemical_Hazardous_Material_Request_Authorization_Form.pdf PDF
Atch 1l UFC 3-535-01, Visual Air Navigation Facilities 13.pdf PDF
Atch_1v_UFC_4-010-02,_DoD_Minimum_Antiterrorism_Standoff_Distances_forBuildings.pdf PDF
4._OSHA_29_CFR_1926.pdf PDF
6._FAR_52.236-15.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYNOPSIS

AWARD NOTICE

Agency:

Department of the Air Force, Air Education and Training Command (AETC)

Contracting Office Address:

47th Contracting Flight 171 Alabama Ave, Bldg 7 Laughlin AFB, TX, 78843-5102

Point of Contact:

Christopher Robinson, SSgt Phone: (830) 298-5495 Fax: (830) 298-4878 Email: christopher.robinson@us.af.mil

Contract Award and Solicitation Number: FA3099-19-RA003

Contract Award Dollar Amount: $3,193,400.00

Contract Award Date: 18 September 2019

Contractor:

Precision Construction Group LLC 59905 E. Hornbill Place Oracle, AZ 85623

Description:

Maintenance personnel currently do not have any weather protection for the T-1 aircraft and must use portable equipment to provide light in order to perform aircraft maintenance. The constant exposure to the elements along with the retrieval, setup and breakdown of lighting equipment has led to decreased efficiency. The installation of electrical utility lines and sunshades shall not only increase efficiency allowing more training missions to be executed, but shall also protect vital Air Force assets. The contractor shall be responsible for the following: site surveys, determining pre-existing conditions, trenching/excavation work, electrical conduit/wiring installation and testing, electrical lighting installation and testing, concrete demolition/construction and testing, removal of/striping of airfield paint lines, the removal/installation of grounding/tie-down rods, erection of multiple prefabricated metal structures

Place of Contract Performance: Laughlin Air Force Base

Description:

File details come from the government source that posted it.