7 August 2018
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ G
-0 0.
dw g
P lo tte d:
F rid ay
, S ep te m be r 0
7, 1:
:3
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
G -0
0.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D ra w n by
C
SG-00 COVER SHEET & DRAWING LIST
G-01 GENERAL NOTES & ABBREVIATIONS
G-02 CONTRACT LAYOUT PLAN
G-03 TEMPORARY TRAFFIC CONTROL PLAN - PHASE 1
G-04 TEMPORARY TRAFFIC CONTROL PLAN - PHASE 2
V-01 SURVEY CONTROL PLAN
C-01 EXISTING CONDITIONS PLAN
C-02 DEMOLITION PLAN - FIRST STREET
C-03 DEMOLITION PLAN - ROWS "T" & "S"
C-04 DEMOLITION PLAN - ROWS "R" & "Q"
C-05 DEMOLITION PLAN - ROW "P" & TAXIWAY "G"
C-06 GEOMETRY, PAVING AND JOINTING PLAN - FIRST STREET
C-07 GEOMETRY, PAVING AND JOINTING PLAN - ROWS "T" & "S"
C-08 GEOMETRY, PAVING AND JOINTING PLAN - ROWS "R" & "Q"
C-09 GEOMETRY, PAVING AND JOINTING PLAN - ROW "P"
C-10 PAVEMENT MARKING PLAN
C-11 GPU PAD DETAILS
C-12 MISCELLANEOUS DETAILS 1/2
C-13 MISCELLANEOUS DETAILS 2/2
C-14 JOINT DETAILS 1/2
C-15 JOINT DETAILS 2/2
C-16 CONCEPTUAL FUTURE SUNSHADE PLAN AND ELEVATION
E-01 GENERAL NOTES, ABBREVIATIONS & SCOPE OF WORK
E-02 EXISTING CONDITIONS PLAN
E-03 ELECTRICAL DEMOLITION PLAN - FIRST STREET
E-04 ELECTRICAL DEMOLITION PLAN - ROWS "T" & "S"
E-05 ELECTRICAL DEMOLITION PLAN - ROWS "R" & "Q"
E-06 ELECTRICAL DEMOLITION PLAN - ROW "P"
E-07 ELECTRICAL PLAN - FIRST STREET
E-08 ELECTRICAL PLAN - ROWS "T" & "S"
E-09 ELECTRICAL PLAN - ROWS "R" & "Q"
E-10 ELECTRICAL PLAN - ROW "P"
E-11 DUCT BANK DETAILS
E-12 JUNCTION CAN DETAILS
E-13 GPU DISTRIBUTION ONE LINE DIAGRAM
DRAWING LIST
ALLIED SUPPORT T-1A SUNSHADES
LAUGHLIN AIR FORCE BASE, TEXAS
PROJECT ID: MXDP 17-1007
CONTRACT NO: FA3099-13-D-0001 / FA3099-17-F-0033
100% SUBMITTAL
09/07/2018
4000'0 2000'
SCALE IN FEET
N
LOCATION MAP
PROJECT LOCATION
G-00
C O
V E
R S
H E
E T
D
R A
W
IN
G L
IS
T
LAUGHLIN AIR FORCE BASE, TEXAS
CIVIL
D es ig ne d by
C
M
R ev ie w ed b y:
W
G
ELECTRICAL
G-01
G E
N E
R A
L N
O
TE
S
A B
B R
E V
IA
TI
O N
S
DETAIL OR SECTION
IDENTIFICATION
NUMBER
SHEET ON WHICH
DETAIL OR SECTION
OF THE CONDITION IS
DRAWN
TITLE1
SCALE:
SECTION / DETAIL SYMBOLS
AC ASPHALT CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACM ASBESTOS CONTAINING MATERIAL
ADH ADHESIVE
ADJ ADJACENT, ADJOINING,
ADJUSTABLE
AFB AIR FORCE BASE
AGG AGGREGATE
AF AIR FORCE
ALT ALTERNATE
ALUM ALUMINUM
AMP AMPERE
ANCH ANCHOR
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
AP ACCESS PANEL
APPROX APPROXIMATE
APZ ACCIDENT PROTECTION ZONE
ASPH ASPHALT
ATG ADJUST TO GRADE
AUX AUXILIARY
AVG AVERAGE
AWG AMERICAN WIRE GAUGE
BDRY BOUNDARY
BITUM BITUMINOUS
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BLW BELOW
BM BENCHMARK
BTWN BETWEEN
BW BOTH WAYS
CAP CAPACITY
CB CATCH BASIN
CERT CERTIFIED
CFM CUBIC FEET PER MINUTE
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CKT CIRCUIT
CL CENTER LINE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CO CLEANOUT
CONC CONCRETE
CONN CONNECT
CONST CONSTRUCTION
CONT CONTINUOUS
COR CONTRACTING OFFICER
REPRESENTATIVE
CT CURRENT TRANSFORMER
CTR CENTER
CYL CYLINDER
D ISLAND
DAT DATUM
DBL DOUBLE
DCJ DOWELED CONSTRUCTION JOINT
DCJT DUMMY CONTROL JOINT
DD DIRECTIONAL DRILL
DEG DEGREE
DEMO DEMOLISH, DEMOLITION
DEPR DEPRESSION
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DIST DISTRIBUTION
DIV DIVISION
DN DOWN
DND DO NOT DISTURB
DOD DEPARTMENT OF DEFENSE
DWG DRAWING
DWL DOWEL
DWLD DOWELED
DWLS DOWELS
DWPJ DOWELED WEAKENED PLANE
JOINT
DWR DRAWER
E EAST
EA EACH
EJ EXPANSION JOINT
EL ELEVATION - GRADE OR BUILDING
EMERG EMERGENCY
EMH ELECTRIC MANHOLE
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE(D)
EW EACH WAY
EX EXISTING
EXP EXPANSION
EXP BT EXPANSION BOLT
EXP JT EXPANSION JOINT
EXT EXTINGUISHER
FH FIRE HYDRANT
FJT FLUSH JOINT
FL FLOWLINE
FLEX FLEXIBLE
FOD FOREIGN OBJECT DEBRIS
FR FIRE RESISTANT
FT FEET
G GAS
GALV GALVANIZED
GEN GENERAL
GFE GOVERNMENT FURNISHED
EQUIPMENT
GI GALVANIZED IRON
GIP GALVANIZED IRON PIPE
GND GROUND
GOVT GOVERNMENT
GPM GALLONS PER MINUTE
GPU GROUND POWER UNIT
GR GRADE
GVL GRAVEL
HDPE HIGH-DENSITY POLYETHYLENE
HORIZ HORIZONTAL
HPT HIGH POINT
HS HIGH STRENGTH
HYDR HYDRAULIC
HZ HERTZ
I.D. INSIDE DIAMETER
INCL INCLUDE(ED)(ING)
INV INVERT
IP IRON PIPE
IRR IRREGULAR
J-BOX JUNCTION BOX
JCT JUNCTION
JF JOINT FILLER
JT JOINT
KOP KNOCKOUT PANEL
KV KILOVOLTS
KVA KILOVOLT AMPERES
KVAR KILOVOLT AMPERES REACTIVE
KW KILOWATT
LAFB LAUGHLIN AIR FORCE BASE
L LENGTH
LF LINEAR FOOT
LPT LOW POINT
LT LEFT
LZ LANDING ZONE
MAX MAXIMUM
MET METAL
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MPa MEGAPASCALS
MW MONITORING WELL
MUTCD MANUAL OF UNIFORM TRAFFIC
CONTROL DEVICES
N NORTH
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OPH OPPOSITE HAND
ORIG ORIGINAL
P PARKING
PCC PORTLAND CEMENT CONCRETE
PE POLYETHYLENE
PERF PERFORATED
PG PROFILE GRADE
PI POINT OF INTERSECTION
PLYWD PLYWOOD
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
QTY QUANTITY
R RADIUS, REINFORCED
ODD-SHAPED AND BLOCKOUT PCC
SLAB
RCP REINFORCED CONCRETE PIPE
REBAR REINFORCING BAR
REINF REINFORCE
REQD REQUIRED
RT RIGHT
S SOUTH
SCHED SCHEDULE
SD STORM DRAIN
SHLDR SHOULDER
SHT SHEET
SPEC SPECIFICATIONS
SQ SQUARE
SSJ SLEEPER SLAB JOINT
STA STATION
STD STANDARD
STL STEEL
T THICKNESS
T&B TOP AND BOTTOM
TBD TO BE DETERMINED
TBR TO BE REMOVED
TE THICKENED EDGE
TEMP TEMPORARY
TL TAXI LANE
TW TAXIWAY
TYP TYPICAL
UIP USE IN-PLACE
UON UNLESS OTHERWISE NOTED
UTIL UTILITY
V VOLT
VAR VARIABLE, VARIES
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WLXXX MONITORING WELL NUMBER
WPJ WEAKENED PLANE JOINT
WT WEIGHT
WV WATER VALVE
ABBREVIATIONS
C-05
C-05
DETAIL OR SECTION
IDENTIFICATION
NUMBER
SHEET ON WHICH
DETAIL OR SECTION
OF THE CONDITION IS
DRAWN
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ G
-0 1.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:4
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
G -0
1.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
GENERAL NOTES
1. REFER TO DIVISION 01 IN SPECIFICATIONS. BRING ANY CONFLICT BETWEEN THOSE
GENERAL REQUIREMENTS AND THESE NOTES TO THE ATTENTION OF THE
CONTRACTING OFFICER.
2. THIS PROJECT MAY INCLUDE WORK ON LEAD CONTAINING MATERIALS WHICH ARE
HAZARDOUS TO PERSONNEL, REQUIRE SPECIAL DEMOLITION AND DISPOSAL
PROCEDURES, AND ARE SUBJECT TO ADDITIONAL REGULATIONS.
3. COMPLY WITH GUIDELINES IN UFC 3-260-01, APPENDIX B, SECTION 14, SPECIAL SAFETY
REQUIREMENTS DURING CONSTRUCTION, FOR SETBACK DISTANCES OF
CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL ESTABLISH, IN ADVANCE, A
SPECIFIC DEMARCATION OR HOLD LINE LOCATION FOR PERSONNEL AND EQUIPMENT
DURING THE TIMES OF WORK INTERRUPTION TO ENSURE THE SAFETY OF THE
CONTRACTOR AND AIRCRAFT OPERATIONS.
4. THE LOCATIONS OF UNDERGROUND UTILITIES AND FACILITIES SHOWN ON THE PLANS
HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE BELIEVED TO BE CORRECT.
NO GUARANTEE IS MADE AS TO THEIR ACCURACY OR COMPLETENESS. THE
CONTRACTOR SHALL LOCATE AND IDENTIFY ALL UNDERGROUND UTILITIES IN THE
WORK AREA PRIOR TO CONSTRUCTION. ANY UNDERGROUND UTILITIES LOCATED WHICH
DO NOT APPEAR ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER REPRESENTATIVE, AIRFIELD OPERATIONS, AND ENGINEER. ANY
DAMAGE TO UTILITIES CAUSED BY THE CONTRACTOR SHALL BE PROMPTLY REPAIRED
AT THE CONTRACTOR'S EXPENSE.
5. CONTRACTOR SHALL RETAIN THE SERVICES OF A PRIVATE UTILITY LOCATOR SERVICE
DURING THE EXECUTION OF THIS CONTRACT. LAUGHLIN AFB ELECTRICAL SHOP MAY BE
ABLE TO LOCATE AIRFIELD LIGHTING AND COMMUNICATION FACILITIES.
6. FLOWABLE FILL, IF REQUIRED, SHALL MEET THE REQUIREMENTS OF SECTION 03 99 99.
7. PLANT PRE-CAST CONCRETE STRUCTURES ARE REQUIRED FOR LIGHTING
IMPROVEMENTS DEPICTED ON THE DRAWINGS. DIMENSIONS SPECIFIED ON THE
DRAWINGS ARE APPROXIMATE INTERNAL DIMENSIONS. EXTERNAL DIMENSIONS, WALL
THICKNESSES, INTERNAL REINFORCEMENT AND FABRICATION DETAILS MAY VARY. THE
CONTRACTOR SHALL SUBMIT DETAILED SHOP DRAWINGS AND STRUCTURAL
CALCULATIONS SIGNED BY A REGISTERED PROFESSIONAL ENGINEER TO THE
GOVERNMENT FOR APPROVAL PRIOR TO INSTALLATION. STRUCTURES SHALL MEET
THE LOAD CRITERIA IN PARAGRAPH 5-11.1 IN UFC 3-260-01. THE DESIGN LOAD IS
“TRAFFIC AREA A” AND “LIGHT AIRFIELD TYPE” PER TABLE 3-1 IN UFC 3-260-02 WHICH
INCLUDES THE F-15 AND C-17 AIRCRAFT, EITHER OF WHICH MAY BE “CRITICAL ASSIGNED
AIRCRAFT”. DUCTILE IRON CASTINGS OR STEEL LIDS SHALL BE HEAVY-DUTY AIRPORT
TYPE. PRE-CAST CONCRETE STRUCTURES SHALL COMPLY WITH RELEVANT
PROVISIONS OF SECTION 03 42 13.00 10, PLANT PRE-CAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION. ELECTRICAL STRUCTURES SHALL ALSO COMPLY WITH
CHAPTER 12 IN UFC 3-535-01, WHICH INCLUDES REQUIREMENTS ON LABELING,
SPRING-LOADED LIDS, WATER SEALANT, PENETRATIONS, STUB-OUTS, CABLE RACKS,
FLOOR SHAPE, AND GROUND ROD HOLES.
SECURITY
1. THE CONTRACTOR SHALL ENSURE COMPLIANCE WITH ALL SECURITY REGULATIONS
AND ACCESS REQUIREMENTS FOR ALL CONTRACTOR PERSONNEL ENTERING THE
PROJECT SITE. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BADGING AND
TRAINING REQUIRED FOR BASE AND AIRFIELD ACCESS.
2. CLOSE COORDINATION WITH BASE, AIRFIELD MANAGEMENT, AND SECURITY
OPERATIONS IS A REQUIREMENT OF THE CONTRACT.
3. CONTRACTOR VEHICLES SHALL ABIDE BY BASE TRAFFIC REGULATIONS INCLUDING
SPEED LIMITS AND RESTRICTIONS ON CELL PHONE USAGE. COMMERCIAL VEHICLES
AND HEAVY EQUIPMENT MUST TRAVEL ALONG PREDETERMINED HAUL ROUTES AND
PASS THROUGH SECURITY AND AIRFIELD ACCESS POINTS AS SHOWN ON THE
DRAWINGS.
4. ACCESS TO AREAS IN CLOSE PROXIMITY TO THE AIRFIELD SHALL BE STRICTLY
CONTROLLED AT ALL TIMES. TEMPORARY AIRFIELD ACCESS POINTS ARE SUBJECT TO
ADJUSTMENT ACCORDING TO THE STAGES OF CONSTRUCTION. ALL CONTRACTOR
PERSONNEL SHALL REMAIN INFORMED OF ACTIVE AND CLOSED AIRFIELD ACCESS
POINTS.
5. ALL AIRFIELD SECURITY RULES AND REGULATIONS SHALL APPLY EQUALLY TO THE
CONTRACTOR AND ANY SUBCONTRACTORS EMPLOYED ON THE PROJECT.
6. ALL CONTRACTOR PERSONNEL SHALL BE BRIEFED ON FOD, APPROVED HAUL ROUTES,
AND RESTRICTED AREAS.
7. CONTRACTOR VEHICLES PERMITTED TO TRAVEL WITHIN THE AIRFIELD MUST PROPERLY
DISPLAY IDENTIFICATION IF REQUESTED BY THE GOVERNMENT.
8. A CURRENT DRIVER’S LICENSE AS WELL AS AIRFIELD DRIVER TRAINING AND
CERTIFICATION FROM AIRFIELD MANAGEMENT ARE REQUIRED TO DRIVE ON THE
AIRFIELD PER AF 13-213 AND AFI 13-213 LAFB SUPPLEMENT 1.
9. VISITORS TO THE PROJECT SITE MUST BE ACCOMPANIED BY AN APPROVED SPONSOR
AT ALL TIMES.
10. ANY CONTRACTOR PERSONNEL FOUND TO BE IN VIOLATION OF SECURITY
REGULATIONS AND ACCESS RESTRICTIONS ARE SUBJECT TO DETAINMENT AND SEARCH
BY AIR FORCE SECURITY FORCES.
PERMITS
1. CONTRACTOR SHALL WORK WITH THE CONTRACTING OFFICER TO NOTIFY THE
ENVIRONMENTAL ENGINEERING FLIGHT AT LEAST 30 DAYS PRIOR TO BRINGING ANY
RADIOACTIVE MATERIALS ONTO LAUGHLIN AFB. SUCH MATERIALS INCLUDE, BUT ARE
NOT LIMITED TO, INSTRUMENTS THAT CONTAIN RADIOACTIVE SOURCES FOR TESTING
SOIL COMPACTION. THE APPROVAL OF THE ENVIRONMENTAL ENGINEERING FLIGHT IS
REQUIRED BEFORE ANY RADIOACTIVE MATERIALS CAN BE BROUGHT ONTO THE BASE.
2. CONTRACTOR SHALL OBTAIN AN AF IMT 103, BASE CIVIL ENGINEERING WORK
CLEARANCE REQUEST (DIGGING PERMIT) FROM THE CONTRACTING OFFICER
REPRESENTATIVE PRIOR TO ANY EXCAVATION. PERMIT SHALL BE COMPLETED AND
RETURNED TO THE CONTRACTING OFFICER REPRESENTATIVE.
3. CALL TEXAS 811 PRIOR TO EXCAVATION.
ENVIRONMENTAL
1. SHOULD HISTORIC SITES (WALLS, PLATFORMS, PAVEMENTS, MOUNDS) OR REMAINS
(ARTIFACTS, BURIALS) BE ENCOUNTERED DURING CONSTRUCTION ACTIVITIES, WORK
SHALL CEASE IMMEDIATELY IN THE VICINITY OF THE FIND AND THE AREA SHALL BE
PROTECTED FROM FURTHER DAMAGE. THE CONTRACTOR SHALL IMMEDIATELY
CONTACT THE CONTRACTING OFFICER, THE GOVERNMENT WILL BE RESPONSIBLE FOR
CONTACTING THE STATE HISTORIC PRESERVATION DIVISION, IF REQUIRED; TO ASSESS
THE SIGNIFICANCE OF THE FIND AND RECOMMEND AN APPROPRIATE MITIGATION
MEASURE IF NECESSARY.
2. DURATION OF TEMPORARY STOCKPILE SHALL NOT EXCEED THREE (3) MONTHS. IF THE
STOCKPILING WORK INVOLVES CONTAMINATED SOIL AND/OR HAZARDOUS MATERIAL,
THEN ALL STOCKPILING WORK SHALL BE DONE IN CONFORMANCE WITH APPLICABLE
STATE AND FEDERAL REQUIREMENTS. CONTACT THE SOLID AND HAZARDOUS WASTE
BRANCH OF THE TEXAS DEPARTMENT OF STATE HEALTH SERVICES FOR MORE
INFORMATION.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMANCE WITH THE APPLICABLE
PROVISIONS OF THE WATER QUALITY AND WATER POLLUTION CONTROL STANDARDS
CONTAINED IN THE TEXAS TCEQ TPDES CGP TXR150000.
4. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AREA AND
SURROUNDING AREA FREE FROM DUST NUISANCE. THE CONTRACTOR SHALL BE IN
COMPLIANCE WITH THE AIR POLLUTION CONTROL STANDARDS CONTAINED IN THE
TEXAS TCEQ TPDES CGP TXR150000.
5. CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY IF SUSPECTED
CONTAMINATED SOILS ARE ENCOUNTERED DURING EXCAVATION. SUSPECTED
CONTAMINATED SOILS MAY EXHIBIT STAINING, DISCOLORATION OR STRONG ODORS
THAT ARE UNUSUAL WHEN COMPARED TO THE SURROUNDING SOIL.
6. WASTE SLURRY FROM CONCRETE TRUCK WASHOUT MAY NOT BE DISPOSED OF ON THE
INSTALLATION. THE CONTRACTOR SHALL CAPTURE WASTE SLURRY FROM CONCRETE
TRUCK WASHOUT AND DISPOSE OF IT OFF THE INSTALLATION. THE COST TO CAPTURE
AND DISPOSE OF WASTE SLURRY FROM CONCRETE TRUCK WASHOUT WILL BE
CONSIDERED AN INCIDENTAL AND NO SEPARATE PAYMENT WILL BE MADE.
FOREIGN OBJECT DAMAGE (FOD)
1. THE CONTRACTOR SHALL SUBMIT A DETAILED FOD CONTROL PLAN TO THE
GOVERNMENT FOR APPROVAL PRIOR TO CONSTRUCTION.
2. THE CONTRACTOR SHALL PROVIDE SAFETY BARRICADES AROUND THE PERIMETER OF
ALL WORK AREAS ON THE AIRFIELD. FINAL LOCATION OF THE BARRICADES SHALL BE
APPROVED BY THE CONTRACTING OFFICER AND BY THE AIRFIELD MANAGER.
OPERATIONAL REQUIREMENTS MAY REQUIRE BARRICADES AT OTHER LOCATIONS.
BARRICADES WILL NEED TO BE RELOCATED AS THE WORK PROGRESSES OR DUE TO
OPERATIONAL CHANGES DETERMINED BY THE AIRFIELD MANAGER.
3. CONTRACTOR SHALL PRACTICE FOD PREVENTION TECHNIQUES AS DIRECTED BY THE
AIRFIELD MANAGER.
4. THE CONTRACTOR SHALL CHECK AND MAINTAIN BARRICADES DAILY AS DIRECTED BY
THE AIRFIELD MANAGER.
5. THE CONTRACTOR SHALL VACUUM SWEEP ALL AIRFIELD PAVEMENTS AFFECTED BY HIS
OPERATIONS. METAL BRISTLES ARE NOT ALLOWED. THE AIRFIELD MANAGER MUST
APPROVE THE CONDITION OF PAVEMENT PRIOR TO REOPENING PAVEMENT TO
AIRCRAFT TRAFFIC.
WORK AFFECTING LAUGHLIN AFB OPERATIONS
1. THE CONTRACTOR SHALL COORDINATE THE CLOSURE OF ANY
RUNWAY, TAXIWAY, OR APRON WITH THE CONTRACTING OFFICER
REPRESENTATIVE AND AIRFIELD MANAGER IN ADVANCE.
2. THE CONTRACTOR SHALL PROVIDE, IN WRITING, NOTICE TO THE
CONTRACTING OFFICER REPRESENTATIVE THEIR INTENT TO
CLOSE ANY RUNWAY, TAXIWAY, OR APRON. SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL
SUBMIT A WORK PLAN WITH THE NOTICE, DEPICTING LOCATION
OF THE CLOSURE BARRICADES, LIGHTS, ETC. THIS PLAN MUST
HAVE APPROVAL FROM THE AIRFIELD MANAGER BEFORE
CLOSURE CAN TAKE PLACE. THE PLAN MUST ALSO INCLUDE
SCHEDULE AND PROCEDURES SET TO REOPEN THE FACILITIES
TO AIRCRAFT TRAFFIC.
600'0 300'
SCALE IN FEET
G-02
C O
N
TR
A C
T
LA
Y O
U T
P
LA
N
LEGEND
HAUL ROUTE
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ G
-0 2.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:0
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
G -0
2.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
NOTES:
1. PROVIDE SILT FENCE OR STRAW WATTLE
AROUND CONTRACTOR STAGING AREA PER
THE APPROVED SWPPP. RESTORE THIS
AREA TO ITS ORIGINAL CONDITION AND
SEED AT END OF PROJECT.
2. CONTRACTOR HAUL ROUTES ARE NOT
EXCLUSIVE AND SHALL NOT BE BLOCKED
AT ANY TIME.
80'0 40'
SCALE IN FEET
G-03
TE
M
P O
R A
R Y
T R
A
FF
IC
C
O N
TR
O
L P
LA
N
P
H A
S E
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ G
-0 to G
-0 4.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:1
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
G -0 to
G -0
4.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
NOTES
1. WORK IN PHASE 1B REQUIRES
CLOSE COORDINATION WITH
AIRFIELD MANAGEMENT.
2. MINIMUM CLEARANCE DIMENSIONS
DEPICTED ARE EXISTING
CENTERLINE TO BARRICADE FACE.
3. REMOVE AND RELOCATE FIRST
STREET CENTERLINE PAVEMENT
MARKING PRIOR TO CONSTRUCTION.
MIN
32'
MIN
23'
PHASE 1B
PHASE 1 135' TW G
CL OFFSET
LEGEND
LOW LEVEL BARRICADE
AROUND PHASE BOUNDARY
PARKING POSITION CLOSURE
PVMT RECONSTRUCTION -
SEE "C" SERIES
FUTURE SUNSHADES
MUTCD
W20-4
MUTCD
W20-4
PERMANENTLY RELOCATED
"FIRST STREET" CL
G-04
TE
M
P O
R A
R Y
T R
A
FF
IC
C
O N
TR
O
L P
LA
N
P
H A
S E
80'0 40'
SCALE IN FEET
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ G
-0 to G
-0 4.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:2
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
G -0 to
G -0
4.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
LEGEND
LOW LEVEL BARRICADE
AROUND PHASE BOUNDARY
PARKING POSITION CLOSURE
MIN
32'
MIN
32'
135' TW G
CL OFFSET
PHASE 2 PVMT RECONSTRUCTION -
SEE "C" SERIES
FUTURE SUNSHADES
NOTES
1. MINIMUM CLEARANCE DIMENSIONS
DEPICTED ARE EXISTING
CENTERLINE TO BARRICADE FACE.
MUTCD
W20-4
MUTCD
W20-4
PERMANENTLY RELOCATED
"FIRST STREET" CL
600'0 300'
SCALE IN FEET
V-01
S U
R V
E Y
C O
N
TR
O L
P
LA
N
LEGEND
NOTES
1. EXISTING FIELD SURVEYS FOR THE
PROJECT AREA WERE PERFORMED BY
MCGRAY & MCGRAY IN OCTOBER 2017.
2. THE HORIZONTAL CONTROL ON THIS
PROJECT IS TIED TO THE NAD 83, TEXAS
SOUTH CENTRAL ZONE 4204, US SURVEY
FEET.
3. THE VERTICAL CONTROL IS TIED TO THE
NAVD 88.
SURVEY BENCHMARK
CP-13
PROJECT SURVEY CONTROL DATA
BENCHMARK NO. NORTHING EASTING ELEVATION
CP-13 13,683,448.988 1,399,778.353 1,068.03
CP-13C 13,685,493.719 1,399,075.905 1,082.04
CP-13R 13,684,900.564 1,398,951.335 1,076.99
CP-14 13,681,450.110 1,401,688.631 1,079.18
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ V
-0 1.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:4
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
V -0
1.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
CIVIL
SCALE IN FEET
C-01
E X
IS
TI
N G
C O
N D
IT
IO
N S
P
LA
N
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-0 1.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:5
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -0
1.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
NOTES
1. CONTRACTOR TO FIELD VERIFY ALL
UTILITIES.
LEGEND
FUTURE SUNSHADES
40'0 20'
SCALE IN FEET
C-02
D E
M O
LI
TI
O N
P
LA
N
FI
R
S T
S
TR
E E
T
PROVIDE DOUBLE SAWCUT
AT EX CONC PVMT JTS
SAWCUT EX ASPH
PVMT FULL DEPTH
SAWCUT EX ASPH
PVMT FULL DEPTH
M A
TC
H
LI
N
E
S E
E B
E
LO
W
M A
TC
H
LI
N
E
S E
E A
B O
V E
NORTHERN HALF OF FIRST ST
SOUTHERN HALF OF FIRST ST
SEE C-03
EX 8' X 4' STORMWATER BOX CULVERT - UIP
EX 36" RCP - UIP
E X
' X
' S
TO
R
M W
A
TE
R B
O X
C U
LV
E
R T
- U
IP
SEE C-04
EX 12' X 12' STORMWATER
JUNCTION BOX - UIP
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-0 to C
-0 5.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:1
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -0 to
C -0
5.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
R O
W "T
R O
W "S
R O
W "R
R O
W "P
R O
W "Q
SEE C-03
SEE C-05SEE C-04
EX PVMT MARKING - TBR
EX PVMT MARKING - TBR
EX 12' X 12' STORMWATER
JUNCTION BOX - UIP
PROVIDE DOUBLE SAWCUT
AT EX CONC PVMT JTS
PROVIDE DOUBLE SAWCUT
AT EX CONC PVMT JTS PROVIDE DOUBLE SAWCUT
AT EX CONC PVMT JTS
SAWCUT EX ASPH
PVMT FULL DEPTH
SAWCUT EX ASPH
PVMT FULL DEPTH
PROVIDE DOUBLE SAWCUT
AT EX CONC PVMT JTS
SUGGESTED DD PIT
(SIZE VAR)
SUGGESTED DD PIT
(SIZE VAR)
SUGGESTED DD PIT
(SIZE VAR)
SUGGESTED DD PIT
(SIZE VAR)
ASPH PVMT DEMOLITION
(FULL DEPTH)
CONC PVMT DEMOLITION
(FULL DEPTH)
LEGEND
NOTES
1. WARNING: EXISTING AIR PIPES ARE
CATHODICALLY PROTECTED -
LOCKOUT/TAGOUT SYSTEM BEFORE
DEMOLITION OR MODIFICATION.
2. CATHODIC PROTECTION SYSTEM SHALL
REMAIN OPERABLE TO THE EXTENT
PRACTICAL AFTER MODIFICATION.
3. REFER TO DWG C-13 FOR TYPICAL
EXISTING CONCRETE TRENCH DEMOLITION
SECTIONS.
4. SUBMIT WASTE DISPOSAL PLAN PRIOR TO
DEMOLITION.
5. REMOVE ALL EXISTING AIRCRAFT
TIE-DOWN OR GROUND POINTS AND ANY
ASSOCIATED PAVEMENT MARKINGS WITHIN
THE WORK AREA AS DIRECTED BY THE
CONTRACTING OFFICER'S
REPRESENTATIVE. FOR THE EMBEDDED
REBAR LOOP TIE-DOWN TYPE, TRIM THE
EXPOSED PORTION OF THE REBAR FLUSH
WITH THE SURFACE OF THE EXISTING
PAVEMENT WITH A CUTTING WHEEL AND
GRIND ANY SHARP EDGES TO LEAVE A
NEAT APPEARANCE WITHOUT DAMAGING
THE EXISTING CONCRETE PAVEMENT. FOR
THE RECESSED EYELET TIE-DOWN OR
BRASS CUP GROUND POINT TYPE, CORE
THE EXISTING PAVEMENT WITH A SIX-INCH
CORE BARREL AROUND THE CASTING
APPROXIMATELY SIX INCHES DEEP AND
FILL WITH APPROVED NON-SHRINK EPOXY
GROUT. COORDINATE THIS WORK WITH
THE CONTRACTING OFFICER'S
REPRESENTATIVE IN ADVANCE.
REMOVE EX CONC PAD
(NOT PVMT) & PATCH EX PVMT
PENETRATIONS WITH CONC OR
GROUT AS DIRECTED BY COR
SUGGESTED DD PIT
(SIZE VAR)
(FIELD VERIFY)
C-03
D E
M O
LI
TI
O N
P
LA
N
R O
W S
"T
"S
40'0 20'
SCALE IN FEET
EX GPU PAD "T-8X"
ROW "T"
ROW "S"
SEE C-02
MODIFY AND ABANDON
EX TIE DOWN AND/OR GROUND
PIT IN-PLACE AND REMOVE
RELATED PVMT MARKING (TYP)
EX 8' X 4'
STORMWATER
BOX CULVERT
- UIP
EX 12' X 12' STORMWATER JUNCTION BOX - UIP
EX GPU PAD "T-5X"
DISCONNECT AND SALVAGE
EX GPU (TWO PER PAD)
DEMO EX CONC PAD,
DOUBLE SAWCUT CONC PVMT AT EX JTS,
DEMO CONC PVMT, DEMO AIR PIPE UTILITY DUCT
REFER TO ELECT DEMO PLANS
(TYP OF 4 AREAS THIS ROW)
REMOVE PORTION OF
EX CONC TRENCH PATCH FOR
RELOCATION OF GPU PAD
(TYP OF 4 AREAS THIS ROW)
EX GPU PAD "T-1X" EX GPU PAD "T-4X"
REMOVE PORTION OF
EX CONC TRENCH PATCH FOR
RELOCATION OF GPU PAD
(TYP OF 4 AREAS THIS ROW)
EX GPU PAD "S-8X"
DISCONNECT AND SALVAGE
EX GPU (TWO PER PAD)
DEMO EX CONC PAD,
DOUBLE SAWCUT CONC PVMT AT EX JTS,
DEMO CONC PVMT, DEMO AIR PIPE UTILITY DUCT
REFER TO ELECT DEMO PLANS
(TYP OF 4 AREAS THIS ROW)
EX GPU PAD "S-1X" EX GPU PAD "S-4X" EX GPU PAD "S-5X"
SEE C-02
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-0 to C
-0 5.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:3
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -0 to
C -0
5.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
EX PVMT MARKING - TBR
EX PVMT MARKING - TBR
MODIFY AND ABANDON
EX TIE DOWN AND/OR GROUND
PIT IN-PLACE AND REMOVE
RELATED PVMT MARKING (TYP)
E X
' X
' S
TO
R
M W
A
TE
R B
O X
C U
LV
E
R T
- U
IP
E X
' X
' S
TO
R
M W
A
TE
R B
O X
C U
LV
E
R T
- U
IP
ASPH PVMT DEMOLITION
(FULL DEPTH)
CONC PVMT DEMOLITION
(FULL DEPTH)
LEGEND
NOTES
1. WARNING: EXISTING AIR PIPES ARE
CATHODICALLY PROTECTED -
LOCKOUT/TAGOUT SYSTEM BEFORE
DEMOLITION OR MODIFICATION.
2. CATHODIC PROTECTION SYSTEM SHALL
REMAIN OPERABLE TO THE EXTENT
PRACTICAL AFTER MODIFICATION.
3. REFER TO DWG C-13 FOR TYPICAL
EXISTING CONCRETE TRENCH DEMOLITION
SECTIONS.
4. SUBMIT WASTE DISPOSAL PLAN PRIOR TO
DEMOLITION.
5. REMOVE ALL EXISTING AIRCRAFT
TIE-DOWN OR GROUND POINTS AND ANY
ASSOCIATED PAVEMENT MARKINGS WITHIN
THE WORK AREA AS DIRECTED BY THE
CONTRACTING OFFICER'S
REPRESENTATIVE. FOR THE EMBEDDED
REBAR LOOP TIE-DOWN TYPE, TRIM THE
EXPOSED PORTION OF THE REBAR FLUSH
WITH THE SURFACE OF THE EXISTING
PAVEMENT WITH A CUTTING WHEEL AND
GRIND ANY SHARP EDGES TO LEAVE A
NEAT APPEARANCE WITHOUT DAMAGING
THE EXISTING CONCRETE PAVEMENT. FOR
THE RECESSED EYELET TIE-DOWN OR
BRASS CUP GROUND POINT TYPE, CORE
THE EXISTING PAVEMENT WITH A SIX-INCH
CORE BARREL AROUND THE CASTING
APPROXIMATELY SIX INCHES DEEP AND
FILL WITH APPROVED NON-SHRINK EPOXY
GROUT. COORDINATE THIS WORK WITH
THE CONTRACTING OFFICER'S
REPRESENTATIVE IN ADVANCE.
REMOVE EX CONC PAD
(NOT PVMT) & PATCH EX PVMT
PENETRATIONS WITH CONC OR
GROUT AS DIRECTED BY COR
C-04
40'0 20'
SCALE IN FEET
ROW "R"
ROW "Q"
D E
M O
LI
TI
O N
P
LA
N
R O
W S
"R
"Q
EX GPU PAD "R-8X"
SEE C-02
MODIFY AND ABANDON
EX TIE DOWN AND/OR GROUND
PIT IN-PLACE AND REMOVE
RELATED PVMT MARKING (TYP)
MODIFY AND ABANDON
EX TIE DOWN AND/OR GROUND
PIT IN-PLACE AND REMOVE
RELATED PVMT MARKING (TYP)
EX GPU PAD "R-5X"
DISCONNECT AND SALVAGE
EX GPU (TWO PER PAD)
DEMO EX CONC PAD,
DOUBLE SAWCUT CONC PVMT AT EX JTS,
DEMO CONC PVMT, DEMO AIR PIPE UTILITY DUCT
REFER TO ELECT DEMO PLANS
(TYP OF 4 AREAS THIS ROW)
REMOVE PORTION OF
EX CONC TRENCH PATCH FOR
RELOCATION OF GPU PAD
(TYP OF 4 AREAS THIS ROW)
EX GPU PAD "R-1X" EX GPU PAD "R-4X"
REMOVE PORTION OF
EX CONC TRENCH PATCH FOR
RELOCATION OF GPU PAD
(TYP OF 4 AREAS THIS ROW)
EX GPU PAD "Q-8X"
DISCONNECT AND SALVAGE
EX GPU (TWO PER PAD)
DEMO EX CONC PAD,
DOUBLE SAWCUT CONC PVMT AT EX JTS,
DEMO CONC PVMT, DEMO AIR PIPE UTILITY DUCT
REFER TO ELECT DEMO PLANS
(TYP OF 4 AREAS THIS ROW)
EX GPU PAD "Q-1X" EX GPU PAD "Q-4X" EX GPU PAD "Q-5X"
SEE C-02
E X
6"
R C
P
U
IP
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-0 to C
-0 5.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:4
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -0 to
C -0
5.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
EX PVMT MARKING - TBR
EX PVMT MARKING - TBR
E X
6"
R C
P
U
IP
EX 8' X 4'
STORMWATER
BOX CULVERT
- UIP
EX 12' X 12' JUNCTION BOX - UIP
ASPH PVMT DEMOLITION
(FULL DEPTH)
CONC PVMT DEMOLITION
(FULL DEPTH)
LEGEND
NOTES
1. WARNING: EXISTING AIR PIPES ARE
CATHODICALLY PROTECTED -
LOCKOUT/TAGOUT SYSTEM BEFORE
DEMOLITION OR MODIFICATION.
2. CATHODIC PROTECTION SYSTEM SHALL
REMAIN OPERABLE TO THE EXTENT
PRACTICAL AFTER MODIFICATION.
3. REFER TO DWG C-13 FOR TYPICAL
EXISTING CONCRETE TRENCH DEMOLITION
SECTIONS.
4. SUBMIT WASTE DISPOSAL PLAN PRIOR TO
DEMOLITION.
5. REMOVE ALL EXISTING AIRCRAFT
TIE-DOWN OR GROUND POINTS AND ANY
ASSOCIATED PAVEMENT MARKINGS WITHIN
THE WORK AREA AS DIRECTED BY THE
CONTRACTING OFFICER'S
REPRESENTATIVE. FOR THE EMBEDDED
REBAR LOOP TIE-DOWN TYPE, TRIM THE
EXPOSED PORTION OF THE REBAR FLUSH
WITH THE SURFACE OF THE EXISTING
PAVEMENT WITH A CUTTING WHEEL AND
GRIND ANY SHARP EDGES TO LEAVE A
NEAT APPEARANCE WITHOUT DAMAGING
THE EXISTING CONCRETE PAVEMENT. FOR
THE RECESSED EYELET TIE-DOWN OR
BRASS CUP GROUND POINT TYPE, CORE
THE EXISTING PAVEMENT WITH A SIX-INCH
CORE BARREL AROUND THE CASTING
APPROXIMATELY SIX INCHES DEEP AND
FILL WITH APPROVED NON-SHRINK EPOXY
GROUT. COORDINATE THIS WORK WITH
THE CONTRACTING OFFICER'S
REPRESENTATIVE IN ADVANCE.
REMOVE EX CONC PAD
(NOT PVMT) & PATCH EX PVMT
C-05
D E
M O
LI
TI
O N
P
LA
N
R O
W "P
T A
X
IW
A Y
"G
40'0 20'
SCALE IN FEET
ROW "P"
EX GPU PAD "P-8X"
SEE C-02
MODIFY AND ABANDON
EX TIE DOWN AND/OR GROUND
PIT IN-PLACE AND REMOVE
RELATED PVMT MARKING (TYP)
EX GPU PAD "P-5X"
DISCONNECT AND SALVAGE
EX GPU (TWO PER PAD)
DEMO EX CONC PAD,
DOUBLE SAWCUT CONC PVMT AT EX JTS,
DEMO CONC PVMT, DEMO AIR PIPE UTILITY DUCT
REFER TO ELECT DEMO PLANS
(TYP OF 4 AREAS THIS ROW)
EX GPU PAD "P-1X" EX GPU PAD "P-4X"
E X
6"
R C
P
U
IP
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-0 to C
-0 5.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:0
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -0 to
C -0
5.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
EX PVMT MARKING - TBR
EX TL CL PVMT MARKING - TBR -
TYP OF ALL CL PVMT MARKINGS
THIS SIDE OF TW G CL
TAXIWAY "G"
80'0 40'
SCALE IN FEET
EX TW CL PVMT MARKING - UIP
REMOVE PORTION OF
EX CONC TRENCH PATCH FOR
RELOCATION OF GPU PAD
(TYP OF 4 AREAS THIS ROW)
ASPH PVMT DEMOLITION
(FULL DEPTH)
CONC PVMT DEMOLITION
(FULL DEPTH)
LEGEND
NOTES
1. WARNING: EXISTING AIR PIPES ARE
CATHODICALLY PROTECTED -
LOCKOUT/TAGOUT SYSTEM BEFORE
DEMOLITION OR MODIFICATION.
2. CATHODIC PROTECTION SYSTEM SHALL
REMAIN OPERABLE TO THE EXTENT
PRACTICAL AFTER MODIFICATION.
3. REFER TO DWG C-13 FOR TYPICAL
EXISTING CONCRETE TRENCH DEMOLITION
SECTIONS.
4. SUBMIT WASTE DISPOSAL PLAN PRIOR TO
DEMOLITION.
5. REMOVE ALL EXISTING AIRCRAFT
TIE-DOWN OR GROUND POINTS AND ANY
ASSOCIATED PAVEMENT MARKINGS WITHIN
THE WORK AREA AS DIRECTED BY THE
CONTRACTING OFFICER'S
REPRESENTATIVE. FOR THE EMBEDDED
REBAR LOOP TIE-DOWN TYPE, TRIM THE
EXPOSED PORTION OF THE REBAR FLUSH
WITH THE SURFACE OF THE EXISTING
PAVEMENT WITH A CUTTING WHEEL AND
GRIND ANY SHARP EDGES TO LEAVE A
NEAT APPEARANCE WITHOUT DAMAGING
THE EXISTING CONCRETE PAVEMENT. FOR
THE RECESSED EYELET TIE-DOWN OR
BRASS CUP GROUND POINT TYPE, CORE
THE EXISTING PAVEMENT WITH A SIX-INCH
CORE BARREL AROUND THE CASTING
APPROXIMATELY SIX INCHES DEEP AND
FILL WITH APPROVED NON-SHRINK EPOXY
GROUT. COORDINATE THIS WORK WITH
THE CONTRACTING OFFICER'S
REPRESENTATIVE IN ADVANCE.
REMOVE EX CONC PAD
(NOT PVMT) & PATCH EX PVMT
SCALE IN FEET
C-06
G E
O M
E
TR
Y , P
A V
IN
G
, A N
D
JO
IN
TI
N G
P
LA
N
FI
R
S T
S
TR
E E
T
LEGEND
16-INCH CONC
TRENCH PATCH
NOTES
1. REFER TO DRAWING C-13 FOR PAVEMENT
PATCH DETAILS.
2. REFER TO DRAWING C-14 & C-15 FOR
JOINT DETAILS.
6-INCH ASPH
ROAD PATCH
M A
TC
H
LI
N
E
S E
E B
E
LO
W
M A
TC
H
LI
N
E
S E
E A
B O
V E
NORTHERN HALF OF FIRST ST
SOUTHERN HALF OF FIRST ST
SEE C-07SEE C-07
EX 8' X 4' STORMWATER BOX CULVERT
EX 36" RCP
EX 12' X 12'
STORMWATER
JUNCTION BOX
EX 12' X 12' STORMWATER
JUNCTION BOX
SEE C-08 SEE C-09
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-0 to C
-0 9.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:2
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -0 to
C -0
9.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
R O
W "T
R O
W "S
R O
W "R
R O
W "P
R O
W "Q
E X
' X
' S
TO
R
M W
A
TE
R B
O X
C U
LV
E
R T
EX 8' X 4' STORMWATER BOX CULVERT
SEE C-08
13-INCH NOMINAL CONC
APRON EXTENSION
C-13
C-13
C-13
A PCC-AC JT
A
C-14
TE JT
DWLD CONST JT
DWLD CONTRACTION JT
REINF SLAB
C-15
B
D
F
R
B
C-14
D
C-14
F
C-14
ASPH BUTT JT
(TYP)
ASPH BUTT JT
(TYP)
TRENCH PATCH
CONTRACTION JTG
C-14
C-07
G E
O M
E
TR
Y , P
A V
IN
G
, A N
D
JO
IN
TI
N G
P
LA
N
R O
W S
"T
"S
40'0 20'
SCALE IN FEET
ROW "T"
ROW "S"
RELOCATED
GPU PAD "T1-R"
RELOCATED
GPU PAD "T4-R"
RELOCATED
GPU PAD "T5-R"
E X
' X
' S
TO
R
M W
A
TE
R B
O X
C U
LV
E
R T
EX 8' X 4'
STORMWATER
BOX CULVERT
EX STORMWATER 12' X 12' JUNCTION BOX
GPU SHIFT 78' ± GPU SHIFT 63' ± GPU SHIFT 48' ± GPU SHIFT 33' ±
FUTURE BLDG COLUMN (TYP)
FUTURE BLDG COLUMN (TYP)
GPU SHIFT 49' ± GPU SHIFT 34' ±GPU SHIFT 63' ±GPU SHIFT 78' ±
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-0 to C
-0 9.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:3
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -0 to
C -0
9.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
E X
' X
' S
TO
R
M W
A
TE
R B
O X
C U
LV
E
R T
RELOCATED
GPU PAD "S1-R"
RELOCATED
GPU PAD "S4-R"
RELOCATED
GPU PAD "S5-R"
RELOCATED
GPU PAD "S8-R"
FIRE EXT
MARKING TYP
RELOCATED
GPU PAD "T8-R"
FIRE EXT
MARKING TYP
EX 36" RCP
INSTALL MULTIPLE TIE DOWN/GROUND RECEPTACLES (TYP)
C-12
INSTALL MULTIPLE TIE DOWN/GROUND RECEPTACLES (TYP)
C-12
TYP
C-13
TYP
GPU PAD CONTROL POINTS
GPU DESIGNATION STATION OFFSET
T1-R 12+15.00 0.00
T4-R 12+15.00 122.00 LT
T5-R 12+15.00 244.00 LT
T8-R 12+15.00 366.00 LT
S1-R 13+35.00 0.00
S4-R 13+35.00 122.00 LT
S5-R 13+35.00 244.00 LT
S8-R 13+35.00 366.00 LT
C-13
LEGEND
16-INCH CONC
TRENCH PATCH
NOTES
1. REFER TO DRAWING C-13 FOR PAVEMENT
PATCH DETAILS.
2. REFER TO DRAWING C-14 & C-15 FOR
JOINT DETAILS.
6-INCH ASPH
ROAD PATCH
13-INCH NOMINAL CONC
APRON EXTENSION
C-13
C-13
C-13
A PCC-AC JT
A
C-14
TE JT
DWLD CONST JT
DWLD CONTRACTION JT
REINF SLAB
C-15
B
D
F
R
B
C-14
D
C-14
F
C-14
TRENCH PATCH
CONTRACTION JTG
C-08
40'0 20'
SCALE IN FEET
ROW "R"
ROW "Q"
G E
O M
E
TR
Y , P
A V
IN
G
, A N
D
JO
IN
TI
N G
P
LA
N
R O
W S
"R
"Q
E X
6"
R C
P E
X
6" R
C P
GPU SHIFT 80' ± GPU SHIFT 65' ± GPU SHIFT 50' ± GPU SHIFT 35' ±
GPU SHIFT 50' ± GPU SHIFT 35' ±GPU SHIFT 65' ±GPU SHIFT 80' ±
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-0 to C
-0 9.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:5
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -0 to
C -0
9.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
RELOCATED
GPU PAD "R1-R"
RELOCATED
GPU PAD "R4-R"
RELOCATED
GPU PAD "R5-R"
FUTURE BLDG COLUMN (TYP)
FUTURE BLDG COLUMN (TYP)
RELOCATED
GPU PAD "R8-R"
RELOCATED
GPU PAD "Q1-R"
RELOCATED
GPU PAD "Q4-R"
RELOCATED
GPU PAD "Q5-R"
RELOCATED
GPU PAD "Q8-R"
FIRE EXT
MARKING TYP
FIRE EXT
MARKING TYP
EX 8' X 4'
STORMWATER
BOX CULVERT EX STORMWATER 12' X 12' JUNCTION BOX
INSTALL MULTIPLE TIE DOWN/GROUND RECEPTACLES (TYP)
C-12
INSTALL MULTIPLE TIE DOWN/GROUND RECEPTACLES (TYP)
C-12
TYP
C-13
GPU PAD CONTROL POINTS
GPU DESIGNATION STATION OFFSET
R1-R 15+15.00 0.00
R4-R 15+15.00 122.00 LT
R5-R 15+15.00 244.00 LT
R8-R 15+15.00 366.00 LT
Q1-R 16+35.00 0.00
Q4-R 16+35.00 122.00 LT
Q5-R 16+35.00 244.00 LT
Q8-R 16+35.00 366.00 LT
TYP
C-13
LEGEND
16-INCH CONC
TRENCH PATCH
NOTES
1. REFER TO DRAWING C-13 FOR PAVEMENT
PATCH DETAILS.
2. REFER TO DRAWING C-14 & C-15 FOR
JOINT DETAILS.
6-INCH ASPH
ROAD PATCH
13-INCH NOMINAL CONC
APRON EXTENSION
C-13
C-13
C-13
A PCC-AC JT
A
C-14
TE JT
DWLD CONST JT
DWLD CONTRACTION JT
REINF SLAB
C-15
B
D
F
R
B
C-14
D
C-14
F
C-14
TRENCH PATCH
CONTRACTION JTG
C-09
G E
O M
E
TR
Y , P
A V
IN
G
, A N
D
JO
IN
TI
N G
P
LA
N
R O
W "P
40'0 20'
SCALE IN FEET
ROW "P"
E X
6"
R C
P
GPU SHIFT 80' ± GPU SHIFT 66' ± GPU SHIFT 51' ± GPU SHIFT 36' ±
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-0 to C
-0 9.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:0
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -0 to
C -0
9.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
RELOCATED
GPU PAD "P1-R"
RELOCATED
GPU PAD "P4-R"
RELOCATED
GPU PAD "P5-R"
FUTURE BLDG COLUMN (TYP)
RELOCATED
GPU PAD "P8-R"
FIRE EXT
MARKING TYP
INSTALL MULTIPLE TIE DOWN/GROUND RECEPTACLES (TYP)
C-12
TYP
GPU PAD CONTROL POINTS
GPU DESIGNATION STATION OFFSET
P1-R 18+15.00 0.00
P4-R 18+15.00 122.00 LT
P5-R 18+15.00 244.00 LT
P8-R 18+15.00 366.00 LT
C-13
LEGEND
16-INCH CONC
TRENCH PATCH
NOTES
1. REFER TO DRAWING C-13 FOR PAVEMENT
PATCH DETAILS.
2. REFER TO DRAWING C-14 & C-15 FOR
JOINT DETAILS.
6-INCH ASPH
ROAD PATCH
13-INCH NOMINAL CONC
APRON EXTENSION
C-13
C-13
C-13
A PCC-AC JT
A
C-14
TE JT
DWLD CONST JT
DWLD CONTRACTION JT
REINF SLAB
C-15
B
D
F
R
B
C-14
D
C-14
F
C-14
TRENCH PATCH
CONTRACTION JTG
SCALE IN FEET
C-10
P A
V E
M E
N T
M A
R K
IN
G
P
LA
N
NOTES
1. PAVEMENT SHALL BE PREPARED BEFORE
APPLICATION OF THE PAVEMENT
MARKING PER SECTION 32 17 23.
2. REFER TO DRAWING C-12 FOR PAVEMENT
MARKING DETAILS.
3. PAVEMENT MARKINGS SHALL BE IN
ACCORDANCE WITH ETL 04-2 CHANGE 1,
STANDARD AIRFIELD PAVEMENT MARKING
SCHEMES.
4. REQUEST CAD FILES FROM ENGINEER
FOR DETAILED PAVEMENT MARKING
LAYOUT INFORMATION.
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-1 0.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:1
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -1
0.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
CIVIL
12.0'
1.
0'
1.0'
3" M
A X
SALVAGED EX/GFE
HOBART GPU-400
(TYP)
3.0'±4.0'±
1.0'
1.
0'
4.
0'
2.
0'
3.0'±
2.
0'
RELOCATED EX GPU RECEPTACLES WIREWAY,
CONDUIT SEAL OFF FITTING STEEL EQUIPMENT RACK
AND ASSOCIATED SERVICE MODULE
REMOVE AND DISPOSE OF ORIGINAL AIR EQUIPMENT
FIBER-REINF CONC
ELECTRICAL EQUIPMENT
SUPPORT PAD (SECTION 03 30 53)
EX JOINTED
CONC PVMT-UIP
EX CONC JT -
LOCATION VARIES
(TYP)
REPLACEMENT
CONC TRENCH PATCH
(SECTION 32 13 14.13)
EXTEND 2" GRS PVC COATED CONDUIT
FROM NEW DUCT BANK SECTION TO
NEW SEAL OFF FITTING
(SEE ELECTRICAL DRAWINGS)
3.5'±
(F O
R B
ID
P
U R
P O
S E
S O
N
LY
APPROVED
EXPANSION BOARD
(TYP)
.2
5"
EXISTING RELOCATED HOBART
GPU-400 GROUND POWER EQUIPMENT
MOUNT TO CONCRETE PAD PER
MANUFACTURER'S INSTRUCTIONS
NEW CONDUIT
SEAL OFF FITTING
PROPOSED EQUIPMENT RACK ANCHOR BOLT (TYP)
CONTRACTOR IS RESPONSIBLE FOR PREPARING
TEMPLATE FOR INSTALLING ANCHOR BOLTS AT
LOCATIONS APPROPRIATE FOR EACH EQUIPMENT RACK
1/4" HDPE SHEET UNDER ENTIRE PAD
FOR ISOLATION-SHAPE PRODUCTS "220X48X96_BLACK_HDPE"
OR APPROVED EQUAL
EX JOINTED CONC PVMT-UIP
PROVIDE 1" DEEP SAWCUT OVER
ALL PVMT JTS IMMEDIATELY AFTER
INITIAL SET AND SEAL WITH SILICONE
SIMILAR TO 5/C-14
PROVIDE 1" DEEP SAWCUT OVER
ALL PVMT JTS IMMEDIATELY
AFTER INITIAL JT AND
SEAL WITH SILICONE
#4 BARS @ 12" OC
EACH WAY
REPLACEMENT
THRU CONDUITS
REPLACE EX 20'± 400 HZ GPU AIRCRAFT POWER CABLE
WITH NEW 50' "SINGLE JACKET" 400 HZ CABLE
MANUFACTURED BY HOBART OR APPROVED EQUAL - TYP
(CONFIRM PART NUMBER WITH AIRFIELD
MANAGER BEFORE ORDERING)
16" CONC PATCH
C-13
3" M
A X
NO. 6 AWG COPPER SAFETY
GROUND BOND TO GPU
ENCLOSURE/WIREWAY
(TYP OF 3 FOR EACH GPU STATION)
B4
E-11
(TYP)
GROUND ROD (TYP)
REPLACEMENT
CONDUIT W/ STUBUP
STAKEOUT
REFERENCE
POINT
C-11
G P
U P
A D
D E
TA
IL
S
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-1 to C
-1 5.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:2
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -1 to
C -1
5.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVILTWIN GPU PAD DETAIL
SCALE: NTS
EXISTING GPU PAD INSTALLATION
SCALE: NTS
C-02 TO
C-05
C-06 TO
C-09
ATTENTION BIDDERS: THIS CONTRACT
REQUIRES REPLACEMENT OF FORTY (40)
400 HZ GPU CABLE SETS, ONE FOR EACH
GPU. INCLUDE THIS COST IN BID.
RED
2"
YELLOW
4" WIDE WHITE LINE10
4" WIDE WHITE LINE
SERVICE DRIVE MARKING
IN SOME LOCATIONS
TL CL
25' 15' 25'
6" BLACK (TYP)
6" YELLOW W/
GLASS BEADS (TYP)
6" WIDE YELLOW LINE
W/ GLASS BEADS
6" WIDE
BLACK BORDER
6" WIDE TW EDGE
STRIPE YELLOW
W/ GLASS BEADS
CONC SIDE
6" WIDE
BLACK BORDER
EDGE OF APRON PVMT
ASPH SIDE
VERIFY PREFERRED OFFSET OF
BLACK BORDER WITH AIRFIELD
MANAGER PRIOR TO PAINTING
3.5'
2.
5'
4" WIDE WHITE LINE
4" C
LE
A
R
VERIFY COLORS W/ AIRFIELD MANAGER PRIOR TO PAINTING.
TL WINGTIP CLEARANCE
PVMT MARKING
15' 15'
7.
5'
.5
.5
10' 10'
15' 15'
NOSE
WHEEL
TIE DOWN (TYP)
.5
11'
NOTE
1. SEVEN (7) LOCATIONS PER
AIRCRAFT.
2. APPLIES TO ALL SEVEN (7)
POSITIONS PER ROW.
APPROVED
HOUSING
COPPER GROUND ROD
AND EYELET
APPROVED NON SHRINK
EPOXY GROUT
APPROVED NON SHRINK
EPOXY GROUT
6" DIA CORE HOLE
EX CONC
COPPER SLEEVE
COMPRESSED
ON ROD
3/4" DIA COPPER GROUND ROD
GROUND
1"
4"
1" 6"
APPROVED EYELET
APPROVED HOUSING
A P
P R
O X
2"
NOTE
SUBMIT ALL COMPONENTS TO AIRFIELD
MANAGER FOR APPROVAL PRIOR
TO CONSTRUCTION.
C-12
M
IS
C E
LL
A
N E
O U
S D
E
TA
IL
S
/2
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-1 to C
-1 5.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:2
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -1 to
C -1
5.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
RED FLASHING LIGHTS
8' SEPARATION
MULTI-BARRIER AR 10X96
8'-0"
NOTES
1. BARRICADES SHALL BE SPACED 8' MAXIMUM SEPARATION, OR AS INSTRUCTED BY THE
CONTRACTING OFFICER OR AIRFIELD MANAGER.
2. INSTALL WHERE INDICATED ON PHASING PLANS OR IN LOCATIONS APPROVED BY THE CONTRACTING
OFFICER OR AIRFIELD MANAGER.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING, MOVING, LIGHTING AND MAINTAINING THE
BARRICADES DURING CONSTRUCTION OF THE ENTIRE PROJECT. BARRICADE LINES MUST BE
MAINTAINED AT ALL TIMES.
4. INSTALL A MINIMUM OF 2 RED FLASHING LIGHTS EQUALLY SPACED PER EACH 8' LONG BARRICADE.
FLASHING LIGHTS MUST BE AT LEAST FIVE CANDELAS EFFECTIVE INTENSITY AND FLASH AT A RATE OF
FROM 55 TO 160 FLASHES PER MINUTE PER AF ETL 04-2 PARAGRAPH 9.2.1.
5. CONTRACTOR SHALL USE WATER-FILLED LOW PROFILE BARRICADES DESIGNED FOR AIRPORT USE, SUCH AS MANUFACTURED BY MULTI-BARRIER, MODEL NO. AR10X96 OR APPROVED EQUAL.
HIGHLY REFLECTIVE DIAGONAL
ALTERNATING ORANGE AND
WHITE STRIPES (BOTH SIDES)
OR APPROVED EQUAL
1 LOW PROFILE CONSTRUCTION BARRICADE
G-03 TO
G-06
SERVICE VEHICLE DRIVE LANE MARKING7
SCALE: NTSC-10
TAXIWAY CENTERLINE MARKING DETAIL
C-10
SCALE: NTS
TIE DOWN/GROUND RECEPTACLE
PAVEMENT MARKING DETAIL8
SCALE: NTSC-10
FIRST STREET CENTERLINE MARKING DETAIL
C-10
SCALE: NTS
TAXILANE WINGTIP CLEARANCE PAVEMENT MARKING5
SCALE: NTSC-10
TYPICAL T-1A TIE DOWN/GROUND
RECEPTACLE LAYOUT
C-12
SCALE: NTS
COMBINATION TIE-DOWN/GROUND RECEPTACLE DETAIL
C-12
SCALE: NTSSCALE: NTS
APRON EDGE PAVEMENT MARKING DETAIL
C-10
SCALE: NTS
FIRE EXTINGUISHER
STORAGE MARKING10
SCALE: NTSC-10
CATHODICALLY PROTECTED
6" DIA STEEL AIR PIPE
EX ELECT CONDUITS - UIP
FLOWABLE FILL
U N
K N
O W
N
.2
5"
U N
K N
O W
N
EX ELECT CONDUITS - UIP
EX ORIG PVMT
EX CONC TRENCH/PATCH
CIRCA 2015 - TBR
CONST BUTT JT (TYP)
GEOTEXTILE
NOTE
ALL DIMENSIONS ARE
APPROXIMATE. FIELD VERIFY.
FLOWABLE FILL - TBR
CONCRETE ENCASED
UTILITY BANK - TBR
(F O
R B
ID
P
U R
P O
S E
S O
N
LY
SEAL PER DETAIL 1/C-14 (TYP)
APPROVED
EXPANSION BOARD
(TYP)
REPLACEMENT 16-INCH CONC PATCH
(SECTION 32 13 14.13)
TWO COATS OF
PARAFFIN CURING
COMPOUND AS
BOND BREAKER
.2
5"
5" T
Y P
#4 BARS @ 12" OC
EACH WAY
VAR - APPROX 4' TYP - UP TO 25'
VERIFY
DEPTH
IN FIELD
TO
G
P U
V
IA
S E
A L
O
FF
FI
TT
IN
G
REPLACEMENT
THRU CONDUITS
EX ELECT
CONDUITS
REPLACEMENT
CONDUIT W/ STUBUP
NOTE
1. SAW CUT TRANSVERSE CONTRACTION JOINTS TO MATCH
EXISTING PATTERN PER DETAIL G/C-14.
2. REFER TO ROW "P" GPU'S CONDUIT SCHEMATIC ON SHEET
E-10 FOR SECTION A-A'
3. GPU PAD NOT SHOWN FOR CLARITY.
DOUBLE FULL DEPTH SAWCUT
EX PCC APRON
PVMT - UIP
EX SUBGRADE - UIP
6" GRADED-CRUSHED
AGG BASE COURSE
13" PCC PVMT
6" HOT MIX ASPH PVMT
8" GRADED-CRUSHED
AGG BASE COURSE
FULL DEPTH SAWCUT
VARVAR
3'
(TYP) 14' TO 19' (TYP) 14' TO 19' (TYP)
EX ASPH ROADWAY
5' (TYP)
DUCT BANK IN SOME LOCATIONS-
SEE ELECT DWGS
JOINTS PER DRAWING C-14.
A D / BF
EX OR NEW PVMTJOINT SEALANT
SUNSHADE COLUMN (STEEL "I" BEAM)
2" T
O
" R E
V E
A L
A B
O V
E E
X P
V M
T
REBAR CAGE
BOND BREAKER
24" TO 36"
A P
P R
O X
2'
EMBEDDED THREADED RODS
NOTE
ALL DIMENSIONS AREPER
SUNSHADE MANUFACTURER.
NO ACTION REQUIRED CORNER RELIEF PATCH
FULL DIAMOND RELIEF PATCHHALF DIAMOND RELIEF PATCH
C-13
M
IS
C E
LL
A
N E
O U
S D
E
TA
IL
S
/2
D at e:
S ub m itt ed b y:
D es cr ip tio n
D at e A ct io n
R ev
DRAWING
NUMBER:
A
B
C
D
2 3 4 5
Fi le n am e:
P lo t d at e:
P lo t s ca le
S ym bo l
C :\U se rs
\c ur t.s m ith \D es kt op \A
E C
O M
P ro je ct s\ S un sh ad es
\9
_C A
D _G
IS
\9
_C
A D
\D ra w in gs \M
X D
P
-1
7_ C
-1 to C
-1 5.
tte d:
F rid ay
, S ep te m be r 0
7, 1:
:3
P M b y
S m ith , C ur t
Tr ac ki ng
N o.
9/ 7/
M X
D P
-1
7_
C -1 to
C -1
5.
dw g
A
LL
IE
D
S U
P P
O R
T T-
1A S
U N
S H
A D
E S
LA
U
G H
LI
N
A
IR
F O
R C
E B
A S
E , T
E X
A S
TH
C O
N
TR
A C
TI
N
G F
LI
G
H T/
LG
C
B
A
LA
B
A M
A A
V E
, B
LD
G
LA
U
G H
LI
N
A
FB
, T E
X A
S
U R
S /A
E C
O M
P R
O
JE
C T
N U
M B
E R
: 6
P ro je ct
ID
M X
D P
7-
C on tra ct
N o:
FA
9-
-D
-0
FA
9-
-F -0
U R
S G
R O
U P
, I N
C
A M
B E
R G
LE
N
B
LV
D
A U
S
TI
N , T
E X
A S
2-
9-
TE
X A
S P
E F
IR
M
F -1
E X
P
1/
/2
D es ig ne d by
C
M
D ra w n by
C S
R ev ie w ed b y:
W
G
CIVIL
EXISTING CONCRETE TRENCH
SCALE: NTS
2 16-INCH CONCRETE TRENCH PATCH - SECTION 'A-A'
SCALE: NTS
C-02 TO
C-05
C-06 TO
C-09
APRON EXTENSION PAVEMENT SECTION
(13-INCH NOMINAL CONCRETE WITH 6-INCH ASPHALT ROAD PATCH)
SCALE: NTS
C-06
CONCEPTUAL FOUNDATION DETAIL
SCALE: NTS
C-13
NOT IN CONTRACT
SUGGESTED TREATMENT FOR BUILDING COLUMNS NEAR
EXISTING CONCRETE AIRFIELD PAVEMENT JOINT
SCALE: NTS
C-13
NOT IN CONTRACT
.5
TO NEAREST JT
BUT NOT LESS
THAN 5'
TO NEAREST JT
BUT NOT LESS
THAN 5'
C-14
6.
5"
1/
2"
C-14
C-15
2 & 3
DWL BAR. SEE
C-14
5 C-15
TOP & BOTTOM
SPACERS
ANCHOR BASKETS
TO AGG BASE
SPREADER WIRE
"VEE" LEG CHAIR.
SEE DETAIL
DWL BAR. SEE
6.
5"
1/
2"
3/4" ±1/8"
HOT POUR ASTM D 6690
PER SPEC
SEALANT RECESSED
1/16" TO 1/4" BELOW
TOP OF PVMT
ASPH PVMT
HEAT RESISTANT
NON MOISTURE
ABSORPTIVE, NON
REACTIVE BACKER ROD
TO FIT SNUG IN JT
PCC PVMT 3/4" TO 1 1/8"
PCC PVMT
EX AGG
BASE
EX AGG BASE
ASPH SHLDR OR
EX ASPH PVMT
C-14
1/2"
1/8" TO 1/4"
CONTRACTOR SHALL PLACE
TEMP 3/8" BACKER ROD IN ALL
INITIAL SAW CUTS IMMEDIATELY
FOLLOWING SAWING TO KEEP
MATERIAL FROM ENTERING SAW
JT.
3"
3/4" (± 1/8")
NON-EXTRUDED PREMOLDED
COMPRESSIBLE MATERIAL
ASTM D-1751 OR 1752
BACKER ROD
3/4" TO 1-1/8"
SEAL 1/16"-1/4"
BELOW SURFACE, TYP
HOT POUR
ASTM D 6690
JT SEALANT
PER SPEC
HEAT RESISTANT
NON MOISTURE ABSORPTIVE,
NON REACTIVE BACKER ROD
TO FIT SNUG IN JT
3"
FINAL SAWCUT DEPTH AS
RECOMMENDED BY JT
SEAL MANUFACTURER
1/8" MIN
INITIAL
SAWCUT
SAWCUT COMPLETED JOINT
CONST JT
1/2" TO 5/8"
SAWCUT COMPLETED JOINT
CONST JT
1/2" TO 5/8"1/2" TO 5/8" 1/2" TO 5/8"
FINAL SAWCUT DEPTH AS
RECOMMENDED BY JT
SEAL MANUFACTURER
AS RECOMMENDED
BY JT SEAL…