Site Visit Questions and Answers

View the file

Other files

File Type Posted
190918_Synopsis_of_Award.pdf PDF
FA309919RA0030001_SF_30.pdf PDF
Attendance_Sheet_Redacted.pdf PDF
Atch_1r_AF_Form_3952__ChemicalHazardous_Material_Request.pdf PDF
Atch_1b_Allied_Support_T-1_Sunshades_Project_Specifications.pdf PDF
05_LAFB_Asbestos_Management_and_Operation_Plan_(2019).pdf PDF
Atch_5_Past_Performance_Questionnaire.pdf PDF
MFR_Atch_1g_ASCE_Minimum_Design_Loads_for_Buildings_and_Other_Structures.pdf PDF
5. EM 385-1 U.S. Army Corps of Engineers Safety and Health Requirements Manual.pdf PDF
Atch_1a_Allied_Support_T-1_Sunshades_100__Design_Submittal.pdf PDF
Atch_1s_DD_1354,_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
02_Uniform_Hazardous_Waste_Manifest.pdf PDF
Solicitation_-_FA309919RA003.pdf PDF
Atch_1q_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
10._DD_1354.pdf PDF
9._FAR_52.236-21.pdf PDF
Atch_1l_UFC_3-535-01,_Visual_Air_Navigation_Facilities_13.zip ZIP file
Atch_1e_ETL_04_Standard_Airfield_Pavement_Marking_Schemes,_with_Change_2.pdf PDF
8._AETC_600.pdf PDF
08_Hazmat_Usage_Log.pdf PDF
7._AF_3065.pdf PDF
Atch_1j_AETC_Installation_Excellence_Guide.pdf PDF
Atch_1_Statement_of_Work.pdf PDF
Atch_1u_UFC_4-010-01,_DoD_Minimum_Antiterrorism_Standards_for_Buildings.pdf PDF
2._AF_3000_(Example).pdf PDF
Atch_6_Notification_of_Compliance_with_Contract_Insurance_Requirements.pdf PDF
Atch_1d_Security_Requirements_for_SOW.pdf PDF
Atch_1c_Allied_Support_T-1_Sunshades_Design_Report.pdf PDF
3._OSHA_29_CFR_1910.pdf PDF
06_TCEQ_Multi_Sector_General_Permit_(TXR050000).pdf PDF
03_AF_Form_103_Base_Civil_Engineering_Work_Clearance_Request.pdf PDF
Atch_1n_FAA_Form_7460-1_Notice_of_Construction_permit.pdf PDF
Atch_1m_AF_Form_103,_Work_Clearance_Request.pdf PDF
Atch_1h_UFC_3-310-04,_Seismic_Design_for_Buildings.pdf PDF
Atch_2_Wage_Determinatinon_TX20190186.pdf PDF
Atch_3_AETC_Form_47.pdf PDF
Atch_1t_FAR_52.246-21.pdf PDF
MFR__Environment_Requirements_Atch_07_LAFP_SWPPP.pdf PDF
Atch_1f_Fire_Hydrants_Picture.pdf PDF
Atch_4_Financial_Institution_Reference_Sheet.pdf PDF
04_TCEQ_Construction_General_Permit_(TXR150000).pdf PDF
Atch_1i_Federal_Specification_L-S-300C,_Sheeting_and_Tape,_Reflective_Non-exposed_Lens.pdf PDF
Atch_1o_LAFB_Environmental_Requirements_(CEIE).pdf PDF
Atch_1p_Division_01_Specifications.pdf PDF
01_AF_Form_3952_Chemical_Hazardous_Material_Request_Authorization_Form.pdf PDF
Atch 1l UFC 3-535-01, Visual Air Navigation Facilities 13.pdf PDF
Atch_1v_UFC_4-010-02,_DoD_Minimum_Antiterrorism_Standoff_Distances_forBuildings.pdf PDF
4._OSHA_29_CFR_1926.pdf PDF
6._FAR_52.236-15.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Laughlin AFB T-1 Sunshades Site Visit Questions and Answers Solicitation FA309919RA003 Question: Is Solicitation FA309919RA003 just to include the cost of the “infrastructure” for the T-1 Sunshades or is it to also include the cost to design and build the “T-1 Sunshades”?

Answer: The design for this project has already been completed. This solicitation is for the construction of the real property infrastructure and equipment installation of the T-1 Sunshades.

Question: Standard Form 1442 only provides for one (1) cost line item and it is fairly well noted as “utility infrastructure”. Will additional cost line items be added to itemize cost for the remaining work?

Answer: Regarding materials, there are two portions of funding that are separate: utility infrastructure (what the Contractor sees in the RFP) and equipment (already has been funded by another Government organization). Regarding labor, this construction contract will ensure that the Contractor is responsible for installing both the utility infrastructure (what the Contractor is bidding for here) and equipment (already been paid for by another Government organization).

Section L – Instrs., Conds., and Notices to Offerors L-3 Proposal Preparation Instructions Question: “The response shall consist of two (2) separately bound parts, Part I – Price Proposal, and Part II – Past Performance Information. Please clarify how the Government wants the two portions of the Proposal bound if Contractor is submitting the Proposal electronically?

Answer: The Contractor shall submit the proposal electronically, but still separately. The portion of the submittal containing the price proposal shall be bound together, and the portion of the proposal containing past performance information shall be bound together.

Question: Is the cost of the sunshade structure reinforced concrete foundations to be included in the cost of this solicitation?

Answer: Yes.

Question: A geotechnical soils report for this project was not provided with the solicitation should the following be assumed for purposes of preparing the Contractor’s cost for this solicitation:

· The onsite soil is suitable for all earthwork and backfilling requirements of the project.

Answer: Yes.

· The soil is capable of staying in place for all trenching and drilling requirements and casing to control sluffing and cave-ins will not be required.

Answer: Yes.

· Rock will not be encountered.

Answer: Yes. Assume that rock will not be encountered for the duration of construction.

Atch 1 Statement of Work Infrastructure Work Question: With regards to the current phasing plan as depicted on drawings G-03 and G-04. Would the Government entertain one phase if the Contractor could show an earlier deliverable of the sunshades to the Government?

Answer: No, occupying all five rows will negatively impact the base aircraft maintenance mission.

Geotechnical Survey Current specification requires a soil sampling under each new sunshade column and GPU; this is approximately 84 borings.

· Question: How deep would the Government like the ground sampled too?

Answer: 12’

· Question: Can all of the boring be done in one phase?

Answer: No, occupying all five rows will negatively impact the base aircraft maintenance mission.

· Question: Can the Government provide copies of Geotechnical reports from past projects in the general area?

Answer: The Government cannot provide copies of Geotechnical reports; the Contractor shall be responsible for creating their own Geotechnical report of the construction area.

Grounding and Tie-Down Rods Question: The Contractor shall remove and dispose of the current grounding / tie-down rods appropriately. How many tie downs are currently existing that require removal?

Answer: All 40 (30 underneath the 5 rows of sunshades, 10 not underneath the 5 rows of sunshades) shall require removal and replacement.

Airfield Striping Removal and Installation Question: A backflow preventer shall be procured and installed by the Contractor for the times of use. Please confirm construction water provided by Government is at no charge to the Contractor.

Answer: The Government can provide the Contractor connections to the base water mains for the purposes of construction. The Contractor shall use a backflow preventer while accessing base utility; the Contractor shall notify the Government prior to when they plan on using water for construction.

Sunshade Design/Construction The Contractor shall match future sunshades with current sunshades to be the best of their ability. For the Contractor’s awareness, all painting of the sunshade structure, and its components, shall be conducted off the installation. No exceptions or provisions shall be made.

· Question: Will Government allow minor field paint touch up of sunshade structure from erection process?

Answer: The Contractor shall submit a request for the minor paint touch ups they plan on doing; the Contractor shall ensure the Government approves their submittal before they are permitted to continue.

Structural Design Criteria The structure shall be built to mitigate bird roosting and nesting with the sunshade structure, as depicted in the 100% design.

· Question: During the site visit, we visually noticed the roof purlins were of a low profile. If we match the existing shades under construction have we met the requirement for mitigating bird roosting?

Answer: The proper mitigation for bird roosting is already laid out in the 100% design. Matching the existing shades is not required if the 100% design already accounts for the bird mitigation.

· Question: If this is not the case and some sort of bird mitigation is required please specify the desired deterrent. If its some sort of bird netting please specify the maximum size holes in the netting. Likewise, note that netting will create problems accessing the LED lights.

Answer: The proper mitigation for bird roosting is already laid out in the 100% design. Matching the existing shades is not required if the 100% design already accounts for the bird mitigation.

Material Requirements The sunshade framework and roof structure/covering, including accessories, shall be hot-dipped galvanized steel. The said framework, roof structure/covering, and accessories shall be over coated with a finish coat of dry film paint with a thickness capable of hiding the color of the galvanized steel below.

· Question: Accessories – may the roof purlins remain G-90 galvanized as in the current sunshades that are under construction?

Answer: The structure shall be built to the 100% design, not the existing shades.

Existing Site Conditions We attended the site survey last week to identify, verify and validate the existing conditions that were visually available to us.

· Question: Please specify the existing flight line concrete thickness for the desired area of the new T-1 sunshades?

Answer: 8”

· Question: Is there existing steel reinforcement in the flight line concrete that is to be demoed?

Answer: Yes.

· Question: Is there a designated area on the base to dispose of the demoed concrete and excavated soils?

Answer: No, all waste needs to be disposed of off base.

Airfield Areas and Movement with them Question: Please specify at what elevation/height will the Contractor be required to have a light on any lifting equipment?

Answer: The Contractor shall provide the Government the heights of any/all equipment that they require for the project. The Government shall be responsible of tracking equipment/height requirements needed via FAA Form 7460-01.

On-site Field Oversight Question: A superintendent and Quality Control (QC) manager, approved by the Government, must be on-site whenever work is being performed. The superintendent and the AC manager shall not be the same person. It is well defined that the Government requires a Superintendent and a Quality Control Manager on-site at all times that there is work being performed. Can the two designated positions have any other ancillary duties?

Answer: No, the Superintendent and QC Manager cannot have additional duties.

Contract Information Period of Performance Question: With regards to the first Notice to Proceed so, the Contractor can prepare and submit all required designs, calculations, and material submittals. How many days does the Government require to review submittals?

Answer: The Government’s submittal review process takes up to 14 days.

Question: The second Notice to Proceed states 150 calendar days for the base bid and an additional 30 days per row. Please clarify how many rows are designed in the base bid?

Answer: The scope includes 5 rows total: rows P, Q, R, S, and T.

Deliverables All materials shall be submitted within the specified time after issuance of NTP 1 and approved with the performance period of NTP 1.

· Question: This statement differs from the above information as it infers the Contractor has to develop the engineered drawings, calculations, and material submittals in less than 60 days with an undefined amount for the Government review and approval process. Please specify the Government review and approval process time.

Answer: (1) The engineered drawings and calculations have already been completed via the 100% design. (2) Each material submittal has their own submission date, which can be found on the Schedule of Submittals.

· Question: Progress Schedule – Can the Contractor submit the Construction Schedule utilizing Microsoft Project software?

Answer: The Contractor shall submit their schedule submissions via the Government forms required. The Contractor may submit their schedule submissions via Microsoft Project in addition to the required Government forms if they choose to.

Warranty The sunshade framework, including accessories, shall be hot-dipped galvanized steel and include a 20-year warranty against any material defects, corrosion, and deterioration.

· Question: Please define the level of corrosion and deterioration that is acceptable to the Government? Corrosion, as defined by the Government, is the electrochemical oxidation of metal in reaction with an oxidant such as oxygen; can occur in any environment.

Answer: When constructing the scope, the Contractor shall only use metal that is covered with a 20-year warranty for corrosion.

Question: Section B Supplies or Service and Price/Cost. Please clarify bid form; is this a lump sum bid?

Answer: Yes, this is a lump sum bid.

Question: Will wage rates per General Decision Number: TX20190186 01/04/2019 be required or will equipment installation rates prevail?

Answer: The wage rates per General Decision Number TX20190186 01/04/2019 will be required.

RFI items Question: What are the depth, dimensions, and extent to which the air pipe utility ducts will be demoed?

Answer: The depth, dimensions, and extent to replacing the air pipe utility shall match the existing conditions. Modifying the existing layout of air pipe utility after demolition is beyond the project scope.

Question: Is this to be bid in phases and if so, will this require any remobilizations?

Answer: Is this to be bid in phases and if so, will this require any remobilizations? Although the period of performance of this project consists of two separate phases, the Contractor shall submit their estimate to encompass both phases of work.

Atch 1c Allied Support T-1Sunshades Design Report Question: Section 3 – Para 3.1 – last sentence states “This preparatory project does not include procurement or installation of the sunshades structures themselves.” Is the cost of the sunshade structures to be included with the contractor’s pricing for this solicitation?

Answer: Yes, this construction effort includes both real property infrastructure and equipment installation.

Question: Section 3 – Para 3.26.3 – will any replacement, repair or modifications of the existing compressed air system be a part of this solicitation? If yes, please provide documentation clearly outlining this scope of work and any existing infrastructure that will be encountered.

Answer: Design Report 3.26 Potential Issues for Discussion “3. This project will render the branches of the compressed air system permanently inoperable.” Therefore, if the compressed air function doesn’t work in a certain area, the Contractor shall replace the air pipe utility to match existing conditions.

Question: Section 3 – Para 3.26.4 – will any repairs, replacement or modifications to the existing cathodic protection system be a part of this solicitation? If yes, please provide documentation clearly outlining this scope of work and any existing infrastructure that will be encountered.

Answer: Design Report 3.26 Potential Issues for Discussion “4. …Modifications to the cathodic protection system serving the air lines is beyond the project scope.” Therefore, the cathodic protection system is not part of the project scope.

Plans

Question: Plan sheets C-02 thru C-05 – Legend, legend note the begins “Remove ex conc pad…” provides two replacement remedies, “conc or grout as directed by COR”. The cost of each of these remedies can be significantly different, which methods cost should be included in the Contractor’s proposal?

Answer: The Contractor shall use concrete when creating the cost estimate.

Questions: Plan sheets C-06 thru C-09 – Legend, legend “6” asphalt road patch”, there may not be a hot mix asphalt plant near enough to the project location to provide the “hot mix asphalt” for this work. Would an equivalent profile of concrete paving be an acceptable alternative?

Answer: Yes.

Question: Plan sheet C-12 detail 1, allows an 8’-0” separation between the water-filled barricades or as “instructed by the Contracting Officer or Airfield Manager”. Will an 8’-0” separation be the baseline for Contractor pricing of should a smaller separation dimension be used? If a smaller separation dimension should be used, please provide that dimension.

Answer: The 8’ separation shall be used as the baseline for Contractor pricing.

Question: Plan sheet C-12 detail 3, will all of the aircraft tie-downs require the 10’ grounding rod?

Answer: Yes.

Question: No specific design for air piping is provided with the RFP documents. Please provide design documents for the replacement repair and modifications of the air piping requirements for this project.

Answer: The Contractor shall replace the air pipe utility to match existing conditions. Specific design documents to alter the existing condition are not required.