This Task Assignment (TA) is a state contract executed between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants, Inc. for groundwater monitoring services at the Former Contemporary Cleaners site in Orlando, Florida. The TA is issued under Contract Number HW683, with TA Number DC012C, effective through July 18, 2025. The FDEP Project Manager is Sarah Aduwa, and the Contractor's Project Manager is Maria Lemes. The site is located at 4882 South Kirkman Road, Orlando, Florida 32811, and is identified by FDEP Site ID ERIC_4970.
Geosyntec will conduct annual groundwater monitoring activities comprising three subtasks: Project Management, Annual Groundwater Monitoring, and preparation of a Groundwater Monitoring Report. Subtask 2 includes depth-to-water measurements from 35 monitoring wells over a 24-hour period and groundwater sampling from 25 wells, with analysis of volatile organic halocarbons (VOHs) by EPA Method 8260. The contractor will also manage investigation-derived waste (IDW) disposal, with purge water from sampling containerized in two 55-gallon drums. The total contract value is $19,673.31 on a fixed unit rate basis, with labor totaling 108 hours distributed across staff at various rates. The single deliverable—a Groundwater Monitoring Report and IDW Manifests—is due by May 30, 2025. Funding information indicates Org. Code N/A with no additional funding details provided. The contract incorporates the Scope of Work dated January 16, 2025, prepared by Geosyntec and approved by FDEP.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW683
DC012C Completion July 18, 2025
This Task Assignment authorizes Geosyntec to conduct Annual Groundwater Monitoring activities at Former Contemporary Cleaners in accordance with Geosyntec’s scope of work, cost estimate and schedule received on January 16, 2025.
Sarah Aduwa 850-245-8973 Contractor Geosyntec Contractor
Contractor Maria Lemes Contractor 813-379-4386
ERIC 4970
4882 South Kirkman Road, Orlando, Florida 32811
Former Contemporary Cleaners
Contractor Contractor
✔ $ 19,673.31
$ 19,673.31
Scope of Work
Geosyntec Contractor Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2025.02.05 09:52:57 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.02.05 09:07:36 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1, 2, 3 - Groundwater Monitoring Report and IDW Manifests 05/30/2025
Subtasks 1, 2, 3 - Groundwater Monitoring Report and IDW Manifests $ 19,673.31
$ 19,673.31
HW683
DC012C
FFLLORIDAA DDEEPARTMENTT OOFF
EEnvironmentall Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Jeanette Nuñez
Lt. Governor
Alexiss A.. Lambert Secretary
To: HW683 Contract Negotiation File Former Contemporary Cleaners Orlando, Florida
ERIC_4970
From: Sarah Aduwa, Project Manager Date: February 4, 2025 Subject: Negotiation Summary
HW683_DC012C
This Task Assignment authorizes Geosyntec to conduct Annual Groundwater Monitoring activities at Former Contemporary Cleaners in accordance with Geosyntec’s scope of work, cost estimate and schedule received on January 16, 2025.
Maria Cristina Lemes is the project manager; her hours are directly computed.
Subtask 2 – Groundwater Sampling This subtask includes costs associated with annual groundwater monitoring activities tentatively scheduled for February or March 2025. Geosyntec will measure the DTW from the 35 monitoring wells listed below over a 24-hour period, including 10 not proposed for sampling. 25 monitoring wells were recommended for sampling in 2025 are consistent with the June 2023 sampling plan. Groundwater samples will be collected in accordance with FDEP Standard Operating Procedures and submitted for laboratory analysis of volatile organic halocarbons (VOHs) by Environmental Protection Agency Method 8260.
Subtask 3 – Groundwater Monitoring Report Geosyntec will prepare an Annual Groundwater Monitoring Report documenting the results of the depth to groundwater measurements and VOH concentrations. A final signed waste manifest for IDW transport and disposal will also be included in the Groundwater Monitoring Report.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task assignment. The final cost is $19,673.81 with 108 labor hours.
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 1/16/2025
Task #: Pending SubTask 1 Project Management SubTask 6
Site: SubTask 2 Annual Groundwater Monitoring SubTask 7
Activity/Phase: Annual Groundwater Mo SubTask 3 Groundwater Monitoring Report SubTask 8
Project Manager: M. Lemes SubTask 4 SubTask 9
SubTask 5 SubTask 10
TTotals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$47.57 PProject Manager M. Lemes 11 11.1 $97.11 Principal T. Kafka 2 0 2 0 0 0 0 0 0 0 $47.57 Professional M. Lemes 24 4 20 0 0 0 0 0 0 0 $44.38 Professional C. Saville 8 0 8 0 0 0 0 0 0 0 $39.30 Senior Staff Professiona M. Mohr 33 33 0 0 0 0 0 0 0 0 $35.25 Senior Staff Professiona S. Ohrmundt 30 30 0 0 0 0 0 0 0 0
Total Hours 108 11 67 30 0 0 0 0 0 0 0
Direct Labor $4,571.23 $525.89 $2,544.68 $1,500.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $7,894.51 $908.21 $4,394.66 $2,591.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $12,465.74 $1,434.10 $6,939.34 $4,092.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fomer Contemporary Cleaners
Cost Estimate Page 1 of 4 Cost Estimate
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 1/16/2025
Task #: Pending SubTask 1 Project Management SubTask 6
Site: SubTask 2 Annual Groundwater Monitoring SubTask 7
Activity/Phase: Annual Groundwater Mo SubTask 3 Groundwater Monitoring Report SubTask 8
Project Manager: M. Lemes SubTask 4 SubTask 9
SubTask 5 SubTask 10
TTotals 1 2 3 4 5 6 7 8 9 10
Fomer Contemporary Cleaners
Travel Vehicle Rental $720.00 $720.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $704.00 $704.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,424.00 $1,424.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $390.00 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $390.00 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $39.00 $39.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $429.00 $429.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,898.00 $1,898.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,048.00 $2,048.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,740.00 $1,740.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,060.00 $2,060.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $18,426.74 $1,434.10 $12,900.34 $4,092.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,246.57 $143.41 $693.93 $409.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $19,673.31 $1,577.51 $13,594.27 $4,501.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $19,673.31 Auto-Calculated
Final Total Cost: $19,673.31 Auto-Calculated
Cost Estimate Page 2 of 4 Cost Estimate
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Contemporary Cleaners SUBTASK: Annual Groundwater Monitoring
DATE: 1/16/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Professional M. Lemes 4
Senior Staff Professional M. Mohr 33
Senior Staff Professional S. Ohrmundt 30
TOTAL LABOR 67
VEHICLE TYPE RATE UNIT USEAGE
Truck Mathias $120.00 Day 3 $360.00 Truck Mohr $120.00 Day 3 $360.00
Subtotal $720.00
TOTAL VEHICLE $720.00
PER DIEM STAFF RATE UNIT USEAGE
Mohr Per Diem $36.00 Day 2 $72.00 Mohr Hotel $140.00 Day 2 $280.00 Mathias Per Diem $36.00 Day 2 $72.00 Mathias Hotel $140.00 Day 2 $280.00
TOTAL PER DIEM $704.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW
Erwin Remediation $390.00 $390.00
Subtotal $390.00
TOTAL SUB $390.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs 25 MWs + 1 IDW $73.00 26 0 $1,898.00
Subtotal $1,898.00 Shipping
Large Cooler (25 to 50 lbs) $150.00 1 $150.00 Small Cooler (0 to 25 lbs) $110.00 0 $0.00
Subtotal $150.00
TOTAL LAB $2,048.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Analytical Related
Groundwater Sampling Kit $290.00 Day 6 $1,740.00 Subtotal $1,740.00
IDW Related Drum $100.00 Drum 2 $200.00
Subtotal $200.00 Expendables
$40.00 Day 3 $120.00 Subtotal $120.00
TOTAL EQUIPMENT $2,060.00
Non-hazardous, PFAS-containing liquid IDW (2 drum x $195/drum)
Site property owner notification (1 hr). Evaluate field data (0.5 hr/day x 3 days = 2 hr). IDW profiling and manifesting (1 hr).
Field preparation (1 hr). Field kick off meeting (1 hr). Round trip mobilization from Clearwater (5 hr). Collect 17 depth to water measurements (2.5 hr). Calibrate sampling equipment (0.5 hr/day x 3 days = 1.5 hr). Monitoring well sampling (1.5 hr/well x 12 wells = 18 hr). Collect IDW sample (1 hr). Sample management (2 hr). Compiling field notes (1 hr).
Field kick off meeting (1 hr). Round trip mobilization from Tampa (4 hr). Collect 18 depth to water measurements (2.5 hr). Calibrate sampling equipment (0.5 hr/day x 3 days = 1.5 hr).
Monitoring well sampling (1.5 hr/well x 13 wells = 20 hr). IDW management (1 hr).
2/4/2025 Page 3 of 4 Subtask 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Fomer Contemporary Cleaners SUBTASK: Groundwater Monitoring Report
DATE: 1/16/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 2
Professional C. Saville 8
Professional M. Lemes 20
TOTAL LABOR 30
Evaluating and interpreting groundwater data, develop conclusions and recommendations, and PG sign/seal of Groundwater Monitoring Report
Prepare figure package for Groundwater Monitoring Report
Prepare Groundwater Monitoring Report
2/4/2025 Page 4 of 4 Subtask 3
12802 Tampa Oaks Blvd.
Suite 151
Tampa, Florida 33637
PH 813.558.0990
www.geosyntec.com
Contemporary Cleaners (ERIC_4970)_HW683 SOW_Annual GMR_2025-01
January 16, 2025
Ms. Sarah Aduwa Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Subject: Scope of Work and CEF/LOE Annual Groundwater Monitoring Former Contemporary Cleaners 4882 South Kirkman Road, Orlando, Florida 32811 FDEP Site ID No. ERIC_4970
Dear Ms. Aduwa:
Geosyntec Consultants, Inc. (Geosyntec) has prepared the following scope of work (SOW), Cost Estimating Form (CEF), and Level of Effort (LOE) for annual groundwater monitoring at the Former Contemporary Cleaners (Site) located in Orlando, Florida. A copy of the CEF/LOE is provided in Attachment A. Geosyntec confirmed on January 15, 2025 that the site access agreement is current and property ownership has not changed.
Subtask 1 – Project Management
Costs associated with this subtask are directly computed. Maria Cristina Lemes will serve as the Project Manager for this scope.
Subtask 2 – Annual Groundwater Monitoring
This subtask includes costs associated with annual groundwater monitoring activities tentatively scheduled for February or March 2025. Geosyntec will collect depth to water (DTW) measurements and groundwater samples from select, accessible monitoring wells in the Site-wide network. Geosyntec will measure the DTW from the 35 monitoring wells listed below over a 24-hour period, including 10 not proposed for sampling. The DTW measurement will be used to generate groundwater elevation contour maps to evaluate groundwater flow directions in the upper surficial (screened less than 30 ft BLS), lower surficial (screened between 47 to 55 ft BLS), and intermediate aquifers (screened between 63 to 75 ft BLS).
Each monitoring well is flush mount in either a paved or vegetative area (with overgrown vegetation observed during more recent sampling events), and the manholes will require bailing
Ms. Sarah Aduwa January 16, 2025
Contemporary Cleaners (ERIC_4970)_HW683 SOW_Annual GMR_2025-01 of water to access the wells. A metal detector is recommended to assist with locating monitoring wells within the overgrown vegetative area.
Upper Surficial Aquifer (18) Lower Surficial Aquifer (13) Intermediate Aquifer (4)
MW001*
MW002*
MW003
MW004
MW005*
MW006*
MW019*
MW021
MW027
MW031
MW032
MW033R
MW034
MW035R*
MW036R*
MW038*
MW039*
MW041*
MW008*
MW009*
MW014
MW017*
MW018
MW023*
MW025*
MW026*
MW028*
MW29R*
MW040*
MW042*
MW043*
MW010*
MW015*
MW016*
MW037*
* Indicates the monitoring well is also proposed for sampling.
The 25 monitoring wells recommended for sampling in 2025 include the following, consistent with the June 2023 sampling plan:
Upper Surficial Aquifer (10) Lower Surficial Aquifer (11) Intermediate Aquifer (4)
MW001
MW002
MW019
MW006
MW035R
MW036R
MW038
MW039
MW041
MW005
MW008
MW009
MW017
MW023
MW025
MW026
MW028
MW29R
MW040
MW042
MW043
MW010
MW015
MW016
MW037
Groundwater samples will be collected in accordance with FDEP Standard Operating Procedures and submitted for laboratory analysis of volatile organic halocarbons (VOHs) by Environmental
Contemporary Cleaners (ERIC_4970)_HW683 SOW_Annual GMR_2025-01
Protection Agency Method 8260. The samples will be stored on ice and shipped to the analytical laboratory under chain of custody for analysis under standard turnaround times.
Purge water generated during sampling activities will be containerized in two 55-gallon drums for transportation off-Site for disposal as non-hazardous waste. Screening of per- and polyfluoroalkyl substances (PFAS) has been performed at the Site and PFAS were detected in the associated investigation derived waste (IDW) sample. Thus, the drum will be disposed of as PFAS-containing material. Bid costs for 2025 prepared by the waste disposal companies are summarized in the following table and included in Attachment B. Based on the bids, Geosyntec recommends selecting Erwin Remediation to haul and dispose of IDW generated during monitoring activities.
We have assumed no oversight is required for drum pickup.
IDW Disposal for PFAS-Containing Waste
Disposal Company Non-Hazardous Water (Per 55-gal. drum)
Erwin Remediation $195
Hull’s Environmental $1,150
WRI No Bid
Subtask 3 – Groundwater Monitoring Report
Geosyntec will prepare a Groundwater Monitoring Report (GMR) documenting the results of the depth to groundwater measurements and annual groundwater monitoring event. The report will contain tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the groundwater monitoring event. The GMR will be signed and sealed by a Florida-licensed professional engineer or geologist. A final signed waste manifest for IDW transport and disposal will also be included in the GMR, assuming no scheduling delays occur.
Contemporary Cleaners (ERIC_4970)_HW683 SOW_Annual GMR_2025-01
Deliverable and Invoicing Schedule:
Geosyntec proposes the following deliverables and Period of Performance schedule below.
Subtask Deliverable Deliverable Date Invoice Amount
1, 2, 3 Groundwater Monitoring Report and IDW Manifests May 30, 2025 $19,673.31
Total $19,673.31 The above schedule assumes sampling is conducted in February or March 2025.
Geosyntec appreciates the opportunity to provide this proposal and cost estimate to you and the FDEP. Please contact us if you have any questions or require additional information.
Sincerely, Olivia Cain, P.E. (FL) Todd K. Kafka, P.G. (FL, TN)
Project Engineer Senior Principal Hydrogeologist
Copies to: Maria Cristina Lemes, Geosyntec
Attachments: Attachment A – CEF/LOE Attachment B – IDW Quotes
ATTACHMENT B
IDW Transportation & Disposal Cost
Estimates
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511
To: Ms. Maria Lemes Geosyntec Consultants, Inc.
19321 US Highway 19 North Clearwater, FL 33764
December 16, 2024
Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials
Ms. Lemes:
The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil, mud, and water is listed below:
Impacted with Non-Hazardous Petroleum or Chlorinated Solvents:
Description Rate Unit T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Mud/Water $ 125.00 Per Drum
Impacted with Non-Hazardous PFAS/PFOS:
Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum
Dry cleaning sites will require 8260-VOH lab analysis and PFAS sites will require the full FDEP lab analysis for IDW waste characterization.
This quote is valid for 120 days.
Respectfully, Jonathan Erwin Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com Office: (850) 292-6511
Solids Northeast Region Northwest Region Central Region Southwest Region* T&D, Drum, 55-Gal, Non-Hazardous, IDW $200.00 $695.00 $200.00 $250.00 T&D, Drum, 55-Gal, Hazardous, IDW T&D, Drum, 55-Gal, PFAS, IDW case by case; call for quote $1,100.00 $1,200.00 Liquids (<3% solids) Northeast Region Northwest Region Central Region Southwest Region* T&D, Drum, 55-Gal, Non-Hazardous, IDW $200.00 $200.00 $200.00 $250.00 T&D, Drum, 55-Gal, Hazardous, IDW T&D, Drum, 55-Gal, PFAS, IDW case by case; call for quote $1,200.00 $1,100.00 $1,200.00
Additional Fees <30 Miles 30-50 Miles >50 Miles Transportation (from portal to p/u site) 0 $50 $100
Policies
Jacksonville, FL Larry Hall 4850 Collins Ave, Jacksonville, FL 32244 904-379-3465 Tampa, FL Mike Bevacqua 4390 28th St N, St. Petersburg, FL 33714 727-610-2080 Winter Haven, FL Ben Skidmore 548 E Bridgers Ave, Auburndale, FL 33823 863-213-3996 Panama City, FL Jesse Hixson 1810 Industrial Dr, Panama City, FL 32405 850-571-3124
FDEP PRP / Drycleaner T&D Rates 2024 case by case; call for quote case by case; call for quote
LOCATIONS
Typically waste profiles < 1 year can be utilized. However, this is NOT always the case. Hull's will notify ATC in the event a newer profile is needed.
All Regions
: 2025FC0101
: 1/1/2025
IDW quantity for this project does not meet the minimum for WRI
Jeff Maylon/ Office Manager
From: Jeff Maylon To: Olivia Cain; Amanda Kimball Subject: RE: Request for Quote (WRI/Moran) - 2025 IDW Pricing for FDEP Sites Date: Tuesday, January 14, 2025 10:46:24 AM Attachments: image005.png image006.png image007.png image008.png image009.png image010.png
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."
Good morning Olivia, We only accept non-hazardous waste for disposal at our facility. We do offer transportation of PFAS contaminated waste for disposal at the Waste Management Emelle AL facility.
Respectfully, Jeffrey Maylon Office Manager Water Recovery, LLC
Office: 904.475.9320 WRIJax.com
PERFORMANCE | CAPABILITIES | CULTURE
CONFIDENTIAL NOTICE: This document is for the sole purpose of the intended recipient(s) and may contain confidential and/or privileged information. Any unauthorized review, use, disclosure, or distribution is prohibited. If you are not the intended recipient, please contact the sender and destroy all copies of the original document.
Please consider the environment before printing this email
From: Olivia Cain <OCain@Geosyntec.com> Sent: Tuesday, January 14, 2025 10:42 AM To: Amanda Kimball <akimball@wrijax.com> Cc: Jeff Maylon <jmaylon@wrijax.com> Subject: RE: Request for Quote (WRI/Moran) - 2025 IDW Pricing for FDEP Sites
Good morning! I wanted to follow up on my question from last week.
Olivia B. Cain, P.E. (FL) Project Engineer Geosyntec Consultants, Inc.
Clearwater, FL Pronouns: she/her
We do offer transportation of PFAS contaminated waste for disposal at the Waste Management Emelle AL facility
File details come from the government source that posted it. Updated .