This is a Task Assignment (TA) document executed between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants for environmental services at the Former Trophy Cleaners site located at 2790A Gulf to Bay Boulevard in Clearwater, Pinellas County, Florida. The contract is identified as HW683, with Task Assignment Number DC024B, and is effective through April 30, 2024. The Department Project Manager is Brittany Plyler, and the Contractor's Project Manager is Olivia Cain.
The scope of work encompasses four subtasks: (1) project management calculated at 13% of direct labor costs; (2) installation of two downgradient monitoring wells (MW032 and MW033) using hollow-stem augers to approximately 12 feet below land surface; (3) annual groundwater monitoring including depth-to-water measurements from 24 monitoring wells and groundwater samples from 11 wells, along with surveying of newly installed wells; and (4) preparation of a groundwater monitoring report documenting volatile organic hydrocarbon results. The total contract value is $22,518.46 on a fixed unit rate basis, comprising 92 labor hours. Payment is divided into two invoices: $7,038.79 upon submittal of the Well Installation Field Deliverable by December 29, 2023, and $15,479.67 upon submittal of the Groundwater Monitoring Report and Final IDW Manifests by January 31, 2024. The contract includes subcontracted services for drilling ($3,165.00), surveying ($2,360.00), utility location ($500.00), investigation-derived waste disposal ($975.00), laboratory analysis ($1,117.00), and various field equipment and expendables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
DC024B Completion April 30, 2024
This Task Assignment authorizes Geosyntec to conduct Monitoring Well Installation, and Annual Groundwater Monitoring in accordance with the Geosyntec scope of work, cost estimate, and schedule received on October 23, 2023.
Brittany Plyler 850-245-8851 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec
Geosyntec
Olivia Cain 727-330-9961
ERIC_5301
2790A Gulf to Bay Boulevard Clearwater, Pinellas County, Florida
Former Trophy Cleaners
✔ $ 22,518.46
$ 22,518.46
Scope of Work
Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2023.11.14 16:32:48 -05'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.11.14 15:24:01 -05'00'
N/A
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Well Installation Field Deliverable 12/29/2023
Subtask 1, 3, 4: Groundwater Monitoring Report and Final IDW Manifests; PM 01/31/2024
Subtask 2: Submittal of the Well Installation Field Deliverable $ 7,038.79
Subtask 1, 3, 4: Submittal of the Groundwater Monitoring Report and Final IDW Manifests; PM $ 15,479.67
$ 22,518.46
HW683
DC024B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To: HW683 Contract Negotiation File Former Trophy Cleaners Pinellas County, Florida
ERIC_5301
From: Brittany Plyler, Project Manager Date: October 31, 2023 Subject: Negotiation Summary
HW683_DC024B
This Task Assignment authorizes Geosyntec to conduct Monitoring Well Installation, and Annual Groundwater Monitoring in accordance with the Geosyntec scope of work, cost estimate, and schedule received on October 23, 2023.
Geosyntec confirmed on October 23, 2023, that Subtask 1 consists of the calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.
Subtask 2: This Subtask includes costs associated with the installation of two downgradient monitoring wells (MW032 and MW033).
Subtask 3: This Subtask includes costs associated with annual groundwater monitoring. Depth-to-water measurements will be collected from 24 monitoring wells (MW001 through MW004, MW008, MW009, and MW016 through MW031). Groundwater monitoring well samples will be collected from 11 monitoring wells (MW001, MW008, MW018, MW019, MW024, MW026, MW027, MW028, MW031, MW032, and MW033).
This subtask also includes costs for a Florida professional land surveyor to survey the two (2) newly installed monitoring wells.
Subtask 4: Geosyntec will prepare a Groundwater Monitoring Report documenting the VOH results of the groundwater monitoring event.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost is $22,518.46 with 92 labor hours.
Printed on recycled paper.
FDEP COST ESTIMATE
Contractor: Geosyntec Consultants
Date: 10/23/2023
Task #: Pending SubTask 1 Project Management SubTask 6
Site: Former Trophy Cleaners SubTask 2 Monitoring Well Installation SubTask 7
Activity/Phase: Monitoring SubTask 3 Annual Groundwater Monitoring SubTask 8
Project Manager: O. Cain SubTask 4 Groundwater Monitoring Report SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$49.04 Project Manager O. Cain 9 9.1 $86.54 Principal T. Kafka 2 0 0 2 0 0 0 0 0 0
$51.44 Project Professional M. Hensley 5 0 0 5 0 0 0 0 0 0
$49.04 Project Professional O. Cain 30 5 1 24 0 0 0 0 0 0
$32.45 Staff Professional M. Mohr 26 14 12 0 0 0 0 0 0 0
$33.65 Senior Staff Professional A. Ogunkoya 20 0 20 0 0 0 0 0 0 0
Total Hours 92 9 19 33 31 0 0 0 0 0 0
Direct Labor $3,862.54 $444.36 $699.50 $1,111.44 $1,607.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $6,670.61 $767.41 $1,208.04 $1,919.46 $2,775.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $10,533.15 $1,211.77 $1,907.54 $3,030.90 $4,382.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $480.00 $120.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $480.00 $120.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate Page 1 of 5 Cost Estimate
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 10/23/2023
Task #: Pending SubTask 1 Project Management SubTask 6
Site: Former Trophy Cleaners SubTask 2 Monitoring Well Installation SubTask 7
Activity/Phase: Monitoring SubTask 3 Annual Groundwater Monitoring SubTask 8
Project Manager: O. Cain SubTask 4 Groundwater Monitoring Report SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $3,165.00 $3,165.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $2,360.00 $0.00 $2,360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $975.00 $0.00 $975.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$500.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $7,000.00 $3,665.00 $3,335.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $700.00 $366.50 $333.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $7,700.00 $4,031.50 $3,668.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $1,117.00 $314.00 $803.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $220.00 $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $1,337.00 $424.00 $913.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $120.00 $40.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $325.00 $325.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $870.00 $0.00 $870.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $1,415.00 $365.00 $1,050.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $21,465.15 $1,211.77 $6,848.04 $9,022.40 $4,382.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $1,053.31 $121.18 $190.75 $303.09 $438.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $22,518.46 $1,332.95 $7,038.79 $9,325.49 $4,821.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: Manual Entry Invoice 1 $7,038.79 Cost from Delta CEF; Manual Entry Invoice 2 $15,479.67
Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $22,518.46 Auto-Calculated
Final Total Cost: $22,518.46 Auto-Calculated
Cost Estimate Page 2 of 5 Cost Estimate
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Trophy Cleaners SUBTASK: Monitoring Well Installation
DATE: 10/23/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Professional
O. Cain 5
Staff Professional
M. Mohr 14
TOTAL LABOR 19
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Day 1 $120.00
Subtotal $120.00
TOTAL VEHICLE $120.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Drilling (Conventional)
Action Environmental Well Installation $3,165.00 $3,165.00
Subtotal $3,165.00
Other
Site Lines Utility Locate $500.00 $500.00
Subtotal $500.00
TOTAL SUB $3,665.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs IDW (Soil + Water) $70.00 2 0 $140.00
VOHs IDW (Soil + Water) $73.00 2 0 $146.00
RCRA-8 IDW (Soil + Water) $14.00 2 0 $28.00
Subtotal $314.00
Shipping
Large Cooler (25 to 50 lbs) $150.00 0 $0.00
Small Cooler (0 to 25 lbs) $110.00 1 $110.00
Subtotal $110.00
TOTAL LAB $424.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drilling Related
Monitoring Well Installation Kit $325.00 Day 1 $325.00
Subtotal $325.00
Expendables
$40.00 Day 1 $40.00
Subtotal $40.00
TOTAL EQUIPMENT $365.00
Obtain updated off-site access agreement (2 hr). Tenant and property owner notifications, and field pacakge activities (3 hr).
Prepare field package (1 hr). Field prep (1 hr). Ovsersee monitoring well installation (10 hr).
Manage IDW (1 hr). Collect IDW sample (1 hr).
11/2/2023 Page 3 of 5 Subtask 2
SUBTASK: Annual Groundwater Monitoring
DATE: 10/23/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Professional O. Cain 1
Staff Professional M. Mohr 12
Senior Staff Professional A. Ogunkoya 20
TOTAL LABOR 33
VEHICLE TYPE RATE UNIT USEAGE
Truck Ogunkoya $120.00 Day 2 $240.00 Van Mohr $120.00 Day 1 $120.00
Subtotal $360.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Surveying SurvTech Solutions Monitoring well survey $2,360.00 $2,360.00
Subtotal $2,360.00
IDW
Erwin Remediation $195/drum x 5 drums $975.00 $975.00
Subtotal $975.00
TOTAL SUB $3,335.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs $73.00 11 0 $803.00 Subtotal $803.00
Shipping Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00
Subtotal $110.00
TOTAL LAB $913.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Analytical Related Groundwater Sampling Kit $290.00 Day 3 $870.00
Subtotal $870.00 IDW Related
Drum $100.00 Drum 1 $100.00 Subtotal $100.00
Expendables $40.00 Day 2 $80.00
Subtotal $80.00
TOTAL EQUIPMENT $1,050.00
Mobilization/demobilization from Tampa (1 hr/day x 2 days = 2 hr). Collect depth to water measurements (2 hr). Calibrate sampling equipment (1 hr). Monitoring well sampling (1.5 hr/well x 7 wells = 11 hr). IDW management (1 hr). Sample management (2 hr). Compile field notes (1 hr).
Tenant and property owner notifications, and field package activities
Prepare field pacakage (1 hr). Field prep (1 hr). Collect depth to water measurements (3 hr).
Calibrate sampling equipment (1 hr). Monitoring well sampling (1.5 hr/well x 4 wells = 6 hr).
11/2/2023 Page 4 of 5 Subtask 3
SUBTASK: Groundwater Monitoring Report
DATE: 10/23/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
T. Kafka 2
Project Professional
M. Hensley 5
Project Professional
O. Cain 24
TOTAL LABOR 31
Develop report conclusions and recommendations. PG sign/seal.
Groundwater elevation contours and groundwater results figures
Prepare Groundwater Monitoring Report, including summary of well installation activities
11/2/2023 Page 5 of 5 Subtask 4
Trophy Cleaners (ERIC_5301)_HW683 SOW_Annual GMR_2023-10
19321 U.S. Highway 19 North Building C, Suite 200
Clearwater, Florida 33764
PH 813-792-4820
www.geosyntec.com
October 23, 2023
Ms. Brittany Plyler Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Scope of Work and Level of Effort Annual Groundwater Monitoring Former Trophy Cleaners 2790A Gulf to Bay Boulevard Clearwater, Pinellas County, Florida FDEP Site ID No. ERIC_5301
Dear Ms. Plyler, Geosyntec Consultants, Inc. (Geosyntec) has prepared this s Scope of Work (SOW), Cost Estimating Form (CEF), and Level of Effort (LOE) for monitoring well installation and annual groundwater monitoring activities at the Former Trophy Cleaners Site (Site) located in Clearwater, Florida. Assessment activities proposed in this SOW are consistent with recommendations provided in the January 2023 Annual Groundwater Monitoring Report approved by the Florida Department of Environmental Protection on January 12, 2023. A copy of the CEF/LOE is included in Attachment A.
As part of SOW/LOE preparation, access agreements were evaluated to determine (i) what agreements are in place and (ii) that the existing owners associated with each agreement are current. However, at the request of FDEP an updated access agreement for the downgradient, off- Site parcel will be obtained as part of Subtask 2.
Subtask 1 – Project Management
Costs associated with this subtask are directly computed.
Subtask 2 – Monitoring Well Installation
This Subtask includes costs associated with the installation of two downgradient monitoring wells (Figure 1) at an off-Site parcel. The monitoring wells (MW032 and MW033) will be installed using hollow-stem augers to approximately 12 feet (ft) below land surface (BLS). The monitoring wells will be constructed of 10 ft of Schedule 40 polyvinyl chloride (PVC) well screen slotted at 0.010-inches and 2 ft of Schedule 40 PVC riser. The filter pack will consist of 20/30 silica sand placed around the well screen to approximately 0.5-ft above the top of the well screen, followed by a 0.5-ft thick 30/65 fine sand seal and Portland Cement grout to the surface. The monitoring wells will be competed flush-to-grade in 8-inch diameter manholes embedded in 2-ft by 2-ft concrete pads. The monitoring wells will be developed until visually clear using a combination of surging and pumping. The top-of-casing elevation and horizontal coordinates of each monitoring well will be measured by a Florida-licensed professional surveyor as part of Subtask 3.
Geosyntec obtained cost estimates from three drilling subcontractors – Action Environmental (Action), Environmental Drilling Services (EDS), and Preferred Drilling Solutions (PDS). The quotes are provided in Attachment B. Action provided the most competitive bid and has been selected for this work. Action estimated the work will take approximately 1 day to complete.
Prior to conducting monitoring well installation activities, Geosyntec will observe a subsurface survey to identify potential subsurface utilities or obstructions. Geosyntec obtained cost estimates from three utility locating subcontractors – GeoTek Services, LLC (GeoTek), GeoView, Inc., and Site Lines, LLC. The quotes are provided in Attachment C. Site Lines provided the most competitive bid and has been selected for this work.
Subtask 3 – Annual Groundwater Monitoring and Monitoring Well Surveying
Monitoring Well Sampling
This Subtask includes costs associated with annual groundwater monitoring activities tentatively scheduled for November 2023. Geosyntec will mobilize to the Site to collect depth-to-water measurements from 24 monitoring wells in the Site-wide monitoring well network (MW001 through MW004, MW008, MW009, and MW016 through MW031 and new monitoring wells MW032 and MW033), including 13 not proposed for sampling. Measurements will be collected over a 24-hour period to generate groundwater elevation contour maps to evaluate groundwater flow directions. Due to the presence of standing water historically noted at monitoring well MW001 (located in a drainage ditch next to Gulf to Bay Boulevard), we have included effort to remove water from around and within the manhole prior to sampling as part of the DTW measurements.
Groundwater monitoring well samples will be collected from 11 monitoring wells (MW001, MW008, MW018, MW019, MW024, MW026, MW027, MW028, MW031, MW032, and MW033). Groundwater samples will be collected in accordance with FDEP Standard Operating Procedures and submitted for laboratory analysis of volatile organic halocarbons by Environmental Protection Agency Method 8260B.
Following the collection of the monitoring well samples, purge water will be containerized in one 55-gallon drum for transportation off site for disposal as non-hazardous waste. Screening of per-and polyfluoroalkyl substances (PFAS) has been performed at the Site and PFAS were detected in the associated investigation derived waste (IDW) sample. Thus, the drum will be disposed of as
PFAS-containing material. Bid costs prepared by the waste disposal companies are included in Attachment C. Based on the bids, Geosyntec recommends selecting Erwin Remediation to haul and dispose of IDW generated during monitoring activities. We have assumed no oversight is required for drum pickup.
Monitoring Well Survey
This subtask includes costs for a Florida professional land surveyor to survey the horizontal coordinates, top of casing elevations, and ground surface elevations of the two (2) newly installed monitoring wells. Cost has been included for Geosyntec to oversee the survey during the annual groundwater monitoring event. A copy of the surveyor’s quote is included in Attachment D.
Subtask 4 – Annual Groundwater Monitoring Report
Geosyntec will prepare a Groundwater Monitoring Report documenting the VOH results of the groundwater monitoring event. The report will contain tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the field activities completed. A final signed waste manifest for IDW transport and disposal will also be included in the Groundwater Monitoring Report. The report will be signed and sealed by a Florida-licensed professional geologist or engineer.
Ø
³
²
Î
¼
Deliverable and Invoicing Schedule:
Geosyntec proposes the following deliverables and Period of Performance schedule below.
Subtask Deliverable Deliverable Date Invoice Amount
2 Well Installation Field Deliverable December 7, 2023 $7,038.79
1, 3, 4 Groundwater Monitoring Report and Final IDW Manifests
January 11, 2024 $15,479.67
Total $22,518.46
The above schedule assumes Subtask 2 and 3 activities are conducted in November 2023.
Geosyntec appreciates the opportunity to provide this proposal and cost estimate to you and the FDEP. Please contact us if you have any questions or require additional information.
Sincerely, Olivia Cain, P.E. (FL) Todd K. Kafka, P.G. (FL, VA, TN) Project Engineer Senior Principal Hydrogeologist
Attachments: Attachment A – CEF/LOE Attachment B – Drilling Quotes
Attachment C – IDW Quotes Attachment D – Surveyor’s Quote
ATTACHMENT B
DRILLING QUOTES
October 3, 2023
Geosyntec Consultants
Olivia B. Cain, P.E. | Engineer| ocain@geosyntec.com 19321 US Highway 19, Building C, Suite 200 | Clearwater, FL 33764 T. 727.330.9959 | M. 727.262.8268
Re: Soil Borings and Monitor Well Installation 2790 Gulf to Bay Boulevard Clearwater
Dear Ms. Cain, Action Environmental is pleased to present this proposal you requested for the former Trophy Cleaners site located at 2790 Gulfport Boulevard in Clearwater, Florida. A public utility location will be called in at least 72 hours (3 business days) prior to starting work. All boreholes will be cleared by hand to 5 feet. The scope of work is two soil borings and installation of two monitor wells. The two soil borings will be at monitor well locations and will be done using DPT and macrocore samplers to a depth of 12 feet. The monitor wells will be installed using hollow stem augers to a depth of 12 feet. The monitor wells with be 2 inches diameter with 10 feet of .010 slotted screen. They will have a 20/30 sand pack to 6 inches above the screen, 6 inches of sealing sand and grout seal. The monitor wells will be finished with 2x2 concrete pad and 8 inch bolt down manholes. The monitor wells will be developed using a submersible pump until clear. All drill cuttings, soils and development water will be drummed.
The drums will be staged in designated location at the end of the job by Action. Work area will be cleaned at the completion of work
Scope of Work
• Utility location (Call 811 over 48 hours prior)
• Daily pre-job safety meeting
• Clear each borehole to 5 feet
• Two soil borings using DPT and macrocore samplers to 12 feet
• Installation of two monitor wells using HSA to 12 feet
• Development of monitor wells
• Finish monitor wells with 2x2 concrete pads and 8 inch bolt down manholes
• Drum all drill cuttings, soils and development water
• Stage drums
• Clean work area
Fee Schedule Mob/Demob, Vehicles, Fuel and Permitting 1 Ls 550.00$ 550.00$ Drilling Crew 1 Days 1,775.00$ 1,775.00$ Monitor Well Materials (screens,casing, caps and plug, sand and grout) 2 Ea 215.00$ 430.00$ Well Completions 2 Ea 100.00$ 200.00$ Drums 3 Ea 70.00$ 210.00$
TOTAL 3,165.00$
Assumptions/Conditions
Job is bid at 1 day All locations must be identified and accessible for the job, a remob fee and additional charges may be added if another mob needed Well pads will be cut into concrete slap 3 Drums is an estimate, if extra drums are needed the cost will be added to the final invoice Drums must be staged on hard surface such as asphalt or concrete Wells will be developed until clear or for up to 1 hour of pump time each using a submersible pump. If wells need to be pumped longer or by other method (i.e. using a peristaltic pump because of groundwater level) it is client’s responsibility
Respectfully Submitted, Jonathan Abbott, Drilling Department Manager, Action Environmental
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 10/3/23 FAC ID#: ERIC_5301
Unit Unit Rate Number of Units Extended Price whole day $1,850.00 1 1,850.00$ half day $1,450.00 -$ per foot $25.00 24 600.00$ each $110.00 -$ each $50.00 -$ each $30.00 -$ per well $125.00 2 250.00$ roundtrip $650.00 1 650.00$ per crew / per night $550.00 -$ each $70.00 5 350.00$ per day $100.00 -$ each $75.00 1 75.00$ Decon Pad lump sum $350.00 1 350.00$ per day $100.00 1 100.00$
TOTAL QUOTE PRICE $4,225.00
Notes: 1. Includes saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 10/3/23
Steam Cleaner
Other (specify)
Site Name and Location: Former Trophy Cleaners
Consultant Name: Geosyntec Consultants
PROPOSED SCOPE OF WORK:
(2) DPT borings to 12', convert to MW's
Decon Pad, Decon between wells via steam clean
2790A Gulf to Bay Blvd, Clearwater, Pinellas County, FL
Auger Attachment, 2" Well Install
Direct Push Half-Day Rate 1 - on-site half day
Drum cuttings, development water, and decon fluids
(2) 2" x 12' MW's with 10' .010 screen, soil sampling as needed, drum soil & water, pad and 8" manhole
Days to Complete Scope of Work: 1
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Permits
Other (specify)
DOT Approved 55-gal Drum
Per Diem
Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)
Well Completion (includes MH w/ cover, concrete pad, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
ATTACHMENT C
UTILITY LOCATE QUOTES
GeoTek Services, LLC
03 October 2023
To: Olivia Cain
Geosyntec Consultants 19321 US Highway 19 N Building C, Suite 200 Clearwater, Florida 33764
From: GeoTek Services, LLC 4060 Sparrow Hawk Road
Melbourne, Florida 32934
RE: Utility Locating Services – Former Trophy Cleaners in Clearwater, Florida
Ms. Cain, GeoTek Services is pleased to respond to your request for Utility Locating services at 2790 Gulf to Bay Boulevard located in Clearwater, Florida. We will scan a 10’ x 10’ area around the two proposed bore locations with the goal of locating underground utilities. We can only scan the easily accessible open areas for utilities. Note that we cannot scan beneath fixed objects such as landscaping, fencing, buildings, or vehicles.
We will scan as close as reasonably possible to fixed objects such as brush, obstructions, etc. Our deliverable will be marking paint and/or flags indicating the location of potential underground utilities. It is the client’s responsibility to protect and preserve all marks.
We will use both Electromagnetic Induction instruments as well as Ground Penetrating Radar (GPR) to detect objects below the surface. Due to the nature of sub-surface detection and the physical laws governing radio wave propagation, some buried objects may not be detectable due to depth, obscuration, or a weak radar signature. GeoTek Services will use industry standard best practices to locate sub-surface objects, however some objects may not be detectable. Geotek Services does not guarantee that all underground objects can be found. GeoTek Services assumes no liability for any damages.
We request access to any as-built site plans of the scan areas prior to rendering services. Our quote for this effort is $750.00. No out-of-pocket expenses are expected for this project. This quote is valid for sixty days.
Best Regards, Martin (Bud) Connor GeoTek Services, LLC
4060 Sparrow Hawk Road ● Melbourne, FL 32934-8525 ● info@GeoTekServices.com ● 321.473.7498
Olivia Cain
From: Mike Wightman <mwightman@geoviewinc.com> Sent: Tuesday, October 3, 2023 10:25 PM To: Olivia Cain Cc: Mandi Mohr Subject: RE: Request for Quote (GeoView) - Utility Locate in Clearwater - Former Trophy Cleaners
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."
Thanks Olivia, cost for the utility markout only (no figure) would be $1,300. If an AutoCAD site map is required to document the study results, the cost would be $1500. A small world, I was at that same site in 2008 doing a utility locating job inside of the Subway and the commercial space to the north, which was unoccupied at the time.
Let me know if you need a formal proposal and appreciate the opportunity, MJW
Mike Wightman, P.G President, GeoView O: 727‐209‐2334 C: 813‐690‐6667 mwightman@geoviewinc.com
From: Olivia Cain <OCain@Geosyntec.com> Sent: Tuesday, October 3, 2023 6:07 PM To: Mike Wightman <mwightman@geoviewinc.com> Cc: Mandi Mohr <Mandi.Mohr@Geosyntec.com> Subject: Request for Quote (GeoView) ‐ Utility Locate in Clearwater ‐ Former Trophy Cleaners
Hi Mike, Reaching out to get a quote for a utility locate at 2 locations in Clearwater. This is for the Former Trophy Cleaners site located at 2790 Gulf to Bay Boulevard. I’ve attached a map showing the proposed locations for reference. This site is part of the Florida Department of Environmental Protection Waste Site Cleanup Section and the work is being competitively bid. The bidder providing the lowest cost meeting project requirements will be selected for the work.
Let me know if you have any questions or need any additional information! We are requesting that bids be submitted no later than October 6, 2023 at 11:00 AM EST.
Hope you have a nice evening, Olivia B. Cain, P.E. (FL) Project Engineer Geosyntec Consultants, Inc.
19321 U.S. Highway 19 North Building C, Suite 200 Clearwater, Florida 33764 Office: 727-330-9961 Mobile: 727-262-8268
Pronouns: she/her
GEOSYNTEC | SIREM | SAVRON | ATM | GEOSYNTEC PFAS
This electronic mail message contains information that (a) is or may be LEGALLY PRIVILEGED, CONFIDENTIAL, PROPRIETARY IN NATURE, OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) is intended only for the use of the Addressee(s) named herein. If you are not the intended recipient, an addressee, or the person responsible for delivering this to an addressee, you are hereby notified that reading, using, copying, or distributing any part of this message is strictly prohibited. If you have received this electronic mail message in error, please contact us immediately and take the steps necessary to delete the message completely from your computer system.
SITE LINES LLC
Utility Locating 1143 59th Avenue North (727) 432-9482 St. Petersburg, FL 33703 bhardy@sitelinesllc.com
Olivia B. Cain, P.E.
Geosyntec Consultants, Inc.
19321 U.S. Highway 19 North Building C, Suite 200 Clearwater, FL 33764
October 5, 2023
SITE: Former Trophy Cleaners Site – Clearwater, Florida PROPOSAL: 01337p
Dear Ms. Cain:
Thank you for contacting Site Lines LLC regarding the private utility locate at your project site. Attached is our proposal in response to your inquiry.
Please review the proposal to ensure I have accurately captured the project details.
If you agree to the proposal, including the terms and conditions, and the statement of work, please sign, initial and date where indicated. Upon signing, the proposal will serve as the Agreement of the parties as to the above-referenced Project.
If you have any questions, please feel free to contact me. I look forward to working with you.
Site Lines LLC
William L. Hardy II Geophysicist President
Enclosure
SITE LINES LLC PROPOSAL
SITE LOCATION
Former Trophy Cleaners Site – 2790 Gulf to Bay Boulevard, Clearwater, FL
PROPOSED SCOPE OF WORK
Site Lines (“Company”) will use Ground Penetrating Radar (GPR) and conventional electromagnetic (EM) pipe and cable locators to determine the location of underground utilities at the site identified by Geosyntec (“Client”).
RESULTS OF THE INVESTIGATION
The estimated depth and location of utilities identified during the investigation will be marked on the ground surface using spray paint or other method to be agreed upon by the parties. The American Public Works Association Uniform Color Codes for the marking of underground utilities will be used.
PROJECT FEE
The fee to complete the project as described within this proposal is: Five Hundred Dollars [$500.00].
Client shall pay Company in full within thirty (30) days of the invoice date, unless the parties have agreed to another payment arrangement in writing. If during the investigation, Company determines that the goals of the project cannot be achieved with the resources available to Company, Company will notify Client as soon as reasonably possible. Under such circumstances, Company will charge Client only for time expended and materials used to date.
CLIENT REQUIREMENTS
Client is responsible for all site access, maintenance of traffic (MOT), site clearing and/or any other logistical considerations necessary to conduct the utility locate.
Client will also provide all pertinent maps of the project site, including those that show the boundaries of the utility locate, pertinent landmarks, and known utilities (if available). Company is not a substitute for Chapter 556, Florida Statutes.
Accordingly, Client is responsible for calling Sunshine State One Call of Florida
(811) before undertaking any invasive activities, whether through Company, any other entity, or on its own.
DESCRIPTION OF COMPANY INVESTIGATION AND LIMITATIONS
A GSSI SIR-4000 GPR system will be used with a 900, 400, or 270 megahertz antenna configuration depending on site conditions and desired targets. The GPR will assist in locating nonmetallic and metallic utilities. Physical surface conditions, subsurface conditions and technical limitations effect the ability of GPR to resolve targeted utilities and/or subsurface structures. Depth and/or diameter of the utility, soil type, moisture/ionic content of the soil, and electrical properties of the soil compared to that of the utility can prevent the GPR from identifying utilities at the site. The diameter of a utility cannot be determined by GPR data. Estimated depths of utilities are directly affected by soil conditions and the material of the utility. A margin of error of +/- 20-25% in depth should be expected when performing invasive activities.
An RD 8000 will be used for the EM survey. Electromagnetic induction which transmits a signal directly into the desired target and passive power detection which locates naturally occurring magnetic fields in energized lines will be identified by detecting and following the signals with a receiver. The EM survey will assist in finding only metallic utilities. The magnetic field and/or induced signal should emanate from the target in a circular geometry. When this occurs, the receiver will receive its peak signal directly above the target. However, when metallic utilities are running near each other, or there is environmental interference from fences, cars or overhead power lines, the signal can become distorted and the peak no longer can be directly over the utility. Care must be taken when doing any invasive work around the utilities. A margin of error of +/- 20-25% in depth should be expected when performing invasive activities. Company’s personnel are highly experienced and certified operators of GPR and EM pipe and cable locators.
Due to the limitations described above, when Client is working around indicated utilities, a minimum of two (2)-feet clearance from either side of the marked utility will be maintained. For absolute confirmation, Client is responsible for exposing any indicated underground utility.
Company will conduct utility investigations in accordance with the level of care and generally accepted professional practices as ordinarily exercised by members of the same profession practicing in the same locality under similar conditions.
REPRESENTATIONS AND WARRANTIES
Neither Company nor its employees or agents are licensed surveyors under Florida law, nor do they represent themselves as such. Accordingly, the work Company is to perform is not a substitute for work typically completed by a licensed surveyor.
Company specifically and expressly disclaims any liability for any type of property damage or personal injury, including but not limited to death, arising from client’s failure to determine that the services of a licensed surveyor are necessary or to retain a licensed surveyor to perform necessary services.
Limitations in technology, complexity of the physical characteristics of the subsurface conditions, and circumstances beyond Company’s control may limit the performance of Company’s utility investigation. For these reasons, Company expresses no guarantee that all utilities and underground structures will be identified and located during this project.
Company is responsible only for locating underground utilities, the presence of which is both known and indicated on site maps to be provided by Client to Company before Company performs the utility locate. Company will use its best efforts to locate both known and unknown utilities within the project boundaries. However, Company will only be responsible for locating utilities, the presence of which is known before Company undertakes its investigation.
Company expressly disclaims any and all warranties regarding specific or desired results.
TERMS AND CONDITIONS
Additional Insured: If requested, Company will name Client as an additional insured with respect to the services to be performed under this agreement.
Indemnity: Company agrees to indemnify, protect and hold harmless Client from and against all liabilities, claims or demands of every kind of injury, including death, or damages to any person or property related in any way to Company’s performance of this Agreement, except to the extent such liabilities, claims or demands are caused by the negligence or willful misconduct of Client.
Client agrees to indemnify, protect and hold harmless Company from and against all liabilities, claims or demands of every kind of injury, including death, or damages to any person or property related in any way to Client’s performance of this Agreement, except to the extent such liabilities, claims or demands are caused by the negligence or willful misconduct of Company.
Release of Information. Client authorizes Company to release any information regarding Client and this Agreement as may be permitted by Company's privacy policy or as may be required by law or requested by governmental authorities or agencies, law enforcement agencies or courts including, but not limited to, officials from local and state code enforcement agencies.
Governing Law; Jurisdiction; Severability; Waiver of Jury Trial. This Agreement shall be governed and construed in accordance with the laws of the State of Florida. Whenever possible, each provision of this Agreement shall be interpreted in such manner as to be effective and valid under Florida law, but if any provision of this Agreement shall be invalid or prohibited under Florida law, such provision shall be ineffective only as to the invalid portion of the provision without invalidating the remainder of such provision or the remaining provisions of this Agreement.
Client agrees to waive his or her rights to a jury trial for any and all claims made against or through Company. Client further agrees that Company will be notified of all claims no later than the earlier of thirty (30) days from the initial discovery of the claim or default or thirty (30) days following the expiration or termination of this Agreement. Client also agrees that failure to notify Company of any and all claims within this time period will result in the forfeiture of said claim.
Any claims by Client arising under this Agreement must be brought in a state or federal court of competent jurisdiction located in Pinellas County, Florida or in the
United States District Court for the Middle District of Florida in Tampa, Florida.
Client waives any objection to the jurisdiction and venue of such courts. This exclusive choice of jurisdiction and venue does not preclude Client or Company from bringing an action to enforce any judgment or judicial order in any other jurisdiction. The prevailing party in any dispute will be entitled to recover from the losing party its costs, including, but not limited to, costs of collection, reasonable attorney’s fees, and investigative fees.
Assignment; Succession; Third-Party Beneficiaries. Client shall not assign this Agreement or the rights thereto to any other person or entity without the express written consent of the Company. Company may assign or transfer this Agreement without the consent of Client and, after such assignment or transfer, Company shall be released from all obligations under this Agreement occurring after such assignment or transfer. All of the provisions of this Agreement shall apply to, bind and be obligatory upon the heirs, executors, administrators, representatives, successors and assigns of the parties hereto. This Agreement is for the sole benefit of the parties to this Agreement and their respective successors and permitted assigns. Nothing in this Agreement, express or implied, is intended to or shall confer on any other person or entity any legal or equitable right benefit or remedy of any nature whatsoever under or by reason of this Agreement. Notwithstanding the foregoing, any Company Agent is a third-party beneficiary of this Agreement and has the right to enforce the provisions of this Agreement directly against the Client.
Modification of Agreement. No term of this Agreement can be waived or modified except by a writing signed by both parties. If any provision of this Agreement is deemed not to apply, is illegal, or is against public policy, the remainder of the Agreement’s provisions shall retain their full force and effect.
Entire Agreement. This Agreement, including any addenda or schedules specifically incorporated by reference herein, constitutes the entire agreement between Client and Company. This Agreement contains all representations and agreements between Client and Company. Client agrees that Company has not promised Client anything that is not written on the face of this Agreement.
Disclosure Statement. These terms and conditions apply to Projects to which the Company agrees to engage, whether such agreement is made via the Company’s online website, by email, by telephone, or in person. Be advised that the terms and conditions are subject to change without notice. The extent of Site Lines LLC exposure is the limit of this contract.
SITE LINES PROPOSAL ACCEPTANCE
SIGNATURE PAGE
Site Lines Proposal Number: 01337p Proposal Date: October 5, 2023
Project Site: Former Trophy Cleaners Site – 2790 Gulf to Bay Blvd, Clearwater, FL
Project Fee: $500.00
Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE]
INVOICE TO:
Client: Geosyntec Consultants, Inc.
Address: 19321 US Hwy 19 N, Bldng C, Ste 200, Clearwater, FL 33764 Attention: Olivia B. Cain, P.E.
Phone: 727-330-9961 Email: OCain@Geosyntec.com
Special Instructions:
In witness thereof, the parties hereto have made and executed this agreement
FOR [CLIENT] FOR SITE LINES LLC
Signature: Signature:
By: By: William L. Hardy II
Title: Title: President
Date Signed: Date Signed: October 5, 2023
ATTACHMENT D
SURVEYOR’S QUOTE
SurvTech Solutions, Inc.
10220 U.S. Highway 92 East Phone: 813-621-4929 Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com
Wednesday, October 4, 2023
Olivia Cain GeoSyntec Consultants 900 Broken Sound Parkway NW, Suite 200, Boca Raton, FL 33487
RE: Proposal for Services for Former Trophy Cleaners Monitoring Wells located at 2790 Gulf to Bay Blvd, Clearwater, FL, 33759-4959; Folio No.: N/A; Estimate No.: 231560; Project No.:
N/A
Dear Olivia;
SurvTech Solutions, Inc. is pleased to submit the following information for your consideration in selecting a firm to perform the necessary services, as noted above. We feel that you will find SurvTech Solutions, Inc. is well qualified to accomplish all services set forth in the request for proposal. Our outstanding staff of professional, technical, and support personnel has extensive and varied qualifications.
The lump-sum cost for the project will be $2,360.00, with an estimated time frame of 28 days from notice to proceed. Please see attached scope of work for a detailed breakdown of costs and services. If a quicker schedule is needed, please contact us, and we will try to accommodate your schedule.
If this proposal is acceptable, please sign the attached contract and send it to SurvTech Solutions via fax, email, or U.S. Mail. SurvTech cannot start said project without having a signed contract in place. If your firm wishes to use its own in-house contract or purchase order, then please forward them to SurvTech for review and signatures. SurvTech Solutions, Inc. appreciates this opportunity to submit this proposal for services. We look forward to serving GeoSyntec Consultants on this project.
Respectfully submitted, SurvTech Solutions, Inc.
Florida Licensed Business No. 7340
Matthew S. Brooks PSM, LS, PLS V.P. of Contracts Management
PROPOSAL 231560
Monitoring Wells Survey
See Scope of Services Below
$2,360.00
TOTAL $2,360.00
Scope of Services
Standards of Practice:
1. All Surveying and Mapping will be performed per “The Florida Standards of Practice for Surveying and Mapping” and signed and sealed by a Florida Licensed Surveyor and Mapper.
Geodesy & Datums
1. Survey project data will be on the following coordinate system(s) and datum(s):
Horizontal datum (x, y; easting, northing)
SPC NAD1983, Florida West zone state plane coordinates
Vertical datum (z; elevation)
NAVD 1988 benchmark (North American Vertical Datum of 1988)
2. Units for the project shall be:
U.S. Survey Feet
Establish Elevations and State Plane Coordinates on Monitoring Wells
1. SurvTech will recover known horizontal and vertical control stations from governmental agencies, such as:
a. National Geodetic Survey (NGS).
b. Department of Transportation (DOT).
c. County Agency.
d. City Agency.
e. Water Management Districts.
f. Department of Environmental Protection (FDEP).
2. Horizontally locate 2 monitoring wells to an accuracy of +/- 0.1 feet, utilizing RTK (real-time kinematic) GPS and/or conventional surveying instruments.
3. Elevate 2 monitoring wells to an accuracy of +/- 0.01 feet, utilizing closed-loop differential leveling.
Survey Deliverables
1. The following deliverables are included in this proposal:
A spreadsheet will be delivered to client in electronic format and as hard copies accompanying a signed and sealed surveyors report. File will be sent by email unless the client specifically requests a CD of the electronic file. SurvTech is NOT preparing a map of the site. The deliverables shall be a Microsoft Excel spreadsheet (.xlsx) format and surveyors report in Adobe (.pdf) format. Hard copies shall be sent only upon request.
Additional Non-Typical Items, Exceptions, and Conditions
1. Please reference attached aerial imagery for approximate project location and site limits.
Exhibit "A" SurvTech Solutions, Inc. Short Form Agreement
General Terms of Agreement for Consulting (Surveying and Mapping) Services
1. Client hereby agrees to retain SurvTech Solutions, Inc. to perform professional land surveying services as described herein. This Agreement applies only to the specific project identified herein.
2. General Responsibility: SurvTech Solutions, Inc. agrees that we shall act as an independent contractor and shall perform the services provided for in this Agreement in accordance with the generally accepted standard of care of SurvTech Solutions, Inc.'s profession.
3. SurvTech Solutions, Inc. agrees to perform the services set forth in attached “Proposal of Services” ("services").
4. Payment: Client shall be invoiced upon completion of the project . . Client agrees to pay invoice(s) within thirty (30) days of its receipt. Client further agrees to pay interest on all amounts invoiced and not paid or objected to for valid cause in writing within said thirty (30) day period at the rate of eighteen (18) percent per annum (or the maximum interest rate permitted under applicable law), until paid. Client agrees to pay SurvTech Solutions, Inc.'s cost of collection of all amounts due and unpaid after ninety
(90) days, including court costs and reasonable attorney's fees. SurvTech Solutions, Inc. shall not be bound by any provision or agreement requiring or providing for arbitration of disputes or controversies arising out of this agreement, any provision wherein SurvTech Solutions, Inc. waives any rights to a mechanics' lien, or any provision conditioning SurvTech Solutions, Inc.’s right to receive payment for its work upon payment to Client by any third party. These General Conditions are notice where required, that SurvTech Solutions, Inc. shall file a lien whenever necessary to collect past due amounts. Failure to make payment within 30 days of invoice shall constitute a release of SurvTech Solutions, Inc. from any and all claims which Client may have whether in tort, contract or otherwise and whether known or unknown at the time.
5. Insurance: For any services provided under this Agreement, SurvTech Solutions, Inc. shall procure and maintain in effect insurance coverage in amounts not less than set forth below.
a. Workers' Compensation and Employers' Liability: Comply with the laws of the State of Florida.
b. General Liability: Comprehensive Liability Insurance for personal and bodily injury, including death and property damage in the amount of $1,000,000 combined single limit each occurrence and $2,000,000 in aggregate.
c. Professional Liability Insurance: SurvTech Solutions, Inc. shall provide Professional Liability Insurance in the amount of $2,000,000.
d. Umbrella Liability Insurance: SurvTech Solutions, Inc. shall provide additional Liability Insurance in the amount of $6,000,000 for Auto Liability and General Liability.
e. Certificates: SurvTech Solutions, Inc.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .