This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to CDM Smith Inc. for environmental remediation services at First Coast Cleaners located at 610 North 3rd Street, Jacksonville Beach, Florida (Site ID ERIC_4535). The task assignment is executed under Contract Number HW681 with an effective date of May 31, 2024, and a completion date of March 31, 2025. The department's project manager is Benjamin Aoki, and the contractor's project manager is Clint Noble. This document authorizes CDM Smith to conduct an Interim Source Removal (ISR) at the First Coast Cleaners facility based on their scope of work and cost proposal received on April 30, 2024.
The contract establishes a fixed unit rate payment basis with a total task assignment value of $908,158.45. The scope of work encompasses eight subtasks: Project Management (13% of direct labor); Pre-Interim Source Removal Activities including site access, permitting, utility clearance, health and safety planning, and baseline groundwater sampling; ISR Activities and Site Restoration including soil excavation, contamination remediation, structural support via helical anchor installation, and site restoration; ISR Site Restoration Activities including emulsified oil substrate application and horizontal injection well installation; Reporting with submission of an Interim Source Removal Completion Report; and three subcontractor cost categories for pre-construction, excavation/disposal, and site restoration activities. Environmental Remediation Services, Inc. was selected as the lowest responsive bidder for remedial contractor services at $591,474.00 for the combined pre-construction, excavation, disposal, and site restoration work. The project schedule allocates 60 total construction days with deliverables due at specified intervals through January 23, 2025, with invoicing tied to completion of defined subtasks and subcontractor payment documentation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW681
DC002D March 31, 2025
This Task Assignment authorizes CDM Smith Inc. to conduct an Interim Source
Removal (ISR) at First Coast Cleaners based on their scope of work and cost proposal received on 30 April 2024.
Benjamin Aoki 850-245-7527 CDM Smith Inc.
Clint Noble 904-527-6715
ERIC_4535
610 North 3rd Street, Jacksonville Beach, Florida
First Coast Cleaners
$ 908,158.45
$ 908,158.45
Scope of Work
CDM Smith Inc.
Leslie Samel
Vice President
Leslie Samel Digitally signed by Leslie Samel Date: 2024.06.03 11:33:11 -04'00'
Jessica Kramer, Deputy Secretary
Jessica Kramer Digitally signed by Jessica Kramer Date: 2024.05.31 12:01:06 -04'00'
May 31, 2024
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
TO:
FROM:
DATE:
SUBJECT:
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
SITE : First Coast Cleaners SUBTASK: 2 Baseline Soil and Groundwater Monitoring/Pre Excavation
DATE: 4/30/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Tech Leader Technical Data Review, RFIs, Submittal Reviews, Permitting Support, 50
Waste Characterization/Profile 2
Site Access, Permitting, Health and Safety, and Utility Clearance
Professional II Travel (1 trip) 2
HASP Preparation for Excavation 12
On-Site Private Utility Locate Oversight 8
Baseline Groundwater Sampling / Owner Meeting
Professional I Travel (1 trip) 2
Baseline Groundwater Sampling - One Day 10
Site Access with Owner 2
Field Preparation (Baseline Sampling) 1
Sample Kit Preparation 1
IDW Management 4
Soil Sampling
Professional I Travel (1 trip) 4
Soil Sampling - Onsite Boring and Clean Backfill Sampling 16
Contractor and Owner Kickoff Meeting (1 day)
Professional II Travel (1 trip) 2
Meet Contractor On-Site, Existing Condition Survey 4
Excavation Area Demarcation and Horizontal Control
Professional II Travel (1 trip) 2
Elevation Survey/Excavation Area Demarkation 8
Interim Deliverable
Professional I Data Package, Updated Soil and GW Data Tables, Field Notes, Sampling Logs, Survey 30
Project Tech Leader 52
Professional II 38
Professional I 70
TOTAL LABOR 160
VEHICLE TYPE RATE UNIT USEAGE
Truck $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS USEAGE Subtotal
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES
VOH (groundwater) EPA 8260 $73.00 7 includes 2 SPLP samples $511.00
VOH SPLP Extraction (soil EPA 8260 $45.00 2 $90.00
VOH (soil) EPA 8260 $73.00 2 $146.00
VOH (soil) 24-hour TAT EPA 8260 $73.00 2 $146.00
VOCs backfill EPA 8260 $150.00 1 $150.00
SVOCs backfill EPA 8270 $120.00 1 $120.00
PFAS backfill EPA 1633 or similar $325.00 1 $325.00
Petroleum HC FL-PRO $88.00 1 $88.00
Pesticides/PCBs backfill 8081 and 8082 $170.00 1 $170.00
Metals backfill 8-RCRA $104.00 1 $104.00
Shipping (Large Cooler) $150.00 4 $600.00
Ice $6.50 10 $65.00
TOTAL LAB $2,515.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Shallow GW Sampling Kit $290.00 day 1 $290.00
Soil Sampling Kit (concrete) $235.00 day 1 $235.00
Site Recon Kit $150.00 day 3 $450.00
GPS Survey Station $175.00 day 1 $175.00
EnCore Soil Samplers $16.00 5 1 $80.00
Expendables $40.00 day 5 $200.00
Drums $100.00 each 1 $100.00
TOTAL EQUIPMENT $1,530.00
SUBTASK: 3 ISR Activities-Soil Excavation
DATE: 4/30/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
PE Site Visits and Technical Evaluation
Project Tech Leader Technical Evaluation of Field Data/PE Support/RFIs/Pile Tests 24
Travel (2 Site Visits) 8
Site Visits (2) 10
Project Manager Additional Contractor/Owner Coordination and Oversight/RFIs 30
Site Visits (4) 20
Daily Construction Logs / Progress Reports to FDEP 20
Soil Excavation Oversight (45 days) including Documentation and Air Monitoiring
Professional II Travel (45 trips) 90
Oversight (45 days) 450
Sr. Professional ISRP Geotechnical and Structural Support 20
Interim Deliverable
Professional I Data Package, Field Notes, Construction Logs, Manifests, Photos 30
Project Tech Leader 42
Professional II 540
Professional I 30
Project Manager 70
Sr. Professional 20
TOTAL LABOR 702
VEHICLE TYPE RATE UNIT USEAGE
Truck (Construction Oversight) $1,440.00 month 2 $2,880.00
Truck (PE Visit) $120.00 day 2 $240.00
Truck (PM Visit) $120.00 day 4 $480.00
TOTAL VEHICLE $3,600.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS USEAGE Subtotal
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES
VOH (groundwater) EPA 8260 $73.00 15 $1,095.00
VOH SPLP Extraction (soEPA 8260 $45.00 15 $675.00
VOH (soil) EPA 8260 $73.00 15 $1,095.00
Shipping (Large Cooler) $150.00 5 $750.00
24 hr TAT (110%) $3,151.50
Ice $6.50 20 $130.00
TOTAL LAB $6,896.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 45 $1,800.00
PID $1,056.00 month 2 $2,112.00
Respiration Dust Monitor $1,440.00 month 2 $2,880.00
Construction Kit $900.00 month 2 $1,800.00
OVA / 4 Gas Meter $1,500.00 month 2 $3,000.00
EnCore Soil Samplers $16.00 15 1 $240.00
TOTAL EQUIPMENT $11,832.00
SUBTASK: 3 ISR Activities-Site Restoration
DATE: 4/30/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
PE Site Visits and Technical Evaluation
Project Tech Leader Technical Evaluation of Field Data/PE Support 20
Travel (1 Site Visit) 4
Site Visit 4
Project Manager Additional Owner/Contrator Coordination 10
Site Visits (2) 10
Daily Construction Logs 10
Site Restoration Oversight (15 days+6 contingency days)
Professional II Travel (15 trips) 30
Oversight (15 days+6 contingency days) 210
Sr. Professional ISRP Geotechnical and Structural Support 4
Interim Deliverable
Professional I Data Package, Field Notes, Construction Logs, Photos 20
Project Tech Leader 28
Professional II 240
Professional I 20
Project Manager 30
Sr. Professional 4
TOTAL LABOR 322
VEHICLE TYPE RATE UNIT USEAGE
Truck (Construction Oversight) $1,440.00 month 1 $1,440.00
Truck (PE Visit) $120.00 day 1 $120.00
Truck (PM Visit) $120.00 day 2 $240.00
TOTAL VEHICLE $1,800.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem day $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS USEAGE Subtotal
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES
VOH (groundwater) EPA 8260 $73.00 0 $0.00
VOH SPLP Extraction (soEPA 8260 $45.00 0 $0.00
VOH (soil) EPA 8260 $73.00 0 $0.00
Shipping (Large Cooler) $150.00 0 $0.00
Ice $6.50 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 21 $840.00
PID $1,056.00 month 1 $1,056.00
Respiration Dust Monitor $1,440.00 month 1 $1,440.00
Construction Kit $900.00 month 1 $900.00
OVA / 4 Gas Meter $1,500.00 month 1 $1,500.00
TOTAL EQUIPMENT $4,236.00
SUBTASK: 4 ISRP Completion Report
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Tech Leader PE Evaluation and Certification 12
Professional II ISRP Completion Report Preparation 40
Professional I ISRP Completion Report Tables and Documentaiton 40
Project Manager ISRP Completion Report Preparation 12
Sr. Professional ISRP Geotechnical and Structural Support 8
Professional II ISRP Completion Report Figure Support 40
Total Hours:
Project Tech Leader 12
Professional II 80
Professional I 40
Project Manager 12
Sr. Professional 8
TOTAL LABOR 152
VEHICLE TYPE RATE UNIT USEAGE
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
4/30/2024
SUBTASK: 5 Subcontractors - PreConstruction
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR #REF!
VEHICLE TYPE RATE UNIT USEAGE
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
Environmental Remediation Services, Inc. Pre-Construction Activities 1 $16,000.00 $16,000.00
Erwin Remediation IDW Removal $125 drum 1 $125.00
TOTAL $16,125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
SUBTASK: 6 Subcontractors-Excavation and Disposal
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR #REF!
VEHICLE TYPE RATE UNIT USEAGE
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
Environmental Remediation Services, Inc. Excavation and Disposal 1 $305,248.00 $305,248.00
TOTAL $305,248.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
SUBTASK: 7 Subcontractors-Site Restoration
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR #REF!
VEHICLE TYPE RATE UNIT USEAGE
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
Environmental Remediation Services, Inc. Site Restoration 1 $270,226.00 $270,226.00
TOTAL $270,226.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
*Please reference the Interim Source Removal Plan for a complete description of the items listed below
ITEM UNIT QUANTITY COST TOTAL
Site access, coordination and meetings Lump Sum 1 800 800 Permitting Lump Sum 1 1500 1500 Private utility locate, Utility clearance Lump Sum 1 800 800 Health and Safety Plan Lump Sum 1 800 800 Pre-construction surveying and documentation of existing conditions
Lump Sum 1 500 500
Submittals (including subcontractor list) Lump Sum 1 800 800 Mobilization of equipment and manpower to site Lump Sum 1 10000 10000 Temporary power Lump Sum 1 800 800
Helical Anchor Installation Each 46 2500 115000 Groundwater Monitoring Well Protection Each 3 300 900 Vapor Extraction Well and Soil Vapor Monitoring Point Removal Each 11 50 550 Security Fencing Lump Sum 1 2500 2500 Erosion and Stormwater Controls Lump Sum 1 800 800 Concrete Removal and Disposal Square Feet 1300 45 58500 Asphalt Removal and Disposal Square Feet 904 5 4520 Soil Excavation Ton 206 450 92700 Soil Transport and Disposal Ton 206 63 12978 Vibration and Settlement Monitoring Lump Sum 1 5000 5000 Dust Control Lump Sum 1 500 500 Dewatering (if needed) Per Gallon 8300 1 8300 Substrate Application Lump Sum 1 3000 3000
Horizontal Injection Well Installation Each 4 500 2000 No. 57 Stone, Placement, and Compaction Cubic Yards 90 300 27000 Geotextile Placement Square Feet 2204 2 4408 Clean Backfill, Placement, and Compaction Cubic Yards 314 300 94200 Limerock Backfill, Placement, and Compaction Cubic Yards 26 75 1950 Compaction Testing Lump Sum 1 3500 3500 Vapor Extraction Well Installation Each 2 1000 2000 Concrete Placement and Painting (6") Square Feet 1300 70 91000 Asphalt Placement (1.5") Square Feet 904 17 15368
Removal and Replacement of Bathroom and Kitchen "in-kind" Lump Sum 1 22800 22800
Site cleanup Lump Sum 1 500 500 Demobilization of equipment and manpower from site Lump Sum 1 5000 5000
Post-construction surveying and documentation of conditions Lump Sum 1 500 500
$591,474.00
TIME ESTIMATE
Earliest date construction work could be started in the field Date April
Estimated duration for ALL Construction Days 60
Estimated duration for all INTERIOR excavation and restoration* Days 45 *Note - This work may be accelerated first to allow owner access to interior sooner
COMPANY NAME
Environmental Remediatino Service President
PRINT NAME TITLE
John Anderson, Sr 3/29/2024
SIGNATURE DATE
QUOTE IS VALID FOR 30 DAYS
TOTAL:
PRE-CONSTRUCTION
SITE RESTORATION
SOIL EXCAVATION AND DISPOSAL
POST-CONSTRUCTION
BID FORM - CONSTRUCTION CONTRACTOR
First Coast Cleaners
610 3rd Street North Jacksonville Beach, Duval County, Florida
FDEP Facility ID No. ERIC_4521
*Please reference the Interim Source Removal Plan for a complete description of the items listed below
ITEM UNIT QUANTITY COST TOTAL
Site access, coordination and meetings Lump Sum 1 $1,200.00 $1,200.00 Permitting Lump Sum 1 $3,766.00 $3,766.00 Private utility locate, Utility clearance Lump Sum 1 $1,450.00 $1,450.00 Health and Safety Plan Lump Sum 1 $500.00 $500.00 Pre-construction surveying and documentation of existing conditions
Lump Sum 1 $5,200.00 $5,200.00 Submittals (including subcontractor list) Lump Sum 1 $500.00 $500.00 Mobilization of equipment and manpower to site Lump Sum 1 $5,189.00 $5,189.00 Temporary power Lump Sum 1 $3,805.00 $3,805.00
Helical Anchor Installation/Removal Each 46 $3,279.00 $150,834.00 Groundwater Monitoring Well Protection Each 3 $525.00 $1,575.00 Vapor Extraction Well and Soil Vapor Monitoring Point Removal Each 11 $289.00 $3,179.00 Security Fencing Lump Sum 1 $4,882.00 $4,882.00 Erosion and Stormwater Controls Lump Sum 1 $2,680.00 $2,680.00 Concrete Removal and Disposal Square Feet 1300 $17.30 $22,490.00 Asphalt Removal and Disposal Square Feet 904 $14.00 $12,656.00 Soil Excavation Ton 206 $169.00 $34,814.00 Soil Transport and Disposal Ton 206 $90.38 $18,618.28 Vibration and Settlement Monitoring Lump Sum 1 $152, 685.00 $152,685.00 Dust Control Lump Sum 1 $8,250.00 $8,250.00 Dewatering (if needed) Per Gallon 8300 $10,375.00 $10,375.00 Substrate Application Lump Sum 1 $4,550.95 $4,550.95
Horizontal Injection Well Installation Each 4 $390.00 $1,560.00 No. 57 Stone, Placement, and Compaction Cubic Yards 90 $194.40 $17,496.00 Geotextile Placement Square Feet 2204 $3.63 $8,000.52 Clean Backfill, Placement, and Compaction Cubic Yards 314 $31.87 $10,007.18 Limerock Backfill, Placement, and Compaction Cubic Yards 26 $231.36 $6,015.36 Compaction Testing Lump Sum 1 $4,500.00 $4,500.00 Vapor Extraction Well Installation Each 2 $750.00 $1,500.00 Concrete Placement and Painting (6") Square Feet 1300 $68.50 $89,050.00 Asphalt Placement (1.5") Square Feet 904 $27.77 $25,104.08 Removal and Replacement of Bathroom and Kitchen "in-kind" Lump Sum 1 $26,250.00 $26,250.00
Site cleanup Lump Sum 1 $2,980.00 $2,980.00 Demobilization of equipment and manpower from site Lump Sum 1 $5,189.00 $5,189.00 Post-construction surveying and documentation of conditions Lump Sum 1 $5,200.00 $5,200.00
$652,051.37
TIME ESTIMATE
Earliest date construction work could be started in the field Date 4/22/2024
Estimated duration for ALL Construction Days 45
Estimated duration for all INTERIOR excavation and restoration* Days 26 *Note - This work may be accelerated first to allow owner access to interior sooner
COMPANY NAME: Hull's Environmental Servoces, Inc.
Larry Hall Operations Manager
PRINT NAME TITLE
3/29/2024
SIGNATURE DATE
QUOTE IS VALID FOR 90 DAYS
TOTAL:
PRE-CONSTRUCTION
SITE RESTORATION
SOIL EXCAVATION AND DISPOSAL
POST-CONSTRUCTION
BID FORM - CONSTRUCTION CONTRACTOR
First Coast Cleaners 610 3rd Street North
Jacksonville Beach, Duval County, Florida FDEP Facility ID No. ERIC_4521
File details come from the government source that posted it. Updated .