CN-370000-HW681-DC020B.pdf
PDF 3 MB Posted
- Contract number
- HW681
- Issued by
- Florida
About this file
This document is a Task Assignment (TA) under Contract Number HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc., a private environmental consulting firm. The task assignment, designated as DC020B, was executed on June 23, 2023, with a completion date of January 15, 2024, and covers annual groundwater monitoring services at the Touch of Class Cleaners facility located at 8420 Lockwood Ridge Road in Sarasota, Manatee County, Florida (ERIC_4897). The Department Project Manager is Kyle McMurray, and the Contractor's Project Manager is Shayne Wood of CDM Smith Inc.
CDM Smith Inc. will conduct Annual Groundwater Monitoring encompassing four subtasks: Project Management (calculated at 13% of direct labor), MAGS™ Re-testing of soil vapor samples, groundwater sampling from 16 monitoring wells, and preparation of a comprehensive Annual Groundwater Monitoring Report. The total Task Assignment value is $18,086.60, structured as a fixed unit rate payment with two invoice milestones: $2,928.01 upon delivery of field notes and air sample data by August 15, 2023, and $15,158.59 upon delivery of the final Annual Groundwater Monitoring Report by December 15, 2023. The cost estimate includes labor (totaling $12,511.91 with overhead and fringe benefits), travel costs ($600.00 for vehicle rental), laboratory analytical services ($1,857.00 for 16 samples analyzed by EPA Method 8260C), subcontractor services for investigation-derived waste disposal ($137.50 including a $125.00 fee to Erwin Remediation), and field equipment and expendables ($1,729.00). No renewal periods or option periods are specified in the task assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW681
DC020B Completion January 15, 2024
CDM Smith Inc. will conduct Annual Groundwater Monitoring in accordance with the approved June 1st, 2023 Scope of Work and Cost Proposal.
Kyle McMurray 850-245-8973 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
CDM Smith Inc.
CDM Smith Inc.
Shayne Wood 904-527-6703
ERIC_4897
8420 Lockwood Ridge Road, Sarasota, Manatee County, Florida
Touch of Class Cleaners - Sarasota
✔ $ 18,086.60
$ 18,086.60
Scope of Work
Shayne Wood
Project Manager
6/23/2023
Shayne Wood Digitally signed by Shayne Wood DN: C=US, E=woodsh@cdmsmith.com, CN=Shayne Wood Date: 2023.06.23 08:19:19-04'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.06.22 08:56:10 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Field notes, air sample data and updated table 08/15/2023
Annual Groundwater Monitoring Report including tabulated data, conclusions, and recommendations 12/15/2023
Field notes, air sample data and updated table - Subtask 2 $ 2,928.01
Annual Groundwater Monitoring Report including tabulated data, conclusions, and recommendations + Project Management - Subtask 1, 3, and 4. $ 15,158.59
$ 18,086.60
HW681
DC020B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
TO: HW681 Contract File
FROM: Kyle McMurray, Contract Manager
DATE: June 21st, 2023
SUBJECT: Negotiation Summary
Task Assignment DC020B Touch of Class - Sarasota
ERIC_4897
Annual GWM
CDM Smith Inc. (CDM) will conduct Annual Groundwater Monitoring. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2: MAGs Testing MAGS testing will be performed for M-1 in general accordance with the Modified Active Gas Sampling Manual dated October 12, 2004, prepared by HSA Engineers & Scientists. Vacuum and flow rate readings will be recorded, along with vacuum readings at select monitor wells and designated vacuum monitoring points, at 15-minute intervals for a total duration of one hour.
Influent PID readings will also be recorded. CDM Smith assumes that setup, testing, and breakdown for the test will require a half-day. One soil gas sample will be submitted to the laboratory for TO-15 analyses.
Subtask 3: Groundwater Sampling Contractor will mobilize to the Site in October 2023 to collect annual groundwater samples from monitoring wells MW-1, MW-2, MW-4, MW-4D, MW-5, MW-6, MW-8, MW-9, MW-10, MW-12, MW-13, MW-14, MW-16, MW-18, MW-19, and MW-21. Field parameter data will be collected (dissolved oxygen, pH, conductivity, oxidation reduction potential, temperature, turbidity) using properly calibrated probes, and recorded. Depth-to-groundwater measurements will be collected from select monitoring wells prior to the collection of groundwater samples. All monitoring wells will be sampled in accordance with FDEP SOPs. The groundwater samples will be collected in laboratory supplied containers, placed on ice, and delivered to a NELAP certified laboratory for analysis by United States Environmental Protection Agency (EPA) Method 8260C for volatile organic halocarbons (VOHs).
Investigation derived waste (IDW) disposal is anticipated and has been accounted for under this subtask. Erwin Remediation for IDW disposal was chosen on a lowest-cost basis.
Subtask 4: Annual Groundwater Monitoring Report Upon completion of groundwater sampling field work, Contractor will prepare an Annual Groundwater Monitoring Report. This report will summarize all field work completed, field and laboratory data, investigation-derived waste (IDW) management, conclusions, and recommendations.
CDM and the FDEP confirmed on June 21st, 2023, that an Access Agreement with the current real property owner of the site has been executed.
The final cost total for Task Assignment DC020B is $18,086.60.
FDEP COST ESTIMATEContractor: CDM Smith, Inc.
Date: 6/1/2023
Task #: SubTask 1 Project Management SubTask 6
Site: Touch of Class Cleaners - Sarasota SubTask 2 MAGS Test SubTask 7
Activity/Phase: 2023 Groundwater Monit SubTask 3 Annual Groundwater Sampling SubTask 8
Project Manager: Kara Fincham, PMP SubTask 4 Annual Groundwater Monitoring Report SubTask 9
SubTask 5 SubTask 10
3.58 Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$63.58 Project Manager 8.3 8.3 $0.00 0.0 0 0 0 0 0 0 0 0 0 $0.00 0.0 0 0 0 0 0 0 0 0 0
$71.37 Project Technical Leader S. Cobert 2.0 0.0 0.0 2.0 0 0 0 0 0 0 $63.58 Project Manager K. Fincham 6.0 2.0 2.0 2.0 0 0 0 0 0 0 $43.05 Professional II K. Turner 74.0 11.0 39.0 24.0 0 0 0 0 0 0 $23.36 Professional I L. Weber 15.0 1.0 2.0 12.0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 105.3 8.3 14.0 43.0 40 0 0 0 0 0 0
Direct Labor $4,588.16 $527.84 $624.07 $1,852.83 $1,583.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 135.00% $6,194.01 $712.58 $842.49 $2,501.32 $2,137.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.70% $1,729.74 $199.00 $235.27 $698.52 $596.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $12,511.91 $1,439.42 $1,701.83 $5,052.67 $4,317.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 Page 1
FDEP COST ESTIMATEContractor: CDM Smith, Inc.
Date: 6/1/2023
Task #: SubTask 1 Project Management SubTask 6
Site: Touch of Class Cleaners - Sarasota SubTask 2 MAGS Test SubTask 7
Activity/Phase: 2023 Groundwater Monit SubTask 3 Annual Groundwater Sampling SubTask 8
Project Manager: Kara Fincham, PMP SubTask 4 Annual Groundwater Monitoring Report SubTask 9
SubTask 5 SubTask 10
3.58 Totals 1 2 3 4 5 6 7 8 9 10
Travel
Vehicle Rental $600.00 $120.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $600.00 $120.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $125.00 $0.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $125.00 $0.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $12.50 $0.00 $12.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $137.50 $0.00 $137.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs 16 samples 8260 $1,368.00 $200.00 $1,168.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $489.00 $163.00 $326.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,857.00 $363.00 $1,494.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $40.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $500.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $33.00 $33.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) Groundwater Sam $936.00 $0.00 $936.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,729.00 $573.00 $1,156.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $16,835.41 $1,439.42 $2,757.83 $8,320.17 $4,317.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,251.19 $143.94 $170.18 $505.27 $431.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $18,086.60 $1,583.36 $2,928.01 $8,825.44 $4,749.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Touch of Class Cleaners - Sarasota SUBTASK: MAGS Test
DATE: 6/1/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager K. Fincham Prepare Field Scope of Work 1 Review/submittal of Data Summary 1
Professional II K. Turner Mobilization/Demobilization (1 mob) 2 Field Preparation 1 Update HASP 1 Prepare Sample Kit 1 Perform MAGS Test 5 Preparation of Data Summary 1
Professional I L. Weber Data Tabulation/Data Package Preparation 1
Total Hours K.Fincham 2 K. Turner 11 L. Weber 1
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 1 $120.00
TOTAL VEHICLE $120.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs by TO-15 $200.00 1 0 $200.00
Shipping Cooler $150.00 1 $150.00 Ice $6.50 2 $13.00
TOTAL LAB $363.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
MAGS Investigation Kit $500.00 1 day $500.00 Expendables $40.00 1 day $40.00 Summa Canister $33.00 1 each $33.00
TOTAL EQUIPMENT $573.00
FINAL --7/24/96
SUBTASK: Annual Groundwater Sampling
DATE: 6/1/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager K. Fincham Prepare Field Scope of Work 1 Review/submittal of Data Summary 1
Professional II K. Turner Mobilization/Demobilization (4 mob - sampling -IDW) 8 Field Preparation 1 Update HASP 1 Prepare Sample Kit 1 Sample Monitoring Wells 24 Preparation of Data Summary 2 IDW Managment 2
Professional I L. Weber Data Tabulation/Data Package Preparation 2
Total Hours K.Fincham 2 K. Turner 39 L. Weber 2
TOTAL LABOR 43
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 4 $480.00
TOTAL VEHICLE $480.00
SUBCONTRACTOR COSTS
NAME PURPOSE Unit COST Erwin Remediation IDW 1 $125.00 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOH - EPA Method 8260 $73.00 16 0 $1,168.00
Shipping Coolers (Large) $150.00 2 $300.00 Ice $6.50 4 $26.00
TOTAL LAB $1,494.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Groundwater Sampling Kit $290.00 3 day $870.00 Expendables $40.00 3 day $120.00 HDPE Tubing $0.30 160 foot $48.00 Silicon Tubing (1/4") $3.00 6 foot $18.00 Drum $100.00 1 each $100.00
TOTAL EQUIPMENT $1,156.00
SUBTASK: Annual Groundwater Monitoring Report
DATE: 6/1/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Technical Leader S. Cobert PE review/Seal 2 Project Manager K. Fincham GWMR Conclusions/Recommendations 2 Profesisonal II K. Turner Preparation of GWMR - body of report 24 Professional I L. Weber Preparation of GWMR Data Tables, Summaries 12
Total Hours S. Cobert 2 K.Fincham 2 K. Turner 24 L. Weber 12
TOTAL LABOR 40
4651 Salisbury Road, Suite 420
Jacksonville, Florida 32256 tel: 904.527.6716
June 1, 2023
Mr. Kyle McMurray
Florida Department of Environmental Protection
Division of Waste Management
2600 North Blair Stone Road
Tallahassee, Florida 32399
Subject: Task Assignment Request—Annual Groundwater Monitoring
Touch of Class Cleaners - Sarasota
8420 Lockwood Ridge Road, Sarasota, Manatee County, Florida
ERIC_4897
Dear Mr. McMurray:
CDM Smith Inc. is pleased to submit this Task Assignment Request for Annual Groundwater
Monitoring of the Touch of Class Cleaners - Sarasota (the Site) located at 8420 Lockwood Ridge
Road, Sarasota, Manatee County, Florida, ERIC_4897. The scope of work, proposed deliverable, and deliverable schedule are summarized below and the cost estimate is also attached.
This Task Assignment, when executed, shall be incorporated in, and become part of Contract No.
HW681, between the Florida Department of Environmental Protection (FDEP), and CDM Smith, Inc. (Contractor), dated January 5, 2022, hereafter referred to as the Contract.
Scope of Work
The proposed scope of work includes the following elements:
Subtask 1: Project Management
Project management activities performed under this task consist of those generally administrative functions required to maintain the project on schedule, within budget, and that the quality of the work products defined within this scope is consistent with CDM Smith’s quality standards. We will prepare and submit invoices upon approval of each deliverable or milestone completion.
Project Kickoff and Progress Meetings
Contractor expects to have a kickoff meeting or telephone conference with the FDEP to review the status of the project and address FDEP comments regarding the Task Assignment. CDM
Smith will prepare meeting agendas and notes as part of this task.
Project Resource Management
Contractor will manage, allocate, and coordinate necessary resources for completion of tasks related to groundwater sampling.
ERIC_4897 _Touch of Class -Sarasota_MAGS-GWMR Proposal final 05_23
Project Quality Technical Review
Contractor Quality Management System guidelines will be followed. Internal quality reviews will be conducted on plans and on investigation findings and reports.
Project Status Reports
Contractor Project Manager will prepare and submit monthly status reports to accompany each invoice throughout the duration of this project.
Subtask 2: MAGS™ Re-testing
MAGS testing will be performed for M-1 in general accordance with the Modified Active Gas
Sampling Manual dated October 12, 2004, prepared by HSA Engineers & Scientists. More specifically:
To begin the MAGS testing, the Contractor will set up vacuum and flow rates like the test performed by Cardno in 2017 (40 in H2O). Using the previously determined flow rate and vacuum, a vapor sample will be collected at M-1. The vapor sample will be collected using a 6-liter Summa canister. A purge time will be calculated based on the flow rate and estimated radius of influence, to ensure the collection of steady-state data. Vacuum and flow rate readings will be recorded, along with vacuum readings at select monitor wells and designated vacuum monitoring points, at 15-minute intervals for a total duration of one hour. Influent PID readings will also be recorded.
CDM Smith assumes that setup, testing, and breakdown for the test will require a half-day. One soil gas sample will be submitted to the laboratory for TO-15 analyses with standard reporting times.
Deliverable: Field Notes, air sample data and updated table.
Subtask 3: Groundwater Sampling
Contractor will mobilize to the Site in October 2023 to collect annual groundwater samples from monitoring wells MW-1, MW-2, MW-4, MW-4D, MW-5, MW-6, MW-8, MW-9, MW-10, MW-12, MW-13, MW-14, MW-16, MW-18, MW-19, and MW-21. All monitoring wells will be sampled in accordance with FDEP SOPs (FS 2200) for low-flow sampling using a peristaltic pump. A YSI-
556 multi-parameter probe and a turbidimeter will be used to collect field data. Field parameter data will be collected (dissolved oxygen, pH, conductivity, oxidation reduction potential, temperature, turbidity) using properly calibrated probes, and recorded. Depth-to-groundwater measurements will be collected from select monitoring wells prior to the collection of groundwater samples. The groundwater samples will be collected in laboratory supplied containers, placed on ice, and delivered to a NELAP certified laboratory for analysis by United
States Environmental Protection Agency (EPA) Method 8260C for volatile organic halocarbons
(VOHs).
All purge water will be containerized and transferred to a Florida Department of
Transportation-approved 55-gallon drums. One disposal event is planned for all purge water
ERIC_4897 _Touch of Class -Sarasota_MAGS-GWMR Proposal final 05_23 collected under this proposal. The disposal services will be provided by Erwin Environmental and one drum of nonhazardous water for both events is assumed.
Subtask 4: Annual Groundwater Monitoring Report
Upon completion of groundwater sampling field work, Contractor will prepare an Annual
Groundwater Monitoring Report. This report will summarize all field work completed, field and laboratory data, investigation-derived waste (IDW) management, conclusions, and recommendations. Additional elements of the report will include:
Tables summarizing field and analytical data
Groundwater sampling logs
Laboratory analytical reports
Deliverable: Annual Groundwater Monitoring Report
Schedule:
Contractor will schedule the MAGS Retesting after the receipt of formal notice to proceed (NTP).
The previous Annual groundwater monitoring was performed on October 26, 2022, and the
2023 sampling will be scheduled in late October accordingly. The deliverables will be submitted as detailed below:
Subtask 2: Annual Groundwater Monitoring Report
Deliverable: Field notes, air sample data and updated table.
Due Date: August 15, 2023
Subtask 4: Annual Groundwater Monitoring Report
Deliverable: Annual Groundwater Monitoring Report including tabulated data, conclusions, and recommendations.
Due Date: December 15, 2023
CDM Smith appreciates this opportunity to work with FDEP on this contract. If you have any questions, please do not hesitate to contact us.
Sincerely, Approved By:
Kara Fincham, PMP Shayne Wood, P.E., BCEE
Contract Manager Vice President
CDM Smith Inc. CDM Smith Inc.
Attachments: Level of Effort/Cost Estimate Forms
Attachment A
Subcontractor Quotes
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Ms. Kara Fincham CDM Smith 4651 Salisbury road, Suite 420 Jacksonville, FL 32256
May 22, 2023
Re: Non-Hazardous Drum Disposal
Ms. Fincham:
The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil, mud, and water is listed below:
Impacted with Non-Hazardous Dry-Cleaning Solvents:
Description Rate Unit
T&D - Non-Haz Mud/Water $ 125.00 Per Drum
T&D - Non-Haz Soil $ 125.00 Per Drum
All drum lids should be properly secured, and drums should be placed on level ground (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys.
Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: robert@erwinremediation.com
03/02/2023
Kathy Leggoe
CDM Smith
PG, PMP, Geologist
4651 Salisbury Road
Jacksonville, FL, 32256 leggoekr@cdmsmith.com
904*651*0740
Subject: IDW Drums
Quote Number: QT-1093
Dear Kathy, Thank you for the opportunity to provide this proposal for the IDW drums located in the Florida Area.
HEPACO is a premier environmental contractor with coverage from 45 offices. We specialize in emergency response, industrial services, remediation, and waste services. HEPACO serves a multitude of customers including transportation companies, energy companies, environmental consultants, industrial facilities, terminals, environmental service companies, general contractors, property owners, and many other public and private-sector clients.
HEPACO, with its well-rounded and cross-trained staff, can effectively and efficiently complete this project and appreciates the opportunity. We stand firmly behind our work and always strive to deliver exceptional value and a high level of service at reasonable pricing.
Scope of Work
HEPACO will provide the following:
Pickup / Transportation and Disposal of Non-Hazardous IDW drums throughout the state of
Florida
Provide pricing per incident for disposal of Hazardous IDW Drums and PFAS waste.
Assumptions
HEPACO assumes the following:
Pricing for PFAS Drums and Hazardous IDW Drums will be priced according to location. PFAS drums can be transported to WM site in Alabama. Pricing is cost plus 30%.
All work will be completed in one mobilization unless otherwise noted
If groundwater is encountered, additional pricing for transportation, disposal, management, and/or containment will apply. This will be charged according to the HEPACO Time and Materials
Rate Sheet.
Prices do not include any required permitting unless otherwise noted
Prices do not include any surgical excavation around utilities, surface and/or subsurface structures
(it is assumed utilities are not present)
Client will provide any required sampling/analysis, technical reports, surveying, compaction testing and/or private utility locating services unless otherwise noted
All disposal prices are based on final profile approval and waste acceptance by the disposal facility
Client is responsible for any additional price associated with non-conforming waste as determined by the disposal facility
Field crew will be on-site working eight (8) hours per day M-F with no weekend or holiday work unless otherwise noted
Customer is responsible for disposal prices unless otherwise noted
Quantities are speculative. Except for minimums, all billing will be based on actual quantities.
Price
A pricing itemization is provided in Attachment A.
HEPACO Basic Conditions:
All projects require a two (2) week notice to proceed. HEPACO will make every effort possible to meet all our client’s requests; however, HEPACO cannot guarantee a project start date with less than two (2) weeks’ notice to proceed.
This proposal is contingent upon credit approval and valid for thirty days
For any additional work beyond the original scope of work, time and material rates will apply.
Except for minimums, billing will be based on actual quantities at unit prices (see Attachment A).
A four (4)-hour minimum will apply to all unit pricing quoted by the hour
Unit prices quoted by the day will be billed at the full day rate for any work on site. There will be no partial billing for partial workdays.
Unit prices quoted by the day apply up to eight hours per day. After eight hours per day, the day rate will be pro-rated for additional hours.
Unit prices are based on a non-union work force, no prevailing wages, no overtime work, and no performance bond.
Additional costs related to unexpected, concealed, or unknown conditions or any delays at the project site shall be incurred by customer.
HEPACO will not be held responsible if underground or above ground structures, cables, conduits, site features, property, materials, or equipment are destroyed, damaged, or rendered inoperable during the project.
Pricing includes HEPACO’s standard insurance coverage. Adding additional insured or increased coverages will be at additional pricing and will be quoted on a case-by-case basis.
Again, thank you for the opportunity and we look forward to completing this project.
Sincerely, Kevin Hamilton
Kevin Hamilton
HEPACO Territory Account Manager
Subject: IDW Drums
Quote Number: QT-1093
By signing below the customer acknowledges that they have received, reviewed, and agree to the HEPACO
Proposal
Owner or Owner Agent:
Signature:
Date of Acceptance:
Print Name
Owner or Owner Agent
ATTACHMENT A
PRICING ITEMIZATION TABLE
PRICING ITEMIZATION TABLE
PRICING SUMMARY TABLE
Item Type Total Price
MOBILIZATION
LABOR
MATERIALS
PPE
VEHICLES
BOATS
HEAVY EQUIPMENT
RECOVERY/TMT/STORAGE
MISC. EQUIPMENT
MONITORING/SAMPLING
LABORATORY/ANALYTICAL
COMMUNICATION
MISC.
SUBCONTRACTOR
DISPOSAL
DEMOBILIZATION
REPORT
FEES
Fee Calculated As Total Dollar Amount
Energy, Security and Recovery Fee Percentage of Total $82.15
Estimated Total Quote Price: $629.82
Item Name or Description Estimated Quantity Unit Price Units of Measure Total Line-Item Price
TRUCK DRIVER 1 $69.60 HOUR $69.60
FLATBED W/LIFT GATE 1 $76.32 HOUR $76.32
NON-HAZ SOLIDS DISPOSAL (PER
DRUM) 1 $210.00 DRUM $210.00
NON-HAZ LIQUIDS DISPOSAL (PER
DRUM) 1 $141.75 DRUM $141.75
LTL WASTE TRANSPORTATION PER
DRUM 1 $50.00 FEE $50.00