CN-370000-HW681-DC02ECO1.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW681|acc15804f9112ed94de3c1f0669600ae
Contract number
HW681
Issued by
Florida

About this file

Summary of Task Assignment Change Order HW681, DC002E-1

This document is a Task Assignment Change Order issued by the State of Florida Department of Environmental Protection (FDEP) to CDM Smith Inc. for environmental remediation monitoring services at the First Coast Cleaners site located at 610 3rd Street North, Jacksonville Beach, Duval County, Florida. The change order amends the original Task Assignment (TA) Number DC002E under Contract Number HW681. Benjamin Aoki serves as the FDEP Project Manager (850-245-7527), while Clint Noble is the contractor's Project Manager (904-527-6715). Joshua Hirten is listed as the CDM Smith Contract Manager. The change order was executed on December 9, 2025, by FDEP and December 10, 2025, by the contractor.

The change order reduces the total task assignment value from $41,595.12 to $40,240.07, representing a cost decrease of $1,355.05. This reduction eliminates sampling and analytical costs for Monitoring Well MW-020 due to the well being obstructed and unusable. The amendment modifies the sampling plan to remove labor and laboratory expenses associated with MW-020 across multiple subtasks while maintaining the same completion date of December 7, 2026. The total task assignment remains a fixed price of $40,240.07, with invoicing tied to specific deliverables including quarterly data deliverables, a monitoring well installation report, semi-annual reports, and a Year 1 PARM report. Attachment 1 of the change order has been replaced with Attachment 1-1 to reflect the revised scope of work and updated cost estimates.

View the file

Other files

File Type Posted
CN-370000-HW681-DC001A.pdf PDF
CN-370000-HW681-DC001C.pdf PDF
CN-370000-HW681-DC001D.pdf PDF
CN-370000-HW681-DC002B.pdf PDF
CN-370000-HW681-DC003D.pdf PDF
CN-370000-HW681-DC003E.pdf PDF
CN-370000-HW681-DC007C.pdf PDF
CN-370000-HW681-DC008A.pdf PDF
CN-370000-HW681-DC008C.pdf PDF
CN-370000-HW681-DC008D.pdf PDF
CN-370000-HW681-DC009B.pdf PDF
CN-370000-HW681-DC009C.pdf PDF
CN-370000-HW681-DC009D.pdf PDF
CN-370000-HW681-DC010B.pdf PDF
CN-370000-HW681-DC011E.pdf PDF
CN-370000-HW681-DC014A.pdf PDF
CN-370000-HW681-DC014B.pdf PDF
CN-370000-HW681-DC015B.pdf PDF
CN-370000-HW681-DC016A.pdf PDF
CN-370000-HW681-DC016B.pdf PDF
CN-370000-HW681-DC017A.pdf PDF
CN-370000-HW681-DC017C.pdf PDF
CN-370000-HW681-DC017D.pdf PDF
CN-370000-HW681-DC018A.pdf PDF
CN-370000-HW681-DC018B.pdf PDF
CN-370000-HW681-DC01ACO1.pdf PDF
CN-370000-HW681-DC01ACO2.pdf PDF
CN-370000-HW681-DC01ACO3.pdf PDF
CN-370000-HW681-DC025B.pdf PDF
CN-370000-HW681-DC025C.pdf PDF
CN-370000-HW681-DC026B.pdf PDF
CN-370000-HW681-DC026C.pdf PDF
CN-370000-HW681-DC027A.pdf PDF
CN-370000-HW681-DC027C.pdf PDF
CN-370000-HW681-DC028A.pdf PDF
CN-370000-HW681-DC028B.pdf PDF
CN-370000-HW681-DC028C.pdf PDF
CN-370000-HW681-DC029D.pdf PDF
CN-370000-HW681-DC02CCO1.pdf PDF
CN-370000-HW681-DC02DCO3.pdf PDF
CN-370000-HW681-DC032A.pdf PDF
CN-370000-HW681-DC032B.pdf PDF
CN-370000-HW681-DC032C.pdf PDF
CN-370000-HW681-DC033A.pdf PDF
CN-370000-HW681-DC038A.pdf PDF
CN-370000-HW681-DC03BCO1.pdf PDF
CN-370000-HW681-DC03ECO2.pdf PDF
CN-370000-HW681-DC040B.pdf PDF
CN-370000-HW681-DC040C.pdf PDF
CN-370000-HW681-DC041A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC002E 1 HW681

Benjamin Aoki 850-245-7527 Contractor CDM Smith Inc. Contractor

Contractor Clint Noble Contractor 904-527-6715

ERIC_4535

First Coast Cleaners

✔ $ 40,240.07 $ 41,595.12

$ 40,240.07 $ 41,595.12 Completion

✔ Completion 12/07/2026 12/07/2026 0

✔ 1 1 1

CDM Smith Inc.

Contractor Joshua Hirten

CDM Contract Manager

Joshua Hirten Digitally signed by Joshua Hirten Date: 2025.12.10 09:19:22 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.12.09 12:57:19 -05'00'

This Task Assignment Change Order removes the costs for sampling one monitoring well due to it being obstructed.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW681

DC002E

$ 40,240.07

Subtask 2: Quarterly Data Deliverable - Brief note on results, field notes & logs, lab report and chain of custody

Subtask 6: Monitoring Well Installation Report - activity summary, field notes, updated figures, casing elevation, and well completion report

Subtask 3: Semi Annual Report - Field notes & logs, updated figures & tables, lab report and chain of custody

Subtask 4: Quarterly Data Deliverable - Brief note on results, field notes & logs, lab report and chain of custody

Subtask 5: Quarterly Data Deliverable - Brief note on results, field notes & logs, lab report and chain of custody

Subtask 1 & 7: Year 1 PARM Report - updated figures, GW flow maps, plume maps, tabulated and lab analytical data, conclusions, recommendations; Project Management

Subtask 2: FDEP receipt and review of Quarterly Data Deliverable

Subtask 3: FDEP receipt and review of Quarterly Data Deliverable

Subtask 4: FDEP receipt and review of Quarterly Data Deliverable

Subtask 1 & 7: FDEP receipt and approval of Year 1 PARM Report

Subtask 5: FDEP receipt and review of Quarterly Data Deliverable

Subtask 6: FDEP receipt and review of Monitoring Well Installation Report

01/12/2026

03/12/2026

04/12/2026

07/10/2026

10/08/2026

09/08/2026

$ 9,469.18

$ 4,505.21

$ 7,607.40

$ 4,254.71

$ 5,495.19

$ 8,908.38

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Ronn DeSantis

Alexiss A.. Lambert

Memorandum

TO:

FROM:

SUBJECT:

DATE:

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

D M

S m ith In c.

D at e:

/1

2/

T A

C O

Ta sk

D C

2E

P ro po sa l S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

M on ito rin g

W el l I ns ta lla tio n, S ur ve y

S ite

Fi rs t C oa st

C le an er s (E

R

IC

_4

5) S ub Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

Ye ar

P A

R M

R ep or t (

S em i A nn ua l R ep or t)

A ct iv ity

/P ha se

P A

R M

S ub Ta sk

S em i P A

R M

S am pl in g, ID

W , R ep or t S ub Ta sk

P ro je ct

M an ag er

C lin t N ob le

Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

S ub

Ta sk

S em i P

A R

M S am pl in g, ID

W

, D at a D el S ub Ta sk

TTo ta ls

La bo r

R at e C at eg or y

$8 0.

PP

ro je ct M an ag er

.1

.1 $1

.8

S en io r O ffi ce r

0.

0.

0.

0.

0.

0.

0.

$9

0.

S en io r T ec hn ic al

E xp er t

0.

0.

0.

0.

0.

0.

0.

$8

0.

P ro je ct

T ec hn ic al L ea de r

.0 2.

3.

2.

2.

1.

5.

$8 0.

P ro je ct M an ag er

.2 1.

2.

1.

1.

4.

2.

$7 5.

S en io r P ro fe ss io na l 0.

0.

0.

0.

0.

0.

0.

$5 5.

P ro fe ss io na l I

I

6.

.8

.0

.3

.8

.8

.0

$3

7.

P ro fe ss io na l I 0.

0.

0.

0.

0.

0.

0.

$5 7.

S en io r T ec hn ic ia n

0.

0.

0.

0.

0.

0.

0.

$3

2.

S ta ff Te ch ni ci an

0.

0.

0.

0.

0.

0.

0.

$4 4.

P ro je ct A dm in is tra tio n

0.

0.

0.

0.

0.

0.

0.

$4

5.

S en io r S up po rt S er vi ce s

0.

0.

0.

0.

0.

0.

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l H ou rs

7.

.1

.1

.0

.6

.1

D ire ct L ab or

$9

,8

.6

$1 ,1

.0

$1

,0

.8

$1 ,9

.9

$9

.3

$1

,1

.8

$1 ,7

.9

$1

,8

.6

$0 .0

$0

.0

$0 .0

O ve rh ea d

5.

$1

3, 7.

$1 ,5

.9

$1

,3

.3

$2 ,5

.3

$1

,2

.6

$1 ,6

.8

$2

,3

.3

$2 ,4

.2

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.7 0%

$3 ,6

.7

$4

.2

$3

.3

$7

.8

$3

.9

$4

.3

$6

.7

$6

.3

$0

.0

$0 .0

$0

.0

To ta l L

$2 6, 0.

$3

,0

.3

$2 ,8

.5

$5

,1

.1

$2 ,5

.8

$3

,2

.9

$4 ,7

.9

$5

,0

.2

$0 .0

$0

.0

$0 .0

Tr av el V eh ic le R en ta l $8

.0

$1

.0

$1

.0

$1

.0

$1

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $$8

.0

$1

.0

$1

.0

$1

.0

$1

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

Pa ge

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

D M

S m ith

/1

2/

T A

C

D C

2E

P ro po sa l S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

M on ito rin g

W el l I ns ta lla tio n, S ur ve y

S ite

Fi rs t C oa st

C le an er s (E

R

IC

_4

5) S ub Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

Ye ar

P A

R M

R ep or t (

S em i A nn ua l R ep or t)

A ct iv ity

/P ha se

P A

Ta sk

S em i P A

R M

S am pl in g, ID

W , R ep or t S ub Ta sk

P ro je ct

M an ag er

C lin t N

Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

S ub

Ta sk

S em i P

A R

M S am pl in g, ID

W

, D at a D el S ub Ta sk

TTo ta ls

SS

ub co nt ra ct or

(E qu ip m en t P ro cu re m en t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

TTo ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m ril lin g

(C on ve nt io na

l) $2

,4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$2 ,4

.0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$7

.0

$1

.0

$1

.0

$1

.0

$1

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$3 ,1

.0

$1

.0

$1

.0

$1

.0

$1

.0

$2

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $3

.0

$1

2.

$1 2.

$1

2.

$1 2.

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $3

,4

.0

$1

.5

$1

.5

$1

.5

$1

.5

$2 ,9

.0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

A na ly tic al

C os ts $3

,0

.0

$5

.0

$9

.0

$5

.0

$9

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$5

.0

$1

.5

$1

.5

$1

.5

$1

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $3

,5

.0

$6

.5

$1 ,1

.5

$6

.5

$1

,1

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en se s

P er so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$2

.0

$4 0.

$4

0.

$4 0.

$4

0.

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $2

,0

.0

$3

.0

$3

.0

$3

.0

$3

.0

$6

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$6

.0

$1

.0

$1

.0

$1

.0

$1

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$2 ,9

.0

$4

.0

$5

.0

$4

.0

$5

.0

$9

.0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $3

7, 6.

$3 ,0

.3

$4

,2

.5

$7 ,0

.1

$3

,9

.8

$5 ,1

.9

$8

,9

.9

$5 ,0

.2

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$2 ,6

.0

$3

.6

$2

.6

$5

.2

$2

.8

$3

.2

$4

.2

$5

.2

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$4 0, 0.

$3

,3

.9

$4 ,5

.2

$7

,6

.4

$4 ,2

.7

$5

,4

.1

$9 ,4

.1

$5

,5

.4

$0 .0

$0

.0

$0 .0

C os t f ro m P rio r C

E F:

$4 1, 5.

3, 6.

4, 3.

7, 5.

4, 3.

5, 3.

9, 9.

5, 4.

ua l E nt ry

C os t f ro m D el ta

C E

F;

1, 5.

(3

2.

(2

.0

0)

.0

(5

.5

.0 ua l E nt ry C os t (

P rio r + D el ta

$4

0, 0.

$3 ,3

.9

$4

,5

.2

$7 ,6

.4

$4

,2

.7

$5 ,4

.1

$9

,4

.1

$5 ,5

.4 ut o-

C al cu la te d

R ou nd in g E rr or

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ut o-

C al cu la te d

Fi na l T ot al C os t:

$4 0, 0.

$3

,3

.9

$4 ,5

.2

$7

,6

.4

$4 ,2

.7

$5

,4

.1

$9 ,4

.1

$5

,5

.4

A ut o- C al cu la te d

Pa

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : First Coast Cleaners SUBTASK 2: Quarterly PARM Sampling, IDW, Data Del

DATE: 11/12/25 TACO 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Support for GW event 1 Data Review for Interim Submittal 1

Project Manager Prepare Field Scope of Work 1 Data deliverable int submittal 0.25

Professional II Mobilization/Demobilization (2.0 hr roundtrip) 2 Field Preparation 0 Arrange for Site Access with owner 1 Prepare Sample Kit 1 Inspect and gauge Depth to Water in 8 monitoring wells (~10 minutes each well) 1.5 Sample Monitoring Wells (2)(1.5 hrs each) 3 IDW, Data and Sample Management 2 Preparation of Int Data Deliverable 1.75 Attempt to remove concrete from MW-020 1.5

Total Hours

PTL 2

PM 1.25

Prof II 13.75 Prof I 0 Total 17

TOTAL LABOR 17

VEHICLE TYPE RATE UNIT USEAGE

Truck - person 1 $120.00 day 1 $120.00 $120.00 day $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$150.00 Hotel $0.00 $36.00 Food $0.00 $150.00 Hotel $0.00 $36.00 Food $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST Erwin Remediation IDW 1 $125.00 $125.00

$0.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TRPH - Monitoring Wells $88.00 2 $176.00 Methane, Ethane, Ethene RSK 175 $180.00 2 $360.00 Cooler (0 to 25 lbs) - Shipping $110.00 1 $110.00 Ice $6.50 3 $19.50

TOTAL LAB $665.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit $290.00 1 days $290.00 Expendables $40.00 1 days $40.00 HDPE Tubing $0.30 150 foot $45.00 Silicon Tubing (1/4") $3.00 3 foot $9.00 Drum $100.00 1 each $100.00

TOTAL EQUIPMENT $484.00

FINAL --7/24/96

SUBTASK 3: Semi PARM Sampling, IDW, Report

DATE: 11/12/25 TACO 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Support for GW event 1 Data review for deliverable (Semi Annual Event) 2

Project Manager Prepare Field Scope of Work 1 Data deliverable submittal 1

Professional II Mobilization/Demobilization (2 hr roundtrip) 2 Field Preparation 0 Arrange for Site Access with owner 1 Prepare Sample Kit 1 Inspect and gauge Depth to Water in 8 monitoring wells (~10 minutes each well) 1.5 Sample Monitoring Wells (5)(1.5 hrs each) 7.5 IDW, Data and Sample Management 2 Preparation of 1st Semi Annual report (letter, text, table, plume maps, GW map, lab report w/coc) 12

Total Hours

PTL 3

PM 2

Prof II 27 Prof I 0 Total 32

TOTAL LABOR 32

VEHICLE TYPE RATE UNIT USEAGE

Truck - person 1 $120.00 day 1 $120.00 $120.00 day $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$150.00 Hotel $0.00 $36.00 Food $0.00 $150.00 Hotel $0.00 $36.00 Food $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST Erwin Remediation IDW 1 $125.00 $125.00

$0.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOH - EPA Method 8260 - Monitoring Wells $73.00 5 $365.00 Methane, Ethane, Ethene RSK 175 $180.00 2 $360.00

TRPH $88.00 2 $176.00

TOC 5310B $30.00 3 $90.00

Cooler (0 to 25 lbs) - Shipping $110.00 1 $110.00 Ice $6.50 5 $32.50

TOTAL LAB $1,133.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit $290.00 1 days $290.00 Expendables $40.00 1 days $40.00 HDPE Tubing $0.30 200 foot $60.00 Silicon Tubing (1/4") $3.00 5 foot $15.00 Drum $100.00 1 each $100.00

TOTAL EQUIPMENT $505.00

SUBTASK 4: Quarterly PARM Sampling, IDW, Data Del

DATE: 11/12/25 TACO 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Support for GW event 1 Data review for int deliverable 1

Project Manager Prepare Field Scope of Work 1 Data deliverable int submittal 0.25

Professional II Mobilization/Demobilization (2 hr roundtrip) 2 Field Preparation 0 Arrange for Site Access with owner 1 Prepare Sample Kit 1 Inspect and gauge Depth to Water in 8 monitoring wells (~10 minutes each well) 1.5 Sample Monitoring Wells (2)(1.5 hrs each) 3 IDW, Data and Sample Management 2 Preparation of Int Data Deliverable 1.75

Total Hours

PTL 2

PM 1.25

Prof II 12.25 Prof I 0 Total 15.5

TOTAL LABOR 15.5

VEHICLE TYPE RATE UNIT USEAGE

Truck - person 1 $120.00 day 1 $120.00 $120.00 day $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$150.00 Hotel $0.00 $36.00 Food $0.00 $150.00 Hotel $0.00 $36.00 Food $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST Erwin Remediation IDW 1 $125.00 $125.00

$0.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TRPH - Monitoring Wells $88.00 2 $176.00 Methane, Ethane, Ethene RSK 175 $180.00 2 $360.00 Cooler (0 to 25 lbs) - Shipping $110.00 1 $110.00 Ice $6.50 3 $19.50

TOTAL LAB $665.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit $290.00 1 days $290.00 Expendables $40.00 1 days $40.00 HDPE Tubing $0.30 150 foot $45.00 Silicon Tubing (1/4") $3.00 3 foot $9.00 Drum $100.00 1 each $100.00

TOTAL EQUIPMENT $484.00

SUBTASK 5: Semi PARM Sampling, IDW, Data Del

DATE: 11/12/25 TACO 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Support for GW event 1 Data review for int deliverable 1

Project Manager Prepare Field Scope of Work 1 Data deliverable int submittal 0.25

Professional II Mobilization/Demobilization (2.0 hr roundtrip) 2 Field Preparation 0 Arrange for Site Access with owner 1 Prepare Sample Kit 1 Inspect and gauge Depth to Water in 8 monitoring wells (~10 minutes each well) 1.5 Sample Monitoring Wells (5)(1.5 hrs each) 7.5 IDW, Data and Sample Management 2 Preparation of Int. Data Deliverable 1.75

Total Hours

PTL 2

PM 1.25

Prof II 16.75

Total 20

TOTAL LABOR 20

VEHICLE TYPE RATE UNIT USEAGE

Truck - person 1 $120.00 day 1 $120.00 $120.00 day $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$150.00 Hotel $0.00 $36.00 Food $0.00 $150.00 Hotel $0.00 $36.00 Food $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST Erwin Remediation IDW 1 $125.00 $125.00

$0.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOH - EPA Method 8260 - Monitoring Wells $73.00 5 $365.00 Methane, Ethane, Ethene RSK 175 $180.00 2 $360.00

TRPH $88.00 2 $176.00

TOC 5310B $30.00 3 $90.00

Cooler (0 to 25 lbs) - Shipping $110.00 1 $110.00 Ice $6.50 5 $32.50

TOTAL LAB $1,133.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit $290.00 1 days $290.00 Expendables $40.00 1 days $40.00 HDPE Tubing $0.30 200 foot $60.00 Silicon Tubing (1/4") $3.00 5 foot $15.00 Drum $100.00 1 each $100.00

TOTAL EQUIPMENT $505.00

SUBTASK 6: Monitoring Well Installation, Survey

DATE: 11/12/25 TACO 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical review of interim deliverable 1

Project Manager Utility Clearance/Site Meeting with Owner 4 Data Deliverable Int Submittal 0.25

Professional II Updating HASP 1 Field Preparation 0 Arrange for Site Access with Owner 1 Mobilization/Demobilization (2hr roundtrip, two trips) 4 Field Drilling Oversight and Owner Coordination 10 Prep of Int. Data Deliverable 1.75 Survey One Well, update map 6

Total Hours

PTL 1

PM 4.25

Prof II 23.75

Total 29

TOTAL LABOR 29

VEHICLE TYPE RATE UNIT USEAGE

Truck - person 1 $120.00 day 3 $360.00 $120.00 day $0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$150.00 Hotel $0.00 $36.00 Food $0.00

$150.00 Hotel $0.00 $36.00 Food $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST Erwin Remediation IDW 2 $125.00 $250.00 EDS Driller 1 $2,400.00 $2,400.00

TOTAL $2,650.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Monitoring Well Installation Kit $325.00 1 days $325.00 Expendables $40.00 3 days $120.00 Site Recon/Survey Kit $150.00 2 days $300.00

Drum $100.00 2 each $200.00

TOTAL EQUIPMENT $945.00

SUBTASK 7: Year 1 PARM Report

DATE: 11/12/25 TACO 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader PARM Report Technical Evaluation of data/ PE review/Seal 5

Project Manager PARM Quarterly Report Report Conclusions/Recommendations, Deliver Report 2

Professional II Preparation of PARM Report - text, Figures/Maps, tables, plume and GW flow 23

Total Hours

PTL 5

PM 2

Prof II 23 Prof I 0 Total 30

TOTAL LABOR 30

VEHICLE TYPE RATE UNIT USEAGE

Truck - person 1 $120.00 day 0 $0.00 $120.00 day $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$150.00 Hotel $0.00 $36.00 Food $0.00 $150.00 Hotel $0.00 $36.00 Food $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST Erwin Remediation IDW 0 $125.00 $0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOH - EPA Method 8260 - Monitoring Wells $73.00 0 $0.00

$73.00 $0.00 Cooler (0 to 25 lbs) - Shipping $110.00 0 $0.00 Ice $6.50 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit $290.00 0 days $0.00 Expendables $40.00 0 days $0.00 HDPE Tubing $0.30 0 foot $0.00 Silicon Tubing (1/4") $3.00 0 foot $0.00 Drum $100.00 0 each $0.00

TOTAL EQUIPMENT $0.00

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

D M

S m ith el ta T

A C

D C

2E

P ro po sa l S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

M on ito rin g

W el l I ns ta lla tio n, S ur ve y

S ite

Fi rs t C oa st

C le an er s (E

R

IC

_4

5) S ub Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

Ye ar

P A

R M

R ep or t (

S em i A nn ua l R ep or t)

A ct iv ity

/P ha se

P A

Ta sk

S em i P A

R M

S am pl in g, ID

W , R ep or t S ub Ta sk

P ro je ct

M an ag er

C lin t N

Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

S ub

Ta sk

S em i P

A R

M S am pl in g, ID

W

, D at a D el S ub Ta sk

TTo ta ls

La bo r

R at e C at eg or y

$8 0.

PP

ro je ct M an ag er -0

.1 -0

.1 $1

.8

S en io r O ffi ce r

0.

0.

0.

0.

0.

0.

0.

$9

0.

S en io r T ec hn ic al

E xp er t

0.

0.

0.

0.

0.

0.

0.

$8

0.

P ro je ct

T ec hn ic al L ea de r 0.

0.

0.

0.

0.

0.

0.

$8 0.

P ro je ct M an ag er 0.

0.

0.

0.

0.

0.

0.

$7 5.

S en io r P ro fe ss io na l 0.

0.

0.

0.

0.

0.

0.

$5 5.

P ro fe ss io na l I

I -1

.5 0.

0.

-1

.5 0.

0.

0.

$3 7.

P ro fe ss io na l I

0.

0.

0.

0.

0.

0.

0.

$5

7.

S en io r T ec hn ic ia n 0.

0.

0.

0.

0.

0.

0.

$3 2.

S ta ff

Te ch ni

0.

0.

0.

0.

0.

0.

$4

4.

P ro je ct

A dm in is tra tio n 0.

0.

0.

0.

0.

0.

0.

$4 5.

S en io r S up po rt

S er vi ce s 0.

0.

0.

0.

0.

0.

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l H ou rs -1

.6 -0

.1 0.

0.

-1

.5 0.

D ire ct L

.3

7)

.8

6) $0

.0

$0 .0

.5

1) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

5.

7.

.6 6)

$0 .0

$0

.0

2.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.7

0%

.5

7)

4.

$0

.0

$0 .0

.4

8) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

7.

.6 1)

$0 .0

$0

.0

7.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Tr av el V eh ic le R en ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pa

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

D M

S m ith el ta T

A C

D C

2E

P ro po sa l S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

M on ito rin g

W el l I ns ta lla tio n, S ur ve y

S ite

Fi rs t C oa st

C le an er s (E

R

IC

_4

5) S ub Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

Ye ar

P A

R M

R ep or t (

S em i A nn ua l R ep or t)

A ct iv ity

/P ha se

P A

Ta sk

S em i P A

R M

S am pl in g, ID

W , R ep or t S ub Ta sk

P ro je ct

M an ag er

C lin t N

Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

S ub

Ta sk

S em i P

A R

M S am pl in g, ID

W

, D at a D el S ub Ta sk

TTo ta ls

SS

ub co nt ra ct or

(E qu ip m en t P ro cu re m

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

TTo ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra ly tic al

C os ts

1, 2.

8.

8.

8.

8.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y

1, 2.

8.

8.

8.

8.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l

1, 9.

.6

1)

8.

8.

5.

8.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

.7 3)

2.

$0 .0

$0

.0

.7 7)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

1, 5.

.5 7)

8.

8.

8.

8.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pa

SUBTASK 2: Quarterly PARM Sampling, IDW, Data Del DATE: Delta TACO 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Support for GW event 0 Data Review for Interim Submittal 0

Project Manager Prepare Field Scope of Work 0 Data deliverable int submittal 0

Professional II Mobilization/Demobilization (2.0 hr roundtrip) 0 Field Preparation 0 Arrange for Site Access with owner 0 Prepare Sample Kit 0 Inspect and gauge Depth to Water in 8 monitoring wells (~10 minutes each well) 0 Sample Monitoring Wells (3)(1.5 hrs each) -1.5 IDW, Data and Sample Management 0 Preparation of Int Data Deliverable 0 Attempt to Remove concrete from MW-020 1.5

Total Hours

PTL 0

PM 0

Prof II 0 Prof I 0 Total 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Truck - person 1 $120.00 day 0 $0.00 $120.00 day $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$150.00 Hotel $0.00 $36.00 Food $0.00 $150.00 Hotel $0.00 $36.00 Food $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST Erwin Remediation IDW 0 $125.00 $0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TRPH - Monitoring Wells $88.00 1 ($88.00) Methane, Ethane, Ethene RSK 175 $180.00 1 ($180.00) Cooler (0 to 25 lbs) - Shipping $110.00 0 $0.00 Ice $6.50 0 $0.00

TOTAL LAB ($268.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit $290.00 0 days $0.00 Expendables $40.00 0 days $0.00 HDPE Tubing $0.30 0 foot $0.00 Silicon Tubing (1/4") $3.00 0 foot $0.00 Drum $100.00 0 each $0.00

TOTAL EQUIPMENT $0.00

SUBTASK 3: Semi PARM Sampling, IDW, Report DATE: Delta TACO 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Support for GW event 0 Data review for deliverable (Semi Annual Event) 0

Project Manager Prepare Field Scope of Work 0 Data deliverable submittal 0

Professional II Mobilization/Demobilization (2 hr roundtrip) 0 Field Preparation 0 Arrange for Site Access with owner 0 Prepare Sample Kit 0 Inspect and gauge Depth to Water in 8 monitoring wells (~10 minutes each well) 0 Sample Monitoring Wells (5)(1.5 hrs each) 0 IDW, Data and Sample Management 0 Preparation of 1st Semi Annual report (letter, text, table, plume maps, GW map, lab report w/coc) 0

Total Hours

PTL 0

PM 0

Prof II 0 Prof I 0 Total 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Truck - person 1 $120.00 day 0 $0.00 $120.00 day $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$150.00 Hotel $0.00 $36.00 Food $0.00 $150.00 Hotel $0.00 $36.00 Food $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST Erwin Remediation IDW 0 $125.00 $0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOH - EPA Method 8260 - Monitoring Wells $73.00 0 $0.00 Methane, Ethane, Ethene RSK 175 $180.00 1 ($180.00)

TRPH $88.00 1 ($88.00)

TOC 5310B $30.00 0 $0.00

Cooler (0 to 25 lbs) - Shipping $110.00 0 $0.00 Ice $6.50 0 $0.00

TOTAL LAB ($268.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit $290.00 0 days $0.00 Expendables $40.00 0 days $0.00 HDPE Tubing $0.30 0 foot $0.00 Silicon Tubing (1/4") $3.00 0 foot $0.00 Drum $100.00 0 each $0.00

TOTAL EQUIPMENT $0.00

SUBTASK 4: Quarterly PARM Sampling, IDW, Data Del DATE: Delta TACO 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Support for GW event 0 Data review for int deliverable 0

Project Manager Prepare Field Scope of Work 0 Data deliverable int submittal 0

Professional II Mobilization/Demobilization (2 hr roundtrip) 0 Field Preparation 0 Arrange for Site Access with owner 0 Prepare Sample Kit 0 Inspect and gauge Depth to Water in 8 monitoring wells (~10 minutes each well) 0 Sample Monitoring Wells (3)(1.5 hrs each) -1.5 IDW, Data and Sample Management 0 Preparation of Int Data Deliverable 0

Total Hours

PTL 0

PM 0

Prof II -1.5 Prof I 0 Total -1.5

TOTAL LABOR -1.5

VEHICLE TYPE RATE UNIT USEAGE

Truck - person 1 $120.00 day 0 $0.00 $120.00 day $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$150.00 Hotel $0.00 $36.00 Food $0.00 $150.00 Hotel $0.00 $36.00 Food $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST Erwin Remediation IDW 0 $125.00 $0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TRPH - Monitoring Wells $88.00 1 ($88.00) Methane, Ethane, Ethene RSK 175 $180.00 1 ($180.00) Cooler (0 to 25 lbs) - Shipping $110.00 0 $0.00 Ice $6.50 0 $0.00

TOTAL LAB ($268.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit $290.00 0 days $0.00 Expendables $40.00 0 days $0.00 HDPE Tubing $0.30 0 foot $0.00 Silicon Tubing (1/4") $3.00 0 foot $0.00 Drum $100.00 0 each $0.00

TOTAL EQUIPMENT $0.00

SUBTASK 5: Semi PARM Sampling, IDW, Data Del DATE: Delta TACO 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Support for GW event 0 Data review for int deliverable 0

Project Manager Prepare Field Scope of Work 0 Data deliverable int submittal 0

Professional II Mobilization/Demobilization (2.0 hr roundtrip) 0 Field Preparation 0 Arrange for Site Access with owner 0 Prepare Sample Kit 0 Inspect and gauge Depth to Water in 8 monitoring wells (~10 minutes each well) 0 Sample Monitoring Wells (5)(1.5 hrs each) 0 IDW, Data and Sample Management 0 Preparation of Int. Data Deliverable 0

Total Hours

PTL 0

PM 0

Prof II 0

Total 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Truck - person 1 $120.00 day 0 $0.00 $120.00 day $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$150.00 Hotel $0.00 $36.00 Food $0.00 $150.00 Hotel $0.00 $36.00 Food $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST Erwin Remediation IDW 0 $125.00 $0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOH - EPA Method 8260 - Monitoring Wells $73.00 0 $0.00 Methane, Ethane, Ethene RSK 175 $180.00 1 ($180.00)

TRPH $88.00 1 ($88.00)

TOC 5310B $30.00 0 $0.00

Cooler (0 to 25 lbs) - Shipping $110.00 0 $0.00 Ice $6.50 0 $0.00

TOTAL LAB ($268.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit $290.00 0 days $0.00 Expendables $40.00 0 days $0.00 HDPE Tubing $0.30 0 foot $0.00 Silicon Tubing (1/4") $3.00 0 foot $0.00 Drum $100.00 0 each $0.00

TOTAL EQUIPMENT $0.00

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

D M

S m ith

6/

/2 re v 9/

/2

D C

2E

P ro po sa l S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

M on ito rin g

W el l I ns ta lla tio n, S ur ve y

S ite

Fi rs t C oa st

C le an er s (E

R

IC

_4

5) S ub Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

Ye ar

P A

R M

R ep or t (

S em i A nn ua l R ep or t)

A ct iv ity

/P ha se

P A

Ta sk

S em i P A

R M

S am pl in g, ID

W , R ep or t S ub Ta sk

P ro je ct

M an ag er

C lin t N

Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

S ub

Ta sk

S em i P

A R

M S am pl in g, ID

W

, D at a D el S ub Ta sk

TTo ta ls

La bo r

R at e C at eg or y

$8 0.

PP

ro je ct M an ag er

.2

.2 $1

.8

S en io r O ffi ce r

0.

0.

0.

0.

0.

0.

0.

$9

0.

S en io r T ec hn ic al

E xp er t

0.

0.

0.

0.

0.

0.

0.

$8

0.

P ro je ct

T ec hn ic al L ea de r

.0 2.

3.

2.

2.

1.

5.

$8 0.

P ro je ct M an ag er

.2 1.

2.

1.

1.

4.

2.

$7 5.

S en io r P ro fe ss io na l 0.

0.

0.

0.

0.

0.

0.

$5 5.

P ro fe ss io na l I

I

8.

.8

.0

.8

.8

.8

.0

$3

7.

P ro fe ss io na l I 0.

0.

0.

0.

0.

0.

0.

$5 7.

S en io r T ec hn ic ia n

0.

0.

0.

0.

0.

0.

0.

$3

2.

S ta ff Te ch ni

0.

0.

0.

0.

0.

0.

$4 4.

P ro je ct A dm in is tra tio n

0.

0.

0.

0.

0.

0.

0.

$4

5.

S en io r S up po rt S er vi ce s

0.

0.

0.

0.

0.

0.

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l H ou rs

9.

.2

.1

.0

.1

.1

D ire ct L

$9

,9

.0

$1 ,1

.9

$1

,0

.8

$1 ,9

.9

$1

,0

.8

$1 ,1

.8

$1

,7

.9

$1 ,8

.6

$0

.0

$0 .0

$0

.0

O ve rh ea d

5.

$1

3, 5.

$1 ,5

.5

$1

,3

.3

$2 ,5

.3

$1

,3

.3

$1 ,6

.8

$2

,3

.3

$2 ,4

.2

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.7 0%

$3 ,7

.3

$4

.3

$3

.3

$7

.8

$3

.3

$4

.3

$6

.7

$6

.3

$0

.0

$0 .0

$0

.0

To ta l L

$2 6, 7.

$3

,1

.8

$2 ,8

.5

$5

,1

.1

$2 ,8

.5

$3

,2

.9

$4 ,7

.9

$5

,0

.2

$0 .0

$0

.0

$0 .0

Tr av el V eh ic le R en ta l $8

.0

$1

.0

$1

.0

$1

.0

$1

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $$8

.0

$1

.0

$1

.0

$1

.0

$1

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

Pa

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

D M

S m ith

6/

/2 re v 9/

/2

D C

2E

P ro po sa l S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

M on ito rin g

W el l I ns ta lla tio n, S ur ve y

S ite

Fi rs t C oa st

C le an er s (E

R

IC

_4

5) S ub Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

Ye ar

P A

R M

R ep or t (

S em i A nn ua l R ep or t)

A ct iv ity

/P ha se

P A

Ta sk

S em i P A

R M

S am pl in g, ID

W , R ep or t S ub Ta sk

P ro je ct

M an ag er

C lin t N

Ta sk

Q ua rte rly

P A

R M

S am pl in g, ID

W , D at a

D el

S ub

Ta sk

S ub

Ta sk

S em i P

A R

M S am pl in g, ID

W

, D at a D el S ub Ta sk

TTo ta ls

SS

ub co nt ra ct or

(E qu ip m en t P ro cu re m

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

TTo ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m lin g

(C on ve nt io na

l) $2

,4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$2 ,4

.0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$7

.0

$1

.0

$1

.0

$1

.0

$1

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$3 ,1

.0

$1

.0

$1

.0

$1

.0

$1

.0

$2

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $3

.0

$1

2.

$1 2.

$1

2.

$1 2.

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $3

,4

.0

$1

.5

$1

.5

$1

.5

$1

.5

$2 ,9

.0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra ly tic al

C os ts $4

,1

.0

$8

.0

$1 ,2

.0

$8

.0

$1

,2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$5

.0

$1

.5

$1

.5

$1

.5

$1

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $4

,6

.0

$9

.5

$1 ,4

.5

$9

.5

$1

,4

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$2

.0

$4 0.

$4

0.

$4 0.

$4

0.

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $2

,0

.0

$3

.0

$3

.0

$3

.0

$3

.0

$6

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$6

.0

$1

.0

$1

.0

$1

.0

$1

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$2 ,9

.0

$4

.0

$5

.0

$4

.0

$5

.0

$9

.0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $3

8, 5.

$3 ,1

.8

$4

,4

.5

$7 ,3

.1

$4

,4

.5

$5 ,4

.9

$8

,9

.9

$5 ,0

.2

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$2 ,6

.7

$3

.5

$2

.6

$5

.2

$2

.6

$3

.2

$4

.2

$5

.2

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$4 1, 5.

$3

,4

.4

$4 ,7

.2

$7

,8

.4

$4 ,7

.2

$5

,7

.1

$9 ,4

.1

$5

,5

.4

$0 .0

$0

.0

$0 .0

Pa

From: Noble, Clint C.

To: Aoki, Benjamin Cc: Cobert, Steven C.; Hirten, Joshua J.

Subject: Re: FCC 1st Quarter Sampling Event - Damaged well - TACO 1 Date: Thursday, November 13, 2025 11:37:58 AM Attachments: HW681 CEFLOE_PARM FCC ERIC 4535x - Original.xlsx

HW681 CEFLOE_PARM FCC ERIC 4535x Delta TACO 1.xlsx HW681 CEFLOE_PARM FCC ERIC 4535x - Final TACO 1.xlsx

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Benjamin, Please see attached TACO per your revised sampling plan. Associated changes were made on expenses and labor and overall this is a net reduction of -$1,355.07, primarily from analytical fees and a little labor.

As soon as this is processed CDM will submit the deliverable and invoice for ST 2. The single water drum was removed yesterday from the site.

Clint

From: Aoki, Benjamin <Benjamin.Aoki@FloridaDEP.gov> Sent: Wednesday, October 22, 2025 7:37 AM To: Noble, Clint C. <noblecc@cdmsmith.com> Cc: Cobert, Steven C. <cobertsc@cdmsmith.com> Subject: RE: FCC 1st Quarter Sampling Event - Damaged well

Good Morning Clint, Talked with our tech staff, and we’ll go with the following.

Continue sampling MW002 and MW019 for UIC parameters, but do not include MW005.

MW019 is enough to be representative of the interior for UIC.

Add MW012 to the semi-annual sampling, but only for VOHs and do not sample for UIC parameters.

We will wait to abandon MW020; more than likely it will be abandoned during site restoration.

This should answer your questions from below but let me know if you need anything else.

Thank you, Benjamin Aoki

From: Noble, Clint C. <noblecc@cdmsmith.com> Sent: Friday, October 17, 2025 9:32 AM To: Aoki, Benjamin <Benjamin.Aoki@FloridaDEP.gov> Cc: Cobert, Steven C. <cobertsc@cdmsmith.com> Subject: Re: FCC 1st Quarter Sampling Event - Damaged well

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Happy Friday Benjamin, Any update on this? I will need to proceed with a TACO before we take the next action.

Clint

From: Noble, Clint C. <noblecc@cdmsmith.com> Sent: Friday, October 10, 2025 4:43 PM To: Aoki, Benjamin <benjamin.aoki@floridadep.gov> Cc: Cobert, Steven C. <cobertsc@cdmsmith.com> Subject: FCC 1st Quarter Sampling Event - Damaged well

Benjamin, We conducted the 1st GW sampling event at FCC - PARM on Oct 2. Our approved plan called for 3 wells - MW002, MW019, MW-020 for UIC parameters. These wells are also called for in our semi-annual sampling for CVOCs.

Upon inspection MW-020 is obstructed at depth. The well is located inside the building in the new floor. Logan tried to dislodge the obstruction for a while to no avail. It appears the well is breached and concrete settled in. This well was not sampled and we only sampled two wells. I have dug into the historical data for an alternative, see attached.

MW-020 is in the source zone but it is not a critical well. Last several sampling events show MW-020 to be below GCTLs except for VC. Approximately 15 feet away is our hottest source zone well (MW-

002) with historical concentrations of PCE ranging upwards of several thousand ppb and as high as 40,0000 ppb in 2019. This well is intact and it was sampled. MW-020 is hydraulically between MW-002 and MW-019, therefore the concentrations in these wells bound it.

My suggestion is that MW-005 is used in place of MW-020. It will provide an upgradient data point for UIC background concentrations.

I suggest a TACO that removes MW-020 from the sampling plan. MW-005 will be sampled instead of MW-020 during quarterly events and during semi-annual events MW-012 is added to the plan to track any source zone vertical migration. Historically MW-012 had detections of contaminants.

The TACO can also be used to add the proper well abandonment of MW-020 (as it is inside the building) when the drilling rig is out in the next event (in scope to re-install MW-03 in ST 3), and to subtract the analytical from this sampling event for MW-020 since I cannot invoice without this reduction.

Thank you, Clint Noble, P.G., PMP Principal Geologist

CDM Smith Inc.

4651 Salisbury Road, Suite 420

Jacksonville, FL 32256 O: 904.527.6715

M: 904-625-2125 noblecc@cdmsmith.com Connect on LinkedIn cdmsmith.com

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW681

DC002E December 7, 2026

This Task Assignment authorizes CDM Smith Inc. to conduct PARM at First Coast Cleaners based of their proposed scope of work and cost proposal submitted on

18JUN2025.

Benjamin Aoki 850-245-7527 CDM Smith Inc.

Clint Noble 904-527-6715

ERIC_4535

610 3rd Street North, Jacksonville Beach, Duval County, Florida

First Coast Cleaners

$ 41,595.12

$ 41,595.12

Scope of Work

CDM Smith Inc.

Joshua Hirten

Contract Manager

Joshua Hirten Digitally signed by Joshua Hirten Date: 2025.09.25 14:18:36 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.09.24 17:20:39 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

File details come from the government source that posted it. Updated .