CN-370000-HW681-DC033D.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW681|acc15804f9112ed94de3c1f0669600ae
Contract number
HW681
Issued by
Florida

About this file

This document is a Task Assignment (TA) DC033D under Contract No. HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. The TA authorizes CDM Smith to conduct annual groundwater monitoring at Harris Drive In Cleaners, located at 5961 Arlington Road, Jacksonville, Duval County, Florida (ERIC_4539). The project is managed by Benjamin Aoki for FDEP and Kathy Leggoe for CDM Smith, with a completion date of October 23, 2026.

The scope of work includes four subtasks: (1) project management calculated at 13 percent of direct labor costs; (2) annual groundwater sampling involving collection of one volatile organic halogenated carbons (VOH) sample and seven PFAS samples from monitoring wells; (3) PFAS and impacted investigation-derived waste (IDW) disposal services; and (4) preparation of an annual groundwater monitoring report with conclusions and recommendations. The total TA value is $12,713.02 on a fixed unit rate basis, allocated as follows: Subtask 2 at $5,472.88, Subtask 3 at $1,139.04, and Subtasks 1 and 4 combined at $6,101.10. Deliverables are due on a staggered schedule with field notes and sampling data due 90 days after notice to proceed and the final monitoring report due 120 days after notice to proceed. The work includes subcontracted services for IDW disposal through Erwin Remediation, Inc. at $195.00 per drum for PFAS-impacted non-hazardous materials, with laboratory analysis performed by NELAP-certified facilities.

View the file

Other files

File Type Posted
CN-370000-HW681-DC001F.pdf PDF
CN-370000-HW681-DC002D.pdf PDF
CN-370000-HW681-DC005A.pdf PDF
CN-370000-HW681-DC006A.pdf PDF
CN-370000-HW681-DC007A.pdf PDF
CN-370000-HW681-DC011B.pdf PDF
CN-370000-HW681-DC012B.pdf PDF
CN-370000-HW681-DC015C.pdf PDF
CN-370000-HW681-DC018D.pdf PDF
CN-370000-HW681-DC019A.pdf PDF
CN-370000-HW681-DC01ACO4.pdf PDF
CN-370000-HW681-DC020B.pdf PDF
CN-370000-HW681-DC022B.pdf PDF
CN-370000-HW681-DC023A.pdf PDF
CN-370000-HW681-DC023C.pdf PDF
CN-370000-HW681-DC026A.pdf PDF
CN-370000-HW681-DC027B.pdf PDF
CN-370000-HW681-DC029C.pdf PDF
CN-370000-HW681-DC02DCO2.pdf PDF
CN-370000-HW681-DC02DCO4.pdf PDF
CN-370000-HW681-DC02ECO1.pdf PDF
CN-370000-HW681-DC030A.pdf PDF
CN-370000-HW681-DC031A.pdf PDF
CN-370000-HW681-DC031B.pdf PDF
CN-370000-HW681-DC034A.pdf PDF
CN-370000-HW681-DC034B.pdf PDF
CN-370000-HW681-DC034C.pdf PDF
CN-370000-HW681-DC035A.pdf PDF
CN-370000-HW681-DC035B.pdf PDF
CN-370000-HW681-DC035C.pdf PDF
CN-370000-HW681-DC037C.pdf PDF
CN-370000-HW681-DC03DCO1.pdf PDF
CN-370000-HW681-DC03ECO1.pdf PDF
CN-370000-HW681-DC040A.pdf PDF
CN-370000-HW681-DC044A.pdf PDF
CN-370000-HW681-DC044B.pdf PDF
CN-370000-HW681-DC044C.pdf PDF
CN-370000-HW681-DC06BCO1.pdf PDF
CN-370000-HW681-DC08DCO1.pdf PDF
CN-370000-HW681-DC10BCO1.pdf PDF
CN-370000-HW681-DC11BCO2.pdf PDF
CN-370000-HW681-DC14ACO2.pdf PDF
CN-370000-HW681-DC15ACO1.pdf PDF
CN-370000-HW681-DC15BCO3.pdf PDF
CN-370000-HW681-DC16ACO1.pdf PDF
CN-370000-HW681-DC16ACO2.pdf PDF
CN-370000-HW681-DC16BCO3.pdf PDF
CN-370000-HW681-DC19ACO1.pdf PDF
CN-370000-HW681-DC20BCO1.pdf PDF
CN-370000-HW681-DC21BCO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW681

DC033D Completion October 23, 2026

This Task Assignment authorizes CDM Smith Inc. to conduct Annual Groundwater Monitoring at Harris Drive In Cleaners per their proposed scope of work and cost estimate form.

Benjamin Aoki 850-245-7527 Contractor CDM Smith Inc. Contractor

Contractor Kathy Leggoe Contractor 904-527-6727

ERIC_4539

5961 Arlington Road, Jacksonville, Duval County, Florida

Harris Drive In Cleaners

Contractor Contractor

✔ $ 12,713.02

$ 12,713.02

Scope of Work

CDM Smith Inc.

Contractor Joshua Hirten

Contract Manager

Joshua Hirten Digitally signed by Joshua Hirten Date: 2026.04.09 14:57:27 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.04.09 11:47:54 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Annual Groundwater Sampling - field notes, logs, laboratory chain of custody form 07/23/2026

Subtask 3: PFAS + IDW - IDW manifest and subcontractor invoice 07/23/2026

Subtask 1 & 4: Annual Groundwater Monitoring Report; Project Management 08/24/2026

Subtask 2: FDEP receipt and approval of Annual Groundwater Sampling Data Deliverable $ 5,472.88

Subtask 3: FDEP receipt and approval of IDW manifest and subcontractor invoice $ 1,139.04

Subtask 1 & 4: FDEP receipt and approval of Annual Groundwater Monitoring Report $ 6,101.10

$ 12,713.02

HW681

DC033D

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Alexiss A.. Lambertt Secretary

Memorandum

TO:

FROM:

SUBJECT:

DATE:

FDEP COST ESTI MATEContractor: CDM Smith Inc.

Date: 3/25/2026

Task #: Proposal SubTask 1 Project Management SubTask 6

Site: Harris Dry Cleaners ERIC_4539 SubTask 2 Annual Groundwater Sampling SubTask 7

Activity/Phase: LTM 2026 SubTask 3 PFAS + IDW SubTask 8

Project Manager: Kathy Leggoe, PMP SubTask 4 Annual Groundwater Monitoring Report SubTask 9

SubTask 5 SubTask 10

TTotals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$80.18 PProject Manager 5.48 5.48 $104.89 Senior Officer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$90.43 Senior Technical Expert 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $80.18 Project Technical Leader 4.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 $80.18 Project Manager 7.00 3.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 $75.85 Senior Professional 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $55.67 Professional II 37.50 15.00 2.50 20.00 0.00 0.00 0.00 0.00 0.00 0.00 $37.32 Professional I 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $57.32 Senior Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.69 Staff Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.88 Project Administration 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $45.08 Senior Support Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 64.98 5.48 29.00 4.50 26.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $3,819.55 $439.42 $1,486.11 $299.54 $1,594.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 135.00% $5,156.40 $593.22 $2,006.25 $404.38 $2,152.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.70% $1,439.97 $165.66 $560.26 $112.93 $601.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $10,415.92 $1,198.30 $4,052.62 $816.85 $4,348.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $$120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTI MATEContractor: CDM Smith Inc.

Date: 3/25/2026

Task #: Proposal SubTask 1 Project Management SubTask 6

Site: Harris Dry Cleaners ERIC_4539 SubTask 2 Annual Groundwater Sampling SubTask 7

Activity/Phase: LTM 2026 SubTask 3 PFAS + IDW SubTask 8

Project Manager: Kathy Leggoe, PMP SubTask 4 Annual Groundwater Monitoring Report SubTask 9

SubTask 5 SubTask 10

TTotals 1 2 3 4 5 6 7 8 9 10 SSubcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TTotal Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $195.00 $0.00 $195.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $195.00 $0.00 $195.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $19.50 $0.00 $19.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $214.50 $0.00 $214.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $146.00 $146.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $162.00 $136.00 $26.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $308.00 $282.00 $26.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $473.00 $473.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $613.00 $613.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $11,671.42 $1,198.30 $5,067.62 $1,057.35 $4,348.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,041.60 $119.83 $405.26 $81.69 $434.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $12,713.02 $1,318.13 $5,472.88 $1,139.04 $4,782.97 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Harris Dry Cleaners SUBTASK 2: Annual Groundwater Sampling

DATE: 3/25/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager Field support 2 Preparation and submittal of Data Summary 1

Professional II Mobilization (1 mob 2.5 hr round trip - 1 Sampling) 2.5 Field Preparation 1 Arrange for Site Access with owner 1 Prepare Sample Kit 1 Inspect and gauge Depth to Water in 14 monitoring wells (~10 minutes each well) 1.25 Sample Monitoring Wells (7) (1.5 hrs per well split between 2 people) 5.25 Data and Sample Management 1 Preparation of Data Summary 2

Professional I Mobilization (1 mob 2.5 hr round trip - 1 Sampling) 2.5 Field Preparation 1 Inspect and gauge Depth to Water in 14 monitoring wells (~10 minutes each well) 1.25 Sample Monitoring Wells (7) (1.5 hrs per well split between 2 people) 5.25 Data and Sample Management 1

Total Hours

PM 3.00

Prof II 15.00 Prof I 11.00 Total 29.0

TOTAL LABOR 29.0

VEHICLE TYPE RATE UNIT USEAGE

Truck -Prof II $120.00 day 1 $120.00 $120.00 day $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOH - EPA Method 8260 MWs $73.00 1 $73.00 VOH - EPA Method 8260 IDW $73.00 1 $73.00 Cooler (0 to 25 lbs) - Shipping $110.00 1 $110.00 Ice $6.50 4 $26.00

TOTAL LAB $282.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Groundwater Sampling Kit #1 - Prof $290.00 1 days $290.00 Groundwater Sampling Kit #2 - Prof $290.00 1 days $290.00 Expendables $40.00 1 days $40.00 HDPE Tubing $0.30 500 foot $150.00 Silicon Tubing (1/4") $3.00 11 foot $33.00 Drum $100.00 1 each $100.00

TOTAL EQUIPMENT $613.00

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 3: PFAS + IDW

DATE: 3/25/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager Technical Guidance on PFAS field support & evaluation of data 1 Preparation, Review & submittal of PFAS Data 1

Profesisonal II IDW Sample and Management Sample Drum for PFAS & shipping 1.5 PFAS Data Management/Data Deliverable prep 1

Total Hours

PM 2.00

Prof II 2.50 Prof I 0.00 Total 4.5

TOTAL LABOR 4.5

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST Erwin PFAS Water Drum disposal 1 $195.00 $195.00

$0.00

TOTAL $195.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

PFAS Groundwater FDEP laboratory $0.00 7 $0.00 PFAS Drum IDW Sample FDEP laboratory $0.00 1 $0.00 Ice $6.50 4 $26.00 Shipping large cooler $150.00 $0.00

TOTAL LAB $26.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 days $0.00 $0.00 days $0.00 $0.00 days $0.00 $0.00 foot $0.00 $0.00 foot $0.00 $0.00 each $0.00

TOTAL EQUIPMENT $0.00

FINAL --7/24/96

SUBTASK 4: Annual Groundwater Monitoring Report

DATE: 3/25/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader PE review/Seal 4 Project Manager GWMR Conclusions/Recommendations 2 Profesisonal II Preparation of GWMR (8 hrs text, 3 hrs tables, 7 hrs figures, 2 hr assemble attachments) 20

Total Hours

PTL 4

PM 2

Prof II 20 Prof I 0 Total 26

TOTAL LABOR 26

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

408 Ditmar Street Pensacola, FL 32503

To: Mr. Kyle Turner CDM Smith 4010 West Boy Scout Boulevard, Suite 450 Tampa, FL 33607

January 15, 2024

Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials

Mr. Turner:

The price for the transportation and disposal (T&D) of non-hazardous drums of soil, mud, and water located in the State of Florida is listed below:

Non-Hazardous PFAS/PFOS Impacted Material:

Description Rate Unit

Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Soil/ Mud/Water $ 195.00 Per Drum

Non-Hazardous Material not Impacted with PFAS/PFOS:

Description Rate Unit

T&D - Non-Haz (no PFOS/PFAS) Impacted Mud/Water $ 125.00 Per Drum T&D - Non-Haz (no PFOS/PFAS) Impacted Soil $ 110.00 Per Drum

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

This quote is valid for 90 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: Robert@ErwinRemediation.com Office: (850) 466-2358

Respectfully, Robert Donado

Turner, Kyle M.

From: Turner, Kyle M.

Sent: Tuesday, January 16, 2024 10:03 AM To: stephenharris2@enviroserve.com Subject: IDW Rates - FDEP - CDM Smith

Good morning Steve, I hope you are doing well. I remember working with you back when I was with HSW/Verdantas. I have since moved companies and am trying to get some new quotes for drum disposal. I was wondering if you could provide me with quotes/rates for transporta on and disposal of the following. This will be for our FDEP Drycleaning Sites.

IDW Drum – Soil IDW Drum – Soil – PFAS Impacted IDW Drum – Water IDW Drum – Water – PFAS Impacted

Please include any addi onal charges such are mileage, low volume, waste profiling etc….

Thank you, Kyle M. Turner, MS, GIT Geologist CDM Smith 4010 W Boy Scout Blvd, Suite 450, Tampa, FL 33607 O: 813.262.8851 M: 727.488.4471 cdmsmith.com

Turner, Kyle M.

From: Kevin Hamilton <khamilton@hepaco.com> Sent: Friday, January 19, 2024 11:04 AM To: Turner, Kyle M.; Matthew Merritt Subject: Re: IDW Rates - FDEP - CDM Smith

I have sent this to my waste support group. Someone should reach out shortly.

Kevin Hamilton Territory Account Manager

1830 Clarkson Street Jacksonville, Florida 32202 T (904) 706 3040 | M (904) 303 8696 E khamilton@hepaco.com | HEPACO.com

1-800-888-7689 24/7 EMERGENCY RESPONSE

From: Turner, Kyle M. <turnerkm@cdmsmith.com> Sent: Thursday, January 18, 2024 3:54 PM To: Kevin Hamilton <khamilton@hepaco.com> Cc: Leggoe, Kathy R. <leggoekr@cdmsmith.com> Subject: FW: IDW Rates - FDEP - CDM Smith

HEPACO Notice: This communication is from an [EXTERNAL] sender.

If this email looks suspicious, do NOT click or open any links or attachments in the email. To report a suspicious email, click on the Phish Alert Report icon located on the Outlook menu ribbon.

Kevin, Just wanted to make sure you saw this and see if you had any questions. Please provide your rates to us by COB Tuesday 1/23/24 or we will assume the bid is no response.

Thank you, Kyle M. Turner, MS, GIT Geologist CDM Smith 4010 W Boy Scout Blvd, Suite 450, Tampa, FL 33607 O: 813.262.8851

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.

From: Turner, Kyle M.

Sent: Tuesday, January 16, 2024 10:15 AM To: khamilton@hepaco.com Subject: IDW Rates - FDEP - CDM Smith

Good morning Kevin, It’s a new year which means we must update our IDW transportation and disposal rates. I was wondering if you could provide me with quotes/rates for transportation and disposal for the following. This will be for our FDEP Drycleaning Sites.

IDW Drum – Soil IDW Drum – Soil – PFAS Impacted IDW Drum – Water IDW Drum – Water – PFAS Impacted

Please include any additional charges such are mileage, low volume, waste profiling etc….

Please let me know if you have any questions, and if not, please provide rates at your earliest convenience.

Thank you, Kyle M. Turner, MS, GIT Geologist CDM Smith 4010 W Boy Scout Blvd, Suite 450, Tampa, FL 33607 O: 813.262.8851

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.

This e-mail and any attachments to it contain confidential and proprietary material of HEPACO, LLC, its affiliates or agents, and is solely for the use of the intended recipient. Any review, use, disclosure, distribution or copying of this transmittal is prohibited except by or on behalf of the intended recipient. If you have received this transmittal in error, please notify the sender and destroy this e-mail and any attachments and all copies, whether electronic or printed.

Please consider the environment before printing this email.

File details come from the government source that posted it. Updated .