CN-370000-CN335-T8CO3.pdf
PDF 1 MB Posted
- Contract number
- CN335
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form (Change Order No. 03) issued by the Florida Department of Environmental Protection (FDEP) under Contract No. CN 335 for the Silver Springs State Park New Swim Area project. The contract is with Taylor Engineering, Inc., represented by Terrance Cake, PE, with FDEP Contract Manager Ralph Perkins overseeing the work. The change order was approved on October 12, 2022, by multiple FDEP officials and the consultant representative.
The change order addresses additional insurance costs required due to extended project duration beyond the original completion date of June 30, 2022. The delay resulted from permitting issues with the St. Johns River Water Management District. The architectural subconsultant, SAVANNAPUB, Inc., a small business, requested contract modification to cover renewal costs for Professional Liability insurance ($2,470.00) and General Liability insurance ($553.00), totaling $3,023.00. The net increase to the task amount is $3,023.00 in reimbursement costs, bringing the total task amount with all change orders to $312,692.46. The new task end date is June 29, 2023, with zero net change in days from the present task end date.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN 335 08 03 61263C
Silver Springs State Park New Swim Area
Taylor Engineering, Inc
Terrance Cake, PE 904-731-7040 tcake@taylorengineering.com
Ralph Perkins 850-245-2460 ralph.perkins@Floridadep.gov
Additional insurance required due to extended project duration per the attached proposal dated 9/27/22.
$ 4,595.00 $ 229,658.81 $ 234,253.81 $ 4,595.00 $ 305,074.46 $ 309,669.46 $ 3,023.00 $ 3,023.00 $ 7,618.00 $ 305,074.46 $ 312,692.46
9/21/2020
6/30/2022
6/29/2023
6/29/2023
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2022.10.12 10:50:14 -04'00'
Theresa Carron T.Carron Digitally signed by T.Carron Date: 2022.10.12 10:54:25 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2022.10.12 11:17:10 -04'00'
Johnathan Armbruster Digitally signed by Kenneth Craig Date: 2022.10.12 18:34:31 -04'00'
Bryan Bradner Bryan Bradner Digitally signed by Bryan Bradner Date: 2022.10.18 10:17:52 -04'00'
61263C 37503000203 080039/20 000286 U3200 131500 AD $ 3,023.00
$ 3,023.00
10199 SO UTHS I DE BLVD , S U ITE 310 | J ACK SON V IL LE , F L 3 2256 | TEL 9 04. 731. 704 0
WWW .TAYLO REN G INE ER I N G.C OM
September 27, 2022
Theresa Carron Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, FL 32399
RE: FDEP Agreement Number CN335 Silver Springs State Park Improvements Design, Permitting and Bid Administration Task 7 – Design and Permitting of Bathroom Facilities and Utilities
Dear Ms. Carron:
As you know, the Silver Springs Swimming Area project had encountered significant delays due to permitting issues with the St. Johns River Water Management District. As a result, the project is still ongoing after the originally anticipated completion date. Our architectural subconsultant, SAVANNAPUB, Inc, is a small business and had to purchase specific Professional and General liability insurance policies to meet the insurance requirements for this project. Due to the unanticipated delays, SAVANNAPUB is requesting a contract mod as listed below, to cover the costs of renewing these policies. Please see the attached memo from SAVANNAPUB for additional information.
Subtask 7.B - 90% Design of Restroom Facilities & Utilities
Firm Name Item Unit Rate Quantity Total Fixed Price Cost
SAVANNAPUB, INC. Professional Liability $2,470.00 1 $2,470.00 SAVANNAPUB, INC. General Liability $553.00 1 $553.00
Subtotal: $3,023.00 Subtask 7.B Total $3,023.00
Please let me know if you have any questions.
Sincerely, Terence Cake, P.E.
Sr. Engineer
Attachment: Memo from SAVANAPUB, Inc.
TA8 CO3
SAVANNAPUB, INC.
ARCHITECTURE | DEVELOPMENT | PHILANTHROPY Memo
SAVANNAPUB | PO Box 773553 Ocala, FL 34477 | savannapub.com |savannapub@gmail.com | 813-313-7707
To: Terry Cake, PE., Taylor Engineering
From: Audie Robinson, Director, SAVANNAPUB, Inc.
Email: savannapub@gmail.com
Phone: 813-313-7707 Date: September 25, 2022
Ref: Silver Springs State Park cc:
Subject: Restroom Project General Liability Insurance
Dear Terry, Our Professional Liability insurance coverage is what we have had for years. The General Liability policy was taken out only for the Silver Springs Restroom project. Currently, none of our other projects and clients have required General Liability. Therefore, the coverage continues only for our Silver Springs project
SAVANNAPUB, INC, is a small company with a minor fee for the Silver Springs project. The project literally should have taken a few months to design and permit and that is how we structured our fee. In fact, we were asked to join the team were too high. We carried the cost of the insurance as our personal overhead to work on the project, yet we are continuing to pay for the insurance that is not being utilized because the project has been on hold for quite a while.
We cannot drop our Professional Liability and continue with the General Liability for Silver Springs since we still need if for all our other projects including the Silver Springs project.
Therefore, as we renew the Professional and General Liability policy, we request a contract modification for the $553 for the General Liability and $2,470.44 for the Professional Liability to hold these insurances for the Silver Springs project.
Respectfully, Audie Robinson, NCARB, LEED® AP, DBE, CFRM Director
SAVANNAPUB, INC
Architecture | Development | Philanthropy Cell: +1 (813) 313 7707 | Email: savannapub@gmail.com
File details come from the government source that posted it. Updated .