Task Assignment Notification Form Summary
This document is a Task Assignment Notification Form executed by the Florida Department of Environmental Protection (FDEP) under Contract CN230, Task Assignment Number 71. The contract involves the FDEP, Bureau of Design and Construction, and Weiler Engineering Corporation, a professional engineering firm based in Punta Gorda, Florida. The project is located at Charlotte Harbor Preserve State Park in Punta Gorda, and the work is managed by FDEP's Project Manager Garland Sandel and Contract Manager Ralph Perkins.
The contract covers design and permitting services for the replacement of an existing maintenance building at Charlotte Harbor Preserve State Park. Weiler Engineering will provide civil engineering, structural engineering, surveys, environmental assessments, and permitting coordination across four primary subtasks: (1) Preliminary investigation including 30% design plans, surveys, lead/asbestos assessment, and geotechnical investigation; (2) 60% design documents; (3) 100% design documents with specifications; and (4) Permit applications and approvals. The fixed price cost totals $50,513.59, with reimbursable costs not to exceed $4,303.00, for an overall contract amount of $54,816.59. Work is scheduled to begin upon execution and complete by October 20, 2025. Payment will be made upon FDEP's approval of deliverables for each subtask.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN230 71 FDEP/ RP 61409C
Charlotte Harbor Maintenance Building Replacement
Weiler Engineering
Jeff Weiler 941.505.1700 weiler7@mac.com
Ralph Perkins or successoe 850-245-2560 ralph.perkins@floridadep.gov
Design and permit the replacement maintenance building.... per the attached proposal dated 10/04/23
Garland Sandel or successor upon execution $ 50,513.59 10/20/25 $ 4,303.00
$ 54,816.59
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.10.11 10:46:01 -04'00'
Garland Sandel Garland Sandel Digitally signed by Garland Sandel Date: 2023.10.11 13:20:43 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.10.11 14:35:49 -04'00'
Jeff Weiler Jeff Weiler Digitally signed by Jeff Weiler Date: 2023.10.11 15:07:54 -04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.10.12 14:20:40 -04'00'
61409C 37501017177 087157/23 000286 U3200 131500 AK $ 54,816.59
$ 54,816.59
July 20, 2023- Revised October 4, 2023
Mr. Garland Sandel Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260-L, MS 520 Tallahassee, FL 32399
RE: Charlotte Harbor Preserve State Park - Maintenance Building Replacement CN230
TA71
Dear Mr. Sandel, Thank you for the opportunity to provide this proposal to prepare the plans and documentation necessary to replace the existing pole barn/maintenance building in Charlotte Harbor Preserve State Park.
Scope: Demolish the existing maintenance building and replace it with a new building. Options for the new building will either be a prefabricated metal building or concrete block utilizing the FDEP’s 4 Bay Shop Building standard design. The building will need a restroom with shower, fans, and lighting/electric. The site is likely below flood and will need to be either elevated with fill or have flood panels. Park staff will provide any Protected Species Assessments needed.
Permitting:
1. SWFWMD (likely Verification of Exemption)
2. City of Punta Gorda DRC
3. State Fire Marshal
Our services will include:
A. Civil Engineering Civil Engineering includes providing all site design necessary to permit through both local government and Water Management District for an exemption (or Florida
PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702 MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289- 416 2
WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG
Charlotte Harbor Preserve - Maintenance Bldg. Replacements
Department of Environmental Protection (FDEP), where appropriate). WEC staff will coordinate with the Client to ensure that desired layout fits to the specific jurisdiction requirements and work with the Client to make changes as may be necessary.
B. Building foundation Design/Structural Engineering WEC will coordinate prepare preliminary plans and Opinion of Probable cost to construct either a pre-manufactured metal building or concrete block building and depending on Client’s decision, prepare the necessary plans and documentation for permitting and construction of the building.
For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the services tasks identified below:
Please review the attached Proposal Summary and deliverables.
Sincerely, R. Jeff Weiler, P.E.
President The Weiler Engineering Corporation
Maintenance Building Replacement
Charlotte Harbor Preserve State Park Contract Number 230, Task Assignment Number 71
Subtask 1: Preliminary
1) A - Preliminary investigation,
a) WEC will conduct one site visit.
b) Consultant will conduct a pre-application meeting with the Water Management District or FDEP and the City of Punta Gorda.
c) Consultant will prepare 30% plans including:
i) Site Plan
ii) Floor plan
iii) Opinion of probable cost for pre-manufactured and block.
1) B – Surveys
a) Consultant will coordinate with Survey Sub-Consultant to prepare a special Purpose Survey with topo extending 25 feet outside of the building envelope.
1) C – Lead & Asbestos Survey
a) Consultant will coordinate with Geotechnical Sub-Consultant to prepare a Lead and asbestos report.
b) Consultant will coordinate with Geotechnical Sub-Consultant to provide a subsurface investigation in the area of the proposed building.
1) D – Geotechnical Investigation
a) Consultant will coordinate with Geotechnical Sub-Consultant to conduct a field investigation and borings to determine the sub-surface conditions and make recommendations for foundation.
Deliverable:
1) A - Preliminary, Conceptual Site & Foundation Plans – Consultant shall deliver 30% plans to the client for each building via digital PDF. Plans will include:
Opinion of probable cost Cover sheet Survey Existing Conditions Site Plan Floor Plan Front and Rear Elevations
1) B - Surveys
Completed Survey – Thirty days from execution of Task Assignment, consultant shall deliver a special Purpose Survey via digital PDF, CAD and a Signed and Sealed copy.
1) C – Lead/Asbestos Survey
Completed asbestos and lead based paint assessment and report via PDF.
1) D – Geotech
Completed geotechnical report via PDF.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1A - Preliminary Design 30% Plans
Firm Name Position Classification Hourly Rate Hours Total Fixed Price
Cost
Weiler Engineering Project Manager 145 16 2320
Principal in Charge 195 .25 48.75
Registered Professional Engineer 145 8 1160
Registered Engineer Intern 115 24 2760
Senior Engineering Designer 100 32 3200
Engineering Technician 80 32 2560
Clerical 55 1 55
Total - 30% Plans
12103.75
Mr. Garland Sandel Charlotte Harbor Preserve - Maintenance Bldg. Replacements
Subtask 1D - Geotech
Firm Name
Subtask 1B - Survey
Firm Name Position Classification Unit Unit Rate Number Units
Total Fixed Price Cost
Weiler Engineering Project Manager Hr. 145 2 290
CHW 3 Person Field Crew Hr. 177.54 8 1420.32
CHW Field Technician Hr. 63.45 13 824.85
CHW Professional Surveyor & Mapper
Hr. 163.93 7 1147.51
CHW Total Survey 3682.68
Subtask 1C - Lead/Asbestos
Firm Name Position Classification Unit Unit Rate
Number Units
Total Fixed Price Cost
Weiler Engineering Project Manager Hr. 145 2 290
Universal Senior Geotechnical Engineer. PE
Hr. 165.84 8 1326.72
Universal Hr. 94.50 16 1512
Universal Staff Engineer, EI Hr. 68.46 18 1232.28
Total Lead/Asbestos 4361
Subtask 1D - Geotech
Firm Name Position Classification Unit Unit Rate
Number Units
Total Fixed Price Cost
Weiler Engineering Project Manager Hr. 145 4 $580.00
Universal Engineering
Senior Geotechnical Engineer. PE
Hr. 165.84 16 $2653.44
Project Engineer Hr. 94.5 32 $3024.00
Staff Engineer Hr. 68.46 32 $2190.72
CAD Drafting Hr. 54.00 32 $1728.00
Subtask 1D - Geotech
Firm Name Position Classification Unit Unit Rate
Number Units
Total Fixed Price Cost
Total Geotech $10176.16
]Reimbursable Cost: (if applicable)
Description Number @ Total
Postage 0
Printing
Overnight Travel
(if applicable)
Mileage (@ $0.445 per mile)
0 130 0
Reimbursable Total Cost 1A
Total Subtask 1 30323.59
Subtask 2: 60% documents
Description: Plans completed to 60% for one of the options incorporating comments from 30%.
Deliverable: Plans consultant shall deliver 60% Plans (digital PDF only) including:
Opinion of Probable Cost to construct;
Cover sheet Survey Existing Conditions Best Management Plan Demolition Plan Site & Grading Plan Site Details and General Notes Foundation/Piling Plans and details;
Floor plan, sections and details
Exterior Elevations;
Building Cross sections and details;
Electrical Plans Plumbing Plans (No HVAC)
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Subtask 2 - 60% Plans
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Weiler Engineering Project Manager 145 8 1160
Principal in Charge 195 .25 48.75
Registered Professional Engineer 145 8 1160
Registered Engineer Intern 115 16 1840
Senior Engineering Designer 100 32 3200
Engineering Technician 80 32 2560
Clerical 55 1 55
Total 10023.75
Total for Subtask 2
10023.75
Subtask 3: 100% documents
Description: Plans completed to 100%.
Deliverable: Incorporate Client review of 60% plans, Consultant shall deliver five sets of 100% signed and sealed plans, digital 1-PDF and 1-CAD including:
Opinion of Probable Cost to construct;
Cover sheet Survey
Mr. Garland Sandel Charlotte Harbor Preserve - Maintenance Bldg. Replacements
Existing Conditions Best Management Plan Demolition Plan Site & Grading Plan Site Details and General Notes Foundation/Piling Plans and details;
Floor plan, sections and details Exterior Elevations;
Building Cross sections and details;
Electrical Plans Plumbing Plans (no HVAC) Specifications Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 3 - 100% Plans
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Weiler Engineering Project Manager 145 6 870
Principal in Charge 195 .25 48.75
Registered Professional Engineer 145 4 580
Registered Engineer Intern 115 16 1840
Senior Engineering Designer 100 8 800
Engineering Technician 80 8 640
Clerical 55 1 55
Total 4833.75
Reimbursable Cost:
Description Number @ Total
Postage 1 35 35
Printing 100 2.30 230
Overnight Travel
(if applicable)
Subtask 4A Permit Applications
Reimbursable Total Cost
Subtask 3
5098.75
Subtask 4: Permitting
Description:
4) A – Permit Applications, Consultant will assist Client and Clients contractor to submit permit applications for City and State approvals. WEC will complete applications for the Water Management District for exemption.
WEC staff will coordinate with the Client to ensure that desired layout fits to the specific jurisdiction requirements and work with the Client to make changes as may be necessary.
B – Permit Approvals, Consultant will coordinate with agencies and assist Client and Clients contractor to respond to agencies for additional information.
Deliverable:
4) A – Permit Applications, Incorporate Client review comments from 60% plans and deliver five sets of permit applications with 100% plans.
4) B – Permit Approvals, Depends on agencies but anticipate 60 days after submittal. Consultant will respond to agency requests for additional information and copy Client on all responses. Upon approval, Consultant will provide Client with approvals and revised (if necessary) plans and documentation
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Mr. Garland Sandel Charlotte Harbor Preserve - Maintenance Bldg. Replacements
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Weiler Engineering Project Manager 145 8 1160
Principal in Charge 195 .25 48.75
Registered Professional Engineer 145 3 435
Registered Engineer Intern 115 8 920
Senior Engineering Designer 100 8 800
Engineering Technician 80 8 640
Clerical 55 1 55
Total 4058.75
Subtask 4B Permit Approvals
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Weiler Engineering Project Manager 145 2 290
Principal in Charge 195 .25 48.75
Registered Professional Engineer 145 2 290
Registered Engineer Intern 115 2 230
Senior Engineering Designer 100 2 200
Engineering Technician 80 2 160
Clerical 55 1 55
Total 1273.75
Reimbursable Cost:
Description Number @ Total
Postage 1 35 35
Printing 100 2.3 230
County/City Permit fee
Estimated based on the value of construction
SFM Application fee
1 1500 1500
SWFWMD
Exemption
1 273 273
Reimbursable Total Cost for 4A
Subtask 4
9370.50
Schedule
Activity Duration (Calendar Days) Days from Execution
Subtask 1A Preliminary 60 60
Subtask 1B Survey 60 60
Subtask 1C Lead/Asbestos 60 60
Subtask 1D - Geotech 60 60
Subtask 2: 60% plans 30 - includes 14 days for Client review
Subtask 3: 100% plans 30 – includes 14 days for Client review
Subtask 4A: Permit applications 30 – includes 7 days for Client review
Subtask 4B: Permit approvals 60 – includes response for additional information
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 1A 30% Plans 12103.75 0
Subtask 1B Survey 3682.68 $0.00
Subtask 1C Lead/Asbestos 4361 $0.00
Subtask 1D Geotech $10176.16 0.00
Subtask 2: 60% plans 10023.75 0
Subtask 3: 100% plans 4833.75 265
Subtask 4A Permit applications 4058.75 4038
Mr. Garland Sandel Charlotte Harbor Preserve - Maintenance Bldg. Replacements
Subtask 4B Permit approvals 1273.75 $0.00
Total Fixed Price Cost: $50513.59
Total Fixed Price Cost: $4303.00
Overall Total Cost: $54816.59
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)