This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) for the Lignumvitae Key State Park Service Dock Replacement project. The task assignment, numbered TA 46 under Contract CN230, is awarded to Weiler Engineering Corporation, with Jeff Weiler serving as the consultant representative and Jeff Whitfield serving as the FDEP Contract Manager. The project is located at Lignumvitae Key State Park in Florida.
The contract assigns construction phase services to Weiler Engineering Corporation limited to Requests for Information (RFI) and Material Submittal responses. The scope comprises two subtasks: Subtask 1A involves reviewing contractor submittals and providing stamped acceptance of final submittals within specified timeframes, with a fixed price cost of $2,680.00; Subtask 1B provides assistance during the six-month construction period by responding to RFIs within seven days, with a fixed price cost of $2,520.00. The total task amount is $5,200.00 in fixed price costs with no reimbursable expenses anticipated. The task commenced upon execution with a completion date of August 30, 2022. Payment is contingent upon FDEP approval of deliverables for each subtask.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN230 TA 46 FDEP 61268C
Lignumvitae Key State Park Service Dock Replacement
Weiler Engineering Corporation
Jeff Weiler, P.E. 941-505-1700 weiler7@mac.com
Jeff Whitfield or sucessor 850-245-2630 Jeffery.Whitfield@FloridaDEP.gov
Construction phase services limited to RFI and Material Submittal response. Per attached 3/15/2022
James Post or sucessor
Upon Execution $ 5,200.00 8/30/22 $ 0.00
$ 5,200.00
Diane Langston A Diane Langston Digitally signed by A Diane Langston Date: 2022.03.25 11:39:27 -04'00'
James Post James Post Digitally signed by James Post Date: 2022.03.25 11:08:44 -04'00'
Jeff Whitfield Jeffrey Whitfield Digitally signed by Jeffrey Whitfield Date: 2022.04.05 08:48:00 -04'00'
Jeff Weiler, P.E. R. Jeff Weiler Digitally signed by R. Jeff Weiler Date: 2022.04.06 13:11:43 -04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2022.04.15 09:54:46 -04'00'
61268C 37505000097 080039/22 423002 U3200 131500 QK $ 5,200.00
$ 5,200.00
August 26, 2019 - Revision 7 - March 15, 2022
Mr. James Post Project Manager Division of Recreation and Parks Florida Department of Environmental Protection 3 LaCroix Court Key Largo, Florida 33037
RE: Lignumvitae Dock Replacement - CN 230, TA44
Dear Mr. Post;
Thank you for the opportunity to provide this proposal to provide services during construction for the above referenced project.
For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the services below.
Please review the attached Proposal Summary and deliverables.
Sincerely, R. Jeff Weiler, P.E.
President The Weiler Engineering Corporation
Williams_BrD Text Box
Page
Lignumvitae Key Dock Replacement Construction Services
Contract Number 230, Task Assignment 44
Subtask 1A: Review Contractor submittals Description: WEC will provide engineering review of Contractor's shop drawing submittals as well as assist Client is with responses to Contractor's RFI's.
Deliverable: WEC will review and comment on Contractor submittal package within 14 days of receipt and provide stamped acceptance of final submittals in PDF digital form to FDEP Project Manager within 7 days of final approvals.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Reimbursable Cost:
Subtask 1A - Submittal Review
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 2 $290.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 0 $0.00
Registered Engineer Intern
115 8 $920.00
Senior Engineering Designer
100 12 $1200.00
Engineering Technician
80 2 $160.00
Clerical 55 2 $110.00
Total $2680.00
Postage Not anticipated (all deliverables in digital form only)
Printing Not anticipated (all deliverables in digital form only)
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702 Marathon: 6805 Overseas Highway, Marathon, Florida 33050 | Tel 305-289-4161 | Fax 305-289-4162
Williams_BrD Text Box
Williams_BrD
Subtask 1B: Assistance during construction (6 Months) Description: WEC staff will assist Client with requests for clarifications during construction (assume six months).
Deliverable: WEC will respond to RFI's from Contractor within 7 days throughout the course of the construction phase. WEC will provide copies of all RFI responses to FDEP Project Manager in PDF digital format.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Overnight Travel (if applicable)
Not anticipated
Mileage (@ $0.445 per mile)
Not anticipated
Reimbursable Total Cost
$0.00
Total Subtask 1A - Submittals
$2680.00
Subtask 1B
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 2 $290.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Registered Engineer Intern 115 8 $920.00
Senior Engineering Designer 100 8 $800.00
Engineering Technician 80 0 $0.00
Clerical 55 4 $220.00
Total $2520.00
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702 Marathon: 6805 Overseas Highway, Marathon, Florida 33050 | Tel 305-289-4161 | Fax 305-289-4162
Williams_BrD
Reimbursable Cost:
Project Schedule:
Postage Not anticipated
Printing Not anticipated (all deliverables in digital form only)
Overnight Travel (if applicable) Not anticipated
Mileage (@ $0.445 per mile) Not anticipated
Reimbursable Total Cost $0.00
Total Subtask 1B $2520.00
Activity Duration (Calendar Days) Dates to be based on date of execution of task order
Subtask 1A: Submittals 30
Subtask’s 1B: Assistance during construction
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702 Marathon: 6805 Overseas Highway, Marathon, Florida 33050 | Tel 305-289-4161 | Fax 305-289-4162
Williams_BrD
August 26, 2019 - Revision 7 - 03/22/22 Mr. James Post Lignumvitae Dock Replacement
CN 230 TA44
Summary of Fees:
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)
Subtask Subtask Fixed Price Cost
Subtask Reimbursable
Services during construction
Subtask 1A: Review Submittals $2680.00 $0.00
Subtask 1B: Assistance during Construction - 6 Months $2520.00 $0.00
Total Fixed Price $5200.00
Total Reimbursable Cost $0.00
Total Overall Cost $5200.00
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702 Marathon: 6805 Overseas Highway, Marathon, Florida 33050 | Tel 305-289-4161 | Fax 305-289-4162
Williams_BrD
| CN230 TA 44 Service Dock CA |
| CN230 TA44 Lignumvitae Dock replacement (1) |
File details come from the government source that posted it. Updated .