CN-370000-CN230-T54.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|CN230|5f4ec01f5eb38b1957861cb8292c2183
Contract number
CN230
Issued by
Florida

About this file

This document is a Task Assignment Notification Form and associated proposal from the Florida Department of Environmental Protection (FDEP) to The Weiler Engineering Corporation for design, permitting, and construction-phase services related to the Briggs Boardwalk replacement project at Rookery Bay State Park (Shell Island - RBNERR) in Florida. The contract is identified as CN230, Task Assignment 54, with project number RM2301. Garland Sandel serves as the FDEP project manager, while Jeff Weiler is the consultant representative. The project is located at Rookery Bay National Estuarine Research Reserve.

The contract encompasses design and permitting services to demolish and replace an existing half-mile wood boardwalk with a 6-foot-wide, ADA-compatible structure constructed above the 100-year flood elevation. Services include three conceptual designs (wood, composite, and Permatrak materials), surveys, geotechnical reports, lead and asbestos assessments, environmental evaluations, and comprehensive plan development progressing through 30%, 60%, and 100% design phases, followed by permit application and approval support. Construction-phase services include pre-bid and pre-construction meetings, contractor submittal review, regulatory response coordination, eight monthly inspections, and substantial and final completion certifications. The total contract value is $167,423.14, consisting of $165,166.34 in fixed-price costs and $2,256.80 in reimbursable costs. The project execution date is February 20, 2025, with an anticipated completion date of February 20, 2025. Design and permitting tasks are budgeted at $144,661.34 (fixed) and $1,622.00 (reimbursable), while construction-phase services total $20,505.00 (fixed) and $634.80 (reimbursable). Payment is made upon FDEP approval of deliverables for each subtask.

View the file

Other files

File Type Posted
CN-370000-CN230-CMC3.pdf PDF
CN-370000-CN230-T14CO1.pdf PDF
CN-370000-CN230-T14CO2.pdf PDF
CN-370000-CN230-T15.pdf PDF
CN-370000-CN230-T16.pdf PDF
CN-370000-CN230-T1CO1.pdf PDF
CN-370000-CN230-T20.pdf PDF
CN-370000-CN230-T21.pdf PDF
CN-370000-CN230-T24.pdf PDF
CN-370000-CN230-T25.pdf PDF
CN-370000-CN230-T2CO2.pdf PDF
CN-370000-CN230-T3.pdf PDF
CN-370000-CN230-T34CO2.pdf PDF
CN-370000-CN230-T35.pdf PDF
CN-370000-CN230-T36CO1.pdf PDF
CN-370000-CN230-T36CO2.pdf PDF
CN-370000-CN230-T39.pdf PDF
CN-370000-CN230-T3CO1.pdf PDF
CN-370000-CN230-T45.pdf PDF
CN-370000-CN230-T45CO2.pdf PDF
CN-370000-CN230-T49.pdf PDF
CN-370000-CN230-T51.pdf PDF
CN-370000-CN230-T53CO2.pdf PDF
CN-370000-CN230-T56.pdf PDF
CN-370000-CN230-T62.pdf PDF
CN-370000-CN230-T64CO1.pdf PDF
CN-370000-CN230-T76.pdf PDF
CN-370000-CN230-T79.pdf PDF
CN-370000-CN230-T7CO1.pdf PDF
CN-370000-CN230-T9.pdf PDF
CN-370000-CN230-T92.pdf PDF
CN-370000-CN230-TA33.pdf PDF
CN-370000-CN230-A1.pdf PDF
CN-370000-CN230-CMC1.pdf PDF
CN-370000-CN230-T11.pdf PDF
CN-370000-CN230-T13CO1.pdf PDF
CN-370000-CN230-T2.pdf PDF
CN-370000-CN230-T27.pdf PDF
CN-370000-CN230-T28.pdf PDF
CN-370000-CN230-T34.pdf PDF
CN-370000-CN230-T36.pdf PDF
CN-370000-CN230-T37CO3.pdf PDF
CN-370000-CN230-T3CO2.pdf PDF
CN-370000-CN230-T4.pdf PDF
CN-370000-CN230-T42.pdf PDF
CN-370000-CN230-T42CO2.pdf PDF
CN-370000-CN230-T45CO3.pdf PDF
CN-370000-CN230-T46.pdf PDF
CN-370000-CN230-T4CO2.pdf PDF
CN-370000-CN230-T51CO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN230 54 FDEP-DRP RM2301

Shell Island - RBNERR Briggs Boardwalk

The Weiler Engineering Corporation

Jeff Weiler (941)628-4732 weiler7@mac.com

Ralph Perkins 850.245.2460 Ralph.Perkins@FloridaDEP.gov

The project consist of: design, permitting and construction of a boardwalk. See proposal dated 2.14.23

Garland Sandel or Successor

Execution date $ 165,166.34

02.20.25 $ 2,256.80

$ 167,423.14

Lisa Yarborough Lisa Yarborough Digitally signed by Lisa Yarborough Date: 2023.02.24 13:16:53 -05'00'

Garland Sandel Garland Sandel Digitally signed by Garland Sandel Date: 2023.02.24 13:30:17 -05'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.02.24 13:51:46 -05'00'

Jeff Weiler Jeff Weiler Digitally signed by Jeff Weiler Date: 2023.02.24 14:15:32 -05'00'

Alex Reed Alex Reed Digitally signed by Alex Reed Date: 2023.02.27 15:46:15 -05'00'

RM2301 37538020000 083643/23 423001 U3210 241000 QK $ 167,423.14

$ 167,423.1437202423001375004000008364323

PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702 MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289-416 2

WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG

December 26, 2022 - Revision 5 - February 14, 2023

Mr. Garland Sandel Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260-L, MS 520 Tallahassee, FL 32399

RE: Rookery Bay State Park - Briggs Boardwalk, CN - 230, TA - 54

Dear Mr. Sandel, Thank you for the opportunity to provide this proposal to prepare the plans and documentation necessary to demolish and replace the existing boardwalk and accessory structures identified as Briggs Boardwalk.

December 26, 2022 - Rev 5 - 2/14/23 Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Our services will include:

Design and permitting to remove the existing +/- 1/2 mile long wood boardwalk and replace it with a 6 foot wide, ADA compatible boardwalk constructed above the 100 year flood elevation. Our services will include three conceptual designs with cost estimates.

All three conceptual designs will be the same dimensions and elevations but will consider wood, composite and Permatrak for construction materials.

For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the tasks identified below:

Please review the attached Proposal Summary and deliverables.

Sincerely, R. Jeff Weiler, P.E.

President The Weiler Engineering Corporation

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Briggs Boardwalk Replacement Rookery Bay State Park

Contract Number 230, Task Assignment Number 54

Subtask 1: 30% Design

1) A - Conceptual Design

a) WEC will conduct one site visit.

b) Consultant will conduct a pre-application meeting with the Water Management District or FDEP, the USACOE and the Local Building Department.

c) Consultant will prepare three (3) conceptual site plans & include typical sections adequate to compare costs for wood, composite and Permatrak.

1) B – Surveys

a) Consultant will coordinate with Survey Sub-Consultant to prepare a special Purpose Survey with topo extending 10 feet each side of the existing boardwalk. To be cleared by Client.

1) C –Geotechnical Reports (Universal Engineering)

a) Consultant will coordinate with Geotechnical Sub-Consultant to prepare a geotechnical Report recommending piling depths and seasonal high water elevation.Consultant will coordinate with a consultant to complete lead and asbestos reports for the existing structure.

1) D – Lead/Asbestos Reports (Universal Engineering)

a) Consultant will coordinate with Sub-consultant to prepare lead and asbestos reports on existing structure.

1) E – FLUCFCS Map & Listed Species

a) Consultant will coordinate with Sub-consultant to prepare a FLUCFCS Map and Listed Species Report.

Deliverable:

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

1) A - Conceptual Design, Conceptual Site & Structural Plans – Consultant shall deliver conceptual plans (3) to the client via digital PDF. Plans will include:

Cover sheet Survey Existing Conditions Site Plan Boardwalk Plan View Typical Sections for wood, composite and Permatrak Opinion of probable cost for each option

1) B - Surveys

Completed Survey – Sixty days from execution of Task Assignment, consultant shall deliver a special Purpose Survey via digital PDF, CAD and a Signed and Sealed copy.

1) C –Geotechnical Reports

Geotechnical Report – Sixty days from execution of task assignment, consultant shall deliver a completed geotechnical Report recommending piling depths and seasonal high water elevation via digital PDF.

1) D –Lead/Asbestos Reports

Lead/Asbestos Report – Sixty days from execution of task assignment, consultant shall deliver a completedLead and Asbestos report via digital PDF

1) E –FLUCFCS & Listed Species Reports

FLUCFCS Map & Listed Species Report – Sixty days from execution of task assignment, consultant shall deliver a completed report via digital PDF

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 1A - 30% Plans

Firm Name Position Classification Hourly Rate Hours Total Fixed Price

Cost

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering Project Manager 145 26 3770

Weiler Engineering Principal in Charge 195 1 195

Weiler Engineering

Registered Professional Engineer 145 22 3190

Weiler Engineering Registered Engineer Intern 115 50 5750

Weiler Engineering Senior Engineering Designer 100 90 9000

Weiler Engineering Engineering Technician 80 122 9760

Weiler Engineering Clerical 55 12 660

Total 32325

Subtask 1B - Survey

Firm Name Position Classification Unit Unit Rate Numbe r Units

Total Fixed Price Cost

Weiler Engineering Project Manager Hr 145 4 580

CHW 3 Person Field Crew Hr 177. 14 248

CHW Project Surveyor Hr 74. 14 104 .

CHW Senior CAD/GIS Hr 103.13 8 825.04

CHW Professional Surveyor & Mapper

Hr 163.93 4 655.72

Total Survey 55 .

Subtask 1C Geotech

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Firm Name Position Classification Unit Unit Rate Numbe r Units

Total Fixed Price Cost

Weiler Engineering Project Manager Hr 145 4 580

Geotech Universal

Universal Senior Project Engineer Hr 165.84 8 1326.72

Universal Project Engineer Hr 94.50 8 756

Universal Staff Engineer Hr 68.46 15 1026.9

Universal CAD Drafting Hr 54.00 6 324

Total Geotech 4013.62

Subtask 1D - Lead/Asbestos survey

Firm Name Position Classification

Unit Rate Hours Total Fixed Price Cost

Weiler Engineering Registered Professional Engineer

145 2 $290.00

Weiler Engineering Registered Engineer Intern

115 2 $230.00

Universal Engineering Senior Geotechnical Engineer. PE

165.84 15 $2487.60

Universal Engineering Sr Engineering Technician

49.14 30 $1474.20

Total Lead/ Asbestos Survey

$4481.80

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Reimbursable Cost: (if applicable)

Total Subtask 1D $4481.80

Subtask 1E - FLUCFCS & Listed Species

Firm Name Position Classification

Unit Rate Hour s

Total Fixed Price Cost

Weiler Engineering Registered Professional Engineer

145 4 $580.00

Weiler Engineering Registered Engineer Intern

115 8 $920.00

Passaarella Senior Ecologist 149.50 16 $2392.00

Passaarella Ecologist 104.65 26 $2720.90

Passaarella Design/GIS 89.70 16 $1435.20

Total Sub-task E

FLUCFCS &

Listed Species

$8048.10

Postage

Printing

Overnight Travel

(if applicable) Mileage (@ $0.445 per mile)

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Reimbursable Cost: (if applicable)

Subtask 2: 60% documents

Description: Plans completed to 60% incorporating comments from 30%.

Deliverable: Plans consultant shall deliver 60% Plans (digital PDF only) including:

Opinion of Probable Cost;

Cover sheet Survey Existing Conditions Best Management Plan Demolition Plan Site & Grading Plan Utility Plan Site Details and General Notes

Reimbursable Total Cost $0.00

Total Subtask 1E $8048.10

Postage

Printing

Overnight Travel

(if applicable)

Mileage (@ $0.445 per mile)

0.445 0

Reimbursable Total Cost 1A

Total Subtask 1

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Foundation/Piling Plans and details;

Beam schedules;

Exterior Elevations;

Building Cross sections and details;

ADA Ramp Plan with sections & details;

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 3: 100% documents

Description: Plans completed to 100%.

Subtask 2 - 60% Plans

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost

Weiler Engineering Project Manager 145 27 3915

Weiler Engineering Principal in Charge 195 1 195

Weiler Engineering

Registered Professional Engineer 145 22 3190

Weiler Engineering Registered Engineer Intern 115 36 4140

Weiler Engineering Senior Engineering Designer 100 89 8900

Weiler Engineering Engineering Technician 80 123 9840

Weiler Engineering Clerical 55 11 605

Total 30785

Total for Subtask 2

30785

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Deliverable: Incorporate Client review of 60% plans, Consultant shall deliver one set of 100% signed and sealed plans, digital 1-PDF and 1-CAD including:

Updated Opinion of Probable Cost;

Cover sheet Survey Existing Conditions Best Management Plan Demolition Plan Site & Grading Plan Utility Plan Site Details and General Notes Foundation/Piling Plans and details;

Beam schedules;

Exterior Elevations;

Building foundations Cross sections and details;

ADA Ramp Plan with sections & details;

Specifications

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 3 - 100% Plans

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost

Weiler Engineering Project Manager 145 18 2610

Weiler Engineering Principal in Charge 195 1 195

Weiler Engineering

Registered Professional Engineer 145 14 2030

Weiler Engineering Registered Engineer Intern 115 24 2760

Weiler Engineering Senior Engineering Designer 100 60 6000

Weiler Engineering Engineering Technician 80 82 6560

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Reimbursable Cost:

Subtask 4: Permitting

Description:

4) A – Permit Applications, Consultant will assist Client and Clients contractor to submit permit applications for Local and State approvals. WEC will complete applications for the Water Management District for exemption, the State Fire Marshall, Building for site development approval. WEC staff will coordinate with the Client to ensure that desired layout fits to the specific jurisdiction requirements and work with the Client to make changes as may be necessary.

4) B – Permit Approvals, Consultant will coordinate with agencies and assist Client and Clients contractor to respond to agencies for additional information.

Deliverable:

4) A – Permit Applications, Weiler Engineering Clerical 55 8 440

Total 20595

Postage 1 35 35

Printing 40 2.30 92

Overnight Travel

(if applicable)

Reimbursable Total Cost

Total for Subtask 3

20722

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Incorporate Client review comments from 60% plans and deliver five sets of permit applications with 100% plans.

4) B – Permit Approvals, Depends on agencies but anticipate 60 days after submittal. Consultant will respond to agency requests for additional information and copy Client on all responses. Upon approval, Consultant will provide Client with approvals and revised (if necessary) plans and documentation

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 4A Permit Applications

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost

Weiler Engineering Project Manager 145 18 2610

Weiler Engineering Principal in Charge 195 1 195

Weiler Engineering Registered Professional Engineer 145 24 3480

Weiler Engineering Registered Engineer Intern 115 24 2760

Weiler Engineering Senior Engineering Designer 100 59 5900

Weiler Engineering Engineering Technician 80 82 6560

Weiler Engineering Clerical 55 7 385

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Reimbursable Cost:

Total 21890

Subtask 4B Permit Approvals

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost

Weiler Engineering Project Manager 145 16 2320

Weiler Engineering Principal in Charge 195 1 195

Weiler Engineering Registered Professional Engineer 145 16 2320

Weiler Engineering Registered Engineer Intern 115 24 2760

Weiler Engineering Senior Engineering Designer 100 32 3200

Weiler Engineering Engineering Technician 80 32 2560

Weiler Engineering Clerical 55 1 55

Total 13410

Postage 1 35 35

Printing 200 2.3 460

Permit application fees estimate

1 1000 1000

Reimbursable Total Cost for 4A

Total for Subtask 4

36795

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Subtask 5: Attend a Pre-Bid meeting on-site

Description: Consultant will attend one pre-bid meeting on site to respond to questions and prepare minutes.

Deliverable: Consultant will provide digital minutes of meeting and responses to contractor questions.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Reimbursable Cost:

Subtask 5 - Pre-bid

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 8 $1160.00

Weiler Engineering Principal in Charge 195 0 $0.00

Weiler Engineering Registered Professional Engineer

145 0 $0.00

Weiler Engineering Registered Engineer Intern 115 8 $920.00

Weiler Engineering Senior Engineering Designer 100 8 $800.00

Weiler Engineering Engineering Technician 80 8 $640.00

Weiler Engineering Clerical 55 0 $0.00

Total $3520.00

Description Number @ Total

Postage Not anticipated

Overnight Travel

(if applicable)

Not anticipated

Mileage (@ $0.445 per mile)

$0.00

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Reimbursable Total Cost $0.00

Total Subtask 5 $3520.00

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

WEC will respond to RFI's from Contractor within 7 days throughout the course of the construction phase.

WEC will provide copies of all RFI responses to FDEP Project Manager in PDF digital format.

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

WEC will provide a monthly inspection (NLT every 30 days) during construction.

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Description: WEC will provide a monthly inspection (NLT every 30 days) during construction.

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Weiler Engineering

Weiler Engineering

Weiler Engineering

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Project Schedule:

Weiler Engineering

Weiler Engineering

Weiler Engineering

Activity Duration (Calendar Days) Days from

Subtask 1A ** Preliminary 60 60

Subtask 1B Survey 60 60

Subtask 1C Geotech 60 60

Subtask 1D Lead/asbestos 60 60

Subtask 1E FLUCFCS/Species 60 60

Subtask 2: 60% plans 30 - includes 7 days for Client review

Subtask 3: 100% plans 30 – includes 7 days for Client review

Subtask 4A: Permit applications 30 – includes 7 days for Client review

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Summary of Fees:

Subtask 4B: Permit approvals 60 – includes response for additional information

Subtask 5: Prebid 30 210

Subtask Subtask Fixed Price Cost Subtask Reimbursable

Subtask 1A Preliminary $32325.00 $0.00

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Subtask 1B Survey $559 . $0.00

Subtask 1C Geotech $4013.62 $0.00

Subtask 1D Lead/Asbestos $4481.80 $0.00

Subtask 1E FLUCFCS/Species $8048.10 $0.00

Subtask 2: 60% plans $30785.00 $0.00

Subtask 3: 100% plans $20595.00 $127.00

Subtask 4A Permit applications $21890.00 $1495.00

Subtask 4B Permit approvals $13410.00 $0.00

Subtask 5 Pre-Bid $3520.00 $0.00

Total Design & Permitting $ 44,661 $1622.00

Subtask 6A - Pre-Construction Meeting

$2080.00 $0.00

Subtask 6B - Submittal Review $2680.00 $35.00

Subtask 6C - Regulatory Response

$1980.00 $0.00

Subtask 6D Assistance during construction

$2520.00 $0.00

Subtask 6E Inspection 1 $1007.50 $0.00

Subtask 6F Inspection 2 $1007.50 $177.40

Subtask 6G Inspection 3 $1007.50 $35.00

Subtask 6H Inspection 4 $1007.50 $177.40

Subtask 6I Inspection 5 $1007.50 $35.00

Subtask 6J Inspection 6 $1007.50 $35.00

Subtask 6K Inspection 7 $1007.50 $35.00

Subtask 6L Inspection 8 $1007.50 $35.00

Subtask 6M Substantial Completion

$1805.00 $35.00

Subtask 6N Final Completion $1380.00 $35.00

Total during Construction $20505.00 $634.80

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)

Total Fixed Price Cost: $165,166

Total Fixed Price Cost: $2256.80

Overall Total Cost: $ 67,423

Mr. Garland Sandel Rookery Bay State Park Briggs Boardwalk

CN 230/TA54

Firm Name: Passarella & Associates, Inc.

Overhead Calculation

Position Title Base Rate/Hour Labor Multiplier*

Billing Rate (Base Rate + Multiplier)

Senior Ecologist $50.00 2.99 $149.50

Ecologist $35.00 2.99 $104.65

Design/GIS $30.00 2.99 $89.70

Administrative $24.00 2.99 $71.76

Multiplier Factor Response

Hourly Rate: 1

General Overhead: 1.2

FringeBenefits: 0.64

Sub-Total: 2.84

Profit (%): 0.15

Total Multiplier: 2.99

Mr. Garland Sandel Rookery Bay State Park

Mr. Garland Sandel Rookery Bay State Park

File details come from the government source that posted it. Updated .