This is a Task Assignment Notification Form and supporting proposal documentation for FDEP Agreement #CN225, Task Assignment #44, issued by the Florida Department of Environmental Protection (FDEP) to DRMP, Inc., a consulting firm with offices throughout Florida. The project involves design and permitting services for a mid-block pedestrian crosswalk across County Highway 30A at the Deer Lake State Park entrance in Walton County, Florida. The task assignment was executed on November 20, 2022, with a completion date of November 22, 2025.
The scope of work consists of four subtasks: (1) topographic survey with establishment of site benchmarks and utility location; (2) 90% design plans for the ADA-compliant concrete crossing conforming to FDOT and Walton County standards; (3) 100% final design plans with professional seal; and (4) right-of-way use permit acquisition from Walton County. The total contract value is a fixed price of $7,742.00 with no reimbursable costs, broken down as follows: Subtask 1 ($2,702.23), Subtask 2 ($3,191.56), Subtask 3 ($983.90), and Subtask 4 ($864.31). The project schedule spans approximately 16 weeks from the notice to proceed, with the topographic survey requiring 5 weeks, 90% design 4 weeks from survey completion, 100% design 3 weeks from 90% approval, and permitting 4 weeks from 90% design submittal. Funding is provided through FDEP's budget code 61453C with account codes documented in the 29-digit FLAIR code.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN 225 44 FDEP-DRP 61453C
Deer Lake State Park CR 30A Pedestrian Crosswalk
DRMP
Ben Lennon 850.692.5659 BLennon@drmp.com
Ralph Perkins 850.245.2460 Ralph.Perkins@floridadep.gov
Design and permit a mid block crossing across CR 30A. See attached 10/26/22 proposal.
Garland Sandel
11-20-22 $ 7,742.00 11-22-25 $ 0.00
$ 7,742.00
Tamika Bass
Garland Sandel
Ralph Perkins
Benjamin Lennon
Michael W. Foster Jr., PE
61453C 37501016248 080039/23 000286 U3200 131500 AD $ 7,742.00
$ 7,742.00
1625 Summit Lake Drive, Suite 200, Tallahassee, Florida 32317 Phone: 850.562.9600 | Fax: 850.575.5544
DRMP, INC.
PRINCIPALS
Lawrence L. Smith, Jr
Wayne D. Chalifoux Donaldson K. Barton, Jr.
Glenn J. Lusink Jon S. Meadows Mark D. Prochak Mark E. Puckett
OFFICES
Atlanta, Georgia
Boca Raton, Florida Charlotte, North Carolina
Chipley, Florida Fort Myers, Florida Gainesville, Florida
Jacksonville, Florida Lakeland, Florida
Melbourne, Florida Orlando, Florida
Panama City, Florida Pensacola, Florida
Raleigh, North Carolina Tallahassee, Florida
Tampa, Florida
1.833.811.3767 www.DRMP.com
October 26, 2022 DRMP Proposal #: 14-0210.M44
Garland Sandel Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520
Subject: FDEP Agreement #CN225 Task Assignment #44 61286C Deer Lake State Park 30A Crosswalk in Walton County Proposal for Professional Services
Dear Mr. Sandel:
Our understanding of the project is design and permitting services for a mid-block crosswalk on Highway 30A at Deer Lake State Park in Walton County.
For your review, DRMP, Inc., has provided a proposal summary and man-hour documentation for the services task identified below:
Survey Final Design Services Permitting
Please review the attached Proposal Summary and Deliverables.
Sincerely, _____________________________ 7-8-2022___ Benjamin Lennon, P.E. Date Project Manager
Attachment(s): DRMP, Inc. Proposal
CC: Randall Jernigan (DRMP) Ryan Culton, P.E. (DRMP)
Mr. G. Sandel
P:\Projects14\14-0210.000_FDEP_Base_Project\00_Marketing\TA 44 Deer Lake 30A Crossing\Proposal\CN225_TA44_Deer_Lake _Crossing Proposal_10.27.22.docx
Deer Lake State Park 30A Crosswalk in Walton County FDEP Agreement #CN225 Task Assignment #44
Proposal for Professional Services
Background and Purpose
The project consists of designing a mid-block crossing on County Highway 30A near the Deer Lake State Park entrance road.
asphalt bike/pedestrian path on south side of road. The asphalt path floods on either side of the State Park driveway. Walton County is planning to raise the asphalt path in low areas and will stub us out a connection to the edge of travel way, shown in green below. FDEP will be responsible for the red side. Material would be concrete and designed to be ADA compliant.
Subtask 1: Topographic Survey
Description: The Consultant shall provide a topographic survey in order to facilitate engineering the project site.
The Topographic Survey will be prepared in accordance with the State of Florida Standards of Practice, Chapter 5J-17, Florida Administrative Code, as set forth by the Board of Professional Surveyors and Mappers, pursuant to Section 472.027, Florida Statutes.
Tasks for the topographic survey will include the establishment of no fewer than two (2) site benchmarks, the location of existing above ground evidence of utilities and visible improvements. Survey limits will be the SR30A corridor at the entrance to Deer Lake Park as designated by the Engineer. All horizontal data will be referenced to the North American Datum of 1983/Adjustment of 2011 (NAD83/11) relative to the Florida Permanent Reference Network. Vertical data will be referenced to the North American Vertical Datum of 1988 (NAVD88) relative to the Florida Permanent Reference Network (elevations will be derived from GPS observations of established site benchmarks).
P:\Projects14\14-0210.000_FDEP_Base_Project\00_Marketing\TA 44 Deer Lake 30A Crossing\Proposal\CN225_TA44_Deer_Lake _Crossing Proposal_10.27.22.docx
Deliverable: The Consultant shall provide one (1) Topographic Survey (.pdf and dwg format) to the Department Project Manager.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the survey on the subject property within 5 weeks post receipt of
NTP.
Subtask 2: 90% Design
Description: The Consultant shall design and produce 90% construction plans for the mid-block crossing.
The plans will contain but not limited to:
Cover Sheet
General Notes
Layout
Signage and Striping
Details
The crossing will be designed to FDOT and Walton County standards.
Deliverable: The Consultant shall provide the 90% design plans and construction cost estimate in .pdf format to the Department Project Manager.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the subtask within 4 weeks of completion of the survey.
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Secretary $47.83 0.5 $23.92
DRMP Project Manager $159.52 1 $159.52
DRMP Senior Project Surveyor $138.71 1 $138.71
DRMP Project Surveyor $110.01 8 $880.08
DRMP 3 Man Survey Crew $150.00 10 $1,500.00
$2,702.23
Subtask 1: Topographic Survey
SUBTASK 1 TOTAL:
Firm Name Position Classification Hourly Rate Hours Total Fixed Price
Cost
DRMP Secretary $47.83 0.5 $23.92
DRMP Project Manager $159.52 2 $319.04
DRMP Senior Project Engineer PE $141.12 0.5 $70.56
DRMP Project Engineer PE $110.01 4 $440.04
DRMP Staff Engineer EI $81.79 8 $654.32
DRMP CADD Designer $105.23 16 $1,683.68
$3,191.56
Subtask 2: 90% Design
SUBTASK 2 TOTAL:
P:\Projects14\14-0210.000_FDEP_Base_Project\00_Marketing\TA 44 Deer Lake 30A Crossing\Proposal\CN225_TA44_Deer_Lake _Crossing Proposal_10.27.22.docx
Subtask 3: 100% Design
Description: Upon approval of the 90% plans, The Consultant shall design and produce 100% construction plans.
Deliverable: The Consultant shall provide the 100% design plans digitally signed and sealed and construction cost estimate in .pdf format to the Department Project Manager.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the subtask within 3 weeks of receiving comments from subtask 2.
Subtask 4: Permitting
Description: The Consultant shall obtain a right-of-way use permit from Walton County.
Deliverable: The Consultant shall provide an approved right-of-way use permit in .pdf format.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the services under Subtask 4 within 4 weeks the 90% design submittal.
Firm Name Position Classification Hourly Rate Hours Total Fixed Price
Cost
DRMP Secretary $47.83 0.5 $23.92
DRMP Project Manager $159.52 2 $319.04
DRMP Project Engineer PE $110.01 2 $220.02
DRMP CADD Designer $105.23 4 $420.92
$983.90
Subtask 3: 100% Design
SUBTASK 3 TOTAL:
Firm Name Position Classification Hourly Rate Hours Total Fixed Price
Cost
DRMP Project Manager $159.52 2 $319.04
DRMP Project Engineer PE $110.01 4 $440.04
DRMP CADD Designer $105.23 1 $105.23
$864.31
Subtask 4: Permitting
SUBTASK 4 TOTAL:
P:\Projects14\14-0210.000_FDEP_Base_Project\00_Marketing\TA 44 Deer Lake 30A Crossing\Proposal\CN225_TA44_Deer_Lake _Crossing Proposal_10.27.22.docx
NOTE: Should work effort vary from proposed professional services / anticipated agency requirements, the Consultant shall submit an to modify the agreed upon task assignment (scope of services, schedule, and fees) accordingly.
Reimbursable
Subtask 1: Topographic Survey 5 weeks
3 weeks from 90%
Subtask 4: Permitting 4 weeks from 90%
Total Fixed Price Cost:
Subtask 2: 90% Design 4 weeks from survey
Subtask 3: 100% Design
Total Reimbursable Cost: $0.00
GRAND TOTAL COST: $7,742.00
Project Schedule
Subtask: Duration
Summary of Fees
Subtask 4: Permitting $864.31
Subtask 1: Topographic Survey $2,702.23
Subtask 2: 90% Design $3,191.56
Subtask 3: 100% Design $983.90
Subtask: Fixed Price Cost
$7,742.00