This document is a Task Assignment Notification Form and accompanying proposal from the Florida Department of Environmental Protection (FDEP) for professional services under Contract CN225. The contract involves FDEP's Bureau of Design and Construction, the project owner FDEP-BDC, and the consulting firm DRMP, Inc., located in Tallahassee, Florida. The project concerns alterations and revisions to construction documents for the New Vault Restroom facility at St. Sebastian River Preserve State Park's Horseman's Headquarters.
The scope of work consists of a single subtask requiring the consultant to revise construction plans to include an add alternate for a prefabricated restroom building with necessary notes and drawings from CXT as a basis of design. The consultant shall deliver electronically signed and sealed plans in PDF format to the Department Project Manager, with hard copies (up to 3) available upon request. The fixed price cost for this task is $529.50, comprising 2 hours of Project Manager time at $159.52 per hour ($319.04) and 2 hours of CADD Designer time at $105.23 per hour ($210.46). No reimbursable costs are included. The work must be completed within 7 days of the Notice to Proceed, with a completion date of June 30, 2020. The total task amount is $529.50 with no cost reimbursement authorization.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1625 Summit Lake Drive, Suite 200, Tallahassee, Florida 32317 Phone: 850.562.9600 | Fax: 850.575.5544
DRMP, INC.
PRINCIPALS
Lawrence L. Smith, Jr.
Wayne D. Chalifoux Donaldson K. Barton, Jr.
Glenn J. Lusink Jon S. Meadows Mark D. Prochak Mark E. Puckett
OFFICES
Atlanta, Georgia
Boca Raton, Florida Charlotte, North Carolina
Chipley, Florida Fort Myers, Florida Gainesville, Florida
Jacksonville, Florida Lakeland, Florida
Melbourne, Florida Orlando, Florida
Panama City, Florida Pensacola, Florida
Raleigh, North Carolina Tallahassee, Florida
Tampa, Florida
1.833.811.3767 www.DRMP.com
February 20, 2020 DRMP Proposal #: 14-0210.0MK
Richard Rowe Engineering Specialist IV Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520
Subject: FDEP Agreement #CN225 – Task Assignment #21 St. Sebastian River Preserve State Park – New Vault Restrooms
Horseman’s Headquarters – Construction Plan Revisions Proposal for Professional Services
Dear Mr. Rowe:
For your review, DRMP, Inc., has provided a proposal summary and man-hour documentation for the services task identified below:
Please review the attached Proposal Summary and Deliverables.
Sincerely, _____________________________ 2/20/2020___ Benjamin Lennon, P.E. Date Project Engineer
Attachment(s): DRMP, Inc. Proposal
CC: Bryant King, P.E.
Mr. Richard Rowe
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 20\FDEP\14-0210.0MK_CN225_CSA_2015\14- 0210.021_TA21_SRP_Con_Plan_Revisions_(pending)\2020_02.20_ORIG\Proposal\DRMP_14-0210.0MK_CN225_SRP-Con-Plan-Revisions_Proposal_02.20.2020_DIGITAL.docx
St. Sebastian River Preserve State Park – New Vault Restroom
Horseman’s Headquarters – Construction Plan Revisions FDEP Agreement #CN225 – Task Assignment #21
Proposal for Professional Services
Subtask 1: Construction Plan Revisions
Description: The Consultant shall revise the construction plans to include an add alternate for the prefabricated restroom building and all necessary notes and/or revisions. The plans will also include drawings from CXT to provide a basis of design. Additional permitting is not anticipated due to revisions, and not included in this proposal.
Deliverable: The Consultant shall provide electronically signed and sealed plans (.pdf) to the Department Project Manager. Signed and sealed hard copies (up to 3) will be provided at the Department Project Manager’s request.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: Deliverables shall be completed within 7 days of the NTP.
Summary of Fees:
NOTE: Should work effort vary from proposed professional services / anticipated agency requirements, the Consultant shall submit an additional services proposal for the Department Project Manager’s consideration to modify the agreed upon task assignment (scope of services, schedule, and fees) accordingly.