Task Assignment Change Order Summary
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract CN225, Task Assignment 38, Change Order 1. The contracting parties are FDEP and DRMP (Design and Resource Management Planning), Inc., represented by Benjamin Lennon, PE, Senior Project Manager. The project is located at Ichetucknee Springs State Park and involves the replacement of a restroom facility. The change order was signed by authorized representatives from both parties on May 11-15, 2023.
The change order implements a time extension only with no cost increase. The original task end date of June 30, 2023 is extended by 365 days to June 29, 2024 to accommodate professional engineering services required for design and permitting of the new restroom construction. The total contract amount remains unchanged at $90,561.33, consisting of $2,700.00 in reimbursable expenses and $87,861.33 in fixed fees. The task execution date commenced on March 4, 2022. No modification to the contract budget or funding source occurred with this change order.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN225 38 1 61363C
Ichetucknee Springs State Park Replace Restroom
DRMP
Benjamin Lennon PE (850) 692-5659 blennon@drmp.com
Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
No cost change, time extension only for professional engineering services needed to design and permit the construction of a new restroom at Ichetucknee Springs State Park per attached dated 5/11/23.
$ 2,700.00 $ 87,861.33 $ 90,561.33 $ 2,700.00 $ 87,861.33 $ 90,561.33
$ 0.00 $ 0.00 $ 0.00 $ 2,700.00 $ 87,861.33 $ 90,561.33
03/04/2022
06/30/2023
06/30/2023
06/29/2024
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.05.11 15:57:57 -04'00'
Terry McCullum, Jr. Terry McCullum, Jr.
Digitally signed by Terry McCullum, Jr.
Date: 2023.05.11 16:24:19 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.05.11 16:46:48 -04'00'
Benjamin R. Lennon PE Benjamin R Lennon Digitally signed by Benjamin R Lennon DN: CN=Benjamin R Lennon, dnQualifier=A01410C00000186B4D6E064000660B6, O=DRMP INC., C=US
Date: 2023.05.12 09:42:37-04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.05.15 21:28:35 -04'00'
$ 0.00
McCullum, Terry
From: Benjamin Lennon <BLennon@drmp.com> Sent: Thursday, May 11, 2023 1:43 PM To: McCullum, Terry Cc: Allison DeGraw Subject: CN 225 TA 38 CO1 Time Extension
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Terry, Requesting time extension of 365 days for CN 225 TA 38 Ichetucknee Restroom, hopefully this covers construction.
Thanks, Benjamin Lennon, PE
Senior Project Manager Civil Services
Main: 850.562.9600 | Direct: 850.692.5659 blennon@drmp.com
8000 Regency Parkway, Suite 110, Cary, NC 27518
File details come from the government source that posted it. Updated .