This is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP) for FDEP Contract No. CN225. The contract is between FDEP and DRMP, Inc., a consulting firm specializing in engineering, surveying, planning, and construction services. The project involves a campground septic replacement project at T.H. Stone Memorial St. Joseph Peninsula State Park. The task assignment is identified as Task Assignment No. 07 under Project No. 61165. The FDEP Contract Manager is Mae Roth, and the Project Manager is C. Hewitt or successor. The consultant representative is Bryant King, P.E.
DRMP will provide topographic surveys, construction documents, bid support, and construction administration services for three septic system replacements at the state park. The contract includes five major subtasks: (1) Topographic Survey ($6,428.24); (2) Design services including 60% Design and 100% Design phases ($12,982.34); (3) Septic Tank Permitting ($1,646.20 with a reimbursable permit application fee not to exceed $1,000.00); (4) Electrical Design and Bid/Construction Support ($2,737.04); and (5) Construction Administration Services including bidding, shop drawing review, preconstruction meeting, and final site visit ($3,538.19 with reimbursable mileage of $97.90). The total fixed price cost is $26,234.11 and total reimbursable cost is $1,097.90, for an overall total cost of $27,332.01. Work is scheduled to begin upon execution and conclude on June 30, 2018. Payment will be made upon approval of deliverables for each subtask.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .