This document is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a project involving DRMP, Inc., an engineering and consulting firm with offices throughout Florida and the Southeast. The change order represents an amendment to FDEP Contract No. CN225, Task Assignment No. 14, Change Order No. 3, pertaining to the Colt Creek State Park New Prefabricated Restrooms project (Project No. 61223C). The primary parties include FDEP, represented by Project Manager Philip T. Stone and Contract Manager Michael W. Foster Jr., P.E., and DRMP, Inc., represented by consultant Benjamin Lennon, P.E.
The change order extends the task assignment timeline by 182 days with no adjustment to the contract amount. The original task execution period ran from February 11, 2019, through December 31, 2019, with a previous extension to December 31, 2020. This change order extends the end date to June 30, 2021, to allow DRMP to provide construction administrative services as originally outlined in their scope of work. The total task amount remains $29,351.63, comprised of a $28,351.63 fixed fee and $1,000.00 in reimbursable expenses. Funding is allocated through FDEP's budget system using the 29-digit FLAIR code structure with organizational codes 61223C and 61221C.
Text of this file
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN225 14 3 61223C / 61221C
Colt Creek State Park New Prefabricated Restrooms
DRMP, Inc.
Benjamin Lennon, P.E. 850-692-5659 blennon@drmp.com
Philip T. Stone 850-245-2570 Philip.Stone@floridadep.gov
No cost change. Time extension only so consultant can provide construction administrative services include in the Task Assignment. Please see consultants proposal dated 10/19/2020 attached.
$ 0.00 $ 27,822.13 $ 27,822.13 $ 1,000.00 $ 28,351.63 $ 29,351.63
$ 0.00 $ 0.00 $ 0.00 $ 1,000.00 $ 28,351.63 $ 29,351.63
2/11/2019
12/31/2019
12/31/2020
06/30/2021
Greg Turral Gregory Turral Digitally signed by Gregory Turral Date: 2020.10.23 14:20:58 -04'00'
Bill Brown William R Brown Digitally signed by William R Brown Date: 2020.10.23 09:57:30 -04'00'
Philip T. Stone P.T. Stone Digitally signed by P.T. Stone Date: 2020.10.30 07:30:24 -04'00'
Benjamin Lennon, P.E. Benjamin R Lennon
2020.10.30 09:31:29-04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2020.11.12 15:21:23 -05'00'
$ 0.00
1625 Summit Lake Drive, Suite 200, Tallahassee, Florida 32317 Phone: 850.562.9600 | Fax: 850.575.5544
DRMP, INC.
PRINCIPALS
Lawrence L. Smith, Jr.
Wayne D. Chalifoux
Donaldson K. Barton, Jr.
Glenn J. Lusink
Jon S. Meadows
Mark D. Prochak
Mark E. Puckett
OFFICES
Atlanta, Georgia
Boca Raton, Florida
Charlotte, North Carolina
Chipley, Florida
Fort Myers, Florida
Gainesville, Florida
Jacksonville, Florida
Lakeland, Florida
Melbourne, Florida
Orlando, Florida
Panama City, Florida
Pensacola, Florida
Raleigh, North Carolina
Tallahassee, Florida
Tampa, Florida
1.833.811.3767 www.DRMP.com
October 19, 2020 DRMP Proposal #: 14-0210.014
Eduardo Barreto Assistant Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520
Subject: FDEP Agreement #CN225 – Task Assignment #14 – Change Order #3 Colt Creek State Park – New Prefabricated Restrooms; Project # 61223C Proposal for Time Extension
Dear Mr. Barreto:
The referenced task assignment is set to expire on 12/31/2020. Can you please extend this until 6/30/2021 for the project to be completed.
Sincerely, _____________________________10-19-2020___ Benjamin Lennon, P.E. Date Project Engineer
CC: Richard Rowe, Project Manager (FDEP)
Bryant King, P.E. (DRMP)
| Colt Creek Prefab Restroom TA Change Order 3 |
| DRMP_14-0210.014_CN225-TA14-CO03_Proposal_10.19.20_DIGITAL |
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .