Task Assignment Notification and Proposal Summary

This document is a Task Assignment Notification Form and associated professional services proposal between the Florida Department of Environmental Protection (FDEP) and DRMP, Inc., a consulting firm with offices throughout Florida and Georgia. The task assignment (CN225, Task #28, Project #61289C) was executed on August 23, 2021, and pertains to the design and permitting services for replacement of the campground bathhouse at Hillsborough River State Park in Pasco County, Florida. Key personnel include Bryant King as the Consultant Representative, Alyssa Skehan as the FDEP Contract Manager, and Richard J. Rowe as the Project Manager.

The scope of work encompasses design and permitting services for demolition of the existing restroom facility and construction of a new ADA-compliant bathhouse with male, female, and unisex family restrooms, utility sinks, mop sink, washer/dryer connections, covered vending area, and ADA-accessible ramps and platforms. Services are divided into eight subtasks: topographic survey ($3,785.36), geotechnical engineering ($4,358.04), due diligence ($3,579.67), preliminary/schematic design ($12,159.41), design development/construction documents ($27,747.68), final construction documents ($10,293.79), regulatory permitting ($11,913.42 including $4,962.50 in reimbursable permit fees), and construction administration services (not included in this assignment at $15,632.21). The total fixed price cost is $68,874.87 with reimbursable expenses of $4,962.50, for a grand total of $73,837.37. The project completion date is June 30, 2022, with subtasks scheduled sequentially beginning 3 weeks after contract execution and extending through week 26.

View the file

Other files

File Type Posted
CN-370000-CN204-TA7CO1.pdf PDF
CN-370000-CN225-CMC4.pdf PDF
CN-370000-CN225-T11.pdf PDF
CN-370000-CN225-T15CO2.pdf PDF
CN-370000-CN225-T19.pdf PDF
CN-370000-CN225-T22.pdf PDF
CN-370000-CN225-T29.pdf PDF
CN-370000-CN225-T30.pdf PDF
CN-370000-CN225-T32.pdf PDF
CN-370000-CN225-T36.pdf PDF
CN-370000-CN225-T38.pdf PDF
CN-370000-CN225-T38CO2.pdf PDF
CN-370000-CN225-T39CO3.pdf PDF
CN-370000-CN225-T41CO1.pdf PDF
CN-370000-CN225-T42.pdf PDF
CN-370000-CN225-T5.pdf PDF
CN-370000-CN225-T50.pdf PDF
CN-370000-CN225-T50CO1.pdf PDF
CN-370000-CN225-T6.pdf PDF
CN-370000-CN225-T6CO5.pdf PDF
CN-370000-CN225-T6CO6.pdf PDF
CN-370000-CN225-CMC1.pdf PDF
CN-370000-CN225-T10.pdf PDF
CN-370000-CN225-T10CO2.pdf PDF
CN-370000-CN225-T14CO3.pdf PDF
CN-370000-CN225-T14CO3.pdf.crdownload CRDOWNLOAD file
CN-370000-CN225-T17.pdf PDF
CN-370000-CN225-T17CO3.pdf PDF
CN-370000-CN225-T17CO4.pdf PDF
CN-370000-CN225-T18.pdf PDF
CN-370000-CN225-T20.pdf PDF
CN-370000-CN225-T20CO1.pdf PDF
CN-370000-CN225-T24.pdf PDF
CN-370000-CN225-T26.pdf PDF
CN-370000-CN225-T3.pdf PDF
CN-370000-CN225-T32CO1.pdf PDF
CN-370000-CN225-T32CO3.pdf PDF
CN-370000-CN225-T32CO4.pdf PDF
CN-370000-CN225-T34.pdf PDF
CN-370000-CN225-T37.pdf PDF
CN-370000-CN225-T38CO1.pdf PDF
CN-370000-CN225-T39CO1.pdf PDF
CN-370000-CN225-T39CO2.pdf PDF
CN-370000-CN225-T41.pdf PDF
CN-370000-CN225-T45CO1.pdf PDF
CN-370000-CN225-T46.pdf PDF
CN-370000-CN225-T55.pdf PDF
CN-370000-CN225-T7.pdf PDF
CN-370000-CN225-T7CO1.pdf PDF
CN-370000-CN225-T8.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN225 28 FDEP 61289C

Hillsborough River State Park Campground Bathhouse Replacement

DRMP

Bryant King 850.692.5653 bking@drmp.com

Alyssa Skehan 850.245.2781 Alyssa.Skehan@FloridaDEP.gov

Design and permitting services for the replacement of the campground loop bathhouse. Please see the attached agreement dated 4/13/21 for reference.

Ricahrd J. Rowe or Successor

Upon execution $ 68,874.87 6/30/2022 $ 4,962.50

$ 73,837.37

Greg Turral Gregory Turral Digitally signed by Gregory Turral Date: 2021.08.23 13:43:59 -04'00'

Richard J. Rowe Richard J. Rowe Digitally signed by Richard J.

Rowe Date: 2021.08.23 13:59:24 -04'00'

Alyssa Skehan Alyssa Skehan Digitally signed by Alyssa Skehan Date: 2021.08.23 14:08:22 -04'00'

Bryant King Bryant A King

2021.08.31 14:17:44-04'00'

Michael W. Foster Jr. Michael W. Foster Jr.

Digitally signed by Michael W.

Foster Jr.

Date: 2021.08.31 15:28:17 -04'00'

61289C 37504015037 088130/21 675002 U3100 131500 XR $ 28,410.00

61289C 37504015037 080039/21 423001 U3100 131500 QK $ 45,427.37

$ 73,837.37

1625 Summit Lake Drive, Suite 200, Tallahassee, Florida 32317 Phone: 850.562.9600 | Fax: 850.575.5544

DRMP, INC.

PRINCIPALS

Lawrence L. Smith, Jr

Donaldson K. Barton, Jr.

Glenn J. Lusink

Jon S. Meadows

Mark D. Prochak

Mark E. Puckett

OFFICES

Atlanta, Georgia

Boca Raton, Florida

Charlotte, North Carolina

Chipley, Florida

Fort Myers, Florida

Gainesville, Florida

Jacksonville, Florida

Lakeland, Florida

Melbourne, Florida

Orlando, Florida

Panama City, Florida

Pensacola, Florida

Raleigh, North Carolina

Tallahassee, Florida

Tampa, Florida

1.833.811.3767 www.DRMP.com

April 13, 2021 DRMP Proposal #: 14-0210.M28

Richard Rowe Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520

Subject: FDEP Agreement #CN225 – Task Assignment #28 – 61289C Hillsborough River State Park – Replacement Campground Restroom Proposal for Professional Services

Dear Mr. Rowe:

We are pleased to submit this proposal for the design and permitting of a new ADA compliant restroom facility at Hillsborough State Park.

For your review, DRMP, Inc., has provided a proposal summary and man-hour documentation for the services task identified below:

Please review the attached Proposal Summary and Deliverables.

Sincerely, _____________________________ 4/13/2021___ Bryant King, P.E. Date Project Engineer

Attachment(s): DRMP, Inc. Proposal

CC: Benjamin Lennon, P.E. (DRMP)

Mr. R. Rowe

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

Hillsborough River State Park Replacement Campground Restoration Pasco County, Florida

FDEP Agreement #CN225 – Task Assignment #28 Proposal for Professional Services

Background and Purpose The purpose of this project is to provide professional engineering and architectural services needed to design the following elements at Hillsborough River State Park in Pasco County, Florida:

Our understanding of the project is design and permitting services are required for the demolition of the existing restroom and construction of a new ADA compliant restroom facility. Flood plain issues associated with this project shall be identified and DHR is required; as the building is more than fifty (50) years old. The Hillsborough River State Park manager has indicated assumption to opt for alterations to the existing restrooms instead of demolition of structures; ultimately pendent upon cost comparisons of the two (2) options.

The project consists of construction of a new restroom building and demolition of an existing restroom facility. The new building shall be complete with a Male and Female restroom meeting the following requirements:

• Three (3) water closets (Substitute one (1) urinal for Men’s room)

• Three (3) hand sinks

• Three (3) showers

• Restroom Accessories

In addition to the above new restroom building, an ADA compliant unisex/family restroom; complete with one (1) shower, one (1) water closet, one (1) hand sink, and accessories shall also be constructed.

Additional items to be included in the new restroom building are as follows:

• Two (2) utility sinks with counter area

• One (1) mop sink

• Washer/dryer connections

• Covered vending/ADA drinking fountain area

• ADA ramps/landings/platforms as required

The intent is to leave the existing restroom structure “as is”. With the exception of demolition, no scope of work is intended or included for the existing restroom building until the new restroom building is complete.

The demolition of the existing restroom will not commence until the new restroom building is completed and certificate of occupancy is granted.

The project is located in a regulatory floodplain. Floodplain compensation will be made on site via cut/fill, floodproofing or alternate foundation (piles) to meet state and local code. Design of an offsite floodplain compensation area is not included in this Scope.

The following scope includes Civil Engineering Services, Architectural Design Services, Structural Engineering Services, and Electrical, and Plumbing Engineering Services. The scope of the work will follow the Florida Building Code, FDEP BDC Standards and Local/State review procedures.

Permitting services include securing applicable local, state and federal permits and/or exemptions.

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

Subtask 1: Topographic Survey

Description: The Consultant shall provide a topographic survey in order to facilitate engineering the project site. The Topographic Survey shall be prepared in accordance with the State of Florida Standards of Practice, Chapter 5J-17, Florida Administrative Code, as set forth by the Board of Professional Surveyors and Mappers, pursuant to Section 472.027, Florida Statues.

Scope of services for the topographic survey for the bathhouse replacement immediately north of the existing bathhouse; depicted in Figure “C” below. Services provided are as follows:

• Topographic Survey of the proposed bath house in a portion of the area as depicted in photo Figure “C” below. The Topographic Survey provided will be prepared in accordance with the standards of practice set forth by Florida Administrative Code Section 5J-17.050, Section 472.027 of Florida Statutes (includes all above ground improvements within the selected area). All survey information will be on assumed datums for both Horizontal and Vertical control due to limited existing control in the area.

Contours will be drawn to 1’ intervals. Trees larger than 6” DBH will be located. Any Storm or Sanitary Structures clearly visible at the time of the survey will be located and measured within the topographic Survey task.

• Location of underground utilities within depicted area as shown in Figure “C” below.

o Designate and survey underground water, sewer, electric lines within project limits as shown in

Figure “A” and “B” below o Locates: N/A

Deliverable: The Consultant shall provide one (1) Topographic Survey (.pdf and dwg format) to the Department Project Manager.

Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.

Schedule: The Consultant shall complete the survey on the subject property within three (3) weeks post receipt of NTP.

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

DRMP Project Manager $159.52 3 $478.56

Grady Minor Project Manager $151.20 2 $302.40

Grady Minor Senior Project Surveyor $131.60 3 $394.80

Grady Minor 2 Man Survey Crew $131.60 16 $2,105.60

Grady Minor Senior Surveying Tech $100.80 5 $504.00

$3,785.36

Subtask 1: Topographic Survey

SUBTASK 1 TOTAL:

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

FIGURE “B” Aerial View of approximate location.

FIGURE “A” Map provided by FDEP.

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

FIGURE “C” Proposed new bathhouse site with existing bathhouse in background.

Subtask 2: Geotechnical Engineering

Description: The Consultant shall perform geotechnical engineering services through Subconsultant, NOVA Engineering and Environmental, LLC. The proposed scope of services shall include the following components

• FIELD – Mobilize to site to perform (2) SPT borings to 40 feet BEGS.

• LABORATORY – budget includes (4) wash #200 sieve tests and (4) water content tests. In addition,

(1) Atterberg limit test and (1) organic content test is budgeted for if needed.

• The Geotechnical Report shall include the following:

i. A description of the site, fieldwork, laboratory testing, and general soil conditions encountered, as well as a Boring Location Plan and individual Borings Records.

ii. A discussion of geologic conditions for the subject area based upon available information.

iii. Discussion on potential earthwork-related issues indicated by the exploration, such as materials that would require difficult excavation techniques, unsuitable materials, shallow groundwater table, etc.

iv. Suitability of on-site soils for re-use as structural fill and backfill as well as the criteria for suitable fill materials.

v. Recommendations for controlling groundwater and/or run-off during construction and the need for temporary/permanent dewatering systems based on the anticipated post construction groundwater levels.

vi. Recommendations for foundation design and construction, including allowable bearing pressures and embedment depths.

vii. Estimate of total and differential settlements of foundations based on available structural loading data.

viii. Slab-on-grade construction considerations based on the geotechnical findings, including the need for a sub-slab vapor barrier or a capillary barrier.

ix. Recommendations for an approximate coefficient of subgrade reaction.

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

x. Recommended quality control measures (i.e., sampling, testing, and inspection requirements) for site grading and foundation construction. Soil compaction requirements for foundations and structural fill will be provided.

Deliverable: The Consultant shall provide one digitally signed and sealed geotechnical report in .pdf format to the Department Project Manager.

Schedule: Upon receipt of formal (written or emailed) Notice to Proceed from DRMP, NOVA shall provide the Final

Report within four (4) weeks post receipt of Notice to Proceed.

Subtask 3: Due Diligence

Description: The Consultant and Project Team shall include the Civil Engineer, Structural Engineer, Architect and MEP team. The Consultant, through Subconsultant(s): Fullone Structural Group, Inc.

(Structural), The Lunz Group, Inc. (Architect), and MES Group, Inc. (MEP) shall perform due diligence;

coordinating with Hillsborough County AHJ / Municipality to determine State or Local jurisdiction for approval of facilities proposed, determine: existing electrical power capacity; existing building potable and sanitary plumbing capacity and availability.

• Existing water is supplied from an existing well – ¼ mile north-east.

• Existing power is from an existing independent transformer – 100 yards to the north.

• Outline of alternatives to address filling in the floodplain.

Deliverable: The Consultant shall provide one (1) written summary, .pdf format to the Department Project Manager.

Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.

Schedule: The Consultant shall complete the services under Subtask 3 within three (3) weeks of the start of the project.

DRMP Project Manager $159.52 2 $319.04

NOVA Staff Engineer $78.03 10 $780.30

NOVA Project Manager $96.32 12 $1,155.84

NOVA Project Engineer $96.32 10 $963.20

NOVA Senior Project Engineer $141.61 6 $849.66

NOVA Administrator $58.00 5 $290.00

$4,358.04SUBTASK 2 TOTAL:

Subtask 2: Geotechnical Engineering

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

DRMP Project Manager $159.52 4 $638.08

DRMP Project Engineer $110.01 4 $440.04

LUNZ Principal Architect $225.00 3 $675.00

LUNZ Project Manager $159.00 5 $795.00

MES Registered Engineer (Electrical) $130.30 2 $260.60

MES Registered Engineer (Plumbing) $130.30 2 $260.60

FSG Principal Engineer $191.75 1 $191.75

FSG Registered Engineer $159.30 2 $318.60

$3,579.67

Subtask 3: Due Diligence

SUBTASK 3 TOTAL:

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

Subtask 4: Preliminary / Schematic Design (30%)

Description: The Consultant and Project Team shall perform the Preliminary – Schematic Design (30%):

• Conceptual / Schematic Design of ADA compliant stand-alone restroom.

o The construction type to be as per BDC standards.

o The current restroom at this location has electrical power (independent transformer) and is connected to an existing wastewater plant located on site that will be utilized for the new construction.

o New building shall provide: (1 complete set from list below for Male, Female)

▪ 3 Water Closets (Substitute 1 Urinal for Men’s)

▪ 3 Hand Sinks

▪ 3 Showers

▪ Restroom Accessories

ADA Compliant – Unisex / Family:

▪ 1 Shower

▪ 1 Water Closet

▪ 1 Hand Sink

▪ Restroom Accessories

Additional Components:

▪ 2 Utility Sinks with counter area

▪ 1 Mop Sink

▪ Washer and Dryer hookups

▪ Covered Vending / ADA Drinking Fountain Area

▪ ADA Ramps/Landings/Platforms as required by flood plain

▪ Preliminary Site Plan depicting:

• Existing Survey

• Water Access

• Sewer Access

• Accessible Path to ADA Parking

• Potential Flood Compensation Locations

Deliverable: The Consultant shall provide schematic design plans and elevations to the Department Project Manager; at a minimum, the deliverables shall include the following:

Electronic copies of the 30% Construction Document drawings in PDF file format. The documents shall be formatted for reproduction on 24x36 paper or half size at 12x18 paper.

Electronic copies of the 30% estimate of probable construction cost in PDF file format. The documents shall be formatted for reproduction on 8-1/2”x11” paper.

Electronic copies of all additional materials required to convey the 30% design intent.

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.

Schedule: The Consultant shall complete the services under Subtask 4 within four (4) weeks of the start of the submittal of the Due Diligence Document Submittal.

Subtask 5: Design Development / Construction Documents (75%)

Description: The Consultant and Project Team shall provide the Construction Documents (75%):

Upon approval of the schematic design plans and elevations, the project team shall proceed with the design development and construction documents. There will be 2 submission rounds (75%) for coordination, review, and approval.

• Site Visits for progress review/discussion o 2 Site Visits / Virtual Meetings are included in the scope of services for each discipline during the construction document phase.

Deliverable: The Consultant shall provide 60% DD/CD drawings and 90% CD drawings to the Department Project Manager for review and approval.

Electronic copies of the 75% Construction Document drawings in PDF file format. The documents shall be formatted for reproduction on 24x36 paper or half size at 12x18 paper.

Electronic copies of the 75% estimate of probable construction cost in PDF file format. The documents shall be formatted for reproduction on 8-1/2”x11” paper.

Electronic copies of all additional materials required to convey the 75% design intent.

Schedule: The Consultant shall complete:

• 75% design services under Subtask 5 within twelve (12) weeks of the submission of 30% design deliverables (based on 2-week client review).

DRMP Project Manager $159.52 6 $957.12

DRMP Senior Project Engineer PE $141.12 4 $564.48

DRMP Project Engineer PE $110.01 4 $440.04

DRMP Staff Engineer EI $81.79 6 $490.74

DRMP CADD Designer $105.23 4 $420.92

LUNZ Principal Architect $225.00 4 $900.00

LUNZ Project Manager $159.00 20 $3,180.00

LUNZ CADD Technician $75.00 8 $600.00

MES Registered Engineer (Electrical) $130.30 1 $130.30

MES Registered Engineer (Plumbing) $130.30 1 $130.30

MES Graduate Engineer (Electrical, EI) $88.62 3 $265.86

MES Graduate Engineer (Plumbing, EI) $88.62 3 $265.86

MES CADD Technician (Electrical) $78.62 6 $471.72

MES CADD Technician (Plumbing) $78.62 6 $471.72

FSG Principal Engineer $191.75 1 $191.75

FSG Registered Engineer $159.30 2 $318.60

FSG Graduate Engineer $129.80 8 $1,038.40

FSG CADD Technician $94.40 14 $1,321.60

$12,159.41

Subtask 4: Preliminary / Schematic Design (30%)

SUBTASK 4 TOTAL:

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

Subtask 6: Construction Documents (100%)

Description: The Consultant and Project Team shall perform the Final Construction Documents (100%):

Upon final approval of the 90% drawing package, the project team shall complete the CDs to 100% and provide drawing package for release to the General Contractor/ bidders.

• A Demo Plan shall be provided for the demolition of the existing restroom building (Plan shall indicate that demo shall not commence until a final Certificate of Occupancy for the new structure has been provided by General Contractor).

Deliverable: The Consultant shall provide 100% CD drawings for distribution and deliver digitally signed and sealed 100% design plans and technical specifications to the Department Project Manager. The deliverable shall include digital PDFs of the construction drawings, technical specifications, Engineer’s Estimate of Quantities, opinion of probable construction costs, and Autocad (.dwg) file of the plans.

Schedule: The Consultant shall complete the services under Subtask 6 within 6 weeks of the submission of 90% design deliverables (based on 2-week client review) or one (1) week upon receipt of ALL permits.

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

DRMP Project Manager $159.52 10 $1,595.20

DRMP Senior Project Engineer PE $141.12 8 $1,128.96

DRMP Project Engineer PE $110.01 20 $2,200.20

DRMP Staff Engineer EI $81.79 16 $1,308.64

DRMP CADD Designer $105.23 16 $1,683.68

LUNZ Principal Architect $225.00 8 $1,800.00

LUNZ Project Manager $159.00 60 $9,540.00

LUNZ CADD Technician $75.00 35 $2,625.00

MES Registered Engineer (Electrical) $130.30 1 $130.30

MES Registered Engineer (Plumbing) $130.30 1 $130.30

MES Graduate Engineer (Electrical, EI) $88.62 4 $354.48

MES Graduate Engineer (Plumbing, EI) $88.62 4 $354.48

MES CADD Technician (Electrical) $78.62 6 $471.72

MES CADD Technician (Plumbing) $78.62 6 $471.72

FSG Principal Engineer $191.75 4 $767.00

FSG Registered Engineer $159.30 4 $637.20

FSG Graduate Engineer $129.80 8 $1,038.40

FSG CADD Technician $94.40 16 $1,510.40

$27,747.68SUBTASK 5 TOTAL:

Subtask 5: Design Development / Construction Documents (75%)

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

Subtask 7 Regulatory Permitting

Subtask 7A: Hillsborough Minor Site Plan

Description: The Consultant will secure Minor Site Plan approval from Hillsborough County. The

Consultant will submit the preliminary site plan to the County. This scope includes submittal of a preliminary plan, attendance at the variance hearing, and submittal of the formal application;

response to comments.

Deliverable: The Permit will be delivered in hard copy or digital format consistent with the issuance policy of the regulatory agency.

Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.

Schedule: The permits will be delivered within nine (9) weeks of Subtask 5, 75% Design Documents.

Subtask 7B: SWFWMD General Permit

Description: The Consultant shall demonstrate the project is either exempt or qualifies for a General

Environmental Resource Permit (ERP). We anticipate that this project will not require stormwater treatment based on the project area or as a result of modification of previous permitted activities on the site, however, floodplain no-rise must be demonstrated. Design of an offsite floodplain compensation area is not included in this task.

The Consultant shall prepare the application form (if needed) or letter/email and shall respond to requests for additional information.

Deliverable: The Permit (or notice of no permit) shall be delivered in hard copy or digital format consistent with the issuance policy of the regulatory agency.

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

DRMP Project Manager $159.52 6 $957.12

DRMP Senior Project Engineer PE $141.12 2 $282.24

DRMP Project Engineer PE $110.01 6 $660.06

DRMP Staff Engineer EI $81.79 8 $654.32

DRMP CADD Designer $105.23 8 $841.84

LUNZ Principal Architect $225.00 4 $900.00

LUNZ Project Manager $159.00 16 $2,544.00

LUNZ CADD Technician $75.00 12 $900.00

MES Principal Engineer $155.55 1 $155.55

MES Registered Engineer (Electrical) $130.30 1 $130.30

MES Registered Engineer (Plumbing) $130.30 1 $130.30

MES Graduate Engineer (Electrical, EI) $88.62 2 $177.24

MES Graduate Engineer (Plumbing, EI) $88.62 2 $177.24

MES CADD Technician (Electrical) $78.62 2 $157.24

MES CADD Technician (Plumbing) $78.62 2 $157.24

FSG Principal Engineer $191.75 2 $383.50

FSG Registered Engineer $159.30 2 $318.60

FSG Graduate Engineer $129.80 3 $389.40

FSG CADD Technician $94.40 4 $377.60

$10,293.79

Subtask 6: Final Construction Documents (100%)

SUBTASK 6 TOTAL:

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

Subtask 7C: Permit Fees and Reimbursables

Description: The Consultant will pay all permit fees to be reimbursed directly up to a limiting amount of $7,000.00. The Consultant will pay shipping costs directly up to a limiting amount of $500.00 and will pay for reproduction for up to 250 sheets at $2.25 per sheet.

We estimate the following permit fee allowances:

• SWFWMD $500.00

• Hillsborough County $3,500.00

Additional fees beyond this allowance will require additional fee or be paid the to the review agency directly or to the consultant via a supplemental agreement. Building permit fees will be the responsibility of the Contractor.

Deliverable: The Consultant shall provide receipts for permit fees upon invoicing.

Subtask 8: Construction Administration Services (Not in this Task Assignment)

Subtask 8A: Bidding Support

Description: The Consultant shall answer bid questions provided by the Department and issue any Addenda needed for issuance. The Consultant or respective Subconsultants shall not answer any bid questions directly from Contractors, subcontractors or vendors and will direct all questions to the Purchasing Agent at the Department.

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

DRMP Project Manager $159.52 4 $638.08

DRMP Senior Project Engineer PE $141.12 4 $564.48

DRMP Project Engineer PE $110.01 20 $2,200.20

DRMP Staff Engineer EI $81.79 12 $981.48

DRMP CADD Designer $105.23 10 $1,052.30

$5,436.54

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

DRMP Project Manager $159.52 4 $638.08

DRMP Senior Project Engineer PE $141.12 2 $282.24

DRMP Project Engineer PE $110.01 2 $220.02

DRMP Staff Engineer EI $81.79 2 $163.58

DRMP CADD Designer $105.23 2 $210.46

$1,514.38

Firm Name Expense Type Unit Price Quantity Total NTE Cost

DRMP Plot Sheets - Not To Exceed (5@50 sheets each) $2.25 250 $ 562.50

DRMP Shipping - Not to Exceed $400.00 NTE $ 400.00

DRMP Permit Fee(s) - Not to Exceed $4,000.00 NTE $ 4,000.00

$ 4,962.50

$11,913.42

SUBTASK 7A TOTAL:

Subtask 7A: Hillsborough Minor Site Plan

Subtask 7: Regulatory Permitting

Subtask 7B: SWFWMD General Permit

SUBTASK 7B TOTAL:

Subtask 7C: Permit Fees and Reimbursables

REIMBURSABLE EXPENSE SUBTOTAL:

SUBTASK 7 Grand Total:

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

Subtask 8B: Shop Drawings and RFI’s

Description: The Consultant shall review shop drawings pertaining to Site/Civil work and verify their accuracy with the plans and documents. The Consultant shall respond to the contractor with red line mark ups if the shop drawings are not in accordance with the plans. Markups may be approved as noted or require resubmittal. All shop drawings shall be returned to the Department for concurrence. The Consultant shall respond to contractor related questions and requests for information pertaining to Site/Civil work and verify their accuracy with the plans and documents. The Consultant shall respond to the contractor requests for information (RFI) in writing and provide this to BDC for concurrence.

Subtask 8C Substantial Completion Site Visit and As-built Review

Description: The Consultant will review contractor provided as-built construction survey completed by a registered surveyor and mapper in the State of Florida, for conformance to the permitted construction plans. This survey must be signed and sealed by a State of Florida Professional Surveyor and Mapper. As-Built plans shall be submitted prior to the Substantial completion site review. The Consultant shall attend the inspection for substantial completion when requested by the contractor and prepare a punch list of those items not completed and that do not meet the intent of the plans and technical specifications or need minor adjustment. The Consultant shall sign the DEP certification of substantial completion for setting forth the date of substantial completion for this project.

Subtask 8D: Additional Site Visit

Description: The Consultant shall attend the inspection as needed when requested in writing by the DEP project manager to observe as an experienced and qualified design professional the progress and quality of the executed work and to determine in general if the work is proceeding in accordance with the contract documents and permit conditions for the site work. A limit of three site visits are included and will be billed in equal amounts.

Deliverable(s) & Schedule: (These are payment triggers – what items will consultant provide to FDEP, including format, size, number, minimum content, due date, etc.)

• Subtask 8A: Bidding - Documentation of any responses to RFI’s (.pdf format).

• Subtask 8B: Shop Drawings and RFI’s – Copies of Stamped Shop Drawings and Documentation of any RFI’s (.pdf format). Reviews and Responses will be returned within 7 days of receipt.

• Subtask 8C: Substantial Completion Site Visit – Written Summary of the As-built Review, Meeting and Certification and punch list (.pdf format). Report will be submitted within 7 days of the site visit and receipt of as-builts.

• Subtask 8D: Additional Site Visit (limit of three) – Observation Report of the Site Visit (.pdf format). Report will be submitted within 7 days of the site visit.

Performance Measure: Deliverables shall be reviewed by the Department to confirm they are

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

DRMP Project Manager $159.52 3 $478.56

DRMP Project Engineer PE $110.01 3 $330.03

LUNZ Project Manager $159.00 8 $1,272.00

LUNZ CADD Technician $75.00 4 $300.00

SUBTASK 8A TOTAL: $2,380.59

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

DRMP Project Manager $159.52 8 $1,276.16

DRMP Sr Project Engineer PE $141.12 2 $282.24

DRMP Project Engineer PE $110.01 8 $880.08

DRMP Staff Engineer EI $81.79 2 $163.58

LUNZ Project Manager $159.00 20 $3,180.00

LUNZ CADD Technician $75.00 8 $600.00

MES Registered Engineer (Electrical) $130.30 3 $390.90

MES Registered Engineer (Plumbing) $130.30 3 $390.90

FSG Principal Engineer $191.75 1 $191.75

FSG Registered Engineer $159.30 1 $159.30

FSG Graduate Engineer $129.80 4 $519.20

SUBTASK 8B TOTAL: $8,034.11

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

DRMP Project Manager $159.52 5 $797.60

DRMP Staff Engineer EI $81.79 2 $163.58

LUNZ Project Manager $159.00 5 $795.00

FSG Principal Engineer $191.75 4 $767.00

FSG CADD Technician $94.40 2 $188.80

SUBTASK 8C TOTAL: $2,711.98

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

DRMP Project Manager $159.52 9.5 $1,515.44

DRMP Project Engineer PE $110.01 9 $990.09

SUBTASK 8D TOTAL: $2,505.53

$15,632.21

Subtask 8: Construction Administration Services (Not Included in this Task Assignment)

Subtask 8A - Bidding Support

Subtask 8B: Shop Drawings and RFI’s

Subtask 8C: Substantial Completion Site Visit & As-Built Review

SUBTASK 8 GRAND TOTAL

Subtask 8D: Additional Site Visists (3 Visits to be used as needed)

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.028_TA28_Hillsborough_River_SP_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4_10_21-Submittal\DRMP_14-0210.M28_CN225_TA28_Hillsborough_Proposal_04.13.21.docx

NOTE: Should work effort vary from proposed professional services / anticipated agency requirements, the Consultant shall submit an additional services proposal for the Department Project Manager’s consideration to modify the agreed upon task assignment (scope of services, schedule, and fees) accordingly.

Reimbursable

4,962.50$

$3,785.36

Subtask 4: Preliminary / Schematic Design (30%)

Subtask 2: Geotechnical Engineering

Subtask 3: Due Diligence

$4,358.04

$12,159.41

Summary of Fees

Subtask: Fixed Price Cost

Subtask 1: Topographic Survey

$0.00

Subtask 7B: SWFWMD General Permit $1,514.38

Subtask 7A: Hillsborough Minor Site Plan $5,436.54

Subtask 7: Regulatory Permitting

$3,579.67

Subtask 6: Final Construction Documents (100%)

Subtask 5: Design Development / Construction Documents (75%) $27,747.68

$10,293.79

Subtask 7C: Permit Fees and Reimbursables

Subtask 7A: Hillsborough Minor Site Plan 21 weeks after final execution Subtask 7B: SWFWMD General Permit 21 weeks after final execution

Total Fixed Price Cost: $68,874.87

Subtask 4: Preliminary / Schematic Design (30%) 7 weeks after final execution Subtask 5: Design Development / Construction Documents (75%) 12 weeks after final execution

Project Schedule

Subtask: Duration

Subtask 1: Topographic Survey 3 weeks after final execution

26 weeks after final execution

Subtask 3: Due Diligence 3 weeks after final execution

Total Reimbursable Cost: $4,962.50

GRAND TOTAL COST: $73,837.37

3 weeks after final execution

Subtask 6: Final Construction Documents (100%)

Subtask 2: Geotechnical Engineering