This is a Task Assignment Notification Form and professional services proposal from DRMP, Inc. to the Florida Department of Environmental Protection (FDEP), specifically under FDEP Agreement CN225, Task Assignment #30. The project involves design and permitting services for Lake Manatee State Park in Manatee County, Florida. DRMP serves as the primary consultant with multiple subconsultants including NOVA Engineering and Environmental LLC (geotechnical), Fullone Structural Group Inc. (structural), The Lunz Group Inc. (architecture), and MES Group Inc. (mechanical, electrical, and plumbing engineering). The FDEP Contract Manager is Alyssa Skehan, with Bryant King representing DRMP as the consultant representative.
The scope of work encompasses design and permitting services for two new ADA-compliant unisex restrooms with toilet, sink, shower, washer/dryer facilities, and sink/counter areas for campground loops 1 and 2. Services include topographic survey, geotechnical engineering, due diligence coordination, preliminary/schematic design (30%), design development/construction documents (60% and 90%), final construction documents (100%), and regulatory permitting including minor site plan approval from Manatee County and Southwest Florida Water Management District general permit or exemption. The total task amount is $59,007.54, consisting of $54,882.54 in fixed-price costs and $4,125.00 in reimbursable expenses for permit fees and plot sheets. The project schedule extends 26 weeks from notice to proceed, with completion required by December 31, 2022. Construction administration services are excluded from this task assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN225 30 FDEP-DRP 61286C
Lake Manatee State Park Campground Loops 1 & 2 Restroom ADA Additions
DRMP
Bryant King 850-692-5653 bking@drmp.com
Alyssa Skehan 850-245-2695 Alyssa.Skehan@FloridaDEP.gov
Design and permitting services for two new ADA unisex restrooms for campground loops one and two in Lake Manatee State Park. See proposal dated 4/13/21 for reference.
Richard J. Rowe or successor upon execution $ 54,882.54 12/31/2022 $ 4,125.00
$ 59,007.54
Greg Turral
Richard J. Rowe
Jeffrey Whitfield
Bryant King
Michael Foster
61286C 37504000088 088130/19 675002 U3200 131500 XR $ 29,007.54
61286C 37504000088 088130/21 675002 U3200 131500 XR $ 30,000.00
$ 59,007.54
1625 Summit Lake Drive, Suite 200, Tallahassee, Florida 32317 Phone: 850.562.9600 | Fax: 850.575.5544
DRMP, INC.
PRINCIPALS
Lawrence L. Smith, Jr
Wayne D. Chalifoux
Donaldson K. Barton, Jr.
Glenn J. Lusink
Jon S. Meadows
Mark D. Prochak
Mark E. Puckett
OFFICES
Atlanta, Georgia
Boca Raton, Florida
Charlotte, North Carolina
Chipley, Florida
Fort Myers, Florida
Gainesville, Florida
Jacksonville, Florida
Lakeland, Florida
Melbourne, Florida
Orlando, Florida
Panama City, Florida
Pensacola, Florida
Raleigh, North Carolina
Tallahassee, Florida
Tampa, Florida
1.833.811.3767 www.DRMP.com
April 13, 2021 DRMP Proposal #: 14-0210.M30
Richard Rowe Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520
Subject: FDEP Agreement #CN225 – Task Assignment #30 – 61286C Lake Manatee State Park ADA Restroom Additions in Manatee County Proposal for Professional Services
Dear Mr. Rowe:
Our understanding of the project is design and permitting services are required to improve restrooms;
allowing ADA compliancy and to add washer dryer facilities to two (2) restrooms, serving campground loops 1 and 2 (one restroom per loop; two total).
For your review, DRMP, Inc., has provided a proposal summary and man-hour documentation for the services task identified below:
Survey Geotechnical Conceptual and Final Design Services Permitting
Please review the attached Proposal Summary and Deliverables.
Sincerely, _____________________________ 4-13-2021___ Bryant King, P.E. Date Project Engineer
Attachment(s): DRMP, Inc. Proposal
CC: Benjamin Lennon, P.E. (DRMP) Patrick Day, P.E. (DRMP)
Mr. R. Rowe
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.030_TA30_Lake_Manatee_SP_RR_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4.13.2021\DRMP_14-0210.M30_CN225_TA30_Lake_Manatee_RR_Proposal_04.13.2021_DIGITAL.docx
Lake Manatee State Park ADA Restroom Additions (61286C) in Manatee County, Florida FDEP Agreement #CN225 – Task Assignment #30
Proposal for Professional Services
Background and Purpose The purpose of this project is to provide professional engineering and architectural services needed to design the following elements at Lake Manatee State Park in Manatee County:
The project consists of the construction of two (2) new unisex ADA compliant restrooms with toilet, sink, shower, washer / dryer facilities with sink / counter area. The new restroom buildings shall be designed similar to the existing open air ventilation restroom facility adjacent to the area of work, therefore mechanical systems will not be required.
The intent is to leave the existing restroom structures “as is” with the exception of minor alterations (if required) to comply with current 2020 Accessibility Code – 2020 Florida Building Code 7th Edition.
The design shall apply to both Loops 1 and 2 restroom buildings. The design shall be a duplicate for each location with minor deviations to accommodate the individual site conditions.
The following scope includes Civil Engineering Services, Architectural Design Services, Structural Engineering Services, and Electrical, and Plumbing Engineering Services
Subtask 1: Topographic Survey
Description: The Consultant shall provide a topographic survey in order to facilitate engineering the project site. The Topographic Survey shall be prepared in accordance with the State of Florida Standards of Practice, Chapter 5J-17, Florida Administrative Code, as set forth by the Board of Professional Surveyors and Mappers, pursuant to Section 472.027, Florida Statues.
Topographic Survey of two bath house areas as depicted in Figure “A” below. The Topographic Survey provided will be prepared in accordance with the standards of practice set forth by Florida Administrative Code Section 5J-17.050, Section 472.027 of Florida Statutes (includes all above ground improvements within the selected area). All survey information will be tied to the NAD83 horizontal datum and NAVD88 Vertical Datum using GPS techniques. Contours will be drawn to 1’ intervals. Trees larger than 6” DBH will be located. Any Storm or Sanitary Structures clearly visible at the time of the survey will be located and measured within the topographic Survey task.
Location of underground utilities within depicted area as shown in Figure “A” below.
• Designate and survey underground water, sewer, electric lines within project limits as shown in Figure “A” below
• Locates: N/A
Deliverable: The Consultant shall provide one (1) Topographic Survey (.pdf and dwg format) to the Department Project Manager.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the survey on the subject property within 3 weeks post receipt of
NTP.
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.030_TA30_Lake_Manatee_SP_RR_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4.13.2021\DRMP_14-0210.M30_CN225_TA30_Lake_Manatee_RR_Proposal_04.13.2021_DIGITAL.docx
FIGURE “A”
Subtask 2: Geotechnical Engineering
Description: The Consultant shall perform geotechnical engineering services through Subconsultant, NOVA Engineering and Environmental, LLC. The proposed scope of services shall include the following components
• FIELD – Mobilize to site to perform (4) SPT borings to 25 below existing ground surface (BEGS) (2 borings beneath each bathroom structure).
• LABORATORY – budget includes (4) wash #200 sieve tests and (4) water content tests. In addition,
(1) Atterberg limit test and (1) organic content test is budgeted for if needed.
• The Geotechnical Report shall include the following:
i. A description of the site, fieldwork, laboratory testing, and general soil conditions encountered, as well as a Boring Location Plan and individual Borings Records.
ii. A discussion of geologic conditions for the subject area based upon available information.
iii. Discussion on potential earthwork-related issues indicated by the exploration, such as materials that would require difficult excavation techniques, unsuitable materials, shallow groundwater table, etc.
iv. Suitability of on-site soils for re-use as structural fill and backfill as well as the criteria for suitable fill materials.
v. Recommendations for controlling groundwater and/or run-off during construction and the need for temporary/permanent dewatering systems based on the anticipated post construction groundwater levels.
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 2 $319.04
Grady Minor Project Manager $151.20 2 $302.40
Grady Minor Senior Project Surveyor $131.60 6 $789.60
Grady Minor 2 Man Survey Crew $131.60 30 $3,948.00
Grady Minor Senior Surveying Tech $100.80 15 $1,512.00
$6,871.04
Subtask 1: Topographic Survey
SUBTASK 1 TOTAL:
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.030_TA30_Lake_Manatee_SP_RR_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4.13.2021\DRMP_14-0210.M30_CN225_TA30_Lake_Manatee_RR_Proposal_04.13.2021_DIGITAL.docx
vi. Recommendations for foundation design and construction, including allowable bearing pressures and embedment depths.
vii. Estimate of total and differential settlements of foundations based on available structural loading data.
viii. Slab-on-grade construction considerations based on the geotechnical findings, including the need for a sub-slab vapor barrier or a capillary barrier.
ix. Recommendations for an approximate coefficient of subgrade reaction.
x. Recommended quality control measures (i.e., sampling, testing, and inspection requirements) for site grading and foundation construction. Soil compaction requirements for foundations and structural fill will be provided.
Deliverable: The Consultant shall provide one digitally signed and sealed geotechnical report in .pdf format to the Department Project Manager.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: Upon receipt of formal (written or emailed) NTP from DRMP, NOVA will provide the Final Report within twenty-one (21) calendar days.
Subtask 3: Due Diligence
Description: The Consultant and Project Team shall include the Civil Engineer, Structural Engineer, Architect and MEP team. The Consultant, through Subconsultant(s): Fullone Structural Group, Inc.
(Structural), The Lunz Group, Inc. (Architect), and MES Group, Inc. (MEP) shall perform due diligence;
• Coordinate with Manatee County AHJ / Municipality concerning the current facilities and proposed facilities and determine the extent of revisions required to provide ADA compliant facilities at the existing restroom location.
• This inquiry shall include discussions with the Jurisdictional Fire Marshall to provide a written summary of discussions with AHJ / Fire Marshall for record.
• Determine: State or Local jurisdiction for approval of facilities proposed.
• Determine: existing electrical power capacity; existing building potable and sanitary plumbing capacity and availability.
Deliverable: The Consultant shall provide one (1) written summary, .pdf format to the Department Project Manager.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the services under Subtask 4 within 2 weeks of the start of the project.
Subtask 2: Geotechnical Engineering
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 3 $478.56
NOVA Staff Engineer $78.03 14 $1,092.42
NOVA Project Manager $96.32 15 $1,444.80
NOVA Project Engineer $96.32 10 $963.20
NOVA Senior Project Engineer $141.61 5 $708.05
NOVA Administrator $58.00 5 $290.00
SUBTASK 2 TOTAL: $4,977.03
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.030_TA30_Lake_Manatee_SP_RR_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4.13.2021\DRMP_14-0210.M30_CN225_TA30_Lake_Manatee_RR_Proposal_04.13.2021_DIGITAL.docx
Subtask 4: Preliminary / Schematic Design (30%)
Description: The Consultant and Project Team shall perform the Preliminary – Schematic Design (30%):
• Conceptual / Schematic Design of two (1) unisex ADA compliant restrooms with toilet, sink, and shower;
washer / dryer facilities with sink / counter area.
o The construction type of this building is to be determined. Currently the existing restroom buildings are CMU block walls / wood trusses with metal roofing and exterior vinyl siding.
o The existing buildings have existing electrical service and are open air ventilation structures. The proposed facilities shall be designed as the same type of open air ventilation; therefore, Mechanical Engineering is not required and is not included in this scope of services.
o Two (2) Phase(s) of revisions are included (Scheme A and Scheme B).
Deliverable: The Consultant shall provide schematic design plans and elevations to the Department Project Manager; at a minimum, the deliverables shall include the following:
Electronic copies of the 30% Construction Document drawings in PDF file format. The documents shall be formatted for reproduction on 24x36 paper or half size at 12x18 paper.
Electronic copies of the 30% estimate of probable construction cost in PDF file format. The documents shall be formatted for reproduction on 8-1/2”x11” paper.
Electronic copies of all additional materials required to convey the 30% design intent in PDF file format.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the services under Subtask 5 within 6 weeks of the start of the project.
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 2 $319.04
DRMP Project Engineer PE $110.01 2 $220.02
LUNZ Principal Architect $225.00 2 $450.00
LUNZ Project Manager $159.00 8 $1,272.00
MES Registered Engineer (Electrical) $130.30 2 $260.60
MES Registered Engineer (Plumbing) $130.30 2 $260.60
$2,782.26
Subtask 3: Due Diligence
SUBTASK 3 TOTAL:
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.030_TA30_Lake_Manatee_SP_RR_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4.13.2021\DRMP_14-0210.M30_CN225_TA30_Lake_Manatee_RR_Proposal_04.13.2021_DIGITAL.docx
Subtask 5: Design Development / Construction Documents (75%)
Description: The Consultant Team shall perform the Design Development – Construction Documents (60% and 90%):
Upon approval of the schematic design plans and elevations, the project team shall proceed with the design development and construction documents. There will be 2 submission rounds (60% and 90%) for coordination, review, and approval.
• Site Visits for progress review/discussion o 2 Site Visits / Virtual Meetings are included in the scope of services for each discipline during the construction document phase.
Deliverable: The Consultant shall provide 60% DD/CD drawings and 90% CD drawings to the Department Project Manager for review and approval.
Electronic copies of the 75% Construction Document drawings in PDF file format. The documents shall be formatted for reproduction on 24x36 paper or half size at 12x18 paper.
Electronic copies of the 75% estimate of probable construction cost in PDF file format. The documents shall be formatted for reproduction on 8-1/2”x11” paper.
Electronic copies of all additional materials required to convey the 75% design intent in PDF format.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the 75% design services under Subtask 6 within 16 weeks of the submission of 30% design deliverables (based on 2-week client review).
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 4 $638.08
DRMP Senior Project Engineer PE $141.12 1 $141.12
DRMP Project Engineer PE $110.01 3 $330.03
DRMP Staff Engineer EI $81.79 4 $327.16
DRMP CADD Designer $105.23 6 $631.38
LUNZ Principal Architect $225.00 2 $450.00
LUNZ Project Manager $159.00 16 $2,544.00
LUNZ CADD Technician $75.00 6 $450.00
MES Registered Engineer (Electrical) $130.30 1 $130.30
MES Registered Engineer (Plumbing) $130.30 1 $130.30
MES Graduate Engineer (Electrical, EI) $88.62 2 $177.24
MES Graduate Engineer (Plumbing, EI) $88.62 2 $177.24
MES CADD Technician (Electrical) $78.62 2 $157.24
MES CADD Technician (Plumbing) $78.62 2 $157.24
FSG Principal Engineer $191.75 1 $191.75
FSG Registered Engineer $159.30 1 $159.30
FSG Graduate Engineer $129.80 4 $519.20
FSG CADD Technician $94.40 4 $377.60
$7,689.18
Subtask 4: Preliminary / Schematic Design (30%)
SUBTASK 4 TOTAL:
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.030_TA30_Lake_Manatee_SP_RR_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4.13.2021\DRMP_14-0210.M30_CN225_TA30_Lake_Manatee_RR_Proposal_04.13.2021_DIGITAL.docx
Subtask 6: Construction Documents (100%)
Description: The Consultant Team shall perform the Final Construction Documents (100%):
Upon final approval of the 90% drawing package, the project team shall complete the CDs to 100% and provide drawing package for release to the subcontractor/ bidders.
100% Construction Documents shall incorporate all FDEP comments and all comments from jurisdictional agencies and shall be ready to bid.
Deliverable: The Consultant shall provide 100% CD drawings for distribution and deliver digitally signed and sealed 100% design plans and technical specifications to the Department Project Manager. The deliverable shall include digital PDFs of the construction drawings, technical specifications, Engineer’s Estimate of Quantities, opinion of probable construction costs, and Autocad (.dwg) file of the plans.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the services under Subtask 7 within 6 weeks of the submission of 90% design deliverables (based on 2-week client review) or within 1 week of receipt of all comments from permit agencies.
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 10 $1,595.20
DRMP Senior Project Engineer PE $141.12 6 $846.72
DRMP Project Engineer PE $110.01 10 $1,100.10
DRMP Staff Engineer EI $81.79 4 $327.16
DRMP CADD Designer $105.23 16 $1,683.68
LUNZ Principal Architect $225.00 8 $1,800.00
LUNZ Project Manager $159.00 48 $7,632.00
LUNZ CADD Technician $75.00 28 $2,100.00
MES Registered Engineer (Electrical) $130.30 1 $130.30
MES Registered Engineer (Plumbing) $130.30 1 $130.30
MES Graduate Engineer (Electrical, EI) $88.62 2 $177.24
MES Graduate Engineer (Plumbing, EI) $88.62 2 $177.24
MES CADD Technician (Electrical) $78.62 4 $314.48
MES CADD Technician (Plumbing) $78.62 4 $314.48
FSG Principal Engineer $191.75 1 $191.75
FSG Registered Engineer $159.30 2 $318.60
FSG Graduate Engineer $129.80 4 $519.20
FSG CADD Technician $94.40 6 $566.40
$19,924.85
Subtask 5: Design Development / Construction Documents (75%)
SUBTASK 5 TOTAL:
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.030_TA30_Lake_Manatee_SP_RR_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4.13.2021\DRMP_14-0210.M30_CN225_TA30_Lake_Manatee_RR_Proposal_04.13.2021_DIGITAL.docx
Subtask 7: Regulatory Permitting
Subtask 7A: Minor Site Plan
Description: The Consultant will secure site plan approval from Manatee County. The site plan application will be for a Minor Site Plan Approval. This scope includes submittal of a preliminary plan, attendance at a pre-application, and response to comments. We do not anticipate need for stormwater management, however, based on our review of code, the County will review floodplain compensation, Pedestrian Access and environmental, utilities, demolition and erosion control.
Deliverable: The Permit will be delivered in hard copy or digital format consistent with the issuance policy of the regulatory agency.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The permits will be delivered within 12 weeks of Subtask 7A, 75% Design Documents.
Subtask 7B: SWFWMD General Permit or Exemption
Description: The Consultant will obtain either a General Environmental Resource Permit (ERP) or documentation of an exemption. We anticipate that this project will not require stormwater treatment based on the project area and new impervious area.
The Consultant will prepare the application form and will respond to requests for additional information.
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 4 $638.08
DRMP Senior Project Engineer PE $141.12 1 $141.12
DRMP Project Engineer PE $110.01 2 $220.02
DRMP Staff Engineer EI $81.79 2 $163.58
DRMP CADD Designer $105.23 4 $420.92
LUNZ Principal Architect $225.00 3 $675.00
LUNZ Project Manager $159.00 8 $1,272.00
LUNZ CADD Technician $75.00 5 $375.00
MES Principal Engineer $155.55 1 $155.55
MES Registered Engineer (Electrical) $130.30 1 $130.30
MES Registered Engineer (Plumbing) $130.30 1 $130.30
MES Graduate Engineer (Electrical, EI) $88.62 2 $177.24
MES Graduate Engineer (Plumbing, EI) $88.62 2 $177.24
MES CADD Technician (Electrical) $78.62 2 $157.24
MES CADD Technician (Plumbing) $78.62 2 $157.24
FSG Principal Engineer $191.75 1 $191.75
FSG Registered Engineer $159.30 2 $318.60
FSG Graduate Engineer $129.80 2 $259.60
FSG CADD Technician $94.40 2 $188.80
$5,949.58
Subtask 6: Final Construction Documents (100%)
SUBTASK 6 TOTAL:
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.030_TA30_Lake_Manatee_SP_RR_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4.13.2021\DRMP_14-0210.M30_CN225_TA30_Lake_Manatee_RR_Proposal_04.13.2021_DIGITAL.docx
Deliverable: The Permit will be delivered in hard copy or digital format consistent with the issuance policy of the regulatory agency.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The permits will be delivered within 4 weeks of Subtask 5, 60% Design Documents
Subtask 7C: Permit Fees
Description: The Consultant will pay all permit fees to be reimbursed directly up to a limiting amount of
$8,000.00.
We estimate the following allowances:
• SWFWMD $500
• Manatee County $3,000
Additional fees beyond this allowance will require additional fee or be paid the to the review agency directly or to the consultant via a supplemental agreement. Building permit fees will be the responsibility of the
Contractor.
Deliverable: The Consultant shall provide receipts for permit fees upon invoicing
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The permit fees will be paid upon submittal of the permits listed above.
Subtask 8: Construction Administration Services (Not in this Task Assignment)
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 6 $957.12
DRMP Senior Project Engineer PE $141.12 4 $564.48
DRMP Project Engineer PE $110.01 8 $880.08
DRMP Staff Engineer EI $81.79 8 $654.32
DRMP CADD Designer $105.23 16 $1,683.68
$4,739.68
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 3 $478.56
DRMP Senior Project Engineer PE $141.12 2 $282.24
DRMP Project Engineer PE $110.01 4 $440.04
DRMP Staff Engineer EI $81.79 4 $327.16
DRMP CADD Designer $105.23 4 $420.92
$1,948.92
Firm Name Expense Type Unit Price Quantity Total NTE Cost
DRMP Plot Sheets 5 @ $0.50/EA $225.00 0.5 $225.00
DRMP Shipping - NTE $400.00 NTE $400.00
DRMP Permit Fee(s) - Not to Exceed $3,500.00 NTE $3,500.00
$4,125.00
$10,813.60
Subtask 7: Regulatory Permitting
Subtask 7A: Minor Site Plan
SUBTASK 7D TOTAL:
Subtask 7C: Permit Fees and Direct Reimbursables
REIMBURSABLE EXPENSE SUBTOTAL:
SUBTASK 7 Grand Total:
SUBTASK 7C TOTAL:
Subtask 7B: SWFWMD General Permit
Williams_BrD Cross-Out
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.030_TA30_Lake_Manatee_SP_RR_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4.13.2021\DRMP_14-0210.M30_CN225_TA30_Lake_Manatee_RR_Proposal_04.13.2021_DIGITAL.docx
Subtask 8A: Bidding Support
Description: The Consultant shall answer bid questions provided by the Department and issue any Addenda needed for issuance. The Consultant or respective Subconsultants shall not answer any bid questions directly from Contractors, subcontractors or vendors and will direct all questions to the Purchasing Agent at the Department.
Subtask 8B: Shop Drawings and RFI’s
Description: The Consultant shall review shop drawings pertaining to Site/Civil work and verify their accuracy with the plans and documents. The Consultant shall respond to the contractor with red line mark ups if the shop drawings are not in accordance with the plans. Markups may be approved as noted or require resubmittal. All shop drawings shall be returned to the Department for concurrence. The Consultant shall respond to contractor related questions and requests for information pertaining to Site/Civil work and verify their accuracy with the plans and documents. The Consultant shall respond to the contractor requests for information (RFI) in writing and provide this to BDC for concurrence.
Subtask 8C Substantial Completion Site Visit and As-built Review
Description: The Consultant will review contractor provided as-built construction survey completed by a registered surveyor and mapper in the State of Florida, for conformance to the permitted construction plans. This survey must be signed and sealed by a State of Florida Professional Surveyor and Mapper. As-Built plans shall be submitted prior to the Substantial completion site review. The Consultant shall attend the inspection for substantial completion when requested by the contractor and prepare a punch list of those items not completed and that do not meet the intent of the plans and technical specifications or need minor adjustment. The Consultant shall sign the DEP certification of substantial completion for setting forth the date of substantial completion for this project.
Subtask 8D: Additional Site Visit
Description: The Consultant shall attend the inspection as needed when requested in writing by the DEP project manager to observe as an experienced and qualified design professional the progress and quality of the executed work and to determine in general if the work is proceeding in accordance with the contract documents and permit conditions for the site work. A limit of three site visits are included and will be billed in equal amounts.
Deliverable(s) & Schedule: (These are payment triggers – what items will consultant provide to FDEP, including format, size, number, minimum content, due date, etc.)
• Subtask 8A: Bidding - Documentation of any responses to RFI’s (.pdf format).
• Subtask 8B: Shop Drawings and RFI’s – Copies of Stamped Shop Drawings and Documentation of any RFI’s (.pdf format). Reviews and Responses will be returned within 7 days of receipt.
• Subtask 8C: Substantial Completion Site Visit – Written Summary of the As-built Review, Meeting and Certification and punch list (.pdf format). Report will be submitted within 7 days of the site visit and receipt of as-builts.
• Subtask 8D: Additional Site Visit (limit of three) – Observation Report of the Site Visit (.pdf format). Report will be submitted within 7 days of the site visit.
Performance Measure: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.030_TA30_Lake_Manatee_SP_RR_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4.13.2021\DRMP_14-0210.M30_CN225_TA30_Lake_Manatee_RR_Proposal_04.13.2021_DIGITAL.docx
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 2 $319.04
DRMP Project Engineer PE $110.01 2 $220.02
LUNZ Project Manager $159.00 4 $636.00
LUNZ CADD Technician $75.00 2 $150.00
MES Principal Engineer $155.55 $0.00
MES Registered Engineer (Electrical) $130.30 $0.00
MES Registered Engineer (Plumbing) $130.30 $0.00
MES Graduate Engineer (Electrical, EI) $88.62 $0.00
MES Graduate Engineer (Plumbing, EI) $88.62 $0.00
MES CADD Technician (Electrical) $78.62 $0.00
MES CADD Technician (Plumbing) $78.62 $0.00
FSG Principal Engineer $191.75 $0.00
FSG Registered Engineer $159.30 $0.00
FSG Graduate Engineer $129.80 1 $129.80
FSG CADD Technician $94.40 1 $94.40
SUBTASK 8A TOTAL: $1,549.26
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 2 $319.04
DRMP Sr Project Engineer PE $141.12 1 $141.12
DRMP Project Engineer PE $110.01 2 $220.02
DRMP Staff Engineer EI $81.79 1 $81.79
LUNZ Project Manager $159.00 12 $1,908.00
LUNZ CADD Technician $75.00 8 $600.00
LUNZ Clerical $50.00 4 $200.00
MES Registered Engineer (Electrical) $130.30 3 $390.90
MES Registered Engineer (Plumbing) $130.30 3 $390.90
FSG Principal Engineer $191.75 1 $191.75
FSG Registered Engineer $159.30 2 $318.60
FSG Graduate Engineer $129.80 4 $519.20
SUBTASK 8B TOTAL: $5,281.32
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 6 $957.12
DRMP Staff Engineer EI $81.79 1 $81.79
LUNZ Principal Engineer $225.00 3 $675.00
LUNZ Project Manager $159.00 3 $477.00
FSG Principal Engineer $191.75 4 $767.00
FSG CADD Technician $94.40 2 $188.80
SUBTASK 8C TOTAL: $3,146.71
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 10 $1,595.20
DRMP Staff Engineer EI $81.79 8 $654.32
SUBTASK 8D TOTAL: $2,249.52
$12,226.81
Subtask 8A - Bidding Support
Subtask 8B: Shop Drawings and RFI’s
Subtask 8C: Substantial Completion Site Visit & As-Built Review
Subtask 8D: Final Site Visit
Subtask 8: Construction Administration Services (Not Included in this Task Assignment)
SUBTASK 8 GRAND TOTAL
Williams_BrD Cross-Out
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.030_TA30_Lake_Manatee_SP_RR_(Pending- Execution)\2021_03.xx_ORIG\Proposal\4.13.2021\DRMP_14-0210.M30_CN225_TA30_Lake_Manatee_RR_Proposal_04.13.2021_DIGITAL.docx
NOTE: Should work effort vary from proposed professional services / anticipated agency requirements, the Consultant shall submit an additional services proposal for the Department Project Manager’s consideration to modify the agreed upon task assignment (scope of services, schedule, and fees) accordingly.
Reimbursable
$4,125.00
Summary of Fees
Subtask: Fixed Price Cost
Subtask 1: Topographic Survey $6,871.04
TBDSubtask 8: Construction Administration Services (Not Included)
Subtask 8: Construction Administration Services (Not Included) $0.00
26 weeks post NTP
Total Reimbursable Cost: $4,125.00
GRAND TOTAL COST: $59,007.54
Subtask 6: Final Construction Documents (100%)
Subtask 2: Geotechnical Engineering
Subtask 3: Due Diligence 3 weeks post NTP
Subtask 4: Preliminary / Schematic Design (30%) 7 weeks post NTP
Subtask 5: Design Development / Construction Documents (75%) 16 weeks post NTP
Project Schedule
Subtask: Duration
Subtask 1: Topographic Survey 3 weeks post NTP
Subtask 7B: SWFWMD General Permit 25 weeks post NTP
Subtask 2: Geotechnical Engineering $4,977.03
$2,782.26
$5,949.58
Subtask 3: Due Diligence
Subtask 6: Final Construction Documents (100%)
Subtask 4: Preliminary / Schematic Design (30%) $7,689.18
Subtask 5: Design Development / Construction Documents (75%) $19,924.85
Subtask 7A: Minor Site Plan $4,739.68
Subtask 7C: Permit Fees and Direct Reimbursables $0.00
Subtask 7: Regulatory Permitting
Subtask 7A: Minor Site Plan 25 weeks post NTP
Subtask 7B: SWFWMD General Permit $1,948.92
Total Fixed Price Cost: $54,882.54
3 weeks post NTP