About this file
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for work performed by DRMP, Inc., a consulting firm providing professional engineering services. The change order modifies Task Assignment No. 41 under FDEP Contract No. CN225, which is located at Natural Bridge Battlefield Historic State Park in Florida. Benjamin Lennon PE serves as the consultant representative, and Ralph Perkins (or successor) is the FDEP Contract Manager overseeing the project.
The change order implements a time extension only with no cost increase to the task. The original task amount of $18,469.58 (consisting of $200.00 in reimbursement and $18,269.58 in fixed fee) remains unchanged. The modification extends the task completion date by 365 days, moving the end date from December 31, 2023 to December 30, 2024, to accommodate professional engineering services needed to design and permit the residence replacement facility. The task execution began on January 21, 2022. All required signatures from FDEP budget, project management, and contract authority representatives, as well as the consultant, were obtained digitally on June 8 and 15, 2023, authorizing the extension.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN225 41 1 61383C
Residence Replacement
DRMP, Inc.
Benjamin Lennon PE (850) 692-5659 blennon@drmp.com
Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
No cost change, time extension only for professional engineering services needed to design and permit the residence replacement at Natural Bridge Battlefield Historic State Park per attached dated 06/07/23.
$ 200.00 $ 18,269.58 $ 18,469.58 $ 200.00 $ 18,269.58 $ 18,469.58 $ 0.00 $ 0.00 $ 0.00
$ 200.00 $ 18,269.58 $ 18,469.58
01/21/2022
12/31/2023
12/31/2023
12/30/2024
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.06.08 10:36:41 -04'00'
Terry McCullum, Jr. Terry McCullum, Jr.
Digitally signed by Terry McCullum, Jr.
Date: 2023.06.08 10:42:26 -04'00'
Michael Foster for Ralph Perkins Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.06.08 16:34:21 -04'00'
Benjamin R. Lennon PE
THIS ITEM HAS BEEN DIGITALLY
SIGNED AND SEALED BY:
ON THE DATE ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED AN
THE SIGNATURE MUST BE VERIFIED
ON ANY ELECTRONIC COPIES.
STATE OF
P
R
O
F
E
S
S
I
O
NAL
E
N
G
I
N
E
E
R
B
E
N
J
A
M
I
N R.
L
N
N
O
N
No. 78674
E
F
L
OO
RIIID
A
I
CENS
E
L
ARE
D AN
STATE OF
P
R
O
F
E
S
S
I
O
N
AL
E
N
G
I
N
E
E
R
B
E
N
J
A
M
I
N R.
L
N
N
O
N
No. 78674
E
F
L
OO
RIIID
A
I
C
EN
S
E
LDigitally signed by Benjamin R Lennon Date: 2023.06.12 12:02:17-04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.06.15 13:43:06 -04'00'
$ 0.00
Natural Bridge Battlefield Historic State Park
McCullum, Terry
From: Benjamin Lennon <BLennon@drmp.com> Sent: Wednesday, June 7, 2023 1:37 PM To: McCullum, Terry Subject: CN 225 TA 41 Natural Bridge Time Extension
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Terry, Requesting time extension of 365 days for CN 225 TA 41, hopefully this covers construction.
Thanks, Benjamin Lennon, PE
Senior Project Manager Civil Services
Main: 850.562.9600 | Direct: 850.692.5659 blennon@drmp.com
8000 Regency Parkway, Suite 110, Cary, NC 27518
File details come from the government source that posted it. Updated .