This document is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a project at Colt Creek State Park. The contract involves FDEP as the state agency and DRMP, Inc., a consulting engineering firm based in Tallahassee, Florida, with multiple office locations throughout Florida and the Carolinas. The change order modifies FDEP Contract No. CN225, Task Assignment No. 14, for the New Prefabricated Restrooms project.
Change Order No. 2 authorizes alterations to construction documents to include an add alternate for prefabricated restroom buildings, with a net increase of $529.50 in fixed fees. The consultant shall revise construction plans to incorporate an add alternate design, include drawings from CXT as a basis of design, and provide electronically signed and sealed plans in PDF format, with up to three hard copies available upon request. The work must be completed within seven days of the change order start date. The change order costs include $319.04 for project management services and $210.46 for CADD design services. The cumulative contract value through all change orders totals $29,351.63, consisting of $28,351.63 in fixed price costs and $1,000.00 in reimbursable costs. The task execution period extends from February 11, 2019 to December 31, 2020, with the change order maintaining the same end date. Costs are allocated to FDEP Projects 61223C and 61221C at $264.75 each.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1625 Summit Lake Drive, Suite 200, Tallahassee, Florida 32317 Phone: 850.562.9600 | Fax: 850.575.5544
DRMP, INC.
PRINCIPALS
Lawrence L. Smith, Jr.
Wayne D. Chalifoux
Donaldson K. Barton, Jr.
Glenn J. Lusink
Jon S. Meadows
Mark D. Prochak
Mark E. Puckett
OFFICES
Atlanta, Georgia
Boca Raton, Florida
Charlotte, North Carolina
Chipley, Florida
Fort Myers, Florida
Gainesville, Florida
Jacksonville, Florida
Lakeland, Florida
Melbourne, Florida
Orlando, Florida
Panama City, Florida
Pensacola, Florida
Raleigh, North Carolina
Tallahassee, Florida
Tampa, Florida
1.833.811.3767 www.DRMP.com
February 11, 2020 DRMP Proposal #: 14-0210.014
Richard Rowe Engineering Specialist IV Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520
Subject: FDEP Agreement #CN225 – Task Assignment #14 – Change Order #2 Colt Creek State Park – New Prefabricated Restrooms Proposal for Additional Services
Dear Mr. Rowe:
For your review, DRMP, Inc. has provided a proposal summary and man-hour documentation for the additional services for construction plans revisions.
Please review the attached Proposal Summary and Deliverables and let me know if you have any questions.
Sincerely, _____________________________2-11-2020___ Benjamin Lennon, P.E. Date Project Engineer
CC: Bryant King, P.E.
Mr. Richard Rowe
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 20\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.014_TA14_Colt_Creek_New_Prefab_RR\CO02\DRMP_14-0210.014_CN225- TA14-CO02_Proposal_2.10.20_DIGITAL.docx
Colt Creek State Park – New Prefabricated Restrooms FDEP Agreement #CN225 – Task Assignment #14 (Change Order No. 2)
Proposal for Professional Services
Subtask 10: Construction Plan Revisions
Description: The Consultant shall revise the construction plans to include an add alternate for the prefabricated restroom buildings and all necessary notes and/or revisions. The plans will also include drawings from CXT to provide a basis of design. Additional permitting is not anticipated due to revisions, and not included in this proposal.
Deliverable: The Consultant shall provide electronically signed and sealed plans (.pdf) to the Department Project Manager. Signed and sealed hard copies (up to 3) will be provided at the Department Project Manager’s request
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: Deliverables will be completed within 7 days of the start of the change order.
Firm Name Position Classification Hourly Rate Hours Total Fixed Price
Cost
DRMP Project Manager $159.52 2 $319.04
DRMP CADD Designer $105.23 2 $210.46
$529.50
Subtask 10: Construction Plan Revisions
SUBTASK 6 TOTAL:
Summary of Fees
Subtask: Fixed Price Cost Reimbursable
Subtask 1: Topographic Survey $7,868.35
Subtask 2: Geotechnical Engineering $3,380.71
Subtask 3: 30% Design $2,414.52
Subtask 4: 60% Design $4,699.68
Subtask 5: 90% Design $1,307.98
Subtask 6: 100% Design $1,094.89
Subtask 7: Regulatory Permitting $1,693.23 $1,000.00
Subtask 8: Water Supply Evaluation $1,199.12
Subtask 9: Bid and Construction Services $4,163.65
Subtask 10: Construction Plan Revisions $529.50
Total Change Order #2 Cost: $529.50
Total Fixed Price Cost: $28,351.63
Total Reimbursable Cost: $1,000.00
GRAND TOTAL COST: $29,351.63
FDEP Project 61223C: $264.75 / 61221C: $264.75