CN-370000-CN225-T14CO2.pdf

PDF 375 KB Posted

Attached to
Master Agreement FL|CN225|fa3c1529a78703092d8e1ac8c5b9f699
Contract number
CN225
Issued by
Florida

About this file

This document is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a project at Colt Creek State Park. The contract involves FDEP as the state agency and DRMP, Inc., a consulting engineering firm based in Tallahassee, Florida, with multiple office locations throughout Florida and the Carolinas. The change order modifies FDEP Contract No. CN225, Task Assignment No. 14, for the New Prefabricated Restrooms project.

Change Order No. 2 authorizes alterations to construction documents to include an add alternate for prefabricated restroom buildings, with a net increase of $529.50 in fixed fees. The consultant shall revise construction plans to incorporate an add alternate design, include drawings from CXT as a basis of design, and provide electronically signed and sealed plans in PDF format, with up to three hard copies available upon request. The work must be completed within seven days of the change order start date. The change order costs include $319.04 for project management services and $210.46 for CADD design services. The cumulative contract value through all change orders totals $29,351.63, consisting of $28,351.63 in fixed price costs and $1,000.00 in reimbursable costs. The task execution period extends from February 11, 2019 to December 31, 2020, with the change order maintaining the same end date. Costs are allocated to FDEP Projects 61223C and 61221C at $264.75 each.

View the file

Other files

File Type Posted
CN-370000-CN225-CMC1.pdf PDF
CN-370000-CN225-T10.pdf PDF
CN-370000-CN225-T10CO2.pdf PDF
CN-370000-CN225-T14CO3.pdf PDF
CN-370000-CN225-T14CO3.pdf.crdownload CRDOWNLOAD file
CN-370000-CN225-T17.pdf PDF
CN-370000-CN225-T17CO3.pdf PDF
CN-370000-CN225-T17CO4.pdf PDF
CN-370000-CN225-T18.pdf PDF
CN-370000-CN225-T20.pdf PDF
CN-370000-CN225-T20CO1.pdf PDF
CN-370000-CN225-T24.pdf PDF
CN-370000-CN225-T26.pdf PDF
CN-370000-CN225-T3.pdf PDF
CN-370000-CN225-T32CO1.pdf PDF
CN-370000-CN225-T32CO3.pdf PDF
CN-370000-CN225-T32CO4.pdf PDF
CN-370000-CN225-T34.pdf PDF
CN-370000-CN225-T37.pdf PDF
CN-370000-CN225-T38CO1.pdf PDF
CN-370000-CN225-T39CO1.pdf PDF
CN-370000-CN225-T39CO2.pdf PDF
CN-370000-CN225-T41.pdf PDF
CN-370000-CN225-T45CO1.pdf PDF
CN-370000-CN225-T46.pdf PDF
CN-370000-CN225-T55.pdf PDF
CN-370000-CN225-T7.pdf PDF
CN-370000-CN225-T7CO1.pdf PDF
CN-370000-CN225-T8.pdf PDF
CN-370000-CN225-TA19CO1.pdf PDF
CN-370000-CN204-TA7CO1.pdf PDF
CN-370000-CN225-CMC4.pdf PDF
CN-370000-CN225-T11.pdf PDF
CN-370000-CN225-T15CO2.pdf PDF
CN-370000-CN225-T19.pdf PDF
CN-370000-CN225-T22.pdf PDF
CN-370000-CN225-T28.pdf PDF
CN-370000-CN225-T29.pdf PDF
CN-370000-CN225-T30.pdf PDF
CN-370000-CN225-T32.pdf PDF
CN-370000-CN225-T36.pdf PDF
CN-370000-CN225-T38.pdf PDF
CN-370000-CN225-T38CO2.pdf PDF
CN-370000-CN225-T39CO3.pdf PDF
CN-370000-CN225-T41CO1.pdf PDF
CN-370000-CN225-T42.pdf PDF
CN-370000-CN225-T5.pdf PDF
CN-370000-CN225-T50.pdf PDF
CN-370000-CN225-T50CO1.pdf PDF
CN-370000-CN225-T6.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1625 Summit Lake Drive, Suite 200, Tallahassee, Florida 32317 Phone: 850.562.9600 | Fax: 850.575.5544

DRMP, INC.

PRINCIPALS

Lawrence L. Smith, Jr.

Wayne D. Chalifoux

Donaldson K. Barton, Jr.

Glenn J. Lusink

Jon S. Meadows

Mark D. Prochak

Mark E. Puckett

OFFICES

Atlanta, Georgia

Boca Raton, Florida

Charlotte, North Carolina

Chipley, Florida

Fort Myers, Florida

Gainesville, Florida

Jacksonville, Florida

Lakeland, Florida

Melbourne, Florida

Orlando, Florida

Panama City, Florida

Pensacola, Florida

Raleigh, North Carolina

Tallahassee, Florida

Tampa, Florida

1.833.811.3767 www.DRMP.com

February 11, 2020 DRMP Proposal #: 14-0210.014

Richard Rowe Engineering Specialist IV Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520

Subject: FDEP Agreement #CN225 – Task Assignment #14 – Change Order #2 Colt Creek State Park – New Prefabricated Restrooms Proposal for Additional Services

Dear Mr. Rowe:

For your review, DRMP, Inc. has provided a proposal summary and man-hour documentation for the additional services for construction plans revisions.

Please review the attached Proposal Summary and Deliverables and let me know if you have any questions.

Sincerely, _____________________________2-11-2020___ Benjamin Lennon, P.E. Date Project Engineer

CC: Bryant King, P.E.

Mr. Richard Rowe

M:\Profit-Center-Marketing\Tally\Proposals\Proposals 20\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.014_TA14_Colt_Creek_New_Prefab_RR\CO02\DRMP_14-0210.014_CN225- TA14-CO02_Proposal_2.10.20_DIGITAL.docx

Colt Creek State Park – New Prefabricated Restrooms FDEP Agreement #CN225 – Task Assignment #14 (Change Order No. 2)

Proposal for Professional Services

Subtask 10: Construction Plan Revisions

Description: The Consultant shall revise the construction plans to include an add alternate for the prefabricated restroom buildings and all necessary notes and/or revisions. The plans will also include drawings from CXT to provide a basis of design. Additional permitting is not anticipated due to revisions, and not included in this proposal.

Deliverable: The Consultant shall provide electronically signed and sealed plans (.pdf) to the Department Project Manager. Signed and sealed hard copies (up to 3) will be provided at the Department Project Manager’s request

Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.

Schedule: Deliverables will be completed within 7 days of the start of the change order.

Firm Name Position Classification Hourly Rate Hours Total Fixed Price

Cost

DRMP Project Manager $159.52 2 $319.04

DRMP CADD Designer $105.23 2 $210.46

$529.50

Subtask 10: Construction Plan Revisions

SUBTASK 6 TOTAL:

Summary of Fees

Subtask: Fixed Price Cost Reimbursable

Subtask 1: Topographic Survey $7,868.35

Subtask 2: Geotechnical Engineering $3,380.71

Subtask 3: 30% Design $2,414.52

Subtask 4: 60% Design $4,699.68

Subtask 5: 90% Design $1,307.98

Subtask 6: 100% Design $1,094.89

Subtask 7: Regulatory Permitting $1,693.23 $1,000.00

Subtask 8: Water Supply Evaluation $1,199.12

Subtask 9: Bid and Construction Services $4,163.65

Subtask 10: Construction Plan Revisions $529.50

Total Change Order #2 Cost: $529.50

Total Fixed Price Cost: $28,351.63

Total Reimbursable Cost: $1,000.00

GRAND TOTAL COST: $29,351.63