About this file

This is a template for Attachment E - Historical Small Business Utilization, a required submission form for the solicitation N40085-26-R-0005 issued by the Department of the Navy Naval Facilities Engineering Command. All offerors, regardless of business size, must complete this form to support evaluation of Factor 5, Small Business Utilization and Participation. The form documents the offeror's historical small business subcontracting performance and achievements for up to five projects submitted as corporate experience examples under Factor 1. Offerors must provide actual subcontract dollar values and percentages for all projects, with percentages rounded to one decimal place. Projects must include the contract or task order number, project title, offeror business size designation (large or small), performance role (prime contractor, subcontractor, or JV member), and whether a subcontracting plan was required.

For each project, offerors must complete the "Actual" column showing total project dollar value, total self-performed value, total subcontracted value, and breakdowns of subcontracting by socioeconomic category: small business concerns, large business concerns, small disadvantaged businesses (SDB), women-owned small businesses (WOSB), HUBZone small businesses, veteran-owned small businesses (VOSB), and service-disabled veteran-owned small businesses (SDVOSB). The "Goal" column must be completed only for standalone contracts with established goals; task order goals should not be included if no goals were established at the task order level. Offerors with unmet goals must provide detailed explanations beyond merely acknowledging the miss, and those with zero small business subcontracting must explain why. The form explicitly prohibits responses in alternative formats, attachments, or addendums; only the completed Attachment E will be evaluated.

View the file

Other files

File Type Posted
N4008526R0005 Amendment 0010.pdf PDF
Attachment H - Price Proposal Form Revision 3.docx DOCX document
N4008526R0005 Amendment 0009.pdf PDF
GC100A_Milestones and Coordination Requirements_20260528.pdf PDF
N4008526R0005 Amendment 0008.pdf PDF
Attachment H - Price Proposal Form Revision 2.docx DOCX document
01 11 00.00 22_RevAmend08.pdf PDF
31 00 00.00 22_Attachment A_Salt Water Tunnels and Building 72_Historical Drawings.pdf PDF
00 01 15_RevAmend08.pdf PDF
098 S-502 Rev. 1 P-1112.pdf PDF
A-450 - ENLARGED PLAN DETAILS.pdf PDF
101 S-505 Rev. 1 P-1112.pdf PDF
102 S-506 Rev. 1 P-1112.pdf PDF
Lifting_Eye_Comp_Cut_Sheet_LIFTMAX-PEP-00100 (050726).pdf PDF
P-1112 Drawing Updates 2026-04-29.pdf PDF
072 S-001 Rev. 1 P-1112.pdf PDF
086 S-124 Rev. 1 P-1112.pdf PDF
J and A ML-26-51 P1112 B72 Resiliency Controller Redacted.pdf PDF
N4008526R0005 Amendment 0007.pdf PDF
41 22 13.14.pdf PDF
N4008526R0005 Amendment 0006.pdf PDF
N4008526R0005 Amendment 0005.pdf PDF
PPI 98 - V-104 Archaeology Area Outlined.pdf PDF
PPI 198 - 26 56 00.pdf PDF
PPI 203 - COMNAVREGMIDLANTINST_11320_11B.pdf PDF
PPIs 181.182.183.208 - Schedule of Special Inspections.pdf PDF
PPI 137 - 46 30 00 Attachments 1 to 4.pdf PDF
PPI 91 - Sheet 7 of 226 - H-101.pdf PDF
PPI 166 - Air Valve Detail.pdf PDF
A-500 - WALL SECTIONS.pdf PDF
N4008526R0005 Amendment 0004.pdf PDF
PPI 200 - 32 17 23.pdf PDF
Option 13 - Accessory Structure_REV2.pdf PDF
N4008526R0005 Amendment 0003.pdf PDF
N4008526R0005 Amendment 0002.pdf PDF
P-1112 B72 Resiliency Improvement Site Visit Log.pdf PDF
N4008526R0005 Amendment 0001.pdf PDF
DBIDS 5500 Form.docx DOCX document
Attachment H - Price Proposal Form.docx DOCX document
Attachment G - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
P-1112 Drawings.pdf PDF
Attachment C - Construction Experience Data Sheet.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment A - PPI Log Template.xlsx XLSX spreadsheet
N4008526R0005.pdf PDF
DBIDS 5512 Form.pdf PDF
Memorandum - Bidding Notes P-1112.pdf PDF
P-1112 Specifications.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment D - Past Performance Questionnaire.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT E

HISTORICAL SMALL BUSINESS UTILIZATION

N40085-26-R-0005

This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for the evaluation of Factor 5, Small Business Utilization and Participation. Attachment E documents the offeror’s historical small business utilization and achievements for each project submitted under Factor 1, Corporate Experience. Round all percentages to the nearest tenth of a percent (i.e., include only 1 number after the decimal point).

Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to Attachment E will not be evaluated. Only complete Attachment E. Offerors are permitted to expand portions of the form, as needed, to provide sufficient response.

INSTRUCTIONS FOR COMPLETING ATTACHMENT E:

· Complete the “PROJECT DETAILS” section for each Project submitted under Factor 1, Corporate Experience.

· Include contract or task order number; project title; the offeror’s business size; whether the contract was performed as a prime, subcontractor, or JV member; and whether a subcontracting plan was required.

· Complete the “ACTUAL” column (required for all projects regardless of whether goals were established)

· Enter dollar values actually subcontracted for each of the categories listed.

· Provide actual percentages calculated as a percentage of total subcontract value, unless goals were calculated as a percentage of total contract value.

· Complete the “GOAL” column - Enter goals, if applicable.

· If the project was a task order and no goals were established at the task order level, only complete the “ACTUAL” column. Goals for the overarching IDIQ contract should not be included in the “GOAL” column for task orders.

· Goals shall be included for standalone contracts when established.

· Goals can be entered as a percentage of total subcontract value or total contract value based on how the goals were established in the contract award.

· If goals were not established for the project submitted, or if goals were not established for a specific socioeconomic category, check N/A where applicable. The N/A block does not apply to the “ACTUAL” column, as actual subcontracted values are required for ALL projects, regardless of whether goals were established.

· If a goal was unmet for a Project, complete the section below titled “TO BE COMPLETED AS REQUIRED” under item #1.

· Explanation is required for each unmet goal.

· Item #1 is to be completed for each Project with unmet goal(s).

· If a Project has no small business subcontracting achievement (i.e.: $0 subcontracting in (d)), compete the “TO BE COMPLETED AS REQUIRED” under item #2.

· Item #2 is to be addressed for each Project with no small business subcontracting achievement.

· Enter zeroes (0) where applicable.

DEFINITION OF TERMS IN ATTACHMENT E:

· Total Project Dollar Value: the total contract or task order value; this is the actual value of the contract or task order, rather than a “Not To Exceed” dollar value on an IDIQ type contract.

· Total Self-Performed Value: the contract or task order dollar amount performed by the prime contractor, subcontractor or JV.

· Total Subcontract Value: the dollar amount of the contract or task order performed by subcontractors.

PROJECT DETAILS: Project #1

Contract/Project Number/Task Order Number:

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL

GOAL

(if applicable)

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

TO BE COMPLETED AS REQUIRED:

1. Provide a detailed explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide a detailed explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #2

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_|

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide a detailed explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide a detailed explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #3

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_|

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide a detailed explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide a detailed explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #4

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_|

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide a detailed explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide a detailed explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #5

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_|

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide a detailed explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide a detailed explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

Attachment E – Historical Small Business Utilization, Page 1 of 6

(Rev 3/2023)

File details come from the government source that posted it. Updated .