This is Amendment 0007 to federal solicitation N4008526R0005 for Design-Bid-Build (DBB) construction services at Portsmouth Naval Shipyard (PNSY) in Kittery, Maine. The project, designated P1112 B72 Resiliency Improvements, involves construction and resiliency enhancements to the shipyard facility. The amendment extends the proposal due date from 28 May 2026 to 04 June 2026, with responses due no later than 2:00 PM EDT. The Pre-Proposal Inquiry (PPI) cutoff date remains unchanged at 23 April 2026 NLT 2:00 PM EDT. The amendment incorporates government responses to previously submitted PPIs, provides a Justification and Authorization (J&A) for Controllers, and includes revised architectural and structural drawings with updates to design details and specifications.

The amendment includes 25 PPI responses addressing technical clarifications on lifting eyes, signage requirements per NFPA standards, structural framing details, concrete foundation specifications, CMU infill wall construction, shaft wall termination details, electrical bell specifications and fire alarm integration, wall thickness dimensions, equipment pad details, controlled density fill specifications, rock excavation depth assumptions, and vault wall reinforcement requirements. Attachments include revised construction drawings (S-001, S-102, S-124, S-308, S-502, S-505, S-506), enlarged plan details (A-400, A-450), the Liftmax lifting eye component cut sheet, and updated drawing files. The Contracting Officer is James A. Godwin, issued by NAVFACSYSCOM MID-ATLANTIC, Norfolk, Virginia.

View the file

Other files

File Type Posted
N4008526R0005 Amendment 0010.pdf PDF
Attachment H - Price Proposal Form Revision 3.docx DOCX document
N4008526R0005 Amendment 0009.pdf PDF
GC100A_Milestones and Coordination Requirements_20260528.pdf PDF
N4008526R0005 Amendment 0008.pdf PDF
Attachment H - Price Proposal Form Revision 2.docx DOCX document
01 11 00.00 22_RevAmend08.pdf PDF
31 00 00.00 22_Attachment A_Salt Water Tunnels and Building 72_Historical Drawings.pdf PDF
00 01 15_RevAmend08.pdf PDF
098 S-502 Rev. 1 P-1112.pdf PDF
A-450 - ENLARGED PLAN DETAILS.pdf PDF
101 S-505 Rev. 1 P-1112.pdf PDF
102 S-506 Rev. 1 P-1112.pdf PDF
Lifting_Eye_Comp_Cut_Sheet_LIFTMAX-PEP-00100 (050726).pdf PDF
P-1112 Drawing Updates 2026-04-29.pdf PDF
072 S-001 Rev. 1 P-1112.pdf PDF
086 S-124 Rev. 1 P-1112.pdf PDF
J and A ML-26-51 P1112 B72 Resiliency Controller Redacted.pdf PDF
41 22 13.14.pdf PDF
N4008526R0005 Amendment 0006.pdf PDF
N4008526R0005 Amendment 0005.pdf PDF
PPI 98 - V-104 Archaeology Area Outlined.pdf PDF
PPI 198 - 26 56 00.pdf PDF
PPI 203 - COMNAVREGMIDLANTINST_11320_11B.pdf PDF
PPIs 181.182.183.208 - Schedule of Special Inspections.pdf PDF
PPI 137 - 46 30 00 Attachments 1 to 4.pdf PDF
PPI 91 - Sheet 7 of 226 - H-101.pdf PDF
PPI 166 - Air Valve Detail.pdf PDF
A-500 - WALL SECTIONS.pdf PDF
N4008526R0005 Amendment 0004.pdf PDF
PPI 200 - 32 17 23.pdf PDF
Option 13 - Accessory Structure_REV2.pdf PDF
N4008526R0005 Amendment 0003.pdf PDF
N4008526R0005 Amendment 0002.pdf PDF
P-1112 B72 Resiliency Improvement Site Visit Log.pdf PDF
N4008526R0005 Amendment 0001.pdf PDF
DBIDS 5500 Form.docx DOCX document
Attachment H - Price Proposal Form.docx DOCX document
Attachment G - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
P-1112 Drawings.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment C - Construction Experience Data Sheet.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment A - PPI Log Template.xlsx XLSX spreadsheet
N4008526R0005.pdf PDF
DBIDS 5512 Form.pdf PDF
Memorandum - Bidding Notes P-1112.pdf PDF
P-1112 Specifications.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment D - Past Performance Questionnaire.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): SOLICITATION NUMBER N40085-26-R-0005, DESIGN-BID-BUILD (DBB) P1112 B72

RESILIENCY IMPROVEMENTS, PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE

The proposal due date of 28 May 2026 NLT 2:00 PM EDT has been extended to 04 June 2026 NLT 2:00 PM EDT.

The Amendment is issued to incorporate the following:

1. Provide responses to PPIs (additional PPI responses will be forthcoming via Amendment(s)).

2. Provide J&A for Controllers.

3. Provide Drawing revisions/updates.

3. Extend the proposal due date from 28 May 2026 to 04 June 2026 NLT 2:00 PM EDT. The PPI cutoff date of 23 April 2026 NLT 2:00 PM EDT remains unchanged.

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Date 28 May 2026 04 Jun 2026

N4008526R00050007

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

1. PPI Responses (see revised PPI response denoted in red):

PPI Reference Question Government Response

Page Section Para.

D-102 Reference sheet no. D-102 regarding lifting eyes in ceiling.

Please provide manufacturer, model number, rating and installation detail for the lifting eyes.

Liftmax Plate Mounted Pad Eye

Lifting Point (LM-PEP-00100) or approved equal will satisfy lifting eye requirements.

3 101400.1 2.1 Dimensional Building Letters schedule or text copy description were not provided in spec section and building elevations do not show metal architectural words or numbers

Signage in accordance with NFPA is required.

4,5 101400.2 2 Please provide a sign schedule of required signs

Signage in accordance with NFPA is required.

S-301 Ref. MB Framing - Framing appears to be installed on concrete piers/pads/blocks in Details A, B &

C. S-307 Detail D calls this a concrete footing. However, no detail found in S-301 through S-

506 shows concrete above the slab.

Please confirm if framing will require additional concrete above the slab for column bases.

Confirmed. See sections A, B, & C of

S-301 (for Pump Rm B) for instances of the footing shown on D/S-307.

Details A, B, & C of S-307 depict the foundation elements around the base of the existing cooling tower framing.

S-505 Detail

B

Ref. Equip Pad Detail - Detail is for a 7" max equipment pad, S-502 detail C is for a 6-12" equipment base detail and 26 11 16 para. 3.4.1 requires an 8" slab. Please confirm which detail applies to which equipment (tanks, transformer, pumps, skids, etc.)

All the referenced details apply to their specified context and are not in conflict. C/S-502 relates requirements for concrete pad rebar and anchorage.

B/S-505 constrains concrete pad thickness. The electrical spec (26 11

16) specifies minimum thickness for an exterior slab, not for a concrete pad on existing concrete.

1 07 81 00 1.2.1 Ref. Gen. Requirements -

Specification requires all structural steel and steel roof decks be intumescent paint coated. MB roofing is insulation over purlins.

Please confirm if only the framing and/or purlins require fireproofing.

Refer to PPI 268.

A-400 Ref. Keynotes - Plan is marked with keynote symbols 3, 4 & 5, however, these notes do not exist.

Please confirm if there are notes associated with these keynote symbols. Note, Wall type symbol differs per A-003 (square shaped).

Refer to revised drawing A-400 and

A-450. Wall tags for 1B, 3, and 4 were corrected to square tags.

Keynote 5 symbol removed.

S-307 Details

A&B

Ref. Bondbreaking - Details do not show any premolded fillers between the existing building foundation and the new MB foundation. Structure above is separated by an expansion joint.

Include bond breaker at interface between MB slab and existing building foundation.

Please confirm if filler strip is desired at this location.

40 03 30 00 3.11.1 Ref. Structural Details - Please provide details for concrete construction or control joints for thickened slabs at MB addition.

Note, depth of joints may interfere with reinforcement, please provide guidance on rebar treatment at joint locations.

See revised S-502.

A-400 Ref. CMU Infills - A-400 shows

Type 1B infills for Room C. Detail

1B on A-003 refers to S102 for details, S102 is a floor plan for

Room S. Detail C on S-503 shows a CMU Wall Detail with steel clip attachment at the top to purlins and doweling into floor for top an bottom of infills. Please confirm purlins exist at the Room C infill locations and if the angle will extend to lap the existing walls where possible. Detail only calls for one 12" LLV.

Refer to revised S-506 for typical

CMU details. C/S-503 does not apply to Pump Rm C, since C/S-503 is specific to Pump Rm A.

A-400 Ref. CMU Infills - A-400 shows

Type 1B infills for Room C. Detail

C on S-503 shows a CMU Wall

Detail with attachment at the top to purlins and doweling into floor for top an bottom of infills. Will CMU attach to existing walls horizontally?

Refer to revised S-506 for typical

CMU details. C/S-503 does not apply to Pump Rm C, since C/S-503 is specific to Pump Rm A.

S-106 Ref. Misc MB Framing &

Accessories - Please confirm which

UL detail number is to be used for

MB framing and cross bracing that penetrates the shaft wall in Pump

Room B.

Use UL detail W-L-0012.

S-301 Ref. MB Roof Framing & Shaft

Wall - Please provide a UL rated detail of how the top of shaft wall will terminate at the underside of

MB framing.

Use UL detail HW-D-0824.

FX102 Ref. Electric Bell - Please confirm the origination location (panel) and routing for electrical to the electric bell.

Electric bell and flow switch shall be powered from and reports via the signal line circuits originating from the fire alarm control panel shown on

FA101. Refer to F001 Fire Alarm notes.

21 13 13 &

28 31 60

Ref. Electric Bell - Please confirm product specifications for the electric bell shown on FX102.

Will the bell be monitored by the

FA system?

Bell is indirectly monitored via the flow switch, see response to PPI 296.

A-003 Wall Details Mark 4 wall total thickness should add up to 5 3/4 in., but is listed as 5

1/4 in., please clarify as detail contradicts table.

Wall Mark 4 is a 4" CH Stud with (2) layers of 5/8" GWB (1-1/4" total thickness) installed to the CH stud face. (4" + 1-1/4" = 5-1/4").

S-309 Reference sheet no. S309, section

H regarding foundation for UF

Break Tank. Please confirm that 2

in. rigid insulation is to be

Confirmed.

provided below the concrete slab as per sheet no. S307, section nos.

A, B and F.

S-309 Reference sheet no. S309, section

H regarding foundation for UF

Break Tank. Please confirm that 12

in. crushed stone is to be provided below the concrete slab as per sheet no. S307, section no. F.

Confirmed.

S-307 Reference sheet no. S307, section

B regarding Pump Room B foundation. Please confirm that 5'-

0 in. minimum depth to bottom of crushed stone occurs only at the grade beam along 3 line adjacent to the existing foundation.

Confirmed.

S-302 Reference sheet no. S-302 New

Work Keynote nos. 1,2,3 regarding

Controlled Density Fill. Please provide Specification for

Controlled Density Fill.

See S-001 "Foundations" Section

Item #6.

S-308 Drawing S-308, detail B shows existing rock needing to be excavated. Note 1 states to verify in field for location and depth of rock. Please provide what the assumed depth of rock should be for estimation purposes.

The estimated top of rock is 3-ft below Finished Floor Elevation.

S-308 Reference Sheet No. S-308 section

B pertaining to 2 each new concrete walls associated with the vault. Please provide wall reinforcement details including doweling requirement into existing concrete walls.

Refer to revised S-308.

ATTACHMENTS

1) J&A ML-26-51 P1112 B72 Resiliency Controller Redacted

2) 072 S-001 Rev. 1 P-1112

3) 075 S-102 Rev. 1 P-1112

4) 086 S-124 Rev. 1 P-1112

5) 094 S-308 Rev. 1 P-1112

6) 098 S-502 Rev. 1 P-1112

7) 101 S-505 Rev. 1 P-1112

8) 102 S-506 Rev. 1 P-1112

9) A-400 - ENLARGED PLAN -PUMP ROOMS B & S, AND C

10) A-450 - ENLARGED PLAN DETAILS

11) Lifting_Eye_Comp_Cut_Sheet_LIFTMAX-PEP-00100 (050726)

12) P-1112 Drawing Updates 2026-04-29

(End of Summary of Changes)

IDCode: J
Page: 1
Pages: 2
AmendNo: 0007
EffDate: 20 May 2026
ReqNo: See Continuation Sheet
ProjNo: WON 1710371
IssCode: N40085
AdmCode:
IssuedBy: NAVFACSYSCOM MID-ATLANTIC

9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395

NORFOLK, VA 23511-0395

UNITED STATES

James Godwin, Email: james.a.godwin41.civ@us.navy.mil Telephone: 7573411999 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N4008526R0005
SolDate: 26 Feb 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section 00 70 00 - Conditions of the Contract
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: JAMES A. GODWIN
ContDate:
CODate: 20 May 2026