P-1112 Specifications.pdf
PDF 19 MB Posted
- Solicitation number
- N4008526R0005
About this file
This is a comprehensive Specifications document for delivery order N40085-23-F-4245 related to the P-1112 B72 Resiliency Improvement project at Portsmouth Naval Shipyard (PNSY) in Kittery, Maine. The project involves constructing a desalination facility within Buildings 242 and 72, including a new intake at Building 242, discharge at Berth 4, and repurposing Pump Room 5 in Building 72 into a dedicated desalination facility with multi-step treatment processes (ultrafiltration and reverse osmosis). Major components include a new desalination intake pump station, piping systems connecting the buildings, chemical storage facilities, electrical infrastructure, and associated appurtenances. The work encompasses 46 divisions of specifications addressing general requirements, existing conditions, concrete, masonry, metals, thermal and moisture protection, openings, finishes, specialties, fire suppression, plumbing, HVAC, electrical, communications, earthwork, and water/wastewater equipment.
Key administrative and technical requirements include: submission of detailed submittals (safety plans, schedules, quality control plans, shop drawings) using the eCMS system; compliance with EM 385-1-1 safety standards and OSHA regulations; maintenance of cost-loaded Network Analysis Schedules with monthly updates; preparation of as-built and record drawings in CAD format; provision of operation and maintenance manuals and eOMSI facility data workbooks; construction waste management with minimum 60 percent diversion from landfills; coordination of utility outages and critical infrastructure protection; and post-construction warranty management and facility turnover procedures. The contractor must comply with Portsmouth Naval Shipyard-specific regulations including DBIDS access requirements, security protocols, restricted material prohibitions, and work restrictions in occupied facilities operating 24/7. Work must adhere to historic preservation standards and include archaeological monitoring, environmental controls, and specialized testing and commissioning of mechanical and electrical systems.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
For Commander, NAVFAC:
Date:
Submitted By: Date:
P-1112 B72 Resiliency Improvement Delivery Order N40085-23-F-4245
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 22 05/21 SUMMARY OF WORK (PWD ME)
01 14 00.00 22 11/22, CHG 4: 02/25 WORK RESTRICTIONS (PWD ME)
01 20 00.00 22 11/20, CHG 5: 02/25 PRICE AND PAYMENT PROCEDURES (PWD ME)
01 30 00.00 22 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS (PWD ME)
01 31 23.13 20 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
01 32 17.00 20 11/23, CHG 1: 08/24 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 10 02/24 SUBSTITUTIONS
01 35 26.00 22 05/24 GOVERNMENTAL SAFETY REQUIREMENTS (PWD
ME)
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 44 00.00 22 04/25 ARCHAEOLOGICAL MONITORING (PWD ME)
01 45 00.00 22 08/23, CHG 1: 05/24 QUALITY CONTROL (PWD ME)
01 45 35 05/24 SPECIAL INSPECTIONS
01 50 00.00 22 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS (PWD ME)
01 57 19.00 22 08/22 TEMPORARY ENVIRONMENTAL CONTROLS -
PORTSMOUTH NAVAL SHIPYARD (PWD ME)
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3:11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00.00 22 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS (PWD ME)
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 78 24.00 22 05/23, CHG 1: 11/23 ELECTRONIC OPERATION AND MAINTENANCE
SUPPORT INFORMATION (eOMSI) FACILITY
DATA WORKBOOK (FDW)
01 91 00.15 20 05/23, CHG 3: 08/24 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
02 42 91 11/18 REMOVAL AND SALVAGE OF HISTORIC
CONSTRUCTION MATERIALS
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00.00 22 09/21 ASBESTOS REMEDIATION (PNS PROJECTS)
02 83 00.00 22 3/24 MANAGEMENT OF LEAD, CADMIUM, AND
CHROMIUM (VI) DURING RENOVATION,
DEMOLITION, CONSTRUCTION,REMOVAL AND
ABATEMENT (PNS PROJECTS)
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 2: 05/21 CAST-IN-PLACE CONCRETE
03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION
DIVISION 04 - MASONRY
PROJECT TABLE OF CONTENTS Page 1
04 03 00 11/17 CONSERVATION TREATMENT FOR PERIOD
MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 08/24 MISCELLANEOUS METAL FABRICATIONS
05 51 00 08/23 METAL STAIRS
05 51 33 08/24 METAL LADDERS
05 52 00 08/23 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 20 00 08/24 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING
07 19 00 08/23 WATER REPELLENTS
07 21 13 08/23 BOARD AND BLOCK INSULATION
07 22 00 08/23 ROOF AND DECK INSULATION
07 27 10 08/23 BUILDING AIR BARRIER SYSTEM
07 27 19.01 08/23, CHG 1: 08/24 SELF-ADHERING AIR BARRIERS
07 60 00 08/23 FLASHING AND SHEET METAL
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00.00 22 07/24 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 01 90.50 06/25 PREPARATION OF HISTORIC WOOD AND METAL
SURFACES FOR PAINTING
09 29 00 08/24 GYPSUM BOARD
09 77 23 01/25 PLASTIC WALL PANELS
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 44 16 11/19 FIRE EXTINGUISHERS
DIVISION 13 - SPECIAL CONSTRUCTION
PROJECT TABLE OF CONTENTS Page 2
13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 13 29 02/11 SANITARY SEWERAGE PUMPS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 05/22, CHG 2: 08/24 COMMON PIPING FOR HVAC
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 08/24 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23, CHG 1: 08/24 COMMISSIONING OF MECHANICAL SYSTEMS
23 09 00 08/24 INSTRUMENTATION AND CONTROL FOR HVAC
23 21 13 12/24 POLYPROPYLENE PRESSURE PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 64 26 08/09, CHG 7: 02/24 DESALINATION INTAKE SCREEN SYSTEM
23 81 00 05/24 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 08/24 CYBERSECURITY FOR DESALINATION SCADA
SYSTEM
DIVISION 26 - ELECTRICAL
26 05 13.00 10 11/23 MEDIUM-VOLTAGE CABLES
26 05 19.00 10 11/22 INSULATED WIRE AND CABLE
26 05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 11 16 11/21 SECONDARY UNIT SUBSTATIONS
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 24 13 08/21 SWITCHBOARDS
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 60 08/20 INTERIOR FIRE ALARM SYSTEM,
NON-ADDRESSABLE
PROJECT TABLE OF CONTENTS Page 3
DIVISION 31 - EARTHWORK
31 00 00.00 22 08/2024 EARTHWORK
31 63 33 02/25 DRILLED MICROPILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR
ROADS AND STREETS
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 11 13.28 07/24 HIGH DENSITY POLYETHYLENE PIPE
33 21 00.19 11/24 VERTICAL MULTI-STAGE CENTRIFUGAL PUMPS
33 61 13.19 02/16 VALVES, PIPING, AND EQUIPMENT IN VALVE
MANHOLES
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 45 01 02/21, CHG 3: 08/23 VERTICAL PUMPS, MIXED-FLOW
IMPELLER-TYPE
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 13 10/07, CHG 2: 02/20 PIPELINES, LIQUID PROCESS PIPING
40 05 13.96 05/10 WELDING PROCESS PIPING
40 17 26.00 20 04/06 WELDING PRESSURE PIPING
40 60 00 05/20 PROCESS CONTROL
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 11/19, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP
RUNNING
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
43 21 13.16 09/24 HORIZONTAL END SUCTION PUMPS
43 41 45 01/25 FIBERGLASS REINFORCED PLASTIC CHEMICAL
STORAGE TANKS
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
46 30 00 08/17 WATER AND WASTEWATER CHEMICAL FEED
SYSTEMS
46 64 30 11/24 TEMPORARY ASW PUMP STATION
46 80 00 09/24 BRACKISH WATER REVERSE OSMOSIS UNIT
46 81 00 09/24 SEAWATER WATER REVERSE OSMOSIS UNIT
46 82 00 09/24 IMMERSED MEMBRANE FILTRATION SYSTEM
AND ANCILLARY EQUIPMENT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11, CHG 1: 08/14
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
Sheet Number PWD-MENO NAVFAC Dwg No. Drawing Title
G-001 FAC-YR-NUM ####### COVER SHEET
G-002 FAC-YR-NUM ####### DRAWING LIST PART 1 OF 2
G-003 FAC-YR-NUM ####### DRAWING LIST PART 2 OF 2
G-004 FAC-YR-NUM ####### CODE SUMMARY & LIFE SAFETY NOTES
G-005 FAC-YR-NUM ####### LIFE SAFETY FLOOR PLAN
G-006 FAC-YR-NUM ####### OUTAGE SEQUENCING AND MITIGATION PLAN
H-101 FAC-YR-NUM ####### HAZARDOUS MATERIALS PLAN 1 OF 2
H-102 FAC-YR-NUM ####### HAZARDOUS MATERIALS PLAN 2 OF 2
B-001 FAC-YR-NUM ####### GEOTECHNICAL NOTES AND SYMBOLS
B-101 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS PART 1 OF 3
B-102 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS PART 2 OF 3
B-103 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS PART 3 OF 3
B-104 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS - BID OPTION
C-001 FAC-YR-NUM ####### CIVIL GENERAL NOTES
DOCUMENT 00 01 15 Page 1
C-002 FAC-YR-NUM ####### POTHOLE INFORMATION
V-101 FAC-YR-NUM ####### EXISTING SURVEY OVERALL SITE PLAN
V-102 FAC-YR-NUM ####### EXISTING SURVEY UNDERGROUND UTILITIES
PLAN
V-103 FAC-YR-NUM ####### EXISTING SURVEY ABOVE GROUND
UTILITIES PLAN
V-104 FAC-YR-NUM ####### HISTORICAL QUAY WALLS AND BUILDING
FOUNDATION PLANS
GC100 FAC-YR-NUM ####### GENERAL SITE AREAS
C-100 FAC-YR-NUM ####### SOIL EROSION AND SEDIMENT CONTROL PLAN
C-101 FAC-YR-NUM ####### SITE PLAN
C-102 FAC-YR-NUM ####### UTILITY PLAN
C-103 FAC-YR-NUM ####### GRADING AND DRAINAGE PLAN
C-104 FAC-YR-NUM ####### EXISTING CONDITIONS SITE PLAN - BID
OPTIONS
C-105 FAC-YR-NUM ####### TUNNEL ABANDONMENT PART 1 OF 3 - BID
OPTION 4
C-106 FAC-YR-NUM ####### TUNNEL ABANDONMENT PART 2 OF 3 - BID
OPTION 5
C-107 FAC-YR-NUM ####### TUNNEL ABANDONMENT PART 3 OF 3 - BID
OPTION 6
C-108 FAC-YR-NUM ####### OPTION 13: ACCESSORY STRUCTURE
C-301 FAC-YR-NUM ####### CIVIL PROFILE - B242 TO B72 AND B72
SEWER
C-302 FAC-YR-NUM ####### CIVIL PROFILE - QUAY WALL TO BUILDING
B72
C-303 FAC-YR-NUM ####### CIVIL PROFILE - DMH 54-A1 TO DMH
8-61 - BID OPTION 6
C-304 FAC-YR-NUM ####### CIVIL PROFILE - INTAKE TO B242
CT101 FAC-YR-NUM ####### FIRE TRUCK TURNING MOVEMENT SITE PLAN
C-501 FAC-YR-NUM ####### CIVIL DETAILS PART 1 OF 4
C-502 FAC-YR-NUM ####### CIVIL DETAILS PART 2 OF 4
C-503 FAC-YR-NUM ####### CIVIL DETAILS PART 3 OF 4
C-504 FAC-YR-NUM ####### CIVIL DETAILS PART 4 OF 4
CG101 FAC-YR-NUM ####### DRY DOCK 2 LAYDOWN PLAN - BID OPTION 9
CG102 FAC-YR-NUM ####### DRY DOCK 2 TEMPORARY OUTAGE SYSTEM
SITE PLAN - BID OPTION 9
DOCUMENT 00 01 15 Page 2
CG501 FAC-YR-NUM ####### DRY DOCK 2 TEMPORARY OUTAGE & CIVIL
DETAILS - BID OPTION 9
CG601 FAC-YR-NUM ####### DRY DOCK 2 TEMPORARY PIPING SYSTEM
SCHEMATIC - BID OPTION 9
A-000 FAC-YR-NUM ####### GENERAL PROJECT NOTES
AD001 FAC-YR-NUM ####### DEMOLITION NOTES
AD101 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN
AD102 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN - BID OPTION 8
A-001 FAC-YR-NUM ####### ABBREVIATIONS AND SYMBOLS
A-002 FAC-YR-NUM ####### GENERAL NOTES AND LEGENDS
A-003 FAC-YR-NUM ####### PARTITION, CEILING AND ROOF TYPES
A-101 FAC-YR-NUM ####### PROPOSED FLOOR PLAN - PUMP ROOMS B &
S, ROOM C
A-102 FAC-YR-NUM ####### PROPOSED FLOOR PLAN - BID OPTION 8
A-103 FAC-YR-NUM ####### PROPOSED ROOF PLAN
A-200 FAC-YR-NUM ####### EXTERIOR ELEVATIONS
A-201 FAC-YR-NUM ####### EXTERIOR ELEVATIONS - BID OPTION 8
A-231 FAC-YR-NUM ####### AXONONOMETRIC VIEWS
A-300 FAC-YR-NUM ####### BUILDING SECTIONS PART 1 OF 2
A-301 FAC-YR-NUM ####### BUILDING SECTIONS PART 2 OF 2
A-400 FAC-YR-NUM ####### ENLARGED PLAN -PUMP ROOMS B & S,
ROOMS C & M
A-401 FAC-YR-NUM ####### ENLARGED PLAN - BID OPTION 11
A-402 FAC-YR-NUM ####### PLAN & ELEVATIONS - BID OPTION 13
A-403 FAC-YR-NUM ####### WALL SECTIONS & DETAILS - BID OPTION
A-410 FAC-YR-NUM ####### ENLARGED RCP -PUMP ROOMS B & S, ROOMS
C & M
A-450 FAC-YR-NUM ####### ENLARGED PLAN DETAILS
A-500 FAC-YR-NUM ####### WALL SECTIONS
A-501 FAC-YR-NUM ####### DOOR DETAILS
A-502 FAC-YR-NUM ####### ROOF DETAILS PART 1 OF 2
DOCUMENT 00 01 15 Page 3
A-503 FAC-YR-NUM ####### ROOF DETAILS PART 2 OF 2
A-600 FAC-YR-NUM ####### INTERIOR ELEVATIONS PART 1 OF 2
A-601 FAC-YR-NUM ####### INTERIOR ELEVATIONS PART 2 OF 2
A-602 FAC-YR-NUM ####### DETAILS
A-801 FAC-YR-NUM ####### DOOR DETAILS & SCHEDULE
S-001 FAC-YR-NUM ####### GENERAL NOTES PART 1 OF 2
S-002 FAC-YR-NUM ####### GENERAL NOTES PART 2 OF 2
S-101 FAC-YR-NUM ####### OVERALL PLAN - B72
S-102 FAC-YR-NUM ####### FLOOR PLAN - PUMP ROOM S
S-103 FAC-YR-NUM ####### FLOOR PLAN - UF TANK AND SUCTION WELL
S-104 FAC-YR-NUM ####### FOUNDATION PLAN - PUMP ROOM B ADDITION
S-105 FAC-YR-NUM ####### FOUNDATION PLAN - PUMP ROOM B
ADDITION, BREAK TANK
S-106 FAC-YR-NUM ####### FRAMING PLAN - PUMP ROOM B ADDITION
S-107 FAC-YR-NUM ####### ROOF FRAMING PLAN - PUMP ROOM S
S-108 FAC-YR-NUM ####### ROOF FRAMING PLAN - ROOM M
S-110 FAC-YR-NUM ####### FRAMING PLAN BID OPTIONS - PUMP ROOM S
S-121 FAC-YR-NUM ####### FLOOR PLAN - B242 WET WELL
S-122 FAC-YR-NUM ####### FLOOR PLAN - PUMP ROOM A
S-123 FAC-YR-NUM ####### FOUNDATION PLAN - BID OPTION 13
S-124 FAC-YR-NUM ####### ROOF FRAMING PLAN - PUMP ROOM A
S-301 FAC-YR-NUM ####### SECTIONS PART 1 OF 10
S-302 FAC-YR-NUM ####### SECTIONS PART 2 OF 10
S-303 FAC-YR-NUM ####### SECTIONS PART 3 OF 10
S-304 FAC-YR-NUM ####### SECTIONS PART 4 OF 10
S-305 FAC-YR-NUM ####### SECTIONS PART 5 OF 10
S-306 FAC-YR-NUM ####### SECTIONS PART 6 OF 10
DOCUMENT 00 01 15 Page 4
S-307 FAC-YR-NUM ####### SECTIONS PART 7 OF 10
S-308 FAC-YR-NUM ####### SECTIONS PART 8 OF 10
S-309 FAC-YR-NUM ####### SECTIONS PART 9 OF 10
S-310 FAC-YR-NUM ####### SECTIONS PART 10 OF 10
S-501 FAC-YR-NUM ####### DETAILS PART 1 OF 6 - B72
S-502 FAC-YR-NUM ####### DETAILS PART 2 OF 6 - B72
S-503 FAC-YR-NUM ####### DETAILS PART 3 OF 6 - B242
S-504 FAC-YR-NUM ####### DETAILS PART 4 OF 6 - B242
S-505 FAC-YR-NUM ####### DETAILS PART 5 OF 6 - B72
S-506 FAC-YR-NUM ####### DETAILS PART 6 OF 6 - B72
SD101 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN - PUMP ROOM S
SD102 FAC-YR-NUM ####### DEMOLITION ROOF FRAMING PLAN - PUMP
ROOM S
SD103 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN - PUMP ROOM A
SD104 FAC-YR-NUM ####### DEMOLITION ROOF FRAMING PLAN - PUMP
ROOM A
SD301 FAC-YR-NUM ####### DEMOLITION SECTIONS PART 1 OF 2
SD302 FAC-YR-NUM ####### DEMOLITION SECTIONS PART 2 OF 2
F-001 FAC-YR-NUM ####### FIRE PROTECTION NOTES AND DETAILS
FA101 FAC-YR-NUM ####### FIRE ALARM FLOOR PLAN
FX101 FAC-YR-NUM ####### FIRE SPRINKLER FLOOR PLAN - PUMP ROOM
S
FX102 FAC-YR-NUM ####### FIRE SPRINKLER FLOOR PLAN - PUMP ROOM
C
FX500 FAC-YR-NUM ####### FIRE SPRINKLER DETAILS
M-001 FAC-YR-NUM ####### MECHANICAL SYMBOLS & ABBREVIATIONS
M-002 FAC-YR-NUM ####### MECHANICAL ABBREVIATIONS & NOTES
MD101 FAC-YR-NUM ####### OVERALL DEMOLITION PLAN - B72
MD102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C DEMOLITION PLAN
DOCUMENT 00 01 15 Page 5
MD103 FAC-YR-NUM ####### ROOM M DEMOLITION PLAN - BID OPTION 8
MD301 FAC-YR-NUM ####### PUMP ROOM S DEMOLITION SECTIONS
M-101 FAC-YR-NUM ####### OVERALL PROPOSED WORK PLAN - B72
M-102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C PROPOSED WORK
PLAN
M-103 FAC-YR-NUM ####### ROOM M & PUMP ROOM B PROPOSED WORK
PLAN
M-104 FAC-YR-NUM ####### PUMP ROOM S PROPOSED ROOF PLAN
MP101 FAC-YR-NUM ####### OVERALL BASEMENT MECHANICAL PROPOSED
PIPING PLAN - B72
MP102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C PROPOSED PIPING
PLAN
MP400 FAC-YR-NUM ####### ENLARGED PROPOSED PIPING PLANS
M-501 FAC-YR-NUM ####### MECHANICAL DETAILS PART 1 OF 3
M-502 FAC-YR-NUM ####### MECHANICAL DETAILS PART 2 OF 3
M-503 FAC-YR-NUM ####### MECHANICAL DETAILS PART 3 OF 3
M-600 FAC-YR-NUM ####### MECHANICAL SCHEDULES
M-601 FAC-YR-NUM ####### MECHANICAL AIRFLOW DIAGRAM
M-602 FAC-YR-NUM ####### NORTH TOWER TIE IN DIAGRAM - BID
OPTION 2
M-603 FAC-YR-NUM ####### EXISTING SOUTH TOWER TIE IN DIAGRAM -
BID OPTION 2
M-700 FAC-YR-NUM ####### MECHANICAL SEQUENCE OF OPERATIONS
D-001 FAC-YR-NUM ####### PROCESS NOTES , ABBREVIATIONS, AND
LEGEND
DD101 FAC-YR-NUM ####### DEMOLITION PLAN PUMP ROOM A
D-101 FAC-YR-NUM ####### PUMP ROOM A WET WELL PLAN, SECTION &
DETAIL
D-102 FAC-YR-NUM ####### PUMP ROOM A PROCESS FLOOR PLAN
D-103 FAC-YR-NUM ####### OVERALL PROCESS PLAN - B72
D-104 FAC-YR-NUM ####### PUMP ROOM S PLAN PART 1 OF 3
D-105 FAC-YR-NUM ####### PUMP ROOM S PLAN PART 2 OF 3
D-106 FAC-YR-NUM ####### PUMP ROOM S PLAN PART 3 OF 3
D-107 FAC-YR-NUM ####### UF BREAK TANK PLAN
DOCUMENT 00 01 15 Page 6
D-108 FAC-YR-NUM ####### PUMP ROOM B PLAN PART 1 OF 2
D-109 FAC-YR-NUM ####### PUMP ROOM B PLAN PART 2 OF 2
D-110 FAC-YR-NUM ####### ROOM C PLAN PART 1 OF 2
D-111 FAC-YR-NUM ####### ROOM C PLAN PART 2 OF 2
D-112 FAC-YR-NUM ####### BASEMENT PLAN AND SECTION
D-113 FAC-YR-NUM ####### CONDENSATE TANK PLAN
D-301 FAC-YR-NUM ####### PUMP ROOM A SECTIONS
D-401 FAC-YR-NUM ####### INTAKE SCREEN PLAN, SECTION, AND
DETAILS
D-402 FAC-YR-NUM ####### INTAKE SCREEN FENDER PLAN AND SECTIONS
D-403 FAC-YR-NUM ####### PUMP ROOM S ENLARGED PLAN PART 1 OF 3
D-404 FAC-YR-NUM ####### PUMP ROOM S ENLARGED PLAN PART 2 OF 3
D-405 FAC-YR-NUM ####### PUMP ROOM S ENLARGED PLAN PART 3 OF 3
D-406 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 1 OF 6
D-407 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 2 OF 6
D-408 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 3 OF 6
D-409 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 4 OF 6
D-410 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 5 OF 6
D-411 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 6 OF 6
D-412 FAC-YR-NUM ####### UF BREAK TANK SECTION
D-413 FAC-YR-NUM ####### PUMP ROOM B ENLARGED PLANS PART 1 OF 2
D-414 FAC-YR-NUM ####### PUMP ROOM B ENLARGED PLANS PART 2 OF 2
D-415 FAC-YR-NUM ####### PUMP ROOM B SECTIONS PART 1 OF 3
D-416 FAC-YR-NUM ####### PUMP ROOM B SECTIONS PART 2 OF 3
D-417 FAC-YR-NUM ####### PUMP ROOM B SECTIONS PART 3 OF 3
D-418 FAC-YR-NUM ####### ROOM C SECTIONS PART 1 OF 2
D-419 FAC-YR-NUM ####### ROOM C SECTIONS PART 2 OF 2
D-420 FAC-YR-NUM ####### OUTFALL AND FENDER PLAN AND SECTIONS
DOCUMENT 00 01 15 Page 7
D-501 FAC-YR-NUM ####### DETAILS PART 1 OF 5
D-502 FAC-YR-NUM ####### DETAILS PART 2 OF 5
D-503 FAC-YR-NUM ####### DETAILS PART 3 OF 5
D-504 FAC-YR-NUM ####### DETAILS PART 4 OF 5
D-505 FAC-YR-NUM ####### DETAILS PART 5 OF 5
D-601 FAC-YR-NUM ####### PROCESS FLOW DIAGRAM PART 1 OF 2
D-602 FAC-YR-NUM ####### PROCESS FLOW DIAGRAM PART 2 OF 2
D-603 FAC-YR-NUM ####### CONTROL SEQUENCE ONE-LINE DIAGRAM
D-604 FAC-YR-NUM ####### AIR BURST SYSTEM SCHEMATIC DIAGRAM
D-605 FAC-YR-NUM ####### HYDRAULIC PROFILE
D-606 FAC-YR-NUM ####### CHEMICAL FEED SYSTEM SCHEMATICS
D-607 FAC-YR-NUM ####### PROCESS SCHEDULE AND EQUIPMENT LIST
DI001 FAC-YR-NUM ####### INSTRUMENTATION LEGEND
DI100 FAC-YR-NUM ####### CONTROL ROOM AND TELECOMMUNICATIONS
PLAN VIEW
DI501 FAC-YR-NUM ####### INSTRUMENTATION DETAILS PART 1 OF 2
DI502 FAC-YR-NUM ####### INSTRUMENTATION DETAILS PART 2 OF 2
DI503 FAC-YR-NUM ####### INTAKE SCREEN DETAIL
DI504 FAC-YR-NUM ####### TEMPORARY ASW SYSTEM CONTROL DETAILS
DI601 FAC-YR-NUM ####### NETWORK ARCHITECTURE
DI602 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -
PUMP ROOM A
DI603 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -
PUMP ROOM S
DI604 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -
YARD
DI605 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -
CHEM STORAGE
DI701 FAC-YR-NUM ####### CONTROL STRATEGIES - GENERAL
DI702 FAC-YR-NUM ####### CONTROL STRATEGIES - INTAKE
DI703 FAC-YR-NUM ####### CONTROL STRATEGIES - PERMEATE
DI704 FAC-YR-NUM ####### PLC POINTS LISTS
DOCUMENT 00 01 15 Page 8
DI705 FAC-YR-NUM ####### FIELD INSTRUMENT LIST
E-001 FAC-YR-NUM ####### ELECTRICAL SYMBOLS & LEGENDS
E-002 FAC-YR-NUM ####### ELECTRICAL TYPICAL NOTES AND
EQUIPMENT WIRING SCHEDULES
E-101 FAC-YR-NUM ####### ELECTRICAL SITE PLAN
E-102 FAC-YR-NUM ####### ELECTRICAL SITE GROUNDING PLAN &
RISER DIAGRAM - B72
ED101 FAC-YR-NUM ####### ELECTRICAL SITE DEMOLITION PLAN - B72
ED102 FAC-YR-NUM ####### BASEMENT DEMOLITION PLAN - B72
ED103 FAC-YR-NUM ####### PUMP ROOM S & ROOM C DEMOLITION PLAN
EL101 FAC-YR-NUM ####### ROOM M LIGHTING PLAN - BID OPTION 8
EL102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C LIGHTING PLAN
EL103 FAC-YR-NUM ####### PUMP ROOM B LIGHTING PLAN
EP101 FAC-YR-NUM ####### ELECTRICAL SITE & PUMP ROOM B POWER
PLAN - B72
EP102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C POWER PLAN
EP103 FAC-YR-NUM ####### ROOM M POWER PLAN - BID OPTION 8
EP104 FAC-YR-NUM ####### PUMP ROOM S & PUMP ROOM B ROOF POWER
PLAN
EP105 FAC-YR-NUM ####### BASEMENT MV ROUTING PLAN - B72
EP106 FAC-YR-NUM ####### MIDLEVEL MV ROUTING PLAN - B72
EP107 FAC-YR-NUM ####### SECOND FLOOR MV ROUTING PLAN - B72
EP108 FAC-YR-NUM ####### PUMP ROOM A POWER PLAN
EP109 FAC-YR-NUM ####### ACCESSORY STRUCTURE SITE PLAN - BID
OPTION 13
EP501 FAC-YR-NUM ####### DETAILS PART 1 OF 6
EP502 FAC-YR-NUM ####### DETAILS PART 2 OF 6
EP503 FAC-YR-NUM ####### DETAILS PART 3 OF 6
EP504 FAC-YR-NUM ####### DETAILS PART 4 OF 6
EP505 FAC-YR-NUM ####### DETAILS PART 5 OF 6
EP506 FAC-YR-NUM ####### DETAILS PART 6 OF 6
DOCUMENT 00 01 15 Page 9
EP601 FAC-YR-NUM ####### POWER SYSTEM SINGLE LINE DIAGRAM
EP701 FAC-YR-NUM ####### SCHEDULES PART 1 OF 2
EP702 FAC-YR-NUM ####### SCHEDULES PART 2 OF 2
-- End of Document --
DOCUMENT 00 01 15 Page 10
SECTION 01 11 00.00 22
SUMMARY OF WORK (PWD ME)
05/21
PART 1 GENERAL
This Section applies to Design-Bid-Build projects at the Portsmouth Naval Shipyard and PWD ME AOR Facilities.
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan ; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes the construction of a desalination facility within the area of Building 242 and Building 72 and includes a new intake at Building 242 and a new discharge at Berth 4.
This project will repurpose the Pump Room 5 located in Building 72 to be modified and dedicated to the new desalination facility.
The desalination system will employ a multi-step treatment process to provide feed water for boiler and cooling water in Building 72. In the first treatment step of the process, seawater will be pumped through an ultrafiltration (UF) membrane process. This initial unit process is a prefiltration step before Reverse Osmosis (RO) desalination is used.
Treated water (permeate) from the UF will be pumped through a two stage, high pressure reverse osmosis membrane process.
The major components of this project include:
a. A new intake at Building 242.
b. A new desalination intake pump station within Building 242 that will be installed adjacent to the existing Auxiliary Sea Water (ASW) pump station. The desalination intake pump station will function independently (electrically and hydraulically) of the ASW pump station.
c. A new piping system that connects Building 242 and Building 72. This piping system will convey raw water from Building 242 and Building
72. New conduits for electrical power and signal wires will also be included.
d. A new desalination facility primarily placed within:
(1) The Pump Room S in Building 72
SECTION 01 11 00.00 22 Page 1
(2) A new tank pad adjacent to the Pump Room S (Tank Pad)
(3) A new Pump house located on the tank pad (BWRO / Room B)
(4) A new chemical storage room, Room M
e. A new room located near the condensate tank (Room M)
f. A new stair system in the Pump Room S.
g. A new piping system that connects Building 72 to the outfall at Berth
4. This piping system will convey concentrated brine raw water from Building 72 to the outfall. This piping system will also discharge non-saline water used for backwash in the desalination facility operations.
h. A new outfall at Berth 4.
i. Partial or complete abandonment of the Saltwater Tunnel (as bid options).
j. All associated electrical and process control equipment.
1.2.2 Project Sequencing Requirements
The following restrictions apply to the sequencing of the work:
a. Existing furniture and equipment to remain in construction areas (e.g.
office furniture, etc.) must be protected from dust, debris, demolition, and construction activities to ensure the items are not damaged and are useable at project completion. Temporary partitions must be full height. Provide daily cleanup as specified in Section 02 41 00 DEMOLITION and as directed by the Contracting Officer.
b. The building will be occupied by Government personnel adjacent to and within work areas during the project. Buildings 72 and 242 are 24/7 production facilities. Equipment and personnel must be protected at all times.
c. Construction sequencing and phasing plans have been developed in coordination with the Government and are provided within the drawing set. The construction sequencing/phasing plans provide proposed construction sequence strategies. Development of an independent construction phasing plan and construction schedule is the responsibility of the Contractor and shall be prepared in coordination with the Contracting Officer. The independent construction phasing plan and construction schedule shall be prepared to avoid impacting production operations.
d. During the phased work of this project, occupied portions of Buildings 242 and 72 must remain fully operational including, but not limited to, the following utilities: plumbing, heat, ventilation, air conditioning, fire suppression, fire alarm, electrical power, communications systems, and security systems.
e. Buildings on the Portsmouth Naval Shipyard, including Building 72, are historic facilities and require special coordination to have limited impact on the historic fabric and character defining features of the structure. Work must comply with the SECRETARY OF THE INTERIOR'S
SECTION 01 11 00.00 22 Page 2
STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES.
f. The Government may require and will provide escorts for the Contractor while working inside all buildings. Coordinate with the Contracting Officer to confirm which buildings require escorts and to schedule escorts. The project schedule developed in accordance with Section 01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS) will be used to coordinate required escorts. Notify Contracting Officer weekly of escorts required for the subsequent three weeks of work.
1.2.3 Location
The work is located at the Portsmouth Naval Shipyard in Building 72 and Building 242. Note the "Project Site" is the specific area of construction within the limits of work as defined by the contract documents.
1.3 OCCUPANCY OF PREMISES
All buildings will be occupied during performance of work under this Contract. At a minimum, identify all building occupancies three weeks in advance on the 3-week look-ahead schedule.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. While the building is occupied, life safety measures and access to egress components must be maintained. Provide temporary egress lighting, emergency lighting, fire alarm, and fire protection systems along paths of egress.
1.4 EXISTING WORK
Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 LOCATION OF UNDERGROUND UTILITIES
Verify location of underground utilities in accordance with Section
01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME).
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least fourteen (14) working days prior to starting excavation work. See Section 01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME) and attachments for Dig Safe requirements.
1.6 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located on the Portsmouth Naval Shipyard.
Provide a salvage plan , listing material and equipment to be salvaged, and
SECTION 01 11 00.00 22 Page 3 their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
1.7 BENEFICIAL OCCUPANCY REQUIREMENTS
All work elements identified as "Required for Facility Delivery (BOD)" included in Section 01 30 00.00 22 ADMINISTRATIVE REQUIREMENTS (PWD ME) Appendix A must be completed and accepted by the Contractor's QC Manager prior to submitting the form to the NAVFAC PWD ME Construction Manager for NAVFAC PWD ME signatures.
The Contractor must submit the completed NRZ Checklist with the required documentation no later than ten (10) working days prior to requesting the Government take Beneficial Occupancy.
Failure of the contractor to verify all work and provide the required documentation will delay the processing of acceptance of Beneficial Occupancy.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00.00 22 Page 4
SECTION 01 14 00.00 22
WORK RESTRICTIONS (PWD ME)
11/22, CHG 4: 02/25
PART 1 GENERAL
This Section applies to Design-Bid-Build and Design-Build projects at the Portsmouth Naval Shipyard only.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 241 (2022) Standard for Safeguarding Construction, Alteration, and Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
21 CFR 1040 Performance Standards for Light-Emitting Products
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel ; G
Flooding Mitigation Strategy Plan
SD-06 Test Reports
PWD ME Contractor Weekend Worklist
CRITICAL INFRASTRUCTURE RISK ANALYSIS (RA) AND RISK MITIGATION
PLAN (RMP) ; G
Outage Request s; G
1.3 SPECIAL SCHEDULING REQUIREMENTS (PNSY)
a. Work requiring interruption (i.e., outage) of any Portsmouth Naval Shipyard service or thoroughfare, including but not limited to
SECTION 01 14 00.00 22 Page 1 roadways, parking spaces, crane rail, railroads, and utility services, requires coordination around and submission of an outage package prior to commencement of the work. Outage packages must be submitted to the Contracting Officer a minimum of 15 calendar days prior to the desired date of interruption, unless otherwise specified. See paragraph FACILITY/UTILITY/SERVICE OUTAGE REQUIREMENTS herein for additional details and requirements.
b. Work in certain areas and/or buildings may requiring continuous escorting by a Government employee. See Section 01 11 00.00 22 SUMMARY OF WORK (PWD ME) for further information on Government escorts.
c. Coordinate the work with the sequencing/phasing requirements outlined in Section 01 11 00.00 22 SUMMARY OF WORK (PWD ME) within paragraph
PROJECT SEQUENCING REQUIREMENTS.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES (PNSY)
1.4.1 Portsmouth Naval Shipyard Regulations
Notify the Contracting Officer 21 calendar days in advance for any wide loads. Additional access limitations and coordination with the Contracting Officer may apply.
Ensure that personnel employed on the Portsmouth Naval Shipyard become familiar with and obey Portsmouth Naval Shipyard regulations including safety, fire, traffic, and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE). Do not enter restricted areas unless required to do so and until cleared for such entry.
Ensure all Contractor equipment, including delivery vehicles, are clearly identified with their company name.
1.4.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and Subcontractors including addresses and telephone numbers for use in the event of an emergency at least 15 days prior to the preconstruction meeting. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.1.2 Additional Personnel Requirements
1.4.1.1.1 General Construction and Finish Work
General construction and finish work on the Portsmouth Naval Shipyard must be performed by U.S. firms using U.S. citizens. General construction includes construction activities such as building sitework, utilities, foundations, structure, and enclosure or shell, including doors, windows, and facade work. Finish Work includes construction activities such as insulation, floor, partition, and ceiling systems; cabinet work; conveyor systems; specialties; building furnishings, fixtures, and equipment; and mechanical and electrical services and equipment including those specialized for fire protection, security, communication, control, energy conservation, safety, comfort, convenience, and similar purposes.
SECTION 01 14 00.00 22 Page 2
1.4.1.1.2 Electronic Security Systems Equipment
Electronic Security Systems equipment such as processing control units, workstations, field panels, sensors, high security locks, card readers, cable installation, and system programming, testing and training must be performed by U.S. companies using U.S. citizens who have been subjected to a trustworthiness determination.
1.4.1.2 Installation Access
a. Obtain access to the Portsmouth Naval Shipyard through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/.
No fees are associated with obtaining a DBIDS credential.
1.4.1.2.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/.
PNS has an online appointment system. Appointments may be made using https://kiosk.na4.qless.com/kiosk/app/home/191.
Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the Portsmouth Naval Shipyard's Pass and Identification/Security Office representative.
b. Present two (2) forms of valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the Portsmouth Naval Shipyard's Pass and Identification/Security Office representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/.
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
All Contractors who possess a Commercial Access Control (CAC) System Card are also required to submit an access request (5512) to support a valid purpose to be on the Portsmouth Naval Shipyard. A second form of valid ID may also be required, if requested, upon arrival at the Portsmouth Naval Shipyard's Entrance Gate. All personnel without CAC cards will need two
(2) forms of approved identification for access to the Portsmouth Naval Shipyard.
1.4.1.2.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must
SECTION 01 14 00.00 22 Page 3 continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
1.4.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credential.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security to the Portsmouth Naval Shipyard or anyone therein.
c. Prime contractor is responsible for recovering any badges that are no longer required, including from workers who are no longer employed by prime or subs, and immediately turning badges into the Pass/ID Office.
Failure to maintain accountability of issued badges could cause delays in future badge requests. Contracts are warned that badges are checked for currency and any badge not used within 30 days will be disabled.
1.5 PORTSMOUTH NAVAL SHIPYARD (PNSY) REGULATIONS
1.5.1 Radiological
1.5.1.1 Radiological Indoctrination (PNSY)
All personnel working at the Portsmouth Naval Shipyard are required to view a 15 minute video briefing on radiological postings and controls in use at the Portsmouth Naval Shipyard. The briefing will be given at the Pass Office prior to issue of security badges and vehicle passes.
Any employee who disregards, alters, moves, or otherwise tampers with a radiological posting, or who disobeys a radiological instruction, may be removed from the Portsmouth Naval Shipyard and denied future access.
1.5.1.2 Yellow Materials (PNSY)
Do not use yellow or orange-yellow colored materials at the Portsmouth Naval Shipyard for the following purposes: Protective clothing, hoods, sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding, identification marks on tools, boundary markers, ribbons, vent ducts, temporary erosion control devices, survey ribbon, etc.
Contact the Contracting Officer for a list of yellow items that have been approved for use on the Portsmouth Naval Shipyard. Dispose of generated yellow colored waste off of the Portsmouth Naval Shipyard. Portsmouth
SECTION 01 14 00.00 22 Page 4
Naval Shipyard refuse containers must not be used for disposal of yellow colored waste materials. Yellow colored items such as described above are of special significance within the Portsmouth Naval Shipyard and are subject to strict controls. Yellow colored Contract generated debris must be bagged in non-translucent containers, and promptly removed from the Portsmouth Naval Shipyard.
1.5.1.3 Smoke Detectors (PNSY)
Ionization type smoke detectors and duct smoke detectors contain radioactive material and are prohibited from use on the Portsmouth Naval Shipyard. Photoelectric smoke detectors are the only type authorized for use on the Portsmouth Naval Shipyard.
1.5.1.4 Radioactive Sources (PNSY)
All Contracts involving radiation generating devices must conform to the requirements listed in Section 01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME) and U.S. Army Corps of Engineers Safety Manual
EM 385-1-1 .
1.5.2 Laser Control
Comply with laser safety requirements under 21 CFR 1040 and ANSI Z 136.1-1986 for any work under this Contract utilizing lasers.
1.5.3 Energy Conservation
In cooperation with Government representatives, participate in an active program directed toward the efficient use of energy.
1.5.4 Fire Prevention (PNSY)
Require employees to become familiar with fire prevention regulations within the Portsmouth Naval Shipyard to include the proper method of turning in a fire alarm, storage of flammable and combustible materials, and control of combustible waste and trash. Any "Hot Work" (i.e. welding or cutting) requires a Hot Work Permit prior to commencing such work.
Refer to paragraph HOT WORK PERMIT in Section 01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME) for the requirements.
1.5.5 Identification and Control of Seamed (Welded) Pipe and Tubing (PNSY)
Submarine Safety regulations prohibit the use of seamed (welded) pipe or tubing within the Portsmouth Naval Shipyard, unless such pipe or tubing is identified and controlled so as to prevent its inadvertent substitution for seamless pipe or tubing. The following requirements apply and will be strictly enforced:
Any seamed (welded) copper-nickel, carbon steel, carbon-moly steel, stainless steel, nickel-chromium-iron alloy, or nickel-copper pipe or tubing intended for use on the Portsmouth Naval Shipyard must be identified in the following manner PRIOR TO DELIVERY TO THE PORTSMOUTH
NAVAL SHIPYARD:
Use a lead-free white paint, to mark a 24-inch long stripe and the word "welded" alternately along the entire length of the pipe or tubing. Apply a one-half inch wide stripe unless the size of the pipe or tubing requires use of a narrower stripe.
SECTION 01 14 00.00 22 Page 5
Maintain positive control over seamed pipe or tubing until worked into place or removed from the Portsmouth Naval Shipyard.
Seamless pipe or tubing may be substituted for any seamed (welded) pipe or tubing specified in the technical specifications.
The above requirements do not apply to square or rectangular tubing, copper or brass pipe or tubing, or to piping or tubing which has been incorporated into equipment or fixtures prior to delivery to the Portsmouth Naval Shipyard.
1.5.6 Pesticide and Herbicide Control
Do not apply pesticides nor herbicides unless specifically required by this Contract. Where application of pesticides or herbicides is required, provide the submittals required by the specification and obtain written approval prior to any application. The Contracting Officer will be required to review and approve pesticides or herbicides submittals.
1.5.7 Smoking Policy
In accordance with NAVFAC policy, smoking is prohibited within and outside of all buildings on the Portsmouth Naval Shipyard, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and subject to fines. Smoking is not permitted within 20 feet of air intakes, doorways, or windows.
1.5.8 Portal Crane Clearance Zone (PNSY)
Ensure there is no construction debris or materials within the Crane Clearance Zone (e.g., between the painted yellow lines on each side of the rail) unless a rail outage/securement has been approved.
1.6 WORKING HOURS (PNSY)
Regular working hours will consist of a period between 7 AM and 11 PM, Monday through Friday, and 7 AM Saturday through 11 PM Sunday. Federal holidays will be treated as weekend days, and regular working hours will be between 7 AM and 11 PM. The regular working hours must be confirmed with the Contracting Officer.
Working on Weekends/Federal Holidays: The Contractor must submit the PWD ME Contractor Weekend Worklist to the Contracting Officer by 12 PM on the Wednesday prior to the requested work weekend/Federal Holiday. If the Contractor fails to submit the Weekend Worklist, there are no guarantees that the Contractor will be allowed to work.
1.6.1 Work Outside Regular Hours (PNSY)
Work outside regular working hours requires Contracting Officer approval.
Provide written requests fifteen (15) calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress and to allow scheduling of full time escorts in the building(s) if required. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
SECTION 01 14 00.00 22 Page 6
As part of the requests, provide the specific dates, hours, location(s), type(s) of work to be performed, Contract number, and project title.
Based on the justification provided, the Contracting Officer may approve work outside regular hours.
1.7 WORK IN OCCUPIED AND EXISTING BUILDING(S)
The Contractor can expect to be working in existing buildings which are occupied. These buildings include, but are not limited to, Buildings 72 and Building 242. The existing buildings and its contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer. Provide dust covers or protective enclosures to protect existing work that remains, and Government material during the construction period. Relocate moveable furniture away from the Contractor's working area(s) as required to perform the work; protect the furniture; and replace the furniture in its in original location(s) upon completion of the work. Leave attached equipment in place and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work. If determined necessary by the Contracting Officer, the Government will remove and relocate other Government property in the areas of the buildings scheduled to receive work. After providing written notification, allow 15 calendar days for the Government to relocate Government property.
1.8 FACILITY/UTILITY/SERVICE OUTAGE REQUIREMENTS
Outages are required when normal system operation is or could be impacted for any Portsmouth Naval Shipyard service or thoroughfare, including but not limited to roadways, parking spaces, crane rail, railroads, and utility services (i.e., water, sanitary sewer, storm sewer, electric service, fire alarm). This situation can occur when inspecting, repairing, or upgrading utility systems and equipment, buildings, and structures (facilities). These outages may affect one or several buildings, facilities, production processes, and/or geographical locations. Although most outage requirements are addressed in this section, the entire specification must be reviewed for additional outage requirements.
1.8.1 Operation of Portsmouth Naval Shipyard Utilities/Services
The Contractor shall make utility/service cut overs after normal working hours or on weekends/Federal holidays unless otherwise specified/stated on the contract drawings or approved by the Contracting Officer. This cut over time includes time for deactivation and reactivation. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS (PNSY) herein.
This includes interruption/outage to water, sanitary sewer, storm sewer, telecommunication services (telephone, internet, radio), electric service, air conditioning, heating, fire alarm, compressed air, and other utility services. Anticipated costs must be included in the bid.
The Contractor shall ensure that new utilities/service are complete, except for the connection, before interruption existing services.
The Contractor must not operate nor disturb the setting of control devices in the Portsmouth Naval Shipyard's utilities/service systems, including water, sewer, electrical, air and steam services, except as otherwise noted herein. The Government will operate 480V and 15KV utility systems for the purposes of securing the systems. The Contractor must notify the Contracting Officer giving 15 calendar days' notice when such operation is
SECTION 01 14 00.00 22 Page 7 required. The Contractor is responsible for lockout/tagout and grounding;
refer to the requirements in Section 01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME). The Contractor shall perform updates to control settings required as per the scope of work.
Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain.
1.8.2 Outage Request Requirements
The outage request process includes development of an outage plan and package, coordination meetings to promote Shipyard and stakeholder understanding and alignment on outages, submittal of the outage request package, and Government approval.
Outages involving Critical Shipyard Infrastructure require a specific Risk Analysis and Risk Mitigation Plan as outlined in paragraph CRITICAL SHIPYARD INFRASTRUCTURE REQUIREMENTS. The Critical Infrastructure Risk Analysis and Risk Mitigation Plan must be submitted to the Contracting Officer for review and approval 15 calendar days prior to the submission of the outage request.
Significant outages required to execute the work may be outlined in the Contract Documents. The Contract Documents do not include all the outages that will be required to support the execution of all work. The Contractor is responsible for identifying all required outages and for all outage request packages.
All outage request packages must be submitted to the Contracting Officer, who will then submit to the Back Shift Representative for final stakeholder concurrence. Submission of an outage request package without prior coordination efforts with the Government, including but not limited to the Outage Coordination Meeting, may result in rejection/denial of the outage request. Any outage requests denied due to incomplete stakeholder alignment or information required to support the requested outages will not be justification for a delay claim. Outage request packages must be submitted at least 15 calendar days in advance of the target outage date.
The Contracting Officer will provide the Outage Request Form and the local Outage Instruction.
The Outage Coordination Meetings referenced below are intended to provide a forum to review the outage plan and information required to support outage reviews.
At a minimum, each outage request package must include the following:
1) Specific location/system requiring the outage (i.e., utility, roadway, parking space, crane rail).
2) Duration and timing of outage.
3) Scope of work required for the outage.
4) Outage work plan, including organization responsible for each step to accomplish the outage.
5) Adequate sketches/drawings that clearly depict location, SECTION 01 14 00.00 22 Page 8…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .