00 01 15_RevAmend08.pdf

PDF 67 KB Posted

Attached to
P1112 B72 Resiliency Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, Maine
Solicitation number
N4008526R0005
Issued by

About this file

This document is a List of Drawings for the P-1112 B72 Resiliency Improvement project under Delivery Order N40085-23-F-4245. The list encompasses approximately 250 contract drawings organized by discipline and revised via Amendment 08 as of August 14, 2023. The drawings cover general/administrative requirements, civil/site work, architectural, structural, fire protection, mechanical, process/operational, and electrical systems. Key drawing categories include geotechnical boring logs, site plans and utility layouts, demolition and proposed floor plans, building sections and details, mechanical systems and sequences, process flow diagrams and instrumentation, fire protection and alarm systems, and electrical power and grounding plans. Numerous drawings reference specific bid options (Options 2, 4, 5, 6, 8, 9, 11, and 13) indicating alternate scope configurations. Multiple drawings address pump rooms, intake screens, outfall systems, and water treatment process equipment. The document includes demolition plans, hazardous materials documentation, and coordination schedules reflecting a substantial facility rehabilitation or upgrade project involving structural, mechanical, and process system modifications.

View the file

Other files

File Type Posted
N4008526R0005 Amendment 0010.pdf PDF
N4008526R0005 Amendment 0009.pdf PDF
Attachment H - Price Proposal Form Revision 2.docx DOCX document
01 11 00.00 22_RevAmend08.pdf PDF
GC100A_Milestones and Coordination Requirements_20260528.pdf PDF
N4008526R0005 Amendment 0008.pdf PDF
A-400 - ENLARGED PLAN -PUMP ROOMS B AND S AND C.pdf PDF
075 S-102 Rev. 1 P-1112.pdf PDF
094 S-308 Rev. 1 P-1112.pdf PDF
A-450 - ENLARGED PLAN DETAILS.pdf PDF
101 S-505 Rev. 1 P-1112.pdf PDF
102 S-506 Rev. 1 P-1112.pdf PDF
Lifting_Eye_Comp_Cut_Sheet_LIFTMAX-PEP-00100 (050726).pdf PDF
098 S-502 Rev. 1 P-1112.pdf PDF
P-1112 Drawing Updates 2026-04-29.pdf PDF
072 S-001 Rev. 1 P-1112.pdf PDF
08 53 00.pdf PDF
41 22 13.14.pdf PDF
N4008526R0005 Amendment 0006.pdf PDF
N4008526R0005 Amendment 0005.pdf PDF
PPI 200 - 32 17 23.pdf PDF
Option 13 - Accessory Structure_REV2.pdf PDF
Attachment H - Price Proposal Form Revised.docx DOCX document
PPI 203 - COMNAVREGMIDLANTINST_11320_11B.pdf PDF
PPIs 181.182.183.208 - Schedule of Special Inspections.pdf PDF
PPI 137 - 46 30 00 Attachments 1 to 4.pdf PDF
PPI 91 - Sheet 7 of 226 - H-101.pdf PDF
PPI 166 - Air Valve Detail.pdf PDF
PPI 98 - V-104 Archaeology Area Outlined.pdf PDF
PPI 198 - 26 56 00.pdf PDF
A-500 - WALL SECTIONS.pdf PDF
N4008526R0005 Amendment 0004.pdf PDF
N4008526R0005 Amendment 0003.pdf PDF
P-1112 B72 Resiliency Improvement Site Visit Log.pdf PDF
N4008526R0005 Amendment 0002.pdf PDF
N4008526R0005 Amendment 0001.pdf PDF
DBIDS 5512 Form.pdf PDF
Memorandum - Bidding Notes P-1112.pdf PDF
P-1112 Specifications.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment D - Past Performance Questionnaire.docx DOCX document
P-1112 Drawings.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
DBIDS 5500 Form.docx DOCX document
Attachment H - Price Proposal Form.docx DOCX document
Attachment G - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
Attachment C - Construction Experience Data Sheet.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment A - PPI Log Template.xlsx XLSX spreadsheet
N4008526R0005.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-1112 B72 Resiliency Improvement Delivery Order N40085-23-F-4245

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/ 11, CHG 1: 08/ 14

( Revi sed vi a Amendment 08)

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

Sheet Number PWD-MENO NAVFAC Dwg No. Drawing Title

G-001 FAC-YR-NUM ####### COVER SHEET

G-002 FAC-YR-NUM ####### DRAWING LIST PART 1 OF 2

G-003 FAC-YR-NUM ####### DRAWING LIST PART 2 OF 2

G-004 FAC-YR-NUM ####### CODE SUMMARY & LIFE SAFETY NOTES

G-005 FAC-YR-NUM ####### LIFE SAFETY FLOOR PLAN

G-006 FAC-YR-NUM ####### OUTAGE SEQUENCING AND MITIGATION PLAN

H-101 FAC-YR-NUM ####### HAZARDOUS MATERIALS PLAN 1 OF 2

H-102 FAC-YR-NUM ####### HAZARDOUS MATERIALS PLAN 2 OF 2

B-001 FAC-YR-NUM ####### GEOTECHNICAL NOTES AND SYMBOLS

B-101 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS PART 1 OF 3

B-102 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS PART 2 OF 3

B-103 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS PART 3 OF 3

B-104 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS - BID OPTION

C-001 FAC-YR-NUM ####### CIVIL GENERAL NOTES

C-002 FAC-YR-NUM ####### POTHOLE INFORMATION

V-101 FAC-YR-NUM ####### EXISTING SURVEY OVERALL SITE PLAN

00 01 15 Page 1

V-102 FAC-YR-NUM ####### EXISTING SURVEY UNDERGROUND UTILITIES

PLAN

V-103 FAC-YR-NUM ####### EXISTING SURVEY ABOVE GROUND UTILITIES

PLAN

V-104 FAC-YR-NUM ####### HISTORICAL QUAY WALLS AND BUILDING

FOUNDATION PLANS

GC100 FAC-YR-NUM ####### GENERAL SITE AREAS

GC100A FAC-YR-NUM ####### MILESTONES AND COORDINATION

REQUIREMENTS ( Added Amendment 08)

C-100 FAC-YR-NUM ####### SOIL EROSION AND SEDIMENT CONTROL PLAN

C-101 FAC-YR-NUM ####### SITE PLAN

C-102 FAC-YR-NUM ####### UTILITY PLAN

C-103 FAC-YR-NUM ####### GRADING AND DRAINAGE PLAN

C-104 FAC-YR-NUM ####### EXISTING CONDITIONS SITE PLAN - BID

OPTIONS

C-105 FAC-YR-NUM ####### TUNNEL ABANDONMENT PART 1 OF 3 - BID

OPTION 4

C-106 FAC-YR-NUM ####### TUNNEL ABANDONMENT PART 2 OF 3 - BID

OPTION 5

C-107 FAC-YR-NUM ####### TUNNEL ABANDONMENT PART 3 OF 3 - BID

OPTION 6

C-108 FAC-YR-NUM ####### OPTION 13: ACCESSORY STRUCTURE

C-301 FAC-YR-NUM ####### CIVIL PROFILE - B242 TO B72 AND B72

SEWER

C-302 FAC-YR-NUM ####### CIVIL PROFILE - QUAY WALL TO BUILDING

B72

C-303 FAC-YR-NUM ####### CIVIL PROFILE - DMH 54-A1 TO DMH 8-61

- BID OPTION 6

C-304 FAC-YR-NUM ####### CIVIL PROFILE - INTAKE TO B242

CT101 FAC-YR-NUM ####### FIRE TRUCK TURNING MOVEMENT SITE PLAN

C-501 FAC-YR-NUM ####### CIVIL DETAILS PART 1 OF 4

C-502 FAC-YR-NUM ####### CIVIL DETAILS PART 2 OF 4

C-503 FAC-YR-NUM ####### CIVIL DETAILS PART 3 OF 4

C-504 FAC-YR-NUM ####### CIVIL DETAILS PART 4 OF 4

CG101 FAC-YR-NUM ####### DRY DOCK 2 LAYDOWN PLAN - BID OPTION 9

CG102 FAC-YR-NUM ####### DRY DOCK 2 TEMPORARY OUTAGE SYSTEM

SITE PLAN - BID OPTION 9

CG501 FAC-YR-NUM ####### DRY DOCK 2 TEMPORARY OUTAGE & CIVIL

DETAILS - BID OPTION 9

CG601 FAC-YR-NUM ####### DRY DOCK 2 TEMPORARY PIPING SYSTEM

SCHEMATIC - BID OPTION 9

A-000 FAC-YR-NUM ####### GENERAL PROJECT NOTES

00 01 15 Page 2

AD001 FAC-YR-NUM ####### DEMOLITION NOTES

AD101 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN

AD102 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN - BID OPTION 8

A-001 FAC-YR-NUM ####### ABBREVIATIONS AND SYMBOLS

A-002 FAC-YR-NUM ####### GENERAL NOTES AND LEGENDS

A-003 FAC-YR-NUM ####### PARTITION, CEILING AND ROOF TYPES

A-101 FAC-YR-NUM ####### PROPOSED FLOOR PLAN - PUMP ROOMS B &

S, ROOM C

A-102 FAC-YR-NUM ####### PROPOSED FLOOR PLAN - BID OPTION 8

A-103 FAC-YR-NUM ####### PROPOSED ROOF PLAN

A-200 FAC-YR-NUM ####### EXTERIOR ELEVATIONS

A-201 FAC-YR-NUM ####### EXTERIOR ELEVATIONS - BID OPTION 8

A-231 FAC-YR-NUM ####### AXONONOMETRIC VIEWS

A-300 FAC-YR-NUM ####### BUILDING SECTIONS PART 1 OF 2

A-301 FAC-YR-NUM ####### BUILDING SECTIONS PART 2 OF 2

A-400 FAC-YR-NUM ####### ENLARGED PLAN -PUMP ROOMS B & S, ROOMS

C & M

A-401 FAC-YR-NUM ####### ENLARGED PLAN - BID OPTION 11

A-402 FAC-YR-NUM ####### PLAN & ELEVATIONS - BID OPTION 13

A-403 FAC-YR-NUM ####### WALL SECTIONS & DETAILS - BID OPTION 13

A-410 FAC-YR-NUM ####### ENLARGED RCP -PUMP ROOMS B & S, ROOMS

C & M

A-450 FAC-YR-NUM ####### ENLARGED PLAN DETAILS

A-500 FAC-YR-NUM ####### WALL SECTIONS

A-501 FAC-YR-NUM ####### DOOR DETAILS

A-502 FAC-YR-NUM ####### ROOF DETAILS PART 1 OF 2

A-503 FAC-YR-NUM ####### ROOF DETAILS PART 2 OF 2

A-600 FAC-YR-NUM ####### INTERIOR ELEVATIONS PART 1 OF 2

A-601 FAC-YR-NUM ####### INTERIOR ELEVATIONS PART 2 OF 2

A-602 FAC-YR-NUM ####### DETAILS

A-801 FAC-YR-NUM ####### DOOR DETAILS & SCHEDULE

S-001 FAC-YR-NUM ####### GENERAL NOTES PART 1 OF 2

00 01 15 Page 3

S-002 FAC-YR-NUM ####### GENERAL NOTES PART 2 OF 2

S-101 FAC-YR-NUM ####### OVERALL PLAN - B72

S-102 FAC-YR-NUM ####### FLOOR PLAN - PUMP ROOM S

S-103 FAC-YR-NUM ####### FLOOR PLAN - UF TANK AND SUCTION WELL

S-104 FAC-YR-NUM ####### FOUNDATION PLAN - PUMP ROOM B ADDITION

S-105 FAC-YR-NUM ####### FOUNDATION PLAN - PUMP ROOM B

ADDITION, BREAK TANK

S-106 FAC-YR-NUM ####### FRAMING PLAN - PUMP ROOM B ADDITION

S-107 FAC-YR-NUM ####### ROOF FRAMING PLAN - PUMP ROOM S

S-108 FAC-YR-NUM ####### ROOF FRAMING PLAN - ROOM M

S-110 FAC-YR-NUM ####### FRAMING PLAN BID OPTIONS - PUMP ROOM S

S-121 FAC-YR-NUM ####### FLOOR PLAN - B242 WET WELL

S-122 FAC-YR-NUM ####### FLOOR PLAN - PUMP ROOM A

S-123 FAC-YR-NUM ####### FOUNDATION PLAN - BID OPTION 13

S-124 FAC-YR-NUM ####### ROOF FRAMING PLAN - PUMP ROOM A

S-301 FAC-YR-NUM ####### SECTIONS PART 1 OF 10

S-302 FAC-YR-NUM ####### SECTIONS PART 2 OF 10

S-303 FAC-YR-NUM ####### SECTIONS PART 3 OF 10

S-304 FAC-YR-NUM ####### SECTIONS PART 4 OF 10

S-305 FAC-YR-NUM ####### SECTIONS PART 5 OF 10

S-306 FAC-YR-NUM ####### SECTIONS PART 6 OF 10

S-307 FAC-YR-NUM ####### SECTIONS PART 7 OF 10

S-308 FAC-YR-NUM ####### SECTIONS PART 8 OF 10

S-309 FAC-YR-NUM ####### SECTIONS PART 9 OF 10

S-310 FAC-YR-NUM ####### SECTIONS PART 10 OF 10

S-501 FAC-YR-NUM ####### DETAILS PART 1 OF 6 - B72

S-502 FAC-YR-NUM ####### DETAILS PART 2 OF 6 - B72

S-503 FAC-YR-NUM ####### DETAILS PART 3 OF 6 - B242

S-504 FAC-YR-NUM ####### DETAILS PART 4 OF 6 - B242

S-505 FAC-YR-NUM ####### DETAILS PART 5 OF 6 - B72

S-506 FAC-YR-NUM ####### DETAILS PART 6 OF 6 - B72

00 01 15 Page 4

SD101 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN - PUMP ROOM S

SD102 FAC-YR-NUM ####### DEMOLITION ROOF FRAMING PLAN - PUMP

ROOM S

SD103 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN - PUMP ROOM A

SD104 FAC-YR-NUM ####### DEMOLITION ROOF FRAMING PLAN - PUMP

ROOM A

SD301 FAC-YR-NUM ####### DEMOLITION SECTIONS PART 1 OF 2

SD302 FAC-YR-NUM ####### DEMOLITION SECTIONS PART 2 OF 2

F-001 FAC-YR-NUM ####### FIRE PROTECTION NOTES AND DETAILS

FA101 FAC-YR-NUM ####### FIRE ALARM FLOOR PLAN

FX101 FAC-YR-NUM ####### FIRE SPRINKLER FLOOR PLAN - PUMP ROOM S

FX102 FAC-YR-NUM ####### FIRE SPRINKLER FLOOR PLAN - PUMP ROOM C

FX500 FAC-YR-NUM ####### FIRE SPRINKLER DETAILS

M-001 FAC-YR-NUM ####### MECHANICAL SYMBOLS & ABBREVIATIONS

M-002 FAC-YR-NUM ####### MECHANICAL ABBREVIATIONS & NOTES

MD101 FAC-YR-NUM ####### OVERALL DEMOLITION PLAN - B72

MD102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C DEMOLITION PLAN

MD103 FAC-YR-NUM ####### ROOM M DEMOLITION PLAN - BID OPTION 8

MD301 FAC-YR-NUM ####### PUMP ROOM S DEMOLITION SECTIONS

M-101 FAC-YR-NUM ####### OVERALL PROPOSED WORK PLAN - B72

M-102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C PROPOSED WORK PLAN

M-103 FAC-YR-NUM ####### ROOM M & PUMP ROOM B PROPOSED WORK PLAN

M-104 FAC-YR-NUM ####### PUMP ROOM S PROPOSED ROOF PLAN

MP101 FAC-YR-NUM ####### OVERALL BASEMENT MECHANICAL PROPOSED

PIPING PLAN - B72

MP102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C PROPOSED PIPING

PLAN

MP400 FAC-YR-NUM ####### ENLARGED PROPOSED PIPING PLANS

M-501 FAC-YR-NUM ####### MECHANICAL DETAILS PART 1 OF 3

M-502 FAC-YR-NUM ####### MECHANICAL DETAILS PART 2 OF 3

M-503 FAC-YR-NUM ####### MECHANICAL DETAILS PART 3 OF 3

M-600 FAC-YR-NUM ####### MECHANICAL SCHEDULES

00 01 15 Page 5

M-601 FAC-YR-NUM ####### MECHANICAL AIRFLOW DIAGRAM

M-602 FAC-YR-NUM ####### NORTH TOWER TIE IN DIAGRAM - BID

OPTION 2

M-603 FAC-YR-NUM ####### EXISTING SOUTH TOWER TIE IN DIAGRAM -

BID OPTION 2

M-700 FAC-YR-NUM ####### MECHANICAL SEQUENCE OF OPERATIONS

D-001 FAC-YR-NUM ####### PROCESS NOTES , ABBREVIATIONS, AND

LEGEND

DD101 FAC-YR-NUM ####### DEMOLITION PLAN PUMP ROOM A

D-101 FAC-YR-NUM ####### PUMP ROOM A WET WELL PLAN, SECTION &

DETAIL

D-102 FAC-YR-NUM ####### PUMP ROOM A PROCESS FLOOR PLAN

D-103 FAC-YR-NUM ####### OVERALL PROCESS PLAN - B72

D-104 FAC-YR-NUM ####### PUMP ROOM S PLAN PART 1 OF 3

D-105 FAC-YR-NUM ####### PUMP ROOM S PLAN PART 2 OF 3

D-106 FAC-YR-NUM ####### PUMP ROOM S PLAN PART 3 OF 3

D-107 FAC-YR-NUM ####### UF BREAK TANK PLAN

D-108 FAC-YR-NUM ####### PUMP ROOM B PLAN PART 1 OF 2

D-109 FAC-YR-NUM ####### PUMP ROOM B PLAN PART 2 OF 2

D-110 FAC-YR-NUM ####### ROOM C PLAN PART 1 OF 2

D-111 FAC-YR-NUM ####### ROOM C PLAN PART 2 OF 2

D-112 FAC-YR-NUM ####### BASEMENT PLAN AND SECTION

D-113 FAC-YR-NUM ####### CONDENSATE TANK PLAN

D-301 FAC-YR-NUM ####### PUMP ROOM A SECTIONS

D-401 FAC-YR-NUM ####### INTAKE SCREEN PLAN, SECTION, AND

DETAILS

D-402 FAC-YR-NUM ####### INTAKE SCREEN FENDER PLAN AND SECTIONS

D-403 FAC-YR-NUM ####### PUMP ROOM S ENLARGED PLAN PART 1 OF 3

D-404 FAC-YR-NUM ####### PUMP ROOM S ENLARGED PLAN PART 2 OF 3

D-405 FAC-YR-NUM ####### PUMP ROOM S ENLARGED PLAN PART 3 OF 3

D-406 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 1 OF 6

D-407 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 2 OF 6

D-408 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 3 OF 6

D-409 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 4 OF 6

00 01 15 Page 6

D-410 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 5 OF 6

D-411 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 6 OF 6

D-412 FAC-YR-NUM ####### UF BREAK TANK SECTION

D-413 FAC-YR-NUM ####### PUMP ROOM B ENLARGED PLANS PART 1 OF 2

D-414 FAC-YR-NUM ####### PUMP ROOM B ENLARGED PLANS PART 2 OF 2

D-415 FAC-YR-NUM ####### PUMP ROOM B SECTIONS PART 1 OF 3

D-416 FAC-YR-NUM ####### PUMP ROOM B SECTIONS PART 2 OF 3

D-417 FAC-YR-NUM ####### PUMP ROOM B SECTIONS PART 3 OF 3

D-418 FAC-YR-NUM ####### ROOM C SECTIONS PART 1 OF 2

D-419 FAC-YR-NUM ####### ROOM C SECTIONS PART 2 OF 2

D-420 FAC-YR-NUM ####### OUTFALL AND FENDER PLAN AND SECTIONS

D-501 FAC-YR-NUM ####### DETAILS PART 1 OF 5

D-502 FAC-YR-NUM ####### DETAILS PART 2 OF 5

D-503 FAC-YR-NUM ####### DETAILS PART 3 OF 5

D-504 FAC-YR-NUM ####### DETAILS PART 4 OF 5

D-505 FAC-YR-NUM ####### DETAILS PART 5 OF 5

D-601 FAC-YR-NUM ####### PROCESS FLOW DIAGRAM PART 1 OF 2

D-602 FAC-YR-NUM ####### PROCESS FLOW DIAGRAM PART 2 OF 2

D-603 FAC-YR-NUM ####### CONTROL SEQUENCE ONE-LINE DIAGRAM

D-604 FAC-YR-NUM ####### AIR BURST SYSTEM SCHEMATIC DIAGRAM

D-605 FAC-YR-NUM ####### HYDRAULIC PROFILE

D-606 FAC-YR-NUM ####### CHEMICAL FEED SYSTEM SCHEMATICS

D-607 FAC-YR-NUM ####### PROCESS SCHEDULE AND EQUIPMENT LIST

DI001 FAC-YR-NUM ####### INSTRUMENTATION LEGEND

DI100 FAC-YR-NUM ####### CONTROL ROOM AND TELECOMMUNICATIONS

PLAN VIEW

DI501 FAC-YR-NUM ####### INSTRUMENTATION DETAILS PART 1 OF 2

DI502 FAC-YR-NUM ####### INSTRUMENTATION DETAILS PART 2 OF 2

DI503 FAC-YR-NUM ####### INTAKE SCREEN DETAIL

DI504 FAC-YR-NUM ####### TEMPORARY ASW SYSTEM CONTROL DETAILS

DI601 FAC-YR-NUM ####### NETWORK ARCHITECTURE

00 01 15 Page 7

DI602 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -

PUMP ROOM A

DI603 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -

PUMP ROOM S

DI604 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -

YARD

DI605 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -

CHEM STORAGE

DI701 FAC-YR-NUM ####### CONTROL STRATEGIES - GENERAL

DI702 FAC-YR-NUM ####### CONTROL STRATEGIES - INTAKE

DI703 FAC-YR-NUM ####### CONTROL STRATEGIES - PERMEATE

DI704 FAC-YR-NUM ####### PLC POINTS LISTS

DI705 FAC-YR-NUM ####### FIELD INSTRUMENT LIST

E-001 FAC-YR-NUM ####### ELECTRICAL SYMBOLS & LEGENDS

E-002 FAC-YR-NUM ####### ELECTRICAL TYPICAL NOTES AND EQUIPMENT

WIRING SCHEDULES

E-101 FAC-YR-NUM ####### ELECTRICAL SITE PLAN

E-102 FAC-YR-NUM ####### ELECTRICAL SITE GROUNDING PLAN & RISER

DIAGRAM - B72

ED101 FAC-YR-NUM ####### ELECTRICAL SITE DEMOLITION PLAN - B72

ED102 FAC-YR-NUM ####### BASEMENT DEMOLITION PLAN - B72

ED103 FAC-YR-NUM ####### PUMP ROOM S & ROOM C DEMOLITION PLAN

EL101 FAC-YR-NUM ####### ROOM M LIGHTING PLAN - BID OPTION 8

EL102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C LIGHTING PLAN

EL103 FAC-YR-NUM ####### PUMP ROOM B LIGHTING PLAN

EP101 FAC-YR-NUM ####### ELECTRICAL SITE & PUMP ROOM B POWER

PLAN - B72

EP102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C POWER PLAN

EP103 FAC-YR-NUM ####### ROOM M POWER PLAN - BID OPTION 8

EP104 FAC-YR-NUM ####### PUMP ROOM S & PUMP ROOM B ROOF POWER

PLAN

EP105 FAC-YR-NUM ####### BASEMENT MV ROUTING PLAN - B72

EP106 FAC-YR-NUM ####### MIDLEVEL MV ROUTING PLAN - B72

EP107 FAC-YR-NUM ####### SECOND FLOOR MV ROUTING PLAN - B72

00 01 15 Page 8

EP108 FAC-YR-NUM ####### PUMP ROOM A POWER PLAN

EP109 FAC-YR-NUM ####### ACCESSORY STRUCTURE SITE PLAN - BID

OPTION 13

EP501 FAC-YR-NUM ####### DETAILS PART 1 OF 6

EP502 FAC-YR-NUM ####### DETAILS PART 2 OF 6

EP503 FAC-YR-NUM ####### DETAILS PART 3 OF 6

EP504 FAC-YR-NUM ####### DETAILS PART 4 OF 6

EP505 FAC-YR-NUM ####### DETAILS PART 5 OF 6

EP506 FAC-YR-NUM ####### DETAILS PART 6 OF 6

EP601 FAC-YR-NUM ####### POWER SYSTEM SINGLE LINE DIAGRAM

EP701 FAC-YR-NUM ####### SCHEDULES PART 1 OF 2

EP702 FAC-YR-NUM ####### SCHEDULES PART 2 OF 2

-- End of Document --

00 01 15 Page 9

00 01 15 - LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS

File details come from the government source that posted it. Updated .