00 01 15_RevAmend08.pdf
PDF 67 KB Posted
- Solicitation number
- N4008526R0005
About this file
This document is a List of Drawings for the P-1112 B72 Resiliency Improvement project under Delivery Order N40085-23-F-4245. The list encompasses approximately 250 contract drawings organized by discipline and revised via Amendment 08 as of August 14, 2023. The drawings cover general/administrative requirements, civil/site work, architectural, structural, fire protection, mechanical, process/operational, and electrical systems. Key drawing categories include geotechnical boring logs, site plans and utility layouts, demolition and proposed floor plans, building sections and details, mechanical systems and sequences, process flow diagrams and instrumentation, fire protection and alarm systems, and electrical power and grounding plans. Numerous drawings reference specific bid options (Options 2, 4, 5, 6, 8, 9, 11, and 13) indicating alternate scope configurations. Multiple drawings address pump rooms, intake screens, outfall systems, and water treatment process equipment. The document includes demolition plans, hazardous materials documentation, and coordination schedules reflecting a substantial facility rehabilitation or upgrade project involving structural, mechanical, and process system modifications.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-1112 B72 Resiliency Improvement Delivery Order N40085-23-F-4245
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/ 11, CHG 1: 08/ 14
( Revi sed vi a Amendment 08)
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
Sheet Number PWD-MENO NAVFAC Dwg No. Drawing Title
G-001 FAC-YR-NUM ####### COVER SHEET
G-002 FAC-YR-NUM ####### DRAWING LIST PART 1 OF 2
G-003 FAC-YR-NUM ####### DRAWING LIST PART 2 OF 2
G-004 FAC-YR-NUM ####### CODE SUMMARY & LIFE SAFETY NOTES
G-005 FAC-YR-NUM ####### LIFE SAFETY FLOOR PLAN
G-006 FAC-YR-NUM ####### OUTAGE SEQUENCING AND MITIGATION PLAN
H-101 FAC-YR-NUM ####### HAZARDOUS MATERIALS PLAN 1 OF 2
H-102 FAC-YR-NUM ####### HAZARDOUS MATERIALS PLAN 2 OF 2
B-001 FAC-YR-NUM ####### GEOTECHNICAL NOTES AND SYMBOLS
B-101 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS PART 1 OF 3
B-102 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS PART 2 OF 3
B-103 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS PART 3 OF 3
B-104 FAC-YR-NUM ####### GEOTECHNICAL BORING LOGS - BID OPTION
C-001 FAC-YR-NUM ####### CIVIL GENERAL NOTES
C-002 FAC-YR-NUM ####### POTHOLE INFORMATION
V-101 FAC-YR-NUM ####### EXISTING SURVEY OVERALL SITE PLAN
00 01 15 Page 1
V-102 FAC-YR-NUM ####### EXISTING SURVEY UNDERGROUND UTILITIES
PLAN
V-103 FAC-YR-NUM ####### EXISTING SURVEY ABOVE GROUND UTILITIES
PLAN
V-104 FAC-YR-NUM ####### HISTORICAL QUAY WALLS AND BUILDING
FOUNDATION PLANS
GC100 FAC-YR-NUM ####### GENERAL SITE AREAS
GC100A FAC-YR-NUM ####### MILESTONES AND COORDINATION
REQUIREMENTS ( Added Amendment 08)
C-100 FAC-YR-NUM ####### SOIL EROSION AND SEDIMENT CONTROL PLAN
C-101 FAC-YR-NUM ####### SITE PLAN
C-102 FAC-YR-NUM ####### UTILITY PLAN
C-103 FAC-YR-NUM ####### GRADING AND DRAINAGE PLAN
C-104 FAC-YR-NUM ####### EXISTING CONDITIONS SITE PLAN - BID
OPTIONS
C-105 FAC-YR-NUM ####### TUNNEL ABANDONMENT PART 1 OF 3 - BID
OPTION 4
C-106 FAC-YR-NUM ####### TUNNEL ABANDONMENT PART 2 OF 3 - BID
OPTION 5
C-107 FAC-YR-NUM ####### TUNNEL ABANDONMENT PART 3 OF 3 - BID
OPTION 6
C-108 FAC-YR-NUM ####### OPTION 13: ACCESSORY STRUCTURE
C-301 FAC-YR-NUM ####### CIVIL PROFILE - B242 TO B72 AND B72
SEWER
C-302 FAC-YR-NUM ####### CIVIL PROFILE - QUAY WALL TO BUILDING
B72
C-303 FAC-YR-NUM ####### CIVIL PROFILE - DMH 54-A1 TO DMH 8-61
- BID OPTION 6
C-304 FAC-YR-NUM ####### CIVIL PROFILE - INTAKE TO B242
CT101 FAC-YR-NUM ####### FIRE TRUCK TURNING MOVEMENT SITE PLAN
C-501 FAC-YR-NUM ####### CIVIL DETAILS PART 1 OF 4
C-502 FAC-YR-NUM ####### CIVIL DETAILS PART 2 OF 4
C-503 FAC-YR-NUM ####### CIVIL DETAILS PART 3 OF 4
C-504 FAC-YR-NUM ####### CIVIL DETAILS PART 4 OF 4
CG101 FAC-YR-NUM ####### DRY DOCK 2 LAYDOWN PLAN - BID OPTION 9
CG102 FAC-YR-NUM ####### DRY DOCK 2 TEMPORARY OUTAGE SYSTEM
SITE PLAN - BID OPTION 9
CG501 FAC-YR-NUM ####### DRY DOCK 2 TEMPORARY OUTAGE & CIVIL
DETAILS - BID OPTION 9
CG601 FAC-YR-NUM ####### DRY DOCK 2 TEMPORARY PIPING SYSTEM
SCHEMATIC - BID OPTION 9
A-000 FAC-YR-NUM ####### GENERAL PROJECT NOTES
00 01 15 Page 2
AD001 FAC-YR-NUM ####### DEMOLITION NOTES
AD101 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN
AD102 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN - BID OPTION 8
A-001 FAC-YR-NUM ####### ABBREVIATIONS AND SYMBOLS
A-002 FAC-YR-NUM ####### GENERAL NOTES AND LEGENDS
A-003 FAC-YR-NUM ####### PARTITION, CEILING AND ROOF TYPES
A-101 FAC-YR-NUM ####### PROPOSED FLOOR PLAN - PUMP ROOMS B &
S, ROOM C
A-102 FAC-YR-NUM ####### PROPOSED FLOOR PLAN - BID OPTION 8
A-103 FAC-YR-NUM ####### PROPOSED ROOF PLAN
A-200 FAC-YR-NUM ####### EXTERIOR ELEVATIONS
A-201 FAC-YR-NUM ####### EXTERIOR ELEVATIONS - BID OPTION 8
A-231 FAC-YR-NUM ####### AXONONOMETRIC VIEWS
A-300 FAC-YR-NUM ####### BUILDING SECTIONS PART 1 OF 2
A-301 FAC-YR-NUM ####### BUILDING SECTIONS PART 2 OF 2
A-400 FAC-YR-NUM ####### ENLARGED PLAN -PUMP ROOMS B & S, ROOMS
C & M
A-401 FAC-YR-NUM ####### ENLARGED PLAN - BID OPTION 11
A-402 FAC-YR-NUM ####### PLAN & ELEVATIONS - BID OPTION 13
A-403 FAC-YR-NUM ####### WALL SECTIONS & DETAILS - BID OPTION 13
A-410 FAC-YR-NUM ####### ENLARGED RCP -PUMP ROOMS B & S, ROOMS
C & M
A-450 FAC-YR-NUM ####### ENLARGED PLAN DETAILS
A-500 FAC-YR-NUM ####### WALL SECTIONS
A-501 FAC-YR-NUM ####### DOOR DETAILS
A-502 FAC-YR-NUM ####### ROOF DETAILS PART 1 OF 2
A-503 FAC-YR-NUM ####### ROOF DETAILS PART 2 OF 2
A-600 FAC-YR-NUM ####### INTERIOR ELEVATIONS PART 1 OF 2
A-601 FAC-YR-NUM ####### INTERIOR ELEVATIONS PART 2 OF 2
A-602 FAC-YR-NUM ####### DETAILS
A-801 FAC-YR-NUM ####### DOOR DETAILS & SCHEDULE
S-001 FAC-YR-NUM ####### GENERAL NOTES PART 1 OF 2
00 01 15 Page 3
S-002 FAC-YR-NUM ####### GENERAL NOTES PART 2 OF 2
S-101 FAC-YR-NUM ####### OVERALL PLAN - B72
S-102 FAC-YR-NUM ####### FLOOR PLAN - PUMP ROOM S
S-103 FAC-YR-NUM ####### FLOOR PLAN - UF TANK AND SUCTION WELL
S-104 FAC-YR-NUM ####### FOUNDATION PLAN - PUMP ROOM B ADDITION
S-105 FAC-YR-NUM ####### FOUNDATION PLAN - PUMP ROOM B
ADDITION, BREAK TANK
S-106 FAC-YR-NUM ####### FRAMING PLAN - PUMP ROOM B ADDITION
S-107 FAC-YR-NUM ####### ROOF FRAMING PLAN - PUMP ROOM S
S-108 FAC-YR-NUM ####### ROOF FRAMING PLAN - ROOM M
S-110 FAC-YR-NUM ####### FRAMING PLAN BID OPTIONS - PUMP ROOM S
S-121 FAC-YR-NUM ####### FLOOR PLAN - B242 WET WELL
S-122 FAC-YR-NUM ####### FLOOR PLAN - PUMP ROOM A
S-123 FAC-YR-NUM ####### FOUNDATION PLAN - BID OPTION 13
S-124 FAC-YR-NUM ####### ROOF FRAMING PLAN - PUMP ROOM A
S-301 FAC-YR-NUM ####### SECTIONS PART 1 OF 10
S-302 FAC-YR-NUM ####### SECTIONS PART 2 OF 10
S-303 FAC-YR-NUM ####### SECTIONS PART 3 OF 10
S-304 FAC-YR-NUM ####### SECTIONS PART 4 OF 10
S-305 FAC-YR-NUM ####### SECTIONS PART 5 OF 10
S-306 FAC-YR-NUM ####### SECTIONS PART 6 OF 10
S-307 FAC-YR-NUM ####### SECTIONS PART 7 OF 10
S-308 FAC-YR-NUM ####### SECTIONS PART 8 OF 10
S-309 FAC-YR-NUM ####### SECTIONS PART 9 OF 10
S-310 FAC-YR-NUM ####### SECTIONS PART 10 OF 10
S-501 FAC-YR-NUM ####### DETAILS PART 1 OF 6 - B72
S-502 FAC-YR-NUM ####### DETAILS PART 2 OF 6 - B72
S-503 FAC-YR-NUM ####### DETAILS PART 3 OF 6 - B242
S-504 FAC-YR-NUM ####### DETAILS PART 4 OF 6 - B242
S-505 FAC-YR-NUM ####### DETAILS PART 5 OF 6 - B72
S-506 FAC-YR-NUM ####### DETAILS PART 6 OF 6 - B72
00 01 15 Page 4
SD101 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN - PUMP ROOM S
SD102 FAC-YR-NUM ####### DEMOLITION ROOF FRAMING PLAN - PUMP
ROOM S
SD103 FAC-YR-NUM ####### DEMOLITION FLOOR PLAN - PUMP ROOM A
SD104 FAC-YR-NUM ####### DEMOLITION ROOF FRAMING PLAN - PUMP
ROOM A
SD301 FAC-YR-NUM ####### DEMOLITION SECTIONS PART 1 OF 2
SD302 FAC-YR-NUM ####### DEMOLITION SECTIONS PART 2 OF 2
F-001 FAC-YR-NUM ####### FIRE PROTECTION NOTES AND DETAILS
FA101 FAC-YR-NUM ####### FIRE ALARM FLOOR PLAN
FX101 FAC-YR-NUM ####### FIRE SPRINKLER FLOOR PLAN - PUMP ROOM S
FX102 FAC-YR-NUM ####### FIRE SPRINKLER FLOOR PLAN - PUMP ROOM C
FX500 FAC-YR-NUM ####### FIRE SPRINKLER DETAILS
M-001 FAC-YR-NUM ####### MECHANICAL SYMBOLS & ABBREVIATIONS
M-002 FAC-YR-NUM ####### MECHANICAL ABBREVIATIONS & NOTES
MD101 FAC-YR-NUM ####### OVERALL DEMOLITION PLAN - B72
MD102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C DEMOLITION PLAN
MD103 FAC-YR-NUM ####### ROOM M DEMOLITION PLAN - BID OPTION 8
MD301 FAC-YR-NUM ####### PUMP ROOM S DEMOLITION SECTIONS
M-101 FAC-YR-NUM ####### OVERALL PROPOSED WORK PLAN - B72
M-102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C PROPOSED WORK PLAN
M-103 FAC-YR-NUM ####### ROOM M & PUMP ROOM B PROPOSED WORK PLAN
M-104 FAC-YR-NUM ####### PUMP ROOM S PROPOSED ROOF PLAN
MP101 FAC-YR-NUM ####### OVERALL BASEMENT MECHANICAL PROPOSED
PIPING PLAN - B72
MP102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C PROPOSED PIPING
PLAN
MP400 FAC-YR-NUM ####### ENLARGED PROPOSED PIPING PLANS
M-501 FAC-YR-NUM ####### MECHANICAL DETAILS PART 1 OF 3
M-502 FAC-YR-NUM ####### MECHANICAL DETAILS PART 2 OF 3
M-503 FAC-YR-NUM ####### MECHANICAL DETAILS PART 3 OF 3
M-600 FAC-YR-NUM ####### MECHANICAL SCHEDULES
00 01 15 Page 5
M-601 FAC-YR-NUM ####### MECHANICAL AIRFLOW DIAGRAM
M-602 FAC-YR-NUM ####### NORTH TOWER TIE IN DIAGRAM - BID
OPTION 2
M-603 FAC-YR-NUM ####### EXISTING SOUTH TOWER TIE IN DIAGRAM -
BID OPTION 2
M-700 FAC-YR-NUM ####### MECHANICAL SEQUENCE OF OPERATIONS
D-001 FAC-YR-NUM ####### PROCESS NOTES , ABBREVIATIONS, AND
LEGEND
DD101 FAC-YR-NUM ####### DEMOLITION PLAN PUMP ROOM A
D-101 FAC-YR-NUM ####### PUMP ROOM A WET WELL PLAN, SECTION &
DETAIL
D-102 FAC-YR-NUM ####### PUMP ROOM A PROCESS FLOOR PLAN
D-103 FAC-YR-NUM ####### OVERALL PROCESS PLAN - B72
D-104 FAC-YR-NUM ####### PUMP ROOM S PLAN PART 1 OF 3
D-105 FAC-YR-NUM ####### PUMP ROOM S PLAN PART 2 OF 3
D-106 FAC-YR-NUM ####### PUMP ROOM S PLAN PART 3 OF 3
D-107 FAC-YR-NUM ####### UF BREAK TANK PLAN
D-108 FAC-YR-NUM ####### PUMP ROOM B PLAN PART 1 OF 2
D-109 FAC-YR-NUM ####### PUMP ROOM B PLAN PART 2 OF 2
D-110 FAC-YR-NUM ####### ROOM C PLAN PART 1 OF 2
D-111 FAC-YR-NUM ####### ROOM C PLAN PART 2 OF 2
D-112 FAC-YR-NUM ####### BASEMENT PLAN AND SECTION
D-113 FAC-YR-NUM ####### CONDENSATE TANK PLAN
D-301 FAC-YR-NUM ####### PUMP ROOM A SECTIONS
D-401 FAC-YR-NUM ####### INTAKE SCREEN PLAN, SECTION, AND
DETAILS
D-402 FAC-YR-NUM ####### INTAKE SCREEN FENDER PLAN AND SECTIONS
D-403 FAC-YR-NUM ####### PUMP ROOM S ENLARGED PLAN PART 1 OF 3
D-404 FAC-YR-NUM ####### PUMP ROOM S ENLARGED PLAN PART 2 OF 3
D-405 FAC-YR-NUM ####### PUMP ROOM S ENLARGED PLAN PART 3 OF 3
D-406 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 1 OF 6
D-407 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 2 OF 6
D-408 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 3 OF 6
D-409 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 4 OF 6
00 01 15 Page 6
D-410 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 5 OF 6
D-411 FAC-YR-NUM ####### PUMP ROOM S SECTIONS PART 6 OF 6
D-412 FAC-YR-NUM ####### UF BREAK TANK SECTION
D-413 FAC-YR-NUM ####### PUMP ROOM B ENLARGED PLANS PART 1 OF 2
D-414 FAC-YR-NUM ####### PUMP ROOM B ENLARGED PLANS PART 2 OF 2
D-415 FAC-YR-NUM ####### PUMP ROOM B SECTIONS PART 1 OF 3
D-416 FAC-YR-NUM ####### PUMP ROOM B SECTIONS PART 2 OF 3
D-417 FAC-YR-NUM ####### PUMP ROOM B SECTIONS PART 3 OF 3
D-418 FAC-YR-NUM ####### ROOM C SECTIONS PART 1 OF 2
D-419 FAC-YR-NUM ####### ROOM C SECTIONS PART 2 OF 2
D-420 FAC-YR-NUM ####### OUTFALL AND FENDER PLAN AND SECTIONS
D-501 FAC-YR-NUM ####### DETAILS PART 1 OF 5
D-502 FAC-YR-NUM ####### DETAILS PART 2 OF 5
D-503 FAC-YR-NUM ####### DETAILS PART 3 OF 5
D-504 FAC-YR-NUM ####### DETAILS PART 4 OF 5
D-505 FAC-YR-NUM ####### DETAILS PART 5 OF 5
D-601 FAC-YR-NUM ####### PROCESS FLOW DIAGRAM PART 1 OF 2
D-602 FAC-YR-NUM ####### PROCESS FLOW DIAGRAM PART 2 OF 2
D-603 FAC-YR-NUM ####### CONTROL SEQUENCE ONE-LINE DIAGRAM
D-604 FAC-YR-NUM ####### AIR BURST SYSTEM SCHEMATIC DIAGRAM
D-605 FAC-YR-NUM ####### HYDRAULIC PROFILE
D-606 FAC-YR-NUM ####### CHEMICAL FEED SYSTEM SCHEMATICS
D-607 FAC-YR-NUM ####### PROCESS SCHEDULE AND EQUIPMENT LIST
DI001 FAC-YR-NUM ####### INSTRUMENTATION LEGEND
DI100 FAC-YR-NUM ####### CONTROL ROOM AND TELECOMMUNICATIONS
PLAN VIEW
DI501 FAC-YR-NUM ####### INSTRUMENTATION DETAILS PART 1 OF 2
DI502 FAC-YR-NUM ####### INSTRUMENTATION DETAILS PART 2 OF 2
DI503 FAC-YR-NUM ####### INTAKE SCREEN DETAIL
DI504 FAC-YR-NUM ####### TEMPORARY ASW SYSTEM CONTROL DETAILS
DI601 FAC-YR-NUM ####### NETWORK ARCHITECTURE
00 01 15 Page 7
DI602 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -
PUMP ROOM A
DI603 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -
PUMP ROOM S
DI604 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -
YARD
DI605 FAC-YR-NUM ####### PIPING AND INSTRUMENTATION DIAGRAM -
CHEM STORAGE
DI701 FAC-YR-NUM ####### CONTROL STRATEGIES - GENERAL
DI702 FAC-YR-NUM ####### CONTROL STRATEGIES - INTAKE
DI703 FAC-YR-NUM ####### CONTROL STRATEGIES - PERMEATE
DI704 FAC-YR-NUM ####### PLC POINTS LISTS
DI705 FAC-YR-NUM ####### FIELD INSTRUMENT LIST
E-001 FAC-YR-NUM ####### ELECTRICAL SYMBOLS & LEGENDS
E-002 FAC-YR-NUM ####### ELECTRICAL TYPICAL NOTES AND EQUIPMENT
WIRING SCHEDULES
E-101 FAC-YR-NUM ####### ELECTRICAL SITE PLAN
E-102 FAC-YR-NUM ####### ELECTRICAL SITE GROUNDING PLAN & RISER
DIAGRAM - B72
ED101 FAC-YR-NUM ####### ELECTRICAL SITE DEMOLITION PLAN - B72
ED102 FAC-YR-NUM ####### BASEMENT DEMOLITION PLAN - B72
ED103 FAC-YR-NUM ####### PUMP ROOM S & ROOM C DEMOLITION PLAN
EL101 FAC-YR-NUM ####### ROOM M LIGHTING PLAN - BID OPTION 8
EL102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C LIGHTING PLAN
EL103 FAC-YR-NUM ####### PUMP ROOM B LIGHTING PLAN
EP101 FAC-YR-NUM ####### ELECTRICAL SITE & PUMP ROOM B POWER
PLAN - B72
EP102 FAC-YR-NUM ####### PUMP ROOM S & ROOM C POWER PLAN
EP103 FAC-YR-NUM ####### ROOM M POWER PLAN - BID OPTION 8
EP104 FAC-YR-NUM ####### PUMP ROOM S & PUMP ROOM B ROOF POWER
PLAN
EP105 FAC-YR-NUM ####### BASEMENT MV ROUTING PLAN - B72
EP106 FAC-YR-NUM ####### MIDLEVEL MV ROUTING PLAN - B72
EP107 FAC-YR-NUM ####### SECOND FLOOR MV ROUTING PLAN - B72
00 01 15 Page 8
EP108 FAC-YR-NUM ####### PUMP ROOM A POWER PLAN
EP109 FAC-YR-NUM ####### ACCESSORY STRUCTURE SITE PLAN - BID
OPTION 13
EP501 FAC-YR-NUM ####### DETAILS PART 1 OF 6
EP502 FAC-YR-NUM ####### DETAILS PART 2 OF 6
EP503 FAC-YR-NUM ####### DETAILS PART 3 OF 6
EP504 FAC-YR-NUM ####### DETAILS PART 4 OF 6
EP505 FAC-YR-NUM ####### DETAILS PART 5 OF 6
EP506 FAC-YR-NUM ####### DETAILS PART 6 OF 6
EP601 FAC-YR-NUM ####### POWER SYSTEM SINGLE LINE DIAGRAM
EP701 FAC-YR-NUM ####### SCHEDULES PART 1 OF 2
EP702 FAC-YR-NUM ####### SCHEDULES PART 2 OF 2
-- End of Document --
00 01 15 Page 9
| 00 01 15 - LIST OF DRAWINGS |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 CONTRACT DRAWINGS |
File details come from the government source that posted it. Updated .