GC100A_Milestones and Coordination Requirements_20260528.pdf
PDF 1 MB Posted
- Solicitation number
- N4008526R0005
About this file
This document is a Project Milestone Schedule and site plan for a federal construction project involving waterfront infrastructure improvements at what appears to be a naval facility.
The project encompasses three primary milestones with specific scope requirements and start dates. Milestone A (Building 242 Below Sea Level Scope) begins at Award + 0 Days and includes construction of an accessory structure, wet well reassembly, associated subgrade work, and pipe slab restoration to permanent operation standards, with underwater construction limited to a one-month outage window. Milestone B (Discharge Line and Building 178 Southeast Corner Scope) also begins at Award + 0 Days and covers discharge line installation, all features affecting access between Building 178 and Building 72 with potential fire access impacts, and fire suppression connections, with outages restricted to the defined route between structures. Milestone C (Discharge Outlet at Building 178 Scope) begins at Award + 730 Days and includes construction of discharge outlet infrastructure and berth cage work contingent upon completion of related project RM23-0024, with a maximum two-month vessel moorings outage allowance. The project requires complete scope work within the defined Period of Performance unless otherwise noted, maintenance of travel routes per Drawing GC100, and coordination of construction activities to minimize disruption to ongoing operations. The site plan identifies five project zones with specific construction areas, building locations, and utility line routing marked with color-coded overlays indicating installation, restoration, and improvement programs.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1112 MILESTONES
1. COMPLETE ALL P1112 SCOPE WITHIN THE OVERALL PERIOD OF PERFORMANCE
(POP) UNLESS NOTED OTHERWISE VIA BELOW SPECIFIC MILESTONE PRIORITIES.
2. REFER TO DRAWING GC100 FOR REQUIREMENTS PERTAINING TO
MAINTENANCE OF TRAVEL ROUTES AND OTHER PHASING REQUIREMENTS.
3. MILESTONE A: BUILDING 242 BELOW SLAB AND SLAB SCOPE
SCOPE MUST INCLUDE MINIMUM OF THE FOLLOWING: TEMPORARY ASW;
ACCESSORY STRUCTURE; WET WELL RECONFIGURATION; CWIS AND
ASSOCIATED SUBGRADE AND WITHIN PIPING UTILITIES; RECONSTRUCT INTERIOR
SLAB; RESTORE PERMANENT OPERATION OF ASW; AND, REMOVE TEMPORARY
ASW. UNDERWATER CONSTRUCTION AT CWIS WILL BE ALLOWED MAXIMUM OF 2
MONTH OUTAGE TO AFFECTED WATERBORNE VESSEL MORINGS.
START DATE: AWARD + 0 DAYS POP: 365 CALENDAR DAYS
4. MILESTONE B: DISCHARGE LINE AND BID OPTIONS SOUTH OF BLDG 72 TO
SOUTHEAST CORNER OF BLDG 178
SCOPE MUST INCLUDE ALL FEATURES OF WORK WHICH REQUIRE ROADWAY
OUTAGES TO THE ROUTE BETWEEN BLDG 72 AND BLDG 238 AND WORK WHICH
AFFECTS ACCESS TO THE BLDG 178 FIRE PUMP ROOM / FIRE DEPARTMENT
CONNECTIONS. SCOPE ALSO INCLUDES PORTIONS OF SPECIAL FOUNDATION
SOUTH OF BLDG 72 THAT HAVE POTENTIAL TO INTERFERE WITH MAINTAINING
FIRE ACCESS TO BUILDING 178.
START DATE: AWARD + 0 DAYS POP: 365 CALENDAR DAYS
5. MILESTONE C: DISCHARGE OUTLET AT BERTH 4
SCOPE INCLUDES CONSTRUCTION OF DISCHARGE PIPE FROM SOUTHEAST OF
BUILDING 178 TO AND INCLUSIVE OF BERTH 4 OUTFALL PIPE AND PROTECTIVE
CAGE AFTER RM23-0024 COMPLETES BULKHEAD AND UTILITY IMPROVEMENTS IN
THE SUBJECT WORK VICINITY. UNDERWATER CONSTRUCTION AT DISCHARGE
WILL BE ALLOWED MAXIMUM OF 2 MONTH OUTAGE TO AFFECTED WATERBORNE
VESSEL MORINGS.
START DATE: AWARD + 730 DAYS POP: COMPLETE NO LATER THAN
PROJECT BOD
GC100A
MILESTONES AND
COORDINATION
REQUIREMENTS
1. COORDINATE CONSTRUCTION ACTIVITIES TO DECONFLICT WITH
HEREIN DESCRIBED PLANNED ADJACENT CONSTRUCTION BY
OTHERS. PROVIDED SCHEDULES ARE BEST AVAILABLE
INFORMATION AS OF DATE OF THIS DRAWING AND ARE SUBJECT
TO DATE OF AWARD OF THE REFERENCED PROJECTS.
2. CONDUCT COORDINATION MEETINGS WITH ADJACENT
PROJECTS VIA THE NAVY COR.
1.
I S
S U
E D
V
IA
A M
E N
D M
E N
T
/2 8/
R
H R
RM23-0232 REPLACE AC AND DC SWITCHGEAR B238
0. FIELD SCHEDULE (ESTIMATED): SEPT 2026 - SEPT 2027, BULK ON-SITE
WORK ESTIMATED TO BE 6 TO 8 MONTHS)
1. WEST STAGING AREA, APPROX.
2. WEST STAIRWAY: 3 CONSECUTIVE WEEKS.
3. NORTH STAIRWAY: 3 CONSECUTIVE WEEKS.
3A. COORDINATED TEMPORARY CONSTUCTION SPACE NEEDS
PROVIDED TO KTR FOR THE ABOVE NORTH STAIRWAY WORK DURATION.
P1112 KTR MUST ALLOW FOR CONSTRUCTION ACCESS TO THIS AREA.
4. THE PERFORMING KTR IS REQUIRED TO MAINTAIN ACCESS TO AT LEAST
ONE OF THE TWO ABOVE DESCRIBED STAIRWAYS AT ANY GIVEN TIME.
5. ANTICIPATED ROAD BLOCKAGES, EQUIPMENT DEMO AND INSTALL:
A. DEMO / MOVE OUT: 3 CONSECUTIVE WORKING DAYS
B. NEW / MOVE IN: 3 CONSECUTIVE WORKING DAYS
6. ANTICIPATED ROAD BLOCKAGES, ELECTRICAL FEEDERS:
THE PERFORMING KTR IS REQUIRED TO DEMO AND INSTALL FEEDERS VIA
EXISTING MANHOLES. ESTIMATED DURATION: 2 CONSECUTIVE WEEKS.
7 - 19. NOT USED
RM23-0024 BERTH 4 AND 5 STRUCTURAL REPAIRS
20. FIELD SCHEDULE (ESTIMATED): DEC 2027 - FEB 2029
21. TEMPORARY STAGING NEEDS FOR ONE ZONE MAY EXTEND / BE
LOCATED IN OTHER WORK ZONES.
22. ZONE 1 (BERTH 4 RETURN WALL): JAN 2028 - MAY 2028
23. ZONE 2 (BERTH 4): MAY 2028 - AUG 2028
24. ZONES 3, 4, & 5 (BERTH 5): AUG 2028 TO FEB 2029
25. PHASE SEQUENCING: RM23-0024 KTR WILL BE REQUIRED TO COMPLETE
WORK IN THE FOLLOWING SEQUENCE: ZONE 1, ZONE 2, ZONE 3B, ZONE 4B,
ZONE 5, ZONE 3A, ZONE 4A.
26. TEMPORARY CONTRACTOR TRAILER, APPROX. LOCATION
P1080, POWER AND WATER RESILIENCY, B242 IMPROVEMENTS
40. FIELD SCHEDULE (ESTIMATED): To ; BID OPTION, FLEXIBLE START DATE
41. SCOPE SUMMARY: PROJECT MODERNIZES SALT WATER PUMPS,
CONTROLS, AND UPGRADES ELECTRICAL. PROJECT REPLACES
UNDERGROUND SALTWATER FORCEMAIN FROM BUILDING 242 TO DD2
WEST TUNNEL INCLUDING THE PIPING IN THE TUNNEL. PROJECT
INCLUDES A TEMPORARY ASW SYSTEM.
SCHEDULING CONSIDERATIONS
ZONE 1
Z O
N E
ZONE 3
ZONE 4
ZONE 5
RM23-0024 BERTH 4 - 5
STRUCTURAL REPAIRS
P1080 B242
IMPROVEMENTS
3A