PPI 91 - Sheet 7 of 226 - H-101.pdf

PDF 455 KB Posted

Attached to
P1112 B72 Resiliency Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, Maine
Solicitation number
N4008526R0005
Issued by

About this file

This is a Hazardous Material Plan document for a federal construction project at Portsmouth Naval Shipyard in Kittery, Maine. The document is part of Project P-1112, Power Plant Resiliency Improvements, with contract number TBD, and presents environmental sampling and analytical results for hazardous materials assessment.

The plan details RCRA metals analytical results from seven samples collected in the Saltwater Room and Maintenance Room, identifying concentrations of cadmium, chromium, and lead in various building materials including brick walls, concrete floors and walls, and crane beams. Notable findings include lead concentrations ranging from 0.047% to 12% by weight, with the highest levels detected in the Green Crane Beam sample. Hexavalent chromium testing identified 0.25% content in a green brick wall sample and 0.00057% in a concrete floor sample. PCB sampling across fifteen locations in both rooms detected polychlorinated biphenyls in brick walls, concrete surfaces, and metal components, with concentrations ranging from 0.511 to 6.170 mg/kg. Asbestos bulk sampling of twenty-four material samples, including wall paint, floor leveler, pipe insulation, pipe wrapping, door frame caulk, brick mortar, and foundation mastic, detected no asbestos in any samples. The document includes floor plans with keynote references indicating demolition areas, sampling locations, and hazardous material management requirements for contractor coordination during the resiliency improvement project.

View the file

Other files

File Type Posted
N4008526R0005 Amendment 0010.pdf PDF
Attachment H - Price Proposal Form Revision 3.docx DOCX document
N4008526R0005 Amendment 0009.pdf PDF
Attachment H - Price Proposal Form Revision 2.docx DOCX document
N4008526R0005 Amendment 0008.pdf PDF
01 11 00.00 22_RevAmend08.pdf PDF
GC100A_Milestones and Coordination Requirements_20260528.pdf PDF
31 00 00.00 22_Attachment A_Salt Water Tunnels and Building 72_Historical Drawings.pdf PDF
00 01 15_RevAmend08.pdf PDF
J and A ML-26-51 P1112 B72 Resiliency Controller Redacted.pdf PDF
098 S-502 Rev. 1 P-1112.pdf PDF
075 S-102 Rev. 1 P-1112.pdf PDF
102 S-506 Rev. 1 P-1112.pdf PDF
A-400 - ENLARGED PLAN -PUMP ROOMS B AND S AND C.pdf PDF
094 S-308 Rev. 1 P-1112.pdf PDF
101 S-505 Rev. 1 P-1112.pdf PDF
A-450 - ENLARGED PLAN DETAILS.pdf PDF
Lifting_Eye_Comp_Cut_Sheet_LIFTMAX-PEP-00100 (050726).pdf PDF
P-1112 Drawing Updates 2026-04-29.pdf PDF
086 S-124 Rev. 1 P-1112.pdf PDF
072 S-001 Rev. 1 P-1112.pdf PDF
N4008526R0005 Amendment 0007.pdf PDF
08 53 00.pdf PDF
N4008526R0005 Amendment 0006.pdf PDF
41 22 13.14.pdf PDF
N4008526R0005 Amendment 0005.pdf PDF
PPI 98 - V-104 Archaeology Area Outlined.pdf PDF
PPI 203 - COMNAVREGMIDLANTINST_11320_11B.pdf PDF
PPI 200 - 32 17 23.pdf PDF
Attachment H - Price Proposal Form Revised.docx DOCX document
PPI 166 - Air Valve Detail.pdf PDF
PPI 137 - 46 30 00 Attachments 1 to 4.pdf PDF
PPI 198 - 26 56 00.pdf PDF
PPIs 181.182.183.208 - Schedule of Special Inspections.pdf PDF
Option 13 - Accessory Structure_REV2.pdf PDF
A-500 - WALL SECTIONS.pdf PDF
N4008526R0005 Amendment 0004.pdf PDF
N4008526R0005 Amendment 0003.pdf PDF
N4008526R0005 Amendment 0002.pdf PDF
P-1112 B72 Resiliency Improvement Site Visit Log.pdf PDF
N4008526R0005 Amendment 0001.pdf PDF
DBIDS 5500 Form.docx DOCX document
Memorandum - Bidding Notes P-1112.pdf PDF
Attachment H - Price Proposal Form.docx DOCX document
P-1112 Specifications.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment G - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
P-1112 Drawings.pdf PDF
DBIDS 5512 Form.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0' - 0"

SHEET

NAVFAC DRAWING NO.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

PU

BL

IC

W

O R

KS

D

EP

AR

TM

EN

T

- M

AI

N

E N

AV

AL

S H

IP

YA

R D

PO

R

TS

M O

U

TH

, N H

DESIGN MANAGER

PROJECT MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

SY

M

DRAWN BY

DESIGNER

CHECKED BY

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

-A

TL

AN

TI

C

JTL

LBT

MMR

SSR

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

1710371

GENERAL SHEET NOTES

GRAPHIC SCALE

NEW WORK KEYNOTES

KEY PLAN

DEMOLITION KEYNOTES

KI

TT

ER

Y, M

AI

NE

PO

RT

SM

OU

TH

N

AV

AL

S

HI

PY

AR

D

P-

B

R

ES

IL

IE

NC

Y

IM

PR

O

VE

M

EN

TS

CO

NT

RA

CT

N

UM

BE

R:

TB

D

PLAN

NORTH

RCRA Metals Analytical Results

P-1112 Power Plan Resiliency Improvements

Portsmouth Naval Shipyard, Kittery, ME

Sample No. Description Element Symbol Concentration (% by weight)

PC-01 White Brick Wall, Saltwater Room

Cadmium Cd 0.0068

Chromium Cr 0.55

Lead Pb 3.8

PC-02 Green Bric Wall, Saltwater Room

Cadmium Cd 0.0021

Chromium Cr 0.86

Lead Pb 4.1

PC-03

Creen Crane

Beam, Saltwater Room

Cadmium Cd 0.0071

Chromium Cr 0.0029

Lead Pb 12

PC-04

Red Concrete

Floor, Saltwater Room

Cadmium Cd 0.00074

Chromium Cr 0.0043

Lead Pb 0.077

PC-05

Blue Concrete Wall, Maintenance Room

Cadmium Cd 0.00052

Chromium Cr 0.0037

Lead Pb 0.047

PC-06

Gray Concrete Floor, Maintenance Room

Cadmium Cd 0.0012

Chromium Cr 0.034

Lead Pb 0.064

PC-07

Green Concrete

Foundation, Saltwater Room

Cadmium Cd 0.0092

Chromium Cr 0.26

Lead Pb 9.4

Table 3-2 Hexavalent Chromium Analytical Results

P-1112 Power Plan Resiliency Improvements

Portsmouth Naval Shipyard, Kittery, ME

Sample No. Sample Location

Description of Material

Total Cr6+ Content (%) by weight)

Cr(V1)-01 Saltwater Room

Green Brick Wall 0.25%

Cr(V1)-02 Maintenan ce Room

Gray Concrete

Floor 0.00057%

Table 4-1 PCB Sampling

P-1112 Power Plan Resiliency Improvements

Portsmouth Naval Shipyard, Kittery, ME

Sample No. Sample Location Description of Material Total PCB Content (mg/kg)

PCB-01 Saltwater Room White Brick Wall 1.370

PCB-02 Saltwater Room Green Brick Wall 1.160

PCB-03 Saltwater Room White Brick Wall (Opening) 4.090

PCB-04 Saltwater Room White Brick Wall 0.511

PCB-05 Saltwater Room Black Foundation Coating ND

PCB-06 Saltwater Room Red Brick Wall 3.400

PCB-07 Saltwater Room White Brick Wall (Opening) 2.130

PCB-08 Saltwater Room Red Concrete Floor 3.510

PCB-09 Saltwater Room Blue Concrete Wall 2.160

PCB-10 Saltwater Room White Crane Wall 6.170

PCB-11 Saltwater Room Red Crane Rail 2.660

PCB-12 Maintenance Room Red Concrete Floor 1.290

PCB-13 Maintenance Room Blue Concrete Wall 1.230

PCB-14 Maintenance Room Blue Metal Doorframe 2.170

PCB-15 Maintenance Room White Concrete Wall 1.530

Table 4-2 Asbestos Containing Material Bulk Sample Results

P-1112 Power Plan Resiliency Improvements

Portsmouth Naval Shipyard, Kittery, ME

Sample No. Sample Location Description of Material Percent and Type of Asbestos

01A Saltwater Room Wall Paint No Asbestos Detected

01B Saltwater Room Wall Paint No Asbestos Detected

01C Saltwater Room Wall Paint No Asbestos Detected

01D Saltwater Room Wall Paint No Asbestos Detected

01E Saltwater Room Wall Paint No Asbestos Detected

02A Saltwater Room Floor Leveler No Asbestos Detected

02B Saltwater Room Floor Leveler No Asbestos Detected

02C Saltwater Room Floor Leveler No Asbestos Detected

03A Saltwater Room Floor Sandy Debris No Asbestos Detected

03B Saltwater Room Floor Sandy Debris No Asbestos Detected

03C Saltwater Room Floor Sandy Debris No Asbestos Detected

04A Saltwater Room Condensate Pipe Insulation No Asbestos Detected

040B Saltwater Room Condensate Pipe Insulation No Asbestos Detected

04C Saltwater Room Condensate Pipe Insulation No Asbestos Detected

05A Saltwater Room Condensate Pipe Wrap No Asbestos Detected

05V Saltwater Room Condensate Pipe Wrap No Asbestos Detected

05C Saltwater Room Condensate Pipe Wrap No Asbestos Detected

06A Maintenance Room Door Frame Caulk No Asbestos Detected

06B Maintenance Room Door Frame Caulk No Asbestos Detected

06C Maintenance Room Door Frame Caulk No Asbestos Detected

07A Exterior Saltwater Room Brick Mortar No Asbestos Detected

07B Exterior Saltwater Room Brick Mortar No Asbestos Detected

07C Exterior Saltwater Room Brick Mortar No Asbestos Detected

08A Exterior Saltwater Room Foundation Mastic No Asbestos Detected

08B Exterior Saltwater Room Foundation Mastic No Asbestos Detected

08C Exterior Saltwater Room Foundation Mastic No Asbestos Detected

H-101

HA

ZA

RD

O

US

M

AT

ER

IA

L

PL

AN

O

F

FAC-YR-NUM

SS

SS

AAH

A

B72 EXISTING FLOOR PLAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

DRAWFORM REVISION: 07 AUG 2018

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1/8" = 1'

AutoCAD SHX Text scale

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text feet

AutoCAD SHX Text

AutoCAD SHX Text

1. EXISTING SALTWATER ROOM IS CONSIDERED A HISTORIC EXISTING SALTWATER ROOM IS CONSIDERED A HISTORIC STRUCTURE. CONTRACTOR SHALL COORDINATE ABATEMENT OPERATIONS AND METHODOLOGIES WITH PWD CULTURAL RESOURCE MANAGER OR POINT OF CONTACT. 2. REFER TO SHEET H-102 FOR ADDITIONAL SAMPLING IN B72 AND REFER TO SHEET H-102 FOR ADDITIONAL SAMPLING IN B72 AND B242.

AutoCAD SHX Text

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text HAZARDOUS MATERIALS NOTES: 1) THE FOLLOWING SPECIFICATIONS APPLY: THE FOLLOWING SPECIFICATIONS APPLY: a) SECTION 02 82 00.00 22 - ASBESTOS REMEDIATION SECTION 02 82 00.00 22 - ASBESTOS REMEDIATION b) SECTION 02 83 00.00 22 - MANAGEMENT OF LEAD, CADMIUM, SECTION 02 83 00.00 22 - MANAGEMENT OF LEAD, CADMIUM, AND CHROMIUM (VI) DURING RENOVATION, DEMOLITION, CONSTRUCTION, REMOVAL AND ABATEMENT c) SECTION 02 84 33 - REMOVAL AND DISPOSAL OF SECTION 02 84 33 - REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBS) 2) THERE IS THE POTENTIAL FOR HAZARDOUS MATERIALS WITHIN THE THERE IS THE POTENTIAL FOR HAZARDOUS MATERIALS WITHIN THE PROJECT SCOPE OF WORK AREA INCLUDING ASBESTOS, HEAVY METALS, POLYCHLORINATED BIPHENYLS AND OTHER HAZARDOUS OR REGULATED MATERIALS. 3) OBTAIN PERMITS AND LICENSES REQUIRED FOR THE MANAGEMENT, OBTAIN PERMITS AND LICENSES REQUIRED FOR THE MANAGEMENT, REMOVAL AND TRANSPORT OF HAZARDOUS MATERIALS TO INCLUDE ASBESTOS CONTAINING MATERIALS (ACM), LEAD, CADMIUM AND CHROMIUM (VI) CONTAINING PAINT AND DUST, AND POLYCHLORINATED BIPHENYL (PCB) CONTAINING MATERIALS AND DEBRIS IN ACCORDANCE WITH THE SPECIFICATIONS, LOCAL, STATE AND FEDERAL REGULATIONS. DISPOSAL OF HAZARDOUS WASTE IS BY THE GOVERNMENT. 4) REMOVE EXISTING ASBESTOS CONTAINING MATERIALS IN ACCORDANCE REMOVE EXISTING ASBESTOS CONTAINING MATERIALS IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE AND LOCAL REGULATIONS. DISPOSAL OF HAZARDOUS MATERIAL IS BY THE GOVERNMENT. 5) EXISTING PAINT COATINGS WERE FOUND TO CONTAIN LEAD, CADMIUM EXISTING PAINT COATINGS WERE FOUND TO CONTAIN LEAD, CADMIUM AND CHROMIUM (VI) (LCC). MANAGE LCC PAINT IN AREAS INDICATED IN ACCORDANCE WITH SECTION 02 83 00.00 22 AND APPLICABLE STATE AND FEDERAL REGULATIONS. DISPOSAL OF HAZARDOUS MATERIAL IS BY THE GOVERNMENT 6) DESIGNATED MATERIALS HAVE BEEN FOUND TO CONTAIN GREATER THAN DESIGNATED MATERIALS HAVE BEEN FOUND TO CONTAIN GREATER THAN 2 PARTS PER MILLION (PPM) BUT LESS THAN 50 PPM POLYCHLORINATED BIPHENYLS. REMOVAL AND DISPOSAL OF THESE MATERIALS MAY REQUIRE SPECIAL HANDLING AND DISPOSAL IN ACCORDANCE WITH SECTION 02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBS) AND SECTION 01 57 19.00 22 TEMPORARY ENVIRONMENTAL CONTROL. 7) DISPOSAL OF HAZARDOUS MATERIALS WILL BE BY THE GOVERNMENT. DISPOSAL OF HAZARDOUS MATERIALS WILL BE BY THE GOVERNMENT. THIS INCLUDES BUT IS NOT LIMITED TO MATERIALS CONTAINING >1% ASBESTOS, >50 PPM PCBS, AND PAINT CHIPS CONTAINING HEAVY METALS ABOVE THE RCRA LIMIT. DISPOSAL OF CONSTRUCTION AND DEMOLITION MATERIALS, INCLUDING THOSE COATED WITH PAINT CONTAINING <50 PPM PCBS AND/OR HEAVY METALS ABOVE TSCA LIMITS WILL BE BY THE CONTRACTOR. CONTRACTOR RESPONSIBLE FOR CONDUCTING ANY REQUIRED WASTE CHARACTERIZATION SAMPLING IN ACCORDANCE WITH SECTION 01 57 00.

Sheets and Views
H-101 Hazardous Materials Plan-H-101 Hazardous Materials Plan B72
H-101 Hazardous Materials Plan-H-102 Hazardous Materials Plan B72