This is a Hazardous Material Plan document for a federal construction project at Portsmouth Naval Shipyard in Kittery, Maine. The document is part of Project P-1112, Power Plant Resiliency Improvements, with contract number TBD, and presents environmental sampling and analytical results for hazardous materials assessment.
The plan details RCRA metals analytical results from seven samples collected in the Saltwater Room and Maintenance Room, identifying concentrations of cadmium, chromium, and lead in various building materials including brick walls, concrete floors and walls, and crane beams. Notable findings include lead concentrations ranging from 0.047% to 12% by weight, with the highest levels detected in the Green Crane Beam sample. Hexavalent chromium testing identified 0.25% content in a green brick wall sample and 0.00057% in a concrete floor sample. PCB sampling across fifteen locations in both rooms detected polychlorinated biphenyls in brick walls, concrete surfaces, and metal components, with concentrations ranging from 0.511 to 6.170 mg/kg. Asbestos bulk sampling of twenty-four material samples, including wall paint, floor leveler, pipe insulation, pipe wrapping, door frame caulk, brick mortar, and foundation mastic, detected no asbestos in any samples. The document includes floor plans with keynote references indicating demolition areas, sampling locations, and hazardous material management requirements for contractor coordination during the resiliency improvement project.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0' - 0"
SHEET
NAVFAC DRAWING NO.
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
PU
BL
IC
W
O R
KS
D
EP
AR
TM
EN
T
- M
AI
N
E N
AV
AL
S H
IP
YA
R D
PO
R
TS
M O
U
TH
, N H
DESIGN MANAGER
PROJECT MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
SY
M
DRAWN BY
DESIGNER
CHECKED BY
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
M
ID
-A
TL
AN
TI
C
JTL
LBT
MMR
SSR
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
1710371
GENERAL SHEET NOTES
GRAPHIC SCALE
NEW WORK KEYNOTES
KEY PLAN
DEMOLITION KEYNOTES
KI
TT
ER
Y, M
AI
NE
PO
RT
SM
OU
TH
N
AV
AL
S
HI
PY
AR
D
P-
B
R
ES
IL
IE
NC
Y
IM
PR
O
VE
M
EN
TS
CO
NT
RA
CT
N
UM
BE
R:
TB
D
PLAN
NORTH
RCRA Metals Analytical Results
P-1112 Power Plan Resiliency Improvements
Portsmouth Naval Shipyard, Kittery, ME
Sample No. Description Element Symbol Concentration (% by weight)
PC-01 White Brick Wall, Saltwater Room
Cadmium Cd 0.0068
Chromium Cr 0.55
Lead Pb 3.8
PC-02 Green Bric Wall, Saltwater Room
Cadmium Cd 0.0021
Chromium Cr 0.86
Lead Pb 4.1
PC-03
Creen Crane
Beam, Saltwater Room
Cadmium Cd 0.0071
Chromium Cr 0.0029
Lead Pb 12
PC-04
Red Concrete
Floor, Saltwater Room
Cadmium Cd 0.00074
Chromium Cr 0.0043
Lead Pb 0.077
PC-05
Blue Concrete Wall, Maintenance Room
Cadmium Cd 0.00052
Chromium Cr 0.0037
Lead Pb 0.047
PC-06
Gray Concrete Floor, Maintenance Room
Cadmium Cd 0.0012
Chromium Cr 0.034
Lead Pb 0.064
PC-07
Green Concrete
Foundation, Saltwater Room
Cadmium Cd 0.0092
Chromium Cr 0.26
Lead Pb 9.4
Table 3-2 Hexavalent Chromium Analytical Results
P-1112 Power Plan Resiliency Improvements
Portsmouth Naval Shipyard, Kittery, ME
Sample No. Sample Location
Description of Material
Total Cr6+ Content (%) by weight)
Cr(V1)-01 Saltwater Room
Green Brick Wall 0.25%
Cr(V1)-02 Maintenan ce Room
Gray Concrete
Floor 0.00057%
Table 4-1 PCB Sampling
P-1112 Power Plan Resiliency Improvements
Portsmouth Naval Shipyard, Kittery, ME
Sample No. Sample Location Description of Material Total PCB Content (mg/kg)
PCB-01 Saltwater Room White Brick Wall 1.370
PCB-02 Saltwater Room Green Brick Wall 1.160
PCB-03 Saltwater Room White Brick Wall (Opening) 4.090
PCB-04 Saltwater Room White Brick Wall 0.511
PCB-05 Saltwater Room Black Foundation Coating ND
PCB-06 Saltwater Room Red Brick Wall 3.400
PCB-07 Saltwater Room White Brick Wall (Opening) 2.130
PCB-08 Saltwater Room Red Concrete Floor 3.510
PCB-09 Saltwater Room Blue Concrete Wall 2.160
PCB-10 Saltwater Room White Crane Wall 6.170
PCB-11 Saltwater Room Red Crane Rail 2.660
PCB-12 Maintenance Room Red Concrete Floor 1.290
PCB-13 Maintenance Room Blue Concrete Wall 1.230
PCB-14 Maintenance Room Blue Metal Doorframe 2.170
PCB-15 Maintenance Room White Concrete Wall 1.530
Table 4-2 Asbestos Containing Material Bulk Sample Results
P-1112 Power Plan Resiliency Improvements
Portsmouth Naval Shipyard, Kittery, ME
Sample No. Sample Location Description of Material Percent and Type of Asbestos
01A Saltwater Room Wall Paint No Asbestos Detected
01B Saltwater Room Wall Paint No Asbestos Detected
01C Saltwater Room Wall Paint No Asbestos Detected
01D Saltwater Room Wall Paint No Asbestos Detected
01E Saltwater Room Wall Paint No Asbestos Detected
02A Saltwater Room Floor Leveler No Asbestos Detected
02B Saltwater Room Floor Leveler No Asbestos Detected
02C Saltwater Room Floor Leveler No Asbestos Detected
03A Saltwater Room Floor Sandy Debris No Asbestos Detected
03B Saltwater Room Floor Sandy Debris No Asbestos Detected
03C Saltwater Room Floor Sandy Debris No Asbestos Detected
04A Saltwater Room Condensate Pipe Insulation No Asbestos Detected
040B Saltwater Room Condensate Pipe Insulation No Asbestos Detected
04C Saltwater Room Condensate Pipe Insulation No Asbestos Detected
05A Saltwater Room Condensate Pipe Wrap No Asbestos Detected
05V Saltwater Room Condensate Pipe Wrap No Asbestos Detected
05C Saltwater Room Condensate Pipe Wrap No Asbestos Detected
06A Maintenance Room Door Frame Caulk No Asbestos Detected
06B Maintenance Room Door Frame Caulk No Asbestos Detected
06C Maintenance Room Door Frame Caulk No Asbestos Detected
07A Exterior Saltwater Room Brick Mortar No Asbestos Detected
07B Exterior Saltwater Room Brick Mortar No Asbestos Detected
07C Exterior Saltwater Room Brick Mortar No Asbestos Detected
08A Exterior Saltwater Room Foundation Mastic No Asbestos Detected
08B Exterior Saltwater Room Foundation Mastic No Asbestos Detected
08C Exterior Saltwater Room Foundation Mastic No Asbestos Detected
H-101
HA
ZA
RD
O
US
M
AT
ER
IA
L
PL
AN
O
F
FAC-YR-NUM
SS
SS
AAH
A
B72 EXISTING FLOOR PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
DRAWFORM REVISION: 07 AUG 2018
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1/8" = 1'
AutoCAD SHX Text scale
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text feet
AutoCAD SHX Text
AutoCAD SHX Text
1. EXISTING SALTWATER ROOM IS CONSIDERED A HISTORIC EXISTING SALTWATER ROOM IS CONSIDERED A HISTORIC STRUCTURE. CONTRACTOR SHALL COORDINATE ABATEMENT OPERATIONS AND METHODOLOGIES WITH PWD CULTURAL RESOURCE MANAGER OR POINT OF CONTACT. 2. REFER TO SHEET H-102 FOR ADDITIONAL SAMPLING IN B72 AND REFER TO SHEET H-102 FOR ADDITIONAL SAMPLING IN B72 AND B242.
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text HAZARDOUS MATERIALS NOTES: 1) THE FOLLOWING SPECIFICATIONS APPLY: THE FOLLOWING SPECIFICATIONS APPLY: a) SECTION 02 82 00.00 22 - ASBESTOS REMEDIATION SECTION 02 82 00.00 22 - ASBESTOS REMEDIATION b) SECTION 02 83 00.00 22 - MANAGEMENT OF LEAD, CADMIUM, SECTION 02 83 00.00 22 - MANAGEMENT OF LEAD, CADMIUM, AND CHROMIUM (VI) DURING RENOVATION, DEMOLITION, CONSTRUCTION, REMOVAL AND ABATEMENT c) SECTION 02 84 33 - REMOVAL AND DISPOSAL OF SECTION 02 84 33 - REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBS) 2) THERE IS THE POTENTIAL FOR HAZARDOUS MATERIALS WITHIN THE THERE IS THE POTENTIAL FOR HAZARDOUS MATERIALS WITHIN THE PROJECT SCOPE OF WORK AREA INCLUDING ASBESTOS, HEAVY METALS, POLYCHLORINATED BIPHENYLS AND OTHER HAZARDOUS OR REGULATED MATERIALS. 3) OBTAIN PERMITS AND LICENSES REQUIRED FOR THE MANAGEMENT, OBTAIN PERMITS AND LICENSES REQUIRED FOR THE MANAGEMENT, REMOVAL AND TRANSPORT OF HAZARDOUS MATERIALS TO INCLUDE ASBESTOS CONTAINING MATERIALS (ACM), LEAD, CADMIUM AND CHROMIUM (VI) CONTAINING PAINT AND DUST, AND POLYCHLORINATED BIPHENYL (PCB) CONTAINING MATERIALS AND DEBRIS IN ACCORDANCE WITH THE SPECIFICATIONS, LOCAL, STATE AND FEDERAL REGULATIONS. DISPOSAL OF HAZARDOUS WASTE IS BY THE GOVERNMENT. 4) REMOVE EXISTING ASBESTOS CONTAINING MATERIALS IN ACCORDANCE REMOVE EXISTING ASBESTOS CONTAINING MATERIALS IN ACCORDANCE WITH THE SPECIFICATIONS, FEDERAL, STATE AND LOCAL REGULATIONS. DISPOSAL OF HAZARDOUS MATERIAL IS BY THE GOVERNMENT. 5) EXISTING PAINT COATINGS WERE FOUND TO CONTAIN LEAD, CADMIUM EXISTING PAINT COATINGS WERE FOUND TO CONTAIN LEAD, CADMIUM AND CHROMIUM (VI) (LCC). MANAGE LCC PAINT IN AREAS INDICATED IN ACCORDANCE WITH SECTION 02 83 00.00 22 AND APPLICABLE STATE AND FEDERAL REGULATIONS. DISPOSAL OF HAZARDOUS MATERIAL IS BY THE GOVERNMENT 6) DESIGNATED MATERIALS HAVE BEEN FOUND TO CONTAIN GREATER THAN DESIGNATED MATERIALS HAVE BEEN FOUND TO CONTAIN GREATER THAN 2 PARTS PER MILLION (PPM) BUT LESS THAN 50 PPM POLYCHLORINATED BIPHENYLS. REMOVAL AND DISPOSAL OF THESE MATERIALS MAY REQUIRE SPECIAL HANDLING AND DISPOSAL IN ACCORDANCE WITH SECTION 02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBS) AND SECTION 01 57 19.00 22 TEMPORARY ENVIRONMENTAL CONTROL. 7) DISPOSAL OF HAZARDOUS MATERIALS WILL BE BY THE GOVERNMENT. DISPOSAL OF HAZARDOUS MATERIALS WILL BE BY THE GOVERNMENT. THIS INCLUDES BUT IS NOT LIMITED TO MATERIALS CONTAINING >1% ASBESTOS, >50 PPM PCBS, AND PAINT CHIPS CONTAINING HEAVY METALS ABOVE THE RCRA LIMIT. DISPOSAL OF CONSTRUCTION AND DEMOLITION MATERIALS, INCLUDING THOSE COATED WITH PAINT CONTAINING <50 PPM PCBS AND/OR HEAVY METALS ABOVE TSCA LIMITS WILL BE BY THE CONTRACTOR. CONTRACTOR RESPONSIBLE FOR CONDUCTING ANY REQUIRED WASTE CHARACTERIZATION SAMPLING IN ACCORDANCE WITH SECTION 01 57 00.
| Sheets and Views |
| H-101 Hazardous Materials Plan-H-101 Hazardous Materials Plan B72 |
| H-101 Hazardous Materials Plan-H-102 Hazardous Materials Plan B72 |
File details come from the government source that posted it. Updated .