PRICE SCHEDULE
Provide line-item prices, where indicated by blank underlines, for the following items:
Line Item
| Description |
| Quantity |
| Unit |
| Unit Price |
| Sub- |
Total Total Price
| 0001 |
| BASE PRICE: Total Price for Line Item 0001 (includes subtotal of 0001A – 0001O), the entire work for Project P-1112 B72 Resiliency Improvements. The project objective is to provide a desalination plant to produce 400,000 GPD, housed in Building 72 and supplied from a new pump station in Building 242 in accordance with the drawings and specifications, complete, but excluding work provided in another priced line item. |
| 0001A |
| Subtotal of Base Price for hazardous material sampling, abatement, removal, mitigation, and monitoring for B72 Pump Room S, including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
| 0001B |
| Subtotal of Base Price for hazardous material sampling, abatement, removal, mitigation, and monitoring for B242, including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
| 0001C |
| Subtotal of Base Price for hazardous material sampling, abatement, removal, mitigation, and monitoring for B72 Room C, including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
| 0001D |
| Subtotal of Base Price for executing work associated with Room C, including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. Costs shall include architectural features, process features, low voltage (up to 480V) electrical features, mechanical features (HVAC/Plumbing) and all other work associated in this room. Please note piping passing though this room within the pipe chase is not included. |
| 1 |
| EA |
| 0001E |
| Subtotal of Base Price for executing work associated with Pump Room B, including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. Costs shall only include architectural features, structural features, low voltage (up to 480V) electrical features, and mechanical features (HVAC/Plumbing). Desalinization process piping, pumps and equipment shall be excluded. |
| 1 |
| EA |
| 0001F |
| Subtotal of Base Price for executing work associated with Pump Room S, including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. Costs shall only include existing conditions repairs, architectural features, structural features, low voltage (up to 480V) electrical features, and mechanical features (HVAC/Plumbing). Desalinization process piping, pumps and equipment shall be excluded. |
| 1 |
| EA |
| 0001G |
| Subtotal of Base Price for executing all structural work associated with Pump Room S, including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
| 0001H |
| Subtotal of Base Price for executing all Desalinization Process work associated with Intake, B242, Pump Room S, Pump Room B, and Outfall, including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
| 0001I |
| Subtotal of Base Price for executing work for all Medium Voltage (in excess of 480V) Electrical features of the project, including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
| 0001J |
| Subtotal of Base Price for executing all work associated with Site Civil features including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
| 0001K |
| Subtotal of Base Price for executing all site structural work such as micropiles, concrete pads etc. including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
| 0001L |
| Subtotal of Base Price for executing all work associated with process instrumentation including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
| 0001M |
| Subtotal of Base Price for executing work for the installation of the fire protection system including sprinkler system piping and sprinkler heads, pipe, valves, and fittings including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
| 0001N |
| Subtotal of Base Price for providing vendor recommended spare parts supporting maintenance including but not limited to all labor, material, equipment, coordination, but excluding work provided in another line item. |
| 1 |
| EA |
| 0001O |
| Subtotal of Base Price for executing work for the installation of maintenance workshop and all associated work within B72 in accordance with the drawings and specifications including but not limited to all labor, material, equipment, coordination, outage coordination, and supervision required in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
North and South Cooling Tower Permeate Supply. Price for providing and installing piping, pumps and controls to connect the permeate tank to independently feed both north and south cooling tower make up water system and associated electrical work in accordance with the drawings and specifications, but excluding work provided in another line item.
Piping Material Substitution. Price to provide, acquire and install copper nickel piping in lieu of plastic piping that conveys saltwater where used in accordance with the drawings and specifications, but excluding work provided in another line item.
B72 To Berth 5 Saltwater Tunnel. Price for abandoning in place saltwater tunnel (including filling with CDF) from B72 to Berth 5 and branch from B242 in accordance with the drawings and specifications, but excluding work provided in another line item. Assume minimum of 4 excavation locations as indicated on the drawings.
B72 To Manhole/Structure 8-61 Saltwater Tunnel. Price to abandoning in place saltwater tunnel (including filling with CDF) from B72 to drain manhole/structure 8-61 in accordance with the drawings and specifications, but excluding work provided in another line item.
Re-routing of storm drainage. Total Price for Line Item 0006 (includes subtotal of 0006A – 0006B) in accordance with the drawings and specifications, but excluding work provided in another priced line item.
| 0006A |
| Part A: Manhole/structure 8-61 to Berth 4 Saltwater tunnel: Abandoning in place saltwater tunnel (including filling with CDF) from drain manhole/structure 8-61 to Berth 4 in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
| 0006B |
| Part B: Storm Drain line: Replace drain structure 8-61 and provide new storm drainpipe to storm drain SD54-A1 in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1 |
| EA |
Post construction completion follow-on services. Price to provide continuing operation of the desalination plant after project completion and commissioning for one year in accordance with the drawings and specifications, but excluding work provided in another line item.
Temp ASW System. Price to install a temporary auxiliary saltwater system in accordance with the drawings and specifications, but excluding work provided in another line item.
Stair in Pump Room S. Price to demolish existing stair within B72 Pump Room S and installation of new stair in accordance with the drawings and specifications, but excluding work provided in another line item.
Repointing and Repairing of Existing Brick in Pump Room S. Price to repoint and correct existing deficiencies for the existing historic brick in B72 Pump Room in accordance with the drawings and specifications, but excluding work provided in another line item.
Bridge Crane. Price to install bridge crane including concrete work in B72 Pump Room S in accordance with the drawings and specifications, but excluding work provided in another line item.
Accessory Structure. Price to provide design and construction for an accessory structure including concrete, HVAC and Electrical work in accordance with the drawings and specifications, but excluding work provided in another line item.
TOTAL PRICE FOR CLINs 0001 - 0012 $_____________
GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items (CLINs) 0001-0012 (Base and all options).
b. The Government reserves the unilateral right to award CLINs 0002 through 0012 (Option Items 1 through 11) to the Contractor at the proposed price within 180 calendar days after the contract award, and in accordance with all bid notes. A firm fixed proposed price is required for CLINs 0002 through 0012. No provision is made for economic price adjustment. If CLINs 0002 through 0012 are exercised, the contract completion date remains 900 calendar days after award of the contract.
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the option(s) (CLINs 0002-0012) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the option(s).
d. In FAR 52.217-7; Option for Increased Quantity-Separately Priced Line Item (Mar 1989), the Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
e. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
f. If any of the CLINs 0002 through 0012 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.
g. Failure to enter a price for any CLIN will result in a proposal being rejected.
h. All work required in accordance with the drawings and specifications must be included in the Contractor’s proposed price.
i. All hazardous material shall be delivered to the PNSY Hazardous Waste Facility in Building 357 for disposal in accordance with the project specifications.