Lifting_Eye_Comp_Cut_Sheet_LIFTMAX-PEP-00100 (050726).pdf

PDF 119 KB Posted

Attached to
P1112 B72 Resiliency Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, Maine
Solicitation number
N4008526R0005
Issued by

About this file

This is a technical engineering drawing for a plate-mounted pad eye lifting device manufactured by Bishop Lifting Products Inc. The drawing (PEP-00100, Revision 2) specifies a 1 metric ton rated capacity (RC) pad eye designed for below-the-hook lifting applications. The device features a 1/2-inch diameter eye opening with an 5/8-inch radius, dimensions of 5 inches by 4 inches on the mounting plate, and four mounting holes (3/8-inch diameter, typical). The estimated weight is 2.9 pounds.

The drawing includes comprehensive specifications requiring welding per AWS D1.1 standards, cold galvanized coating system, testing to 2.0 times rated capacity per BLP procedures, and compliance with ANSI/ASME B30.20 below-the-hook lifting device requirements. Design temperature range is -20°F to 150°F. Tolerance requirements specify machined surfaces per ASME/ANSI B46.1 with standard fractional tolerances (±1/8" for whole numbers, ±0.02 for decimals to two places, and ±1° for angular dimensions). The drawing contains confidential information and was approved through revision cycles in April 2023, September 2023, and November 2023, with the final check dated November 30, 2023. General notes emphasize that the base structure must be capable of handling applied forces, the pad eye should be oriented to minimize side loads, and all edges should be chamfered approximately 1/8 inch.

View the file

Other files

File Type Posted
N4008526R0005 Amendment 0010.pdf PDF
Attachment H - Price Proposal Form Revision 3.docx DOCX document
N4008526R0005 Amendment 0009.pdf PDF
Attachment H - Price Proposal Form Revision 2.docx DOCX document
N4008526R0005 Amendment 0008.pdf PDF
01 11 00.00 22_RevAmend08.pdf PDF
GC100A_Milestones and Coordination Requirements_20260528.pdf PDF
31 00 00.00 22_Attachment A_Salt Water Tunnels and Building 72_Historical Drawings.pdf PDF
00 01 15_RevAmend08.pdf PDF
J and A ML-26-51 P1112 B72 Resiliency Controller Redacted.pdf PDF
098 S-502 Rev. 1 P-1112.pdf PDF
075 S-102 Rev. 1 P-1112.pdf PDF
102 S-506 Rev. 1 P-1112.pdf PDF
A-400 - ENLARGED PLAN -PUMP ROOMS B AND S AND C.pdf PDF
094 S-308 Rev. 1 P-1112.pdf PDF
101 S-505 Rev. 1 P-1112.pdf PDF
A-450 - ENLARGED PLAN DETAILS.pdf PDF
P-1112 Drawing Updates 2026-04-29.pdf PDF
086 S-124 Rev. 1 P-1112.pdf PDF
072 S-001 Rev. 1 P-1112.pdf PDF
N4008526R0005 Amendment 0007.pdf PDF
08 53 00.pdf PDF
N4008526R0005 Amendment 0006.pdf PDF
41 22 13.14.pdf PDF
N4008526R0005 Amendment 0005.pdf PDF
PPI 98 - V-104 Archaeology Area Outlined.pdf PDF
PPI 203 - COMNAVREGMIDLANTINST_11320_11B.pdf PDF
PPI 200 - 32 17 23.pdf PDF
Attachment H - Price Proposal Form Revised.docx DOCX document
PPI 166 - Air Valve Detail.pdf PDF
PPI 137 - 46 30 00 Attachments 1 to 4.pdf PDF
PPI 198 - 26 56 00.pdf PDF
PPIs 181.182.183.208 - Schedule of Special Inspections.pdf PDF
PPI 91 - Sheet 7 of 226 - H-101.pdf PDF
Option 13 - Accessory Structure_REV2.pdf PDF
A-500 - WALL SECTIONS.pdf PDF
N4008526R0005 Amendment 0004.pdf PDF
N4008526R0005 Amendment 0003.pdf PDF
N4008526R0005 Amendment 0002.pdf PDF
P-1112 B72 Resiliency Improvement Site Visit Log.pdf PDF
N4008526R0005 Amendment 0001.pdf PDF
DBIDS 5500 Form.docx DOCX document
Memorandum - Bidding Notes P-1112.pdf PDF
Attachment H - Price Proposal Form.docx DOCX document
P-1112 Specifications.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment G - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
P-1112 Drawings.pdf PDF
DBIDS 5512 Form.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PEP-00100

B SIZE SCALE:NTS

REV.

DWG NO.THIRD ANGLE

PROJECTION

EST. WT. 2.9 lbm SHEET 1 OF 1

REVISION HISTORY

REV. DESCRIPTION DATE APPROVED

0 PRELIMINARY 4-14-23 AQ

1 UPDATED WELD SIZE 09-05-23 OO

2 INTERNAL UPDATES 11-29-23 OO

THIS DRAWING CONTAINS CONFIDENTIAL INFORMATION.

DATA CONTAINED WITHIN IS TO BE USED FOR INTENDED

PURPOSES ONLY. NO DUPLICATION OR DISCLOSURE ALLOWED

WITHOUT PRIOR WRITTEN CONSENT FROM BISHOP LIFTING

PRODUCTS INC. ALL DUPLICATES SHALL BE RETURNED OR

DESTROYED IMMEDIATELY UPON REQUEST!

UNLESS NOTED

ALL MACHINED

SURFACES PER

ASME/ANSI B46.1

TITLE

10340 WALLISVILLE RD.

HOUSTON,TEXAS 77013

WWW.LIFTING.COM • (713)674-2266

CHECK OFF

ACTION APP. DATE

DESIGN AQ 4-14-23

DRAWN OO 11-29-23

ENG. CH 4-14-23

CHK. CH 11-30-23

µin

ALL FRACTIONAL u 1/8" .0 u 0.1 .00 u 0.02 .000 u 0.005

ANGULAR TOLERANCE

UNLESS NOTED

ALL ANGULAR DIM. u 1v

PROJECT: REF # UPE-001000

TOLERANCE UNLESS NOTED

DRAWING APPROVAL

BY

DATE

AS DRAWN AS NOTED

GENERAL NOTES:

1. WELDING PER AWS D1.1.

2. ENSURE BASE STRUCTURE IS CAPABLE OF HANDLING FORCES APPLIED BY PADEYE.

3. ORIENT PADEYE IN DIRECTION OF SLING TO MINIMIZE SIDE LOAD.

4. TESTING SHALL BE PERFORMED AS PER BLP PROCEDURE TO 2.0 X RATED CAPACITY.

5. BREAK ALL EDGES AND CORNERS UNLESS OTHERWISE SPECIFIED, CHAMFER EDGES APPROX. 1/8".

6. THIS PADEYE MEETS OR EXCEEDS ANSI/ASME B30.20 BELOW THE HOOK LIFTING DEVICES REQUIREMENTS.

7. COATING SYSTEM SHALL BE COLD GALVANIZED.

8. DESIGN TEMP. -20 DEG F TO 150 DEG F.

BLP PLATE MOUNTED PAD EYE

RC 1 METRIC TON

2"

2-1/2"

3"

5"

4"

2"

O 1/2"

R 5/8"

1/2"

1/2"

XXX XXX XXXX

XX XXX XXX

STAMP SN,RC,PN.

O 3/8"

TYP.

File details come from the government source that posted it. Updated .