This is Amendment 0006 to solicitation N4008526R0005, a Design-Bid-Build (DBB) project for P1112 B72 Resiliency Improvements at Portsmouth Naval Shipyard (PNSY) in Kittery, Maine, issued by NAVFACSYSCOM Mid-Atlantic on 12 May 2026. The amendment extends the proposal due date from 21 May 2026 to 28 May 2026, both at 2:00 PM EDT, while the PPI (Prospective Prime Information) cutoff date remains unchanged at 23 April 2026. The contracting officer is James A. Godwin.

The amendment incorporates specification and drawing revisions across multiple disciplines and provides responses to 41 previously submitted PPIs. Key revisions include: specification changes to roof hatches (Section 05 50 13 2.10) detailing aluminum construction with specific dimensions and safety features; clarification on stair treads to be metal grate rather than concrete-filled; confirmation that all stairs use metal grate construction; specification updates for floor hatches with loading capacity of 300-lbf/sq ft; and deletion of manufacturer's technical representative requirements from final testing procedures. Additionally, the amendment clarifies bid option scopes, including confirmation that Option 8 (Workshop installation) is now a CLIN 0001O under the base bid; defines small business participation requirements at 20 percent minimum for Factor 5 evaluation; addresses extensive piping material specifications including copper-nickel (CuNi), super duplex stainless steel (SDSS), and polypropylene materials with specific clarifications on transition points and routing; confirms fire-rating requirements for structural members and wall assemblies; specifies 14 sample valve locations throughout the process system; and provides detailed responses on electrical equipment placement, HVAC sizing, and compliance with UFC 4-010-06 cybersecurity standards for networked devices. The PPI responses address technical questions regarding structural details, mechanical systems, electrical design, plumbing materials, and project scope clarifications essential for accurate proposal development.

View the file

Other files

File Type Posted
N4008526R0005 Amendment 0010.pdf PDF
Attachment H - Price Proposal Form Revision 3.docx DOCX document
N4008526R0005 Amendment 0009.pdf PDF
GC100A_Milestones and Coordination Requirements_20260528.pdf PDF
N4008526R0005 Amendment 0008.pdf PDF
Attachment H - Price Proposal Form Revision 2.docx DOCX document
01 11 00.00 22_RevAmend08.pdf PDF
31 00 00.00 22_Attachment A_Salt Water Tunnels and Building 72_Historical Drawings.pdf PDF
00 01 15_RevAmend08.pdf PDF
098 S-502 Rev. 1 P-1112.pdf PDF
A-450 - ENLARGED PLAN DETAILS.pdf PDF
101 S-505 Rev. 1 P-1112.pdf PDF
102 S-506 Rev. 1 P-1112.pdf PDF
Lifting_Eye_Comp_Cut_Sheet_LIFTMAX-PEP-00100 (050726).pdf PDF
P-1112 Drawing Updates 2026-04-29.pdf PDF
072 S-001 Rev. 1 P-1112.pdf PDF
086 S-124 Rev. 1 P-1112.pdf PDF
J and A ML-26-51 P1112 B72 Resiliency Controller Redacted.pdf PDF
N4008526R0005 Amendment 0007.pdf PDF
41 22 13.14.pdf PDF
N4008526R0005 Amendment 0005.pdf PDF
PPI 98 - V-104 Archaeology Area Outlined.pdf PDF
PPI 198 - 26 56 00.pdf PDF
PPI 203 - COMNAVREGMIDLANTINST_11320_11B.pdf PDF
PPIs 181.182.183.208 - Schedule of Special Inspections.pdf PDF
PPI 137 - 46 30 00 Attachments 1 to 4.pdf PDF
PPI 91 - Sheet 7 of 226 - H-101.pdf PDF
PPI 166 - Air Valve Detail.pdf PDF
A-500 - WALL SECTIONS.pdf PDF
N4008526R0005 Amendment 0004.pdf PDF
PPI 200 - 32 17 23.pdf PDF
Option 13 - Accessory Structure_REV2.pdf PDF
N4008526R0005 Amendment 0003.pdf PDF
N4008526R0005 Amendment 0002.pdf PDF
P-1112 B72 Resiliency Improvement Site Visit Log.pdf PDF
N4008526R0005 Amendment 0001.pdf PDF
DBIDS 5500 Form.docx DOCX document
Attachment H - Price Proposal Form.docx DOCX document
Attachment G - Small Business Subcontracting Plan (SBSP) Template.docx DOCX document
P-1112 Drawings.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment C - Construction Experience Data Sheet.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment A - PPI Log Template.xlsx XLSX spreadsheet
N4008526R0005.pdf PDF
DBIDS 5512 Form.pdf PDF
Memorandum - Bidding Notes P-1112.pdf PDF
P-1112 Specifications.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment D - Past Performance Questionnaire.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): SOLICITATION NUMBER N40085-26-R-0005, DESIGN-BID-BUILD (DBB) P1112 B72

RESILIENCY IMPROVEMENTS, PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE

The proposal due date of 21 May 2026 NLT 2:00 PM EDT has been extended to 28 May 2026 NLT 2:00 PM EDT.

The Amendment is issued to incorporate the following:

1. Provide Specification/Drawing revisions (See summary of revisions).

2. Provide responses to PPIs (additional PPI responses will be forthcoming via Amendment(s)).

3. Extend the proposal due date from 21 May 2026 to 28 May 2026 NLT 2:00 PM EDT. The PPI cutoff date of 23 April 2026 NLT 2:00 PM EDT remains unchanged.

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Date 21 May 2026 28 May 2026

N4008526R00050006

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

1. Specification Continuation Sheet:

Spec No.

Part / Subpart /

Paragraph Summary of Revision PPI No.

05 50 13 2.9

Revise section to state: “Provide aluminum sheets not less than 14 gauge with 3 inch beaded flange, welded and ground at corners. Provide a minimum clear opening of 48 by 72 inches. Insulate cover and curb with 1 inch thick rigid fiberboard insulation, covered and protected by aluminum sheet of not less than 26 gauge. Provide with 12 inches high curb, formed with 3 inch mounting flanges with holes for securing to the roof deck.”

n/a

05 50 13 2.10

Add section 2.10 Floor Hatches: Provide aluminum sheets not less than 14 gauge with 3 inch beaded flange, welded and ground at corners. Provide a minimum clear opening of 30 by 36 inches unless otherwise noted. Single leaf opening, covered and protected by aluminum sheet of not less than 26 gauge. Loading capacity to be 300-lbf/sq ft pedestrian live load. Cover to have an odor gasket, heavy duty butt hinges with stainless steel pins, adjustable counterbalancing springs, heavy duty open arm that automatically locks door open at 90-degrees, release handle with vinyl grip that allows for one-handed enclosure and recessed lift handle.

Latch to be stainless steel slam latch with a lock with a removable handle. Provide safety accessories such as insertable safety posts and chains around the entire perimeter of the floor hatch with a safety net / fall protection system at floor.

21 13 13 3.6.4 Delete “a. the manufacture’s technical representative.”

41 22 13.14 See updated specification section 302, 303, 304

2. PPI Responses:

PPI Reference Question Government Response

Page Section Para.

N400852

6R0005 -

Page 9 &

7. Small

Business

Subcontracti ng Plan &

Factor 5, Small

Business

Utilization and

Participation

3rd &

Last

The Small Business (SB) % shows to be 40% on page 9; and 20% on page 15. Please confirm the minimum Small Business (SB) goal is 20 % of the total contract value on this project.

The 40% referenced on page 9 is

NAVFAC's command-wide small business subcontracting target for

Small Business (SB). The 20% referenced on page 15 is the minimum required small business participation for the Factor 5 submittal requirements. See basis of evaluation for Factor 5 to see how this requirement is evaluated.

A-400;

A-450

Reference section B/A-450 regarding Stair 2 stair treads. Stair treads appear to show as concrete filled stair pans. All other stair

All stairs to be metal grate.

treads for this project show as grated treads. Are Stair 2 treads to be grated treads or concrete fill stair pans.

D-102, S-122

Reference sheet no. D-102 regarding Bilco 30"x36" access hatch. Please provide model number and rating for the access hatch.

Refer to revised specification 05 50

13 paragraph 2.10.

D-102 &

D-408

CLIN Number 0003, Bid Option 2 states to provide Copper Nickle

Piping in lieu of Plastic piping that conveys Saltwater. Drawing D-

102, Keynote 1 states similar info.

Drawing D-408 shows the Raw

Water piping coming from

Building 242 and entering Building

72 running to the Ultrafilters, however, there is no mention on this line being CuNi as an option.

Please Clarify the extents of this

Bid Option, is it to start at the quay wall Intake Face Plate and stop at the glass lined DIP at the Pig launcher outside Building 242, or is it to run all the way to Building

72 and into the Ultrafilters?

The limit of the bid options is gate valve 7-GV1-001 Room S. Refer to D

407 Section A.

C-102 Please advise if soils excavated within the Installation Restoration

(IR) limits can be re-used as backfill, or if they must be disposed off site

IR soil shall not be reused as backfill, and it must be disposed of off-site.

C-102 For soils within Installation

Restoration (IR) limits, please advise if the contractor is responsible for costs for transportation, disposal, and testing/sampling.

Testing, transport, and disposal of IR soils is by Gov't. Contractor is responsible for excavating, stockpiling, and loading trucks provided by Gov't. Temporary stockpiles shall be located in the same IR area where the materials were generated.

A-102 Drawing A-102 and the associated

Elevation and Demolition drawings state that the New Workshop to be installed is Bid Option #8. This does not appear to be consistent with the Bid Form. Please advise if this work is part of the base bid, or is a bid option.

Refer to memorandum issued 12 Nov.

2025 which changes Option 8

(formally CLIN 009) to a CLIN

0001O which is now an item under the base bid.

A-103 Ref. Fire Rating - Plan A-103

Shows an area 10 feet from existing wall to be fire rated. In contrast, A-410 shades the entire bay adjacent to the existing building as 1hr rated. Please confirm the extents of the rated roof assembly.

A103 shows extent of fire rated roofing assembly.

A410 shaded area shows extent of structural members to be 1 hr rated.

Refer to Note #1 on sheet A400.

A-103 Ref. Fire Rating - Plan A-103

Shows an area to be fire rated. In contrast, A-410 shades the entire bay adjacent to the existing building as 1hr rated roofing.

Refer to PPI 268.

Rated roof details are not included, please provide.

1 07 81 00 1.2.1 Ref. Gen. Requirements -

Specification requires all structural steel and steel roof decks be intumescent paint coated. MB roofing is insulation over purlins.

Please confirm if only the framing and/or purlins require fireproofing.

All structural members new and existing within building envelope, including purlins which are structural members by PEMB manufacturer, need intumescent coating.

A-450 Detail

G

Ref. Shaft Wall - There is only 3-

1/2" between the brick and framing. How will the drywall between existing wall and shaft wall framing be installed?

Inside panels are 24" wide. Panels to be installed with channel stud. Refer to manufacturer’s instructions for construction of Shaft Wall Assembly.

A-450 Detail

G

Ref. Shaft Wall - Will firestopping be required all sides, top and bottom of the 2hr rated shaft wall?

Yes.

A-450 Detail

G

Ref. Shaft Wall Exp. Joint - Will firestopping be required all expansion joints between 2hr rated shaft wall and existing wall?

Yes.

A-503 Detail

B

Ref. Exp. Joint - Wall panels require recompressed foam expansion joint materials. This roof detail does not include the same material. Will Exp. Joint materials be required at roof?

Joint materials required per manufacturer of PEMB/roof.

A-400 Ref. CMU Infills Fire Rating -

Detail 1B on A-003 refers to S102 for details, S102 is a floor plan for

Room S. Detail C on S-503 shows a CMU Wall Detail with attachment at the top to purlins and doweling into floor for top and bottom of infills. Please confirm if firestopping will be required at the top of CMU walls (1-2" gap).

Fire stopping to be used to maintain fire rating of entire wall assembly.

EL102 Ref. Room C Equipment Platform

Lighting - Plans show two fixtures above the equipment platform.

Please confirm if lighting is to be provided below platform.

Lights shown are for installation beneath the existing equipment platform, above dosing skids.

EP102 Ref. Room C Electrical Equipment

- Leaders indicate power panel

B72D and MCC-B72D at existing wall, graphics show process equipment and VFD's at the same location. Are these above or below the equipment platform?

Panel PP-B72D is located in Pump

Room S. MCC-B72D is located on the exterior of Room C as shown on

EP102. Leaders are calling out homerun circuit numbers for process equipment back to panel and MCC.

D-110 Ref. Chem Fill Station - Location for chem fill station appears to conflict with electrical equipment shown at the same location on

EP102. Please confirm if chem fill station or electrical will move.

See Dwg 110 and D502 (detail A5).

The intention of EP102 is to provide the necessary electrical for the instrumentation on these fill boxes.

Ref. Room C Existing Structure

Fire Rating - Drawings indicate exposed steel structural framing in

Room C. Room is 2 hour rated construction. Please confirm if the existing structural steel requires any treatment for fire rating.

Provide intumescent coating on the two structural columns that are within

Room C.

D-110 Ref. Chem Fill Station 2 - Location for chem fill station outside double doors appears to conflict with electrical junction boxes shown at the same location on EP102.

Please confirm if chem fill station or electrical will move.

Refer to PPI 287.

M600 Ref. Emergency Eyewash and

Shower - Specifications require 20 gpm at 30psig and .4 gpm at 30 psig. Schedule on M600 conflicts, which is correct?

Specifications are correct, flow shall be 0.4 gpm at 30 psi.

FX500 Ref. Flow Switch - FX500 indicates a flow switch on the incoming fire protection piping to

Room C. The FA drawings do not indicate any inclusion of this device. Please confirm if this switch will be connected to the existing FA system and if so, provide routing to FACP.

See response to PPI 296.

17 21 13 13 3.6.4.a Ref. Gov't Final Tests -

Specification requires the manufacturer's technical representative to attend final testing. The manufacturer of which product?

Deleted paragraph 3.6.4.a.

Given the highly technical process system, size and complexity of the project, please extend the proposal due date to May 30.

See proposal due date extension.

42 22 13.14 Specification requires hoist headroom not to exceed 24 inches measured from the hook saddle to the underside of the bridge girder.

1. Please clarify the basis for this requirement. Commercially available wire rope hoists meeting

CMAA Class C/H4 duty are not typically available within this headroom constraint.

2. Is this a strict requirement, or can equivalent systems with greater headroom be considered if all other performance and clearance requirements are met?

See revised section 41 22 13.14.

42 22 13.14 Please confirm that the non-sparking requirement applies only to the hook nut and does not require a spark-resistant or hazardous-rated crane system or hook.

See revised section 41 22 13.14.

42 22 13.14 Please confirm the required hook approach dimensions and minimum clearances to surrounding structures, as these are not clearly defined in the drawings.

See revised section 41 22 13.14.

D-401 Drawings D-401 calls for 70/30

CuNi Pipe for the Screen Intake

Piping. However, the Pipe

Schedule shown on D-607 states the "Intake-Submerged" is to be

The piping in the dock area is to be

CuNi pipe due to the dimensional constraints of the layout. After the blind flange hatch, the pipe material

"Polypropylene Pressure Pipe".

Please clarify what material the

Intake Pipe should be, if it should be CuNi please update the schedule and provide more information on the CuNi pipe to be used.

transitions to PP-RCT as shown on

Dwg D-401.

D-401 Drawings D-401 calls for 70/30

CuNi Pipe for the Screen Air

Piping. However, the Pipe

Schedule shown on D-607 states the "Air Piping" is to be "316L

Stainless Steel or Aluminum".

Please clarify what material the Air

Pipe should be, if it should be

CuNi please update the schedule and provide more information on the CuNi pipe to be used.

The submerged section as well as section at the wall of air pipe as shown on D-401 is CuNi for seawater resistance. The remaining air pipe shall be coated 316L SS. The 316L

SS pipe exterior surface shall be protected by a polyethylene (PE) or polyvinyl chloride (PVC) coating suitable for exposure to salt water with no effect. Pipe coating must be a three layer system consisting of a fusion bonded epoxy layer, a copolymer adhesive layer, and an extruded polyethylene final layer. The total coating thickness must be 80 mils. The final polyethylene layer color must be black. Yellow is prohibited. Note that the Contractor shall provide flanged connection with isolation kit to prevent galvanic corrosion

D-607 Drawing D-607, Pipe Schedule

Lines 6 & 8, Location Description state "SWRO HSP…" & "BWRO

HSP…". There appears to be no reference to "HSP" in drawings or specs. Please clarify what "HSP" means in the case of Pipe Schedule

Lines 6 & 8.

The correct designations are: SWRO

Feed and Concentrate Line and

BWRO Feed and Concentrate Line.

The Pipe Schedule on D-607 will be revised accordingly to remove “HSP” in the Conformed Drawing Set issued after contract award.

D-607 Drawing D-607, Pipe Schedule

Lines 6 & 8, Pipe Material states

"Super Duplex Stainless Steel

(SDSS)". It appears on the drawings that the only pipe called out to be SDSS is the Line coming off the UF Pumps running to the

Ultra Filters (as shown in section C on D-405). Please clarify where and what lines should be SDSS.

The only pipe called out to be SDSS is the Line coming off the UF Pumps running to the Ultra Filters (as shown in section C on D-405) and the suction and discharge piping for the

SWRO. The pipe schedule will be revised in the Conformed Drawing

Set issued after contract award.

D-404 &

D-411

Drawing D-404 & Drawing D-411, Section B, show the Suction &

Discharge of the SWRO Pump, However, there does not appear to be a material call out on the drawings for these lines. Please clarify what material these pipes should be.

The suction and discharge piping for the SWRO pump as shown on

Drawings D-404 and D-411, Section

B shall be Super Duplex Stainless

Steel.

D

Drawing s

Rooms S & B each have Pneumatic

Operated Valves, However, it appears that there is no information regarding the source of the air or the material type and size of the air pipe. Please provide more information regarding the source of air for Pneumatic Actuators as well

Refer to drawing D-103 for compressed air tie-in location.

Compressed air piping is small bore and shall be field run by contractor.

as the material type and size of the pipe.

D-607 40 05 13 Drawing D-607, Pipe Schedule

Line 16, Pipe Material states

"CPVC Corazon double containment or Duo-Pro double containment system", both of these brands are a hard pipe system.

Drawing D-606, Chem Feed

System Schematics, show the feed piping to be Flexible 1/4 in. Tubing

& 2 in. Rigid Containment Pipe and Flexible 1-1/2 in. Tubing & 4

in. Rigid Containment Pipe. Please clarify which style of Double

Containment System should be provided.

Both systems are acceptable.

D-106 Drawing D-106, Plan View B, shows 4 in. SS Air Scour Pipe, with 3 in. pipe branching off to the blowers. Drawing D-405 views A, B, C, & D, Drawing D-408 view B, and Drawing D-411 view C, all show the piping as 3 in.. Please clarify what size this piping should be through out its run.

Refer to response to PPI 71.

D-405 &

D-605

Drawing D-405 Views B & C state the Air Scour Line is 3 in. SS, and should switch to 70/30CuNi for

Submerged Line. Drawing D-605, Hydraulic Profile appears to show the water level at +6.00 for the UF

Tanks. Drawings D-405 & D-409 appear to show the Air Scour Line stopping at roughly +6.75. Please provide more information regarding UF Tank Water Level, and the full extents of the air piping that is to be submerged.

The transition point occurs at the tank grating elevation, and the submerged

CuNi piping shall extend approximately 4 ft below the grating level.

A-801, A-201

Room M includes installation of

Window W1. Specifications for windows were not provided in

Division 08 - Openings. Please provide specifications for windows.

Spec Section 08 53 00 has been provided for windows.

A-501 Door

Schedule

Door Schedule on A-801 has the jamb detail for door 100B listed as being I/A501, however, no I Detail exists on sheet A-501, please clarify. Same clarification requested for door 150A.

Jamb detail for door 100B and 150A is G/A-501.

A-801 Window/Do or Schedule

Window W1 does not have a glazing/fireproofing denotation.

The walls for Room M are listed as fireproof rating UL U415, however, the door to room M (door

103A) is listed as having no rating.

Please clarify conflicting information. Are the doors and windows to this room intended to be fire rated along with the walls?

Room M is not required to be fire rated. See sheet G-005.

D-106 B Drawings indicated the Air Scour piping is 4 in. above the roof is this correct?

Refer to response to PPI 71.

C-105 Reference sheet no. C-105 New

Work Keynote no. 1 regarding reference to Sheet No. S-310.

Sheet No. S-310 does not pertain to the tunnel interface to Bldg 72.

Please advise as to reference sheet intended for tunnel interface to

Bldg 72.

Refer to sheet S-308 instead of sheet

S-310.

C-102 Reference sheet no. C-102 New

Work Keynote no. 34 regarding reference to Note Nos. 7,8,9. Sheet

No. C-102 Note Nos. 7,8,9 do not pertain to the bulkhead at tunnel interface to Bldg 72. Please advise as to reference sheet and note nos.

intended for tunnel interface to

Bldg 72.

Refer to sheet S-308.

D-505 D Note D has a Sample valve detail but no sample valves have been called out in the drawings or

P&IDs, please provide the amounts of sample valves required and locations.

The sample valve detail shown in

Note D is intended to apply at all key process sampling points. Total of 14 sample valves shall be provided at the following locations:

One upstream and one downstream of the automatic backwash unit

Three UF permeate lines, with a sample tap installed on each individual permeate line

One upstream of the break tank

One after the mixer and upstream of the UF transfer pumps

One on the SWRO permeate line

One on the BWRO permeate line

One on the discharge to the river concentrate line and one on the combined line to river (meter vault)

One on the final permeate line from the permeate tank

Two for UF CIP cleaning: one on the recirculation line and one on the discharge line

The process flow diagram will be updated in the Conformed Drawing

Set issued after award to reflect the locations of all sampling points.

S-102 Reference Sheet no. S-102 section

A which cites for the new 8 in.

slab, SEE B/S-102. Sheet no. S-

102 is silent as to B. Please advise as to correct citation.

The slab shown on B/S-102 has the thickness called out on its respective region of A/S-102.

Eye wash stations are shown in some of the documents but not detailed as provided, please confirm if any eye wash stations and piping are required.

Plumbed emergency stations (eye wash and shower) are shown on MP drawings, scheduled in Drawing M-

600 and specified in the specifications.

Specification s

Will NAVFAC please confirm that the only FRCS that will require 25

05 11 efforts is the SCADA

Section 25 05 11 shall apply as applicable to networked devices.

system? If not, will NAVFAC please issue design specifications under UFC 4-010-06 for those other in-scope FRCS that require cybersecurity?

Current bid date of 4/30 overlaps with bid date for NAVFAC MACC

B60 project also at PNSY. Due to this and as PPI responses are still forthcoming, kindly request extension to 5/14/26 for final bid date for this project to ensure proper vendor coverage and ability to distribute PPI responses and accommodate associated updates once received.

See proposal due date extension.

As PPI responses have not yet been issued and the responses will need to be evaluated and acted upon by all vendors and contractors pricing this project, we request that the proposal submission date be extended to May 21, 2026, to allow for that effort to be effectively completed. It is also noted that some PPI responses may derive follow-up questions that will need to be resolved prior to proposal submission.

See proposal due date extension.

MD-103 Demolition

Key Notes

MD-103 states that there will be no demo in Room M under the base scope. However, per memorandum issued 12NOV2025, the base scope

(option 8) as identified on the correction table, line 0001O is considered option 8. Please confirm if the mechanical demo on

MD-103 is base scope or not, as the interchanged CLINs and options utilization is not clear.

Memorandum issued 12 Nov 2025 is clear as it changes Option 8 (formally

CLIN 009) to a CLIN 0001O which is now an item under the base bid.

BWRO from

SWRO

Cartridge

Filters

Please confirm that the cartridge filters prior to the BWRO are needed. Since the feed from the

BWRO is directly from the SWRO these cartridge filters will likely cause more harm that good. There will be increase hydrological issues, wear and tear of cartridges, and potential risk of adding contaminants via use. Ideally, these could eliminated from the scope/design.

The cartridge filters shall remain in the scope and design

(End of Summary of Changes)

IDCode: J
Page: 1
Pages: 2
AmendNo: 0006
EffDate: 12 May 2026
ReqNo: See Continuation Sheet
ProjNo: WON 1710371
IssCode: N40085
AdmCode:
IssuedBy: NAVFACSYSCOM MID-ATLANTIC

9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395

NORFOLK, VA 23511-0395

UNITED STATES

James Godwin, Email: james.a.godwin41.civ@us.navy.mil Telephone: 7573411999 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N4008526R0005
SolDate: 26 Feb 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section 00 70 00 - Conditions of the Contract
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: JAMES A. GODWIN
ContDate:
CODate: 12 May 2026