Attachment 9 - Drawings Part-8.pdf
PDF 15 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This document outlines a federal contract opportunity for infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The solicitation seeks a general contractor to provide electrical panel upgrades, power systems work, bonding and grounding, UPS installations, building management system integration, HVAC assessments and work, building reconfigurations and renovations including demolition, construction and finishes, data center renovations, communication infrastructure upgrades including network cabling and outlets, physical security improvements, fiber optic backbone assessments and upgrades across campus buildings, and hazardous material abatement. The work locations include various campus buildings. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
DN
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
A B C D E G H I JF
25L2(2) 25L2(1)
25EP403
25EP403
25EP403
25EP403
OFFICE
314A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
WORKROOM
OFFICE
RECEPTION
OFFICE
STAIRWELL NO. 2
S302
OFFICE
KITCHEN
OFFICE
302OFFICE
303D
OFFICE
303C
STORAGE
303B
OFFICE
304A OFFICE
304 MECH. RM.
OFFICE
ASSOCIATE
DIRECTOR
OFFICE
308A
DEPUTY
DIRECTOR
308B
DIRECTOR
308C
RECEPTION
PIPE CHASE
309A
TOILET, MALE
TOILET, FEMALE
OFFICE
OFFICE
TR
313A
STAIRWELL NO. 1
S301
CORRIDOR
H301
CONFERENCE
RM.
STORAGE
303A
HAC
OFFICE
322A
CORRIDOR
H302
ELEVATOR
E-1
CHASE
CH-3-1
TELECOM
FILE RM.
BLDG 25
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
25EP103
BLDG 25 - FLOOR 3 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LTT
CONSTRUCTION
DOCUMENTS
- 3/16" = 1'-0"
1 BLDG 25 - FLOOR 3 - ELECTRICAL PLAN 0' 2' 4' 8'
PROJECT
NORTH
KEY PLAN
GENERAL NOTES
PROJECT
NORTH
KEY NOTES
Revisions: Date:
LRL/WNM LLT/JPS
UP
J T
J T
X8
FF.2HH.9K
F.7
STAIRWELL NO. 3
S103
MECH. RM.
BA105
ASBESTOS RM.
BA107
PBA
AREA A
AREA B AREA C
AREA A
AREA C
AREA A
AREA C
AREA C
X3.3
X4
X4.2
X6.8
X7
X8
2.2
XAXB
XB.4
XC
XC.2
XC.9
XD
XD.8
XE
XF
XH
CC.1C.5DEGJ
4.1
2.1
B AHEKELEMENEPE
XG.3
JE
FF.2HH.9
X5
X6
F.7
AREA B
AREA B
AREA E: SEE
SHEET
51EP100b
AREA D:
SEE
SHEET
51EP100c
ELL
ELEVATOR
MACHINE AND
MAIN
DISCONNECT
PPD
EHP
ATS - 51A
MSB - 51A
EPP
GDP - 51
ATS - LSDP
ATS - CDP
MDP - 51A
LSPD
CDP
EXISTING 350KW
GENERATOR
GENERATOR
CONTROL CABINET
EMERGENCY
GENERATOR
BA100A
MECH. RM.
BA102
CORRIDOR
H005
CHASE
CH-BA-1
ELEC. RM.
BA100
ELEC. RM.
BA101
LAUNDRY CHUTE
BA103
STORAGE
BA108
CORRIDOR
H004
STORAGE
BA109
STAIRWELL NO. 1
S001ELEVATOR PUMP
RM.
BA104
STORAGE
BA106
ELEVATOR NO.2
E-2
AREA A
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP100a
BLDG 51 - FLOOR 0 - AREA A & C -
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1" = 10'-0"
1 BLDG 51 - FLOOR 0 - AREA A - ELECTRICAL PLAN
PROJECT
NORTH
- 1" = 10'-0"
2 BLDG 51 - FLOOR 0 - AREA C - ELECTRICAL PLAN0' 5' 10' 20' 0' 5' 10' 20'
PROJECT
NORTH
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Revisions: Date:
DN
UP
UP
DN
JT
JT
JT
J T
J T
AREA E
TR
BE111
AREAWELLAREAWELL
BE111
51EP400
51EP400
2.2
CC.1C.5
DE
GJ
2.1
B A AEBECEDEHEKELEMENEPEQE
10E
JE
9E
8E
6E
5E
EP1
LP4
CPPA
PP1
B2
CPP1
LSP1
DP1
ATS - LSP1
ATS - CPP1
DP51
ATS - 51
MP51
4160V PRIMARY
LOAD
INTERUPTING
SWITCH & DRY-
TYPE XFMR
7F
7G
7H
51EP400
51EP400
OFFICE
BE101
OFFICE, OPEN
BE102C
OFFICE
BE102A
SHARED OFFICE
BE102
STORAGE
BE102D
TOILET
BE102B
OI&T
BE103
OFFICE, OPEN
BE102E
RECEIVING
BE109
SOILED LINEN
BE107
SOILED UTILITY
BE106
STORAGE
BE110A
TUNNEL ACCESS
BE104
CORRIDOR
H001
ELEVATOR
LOBBY
BE100
STAIRWELL NO. 2
S002
MECH. RM.
BE115 STORAGE
BE105A
MACHINE REPAIR
BE105
MECH. RM.
BE112
STORAGE
BE113
CORRIDOR
H003
OI&T
BE114
CORRIDOR
H005
CRAWL SPACE
Z001
CORRIDOR
H002
ELEVATOR NO.1
E-1
CHASE
CH-BA-1
CHASE
CH-BE-1
CHASE
CH-BE-3
CHASE
CH-BE-2
CHASE
CH-BE-4
DENTAL CLINIC
BE110
CORRIDOR
H005
51-DP-TRA
51-DP-TRB
A
R E
A D
A R
E A
E
AREA B : SEE
SHEET 51EP100a
AREA D
AREA C : SEE
SHEET 51EP100a
AREA E
AREA C : SEE
SHEET 51EP100a
AREA E
CB51 1
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED. AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
9. REFERENCE ONE-LINE DIAGRAM ON SHEET 51EP602 FOR CONDUIT AND WIRE
SIZING.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP100b
BLDG 51 - FLOOR 0 - AREA E -
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1" = 10'-0"
1 BLDG 51 - FLOOR 0 - AREA E - ELECTRICAL PLAN
PROJECT
NORTH
0' 5' 10' 20'
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Revisions: Date:
1 EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET
51EP602 FOR ADDITIONAL INFORMATION.
EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 51EP602
FOR ADDITIONAL INFORMATION.
AREA A
EDP
C1
TOILET, STAFF
1A133A
MED. PREP.
1A133B
NURSE STATION
1A133
OFFICE
1A131
CORRIDOR
H120DAY RM.
1A135
TR
1A139A
2 BED PATIENT
RM.
1A143
TOILET
1A141A
HAC
1A146A
STAIRWELL NO.3
S103
2 BED PATIENT
RM.
1A144
TOILET
1A142A
2 BED PATIENT
RM.
1A142
2 BED PATIENT
RM.
1A138
2 BED PATIENT
RM.
1A140
TOILET
1A138A
2 BED PATIENT
RM.
1A134
EXAM
1A132
STAIRWELL NO.
3A
S103A
CHASE
CH-A-1
DAY RM.
1A137
2 BED PATIENT
RM.
1A141
SOILED UTILITY
1A145
ELEC. CLOSET
1A146
2 BED PATIENT
RM.
1A136
TOILET
1A134A
AREA A
X7 X8
XH
FF.2HH.9K
F.7
AREA B : SEE SHEET 51EP101b
51EP401c
51EP401c
51EP401c
51EP401c
CLEAN LINEN
1A139
AREA A
AREA C : SEE SHEET 51EP101c
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP101a
BLDG 51 - FLOOR 1 - AREA A -
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/8" = 1'-0"
1 BLDG 51 - FLOOR 1 - AREA A - ELECTRICAL PLAN 0' 4' 8' 16'
PROJECT
NORTH
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Revisions: Date:
JT
J T
J T
J T
J T
JT
JT
JT
JT
JT
J T
JT
J T
J T
J T
J T
JT
JT
JT
JT
JT
J T
AREA B
B2
51EP401a
51EP401a
TR
1A102
CONSULTATION
RM.
1A106
CORRIDOR
H108
OI&T
1A107B
LAUNDRY
1A125
TOILET
1A113A
HALLWAY
H119
DAY RM.
1A115
2 BED PATIENT
RM.
1A110
OFFICE
1A101
STORAGE
1A116A
2 BED PATIENT
RM.
1A112
X2 X2.6 X3 X3.3
X4
X4.2
X6.8
X7
X8
XC
XC.2
XC.9
XD
XD.8
XE
XF
XG
XH
GJLMM.9NPP.4Q
4.1
MENEPEUEVEX.EYE
XG.3
FF.2HH.9K
X5
X6
F.7
51EP401a
51EP401a
AREA A : SEE SHEET 51EP101a
AREA B
AREA A : SEE SHEET 51EP101a
AREA C : SEE SHEET 51EP101c
OFFICE
1A131
TOILET
1A129A
STAFF LOUNGE
1A129
2 BED PATIENT
RM.
1A127
OFFICE
1A117
KITCHEN
1A116C
MED. PREP.
1A116B
CORRIDOR
H114
NURSE STATION
1A116
TOILET
1A157
TELECOM
1A123
SUPPLY RM.
1A119
STORAGE
1A120
EXAM RM.
1A121
SHOWER
1A124
CLOSET
1A115A
CORRIDOR
H118B
CONFERENCE
RM.
1A108
EXAM RM.
1A122
2 BED PATIENT
RM.
1A113
TOILET
1A111A2 BED PATIENT
RM.
1A111
2 BED PATIENT
RM.
1A109
TOILET
1A109A
OFFICE, OPEN
1A169
CONSULTATION
RM.
1A105
HAC
1A107A
OFFICE
1A104
NURSE STATION
1A133
TOILET
1A127A
CORRIDOR
H118
CHASE
CH-A-2
SHOWER
1A124
2 BED PATIENT
RM.
1A114
TOILET
1A111A
DAY RM.
1A100
HAC
1A107A
EXAM
1A103
NURSE STATION
1A133
TOILET
1A127A
CORRIDOR
H118
AREA A
AREA D : SEE SHEET 51EP101a
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP101b
BLDG 51 - FLOOR 1 - AREA B -
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/8" = 1'-0"
1 BLDG 51 - FLOOR 1 - AREA B - ELECTRICAL PLAN 0' 4' 8' 16'
PROJECT
NORTH
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Revisions: Date:
T
J T
JT
JT
J T
J T J T
JT
JT
JT
J T J T
J T
JT
J T
J T
JT
JT
J T
J T
J T
JT
JT
JT
J T J T
J T
AREA C
B1 - R
ECP1
EL51
B1 - L
A1
LPK
ELSK
PPK
51EP401b
51EP401b
ELEC CLOSET
1A147A
CORRIDOR
H118A
TOILET
1A128A
2 BED PATIENT
RM.
1A128
DAY RM.
1A147
2 BED PATIENT
RM.
1A148
ELEVATOR NO.2
E-2
TR
1A183
AREA A: SEE SHEET 51EP101a
AREA C
A R
E A
C
X3.3
X4
X4.2
X6.8
X7
X7
2.2
XA
XB
XB.4
XC
XC.2
XC.9
XD
XD.8
XE
XF
XG
XH
CDEG
4.1
B AHEKELEMENEPE
XG.3
JE
FF.2H
X5
X6
F.7
51EP401b
51EP401b
2 BED PATIENT
RM.
1A149
2 BED PATIENT
RM.
1A150
2 BED PATIENT
RM.
1A151
2 BED PATIENT
RM.
1A152
2 BED PATIENT
RM.
1A153 2 BED PATIENT
RM.
1A154
MECH. RM.
1A180
LOUNGE
1A181
LOCKER RM.
1A181A
DAY RM.
1A164
DAY RM.
1A165
STORAGE
1A166
CLEAN LINEN
1A159
OFFICE
1A168
CORRIDOR
H114
LOCKER RM.
1A118
TOILET, FEMALE
1A118B
TOILET, MALE
1A118A
SECLUSION
1A156A
SECLUSION
1A155A
CORRIDOR
H112
HAC
1A160
CORRIDOR
H113
WORK RM. (COPY
RM.)
1A161
OFFICE
1A162
KITCHEN
1A163A
NURSE STATION
1A163
TOILET
1A150A
ELEC CLOSET
1A154B
TOILET
1A154A
LAUNDRY CHUTE
1A178
CHASE
CH-A-2
CHASE
CH-A-2
TOILET
1A148A
CORRDIOR
H116
OFFICE
1A174A
CHASE
CH-A-4
2 BED PATIENT
RM.
1A134
EXAM
1A132
TOILET
1A130A
2 BED PATIENT
RM.
1A130
CORRIDOR
H120
AREA A : SEE SHEET 51EP101a
AREA B : SEE SHEET 51EP101b
AREA C
AREA E : SEE SHEET 51EP101e
AREA B : SEE SHEET 51EP101b
AREA D : SEE SHEET 51EP101d
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP101c
BLDG 51 - FLOOR 1 - AREA C -
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/8" = 1'-0"
1 BLDG 51 - FLOOR 1 - AREA C - ELECTRICAL PLAN 0' 4' 8' 16'
PROJECT
NORTH
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Revisions: Date:
T
J T
JT
JT
JT
JT
JT
JT
JT
JT
J T
J T
JT
JT
JT
JT
JT
JT
JT
JT
AREA D
EP4
PP4L
PP4R
LP3
CORRIDOR
H106
611 SF
OFFICE
1W179
OFFICE
1W180
CLOSET
1W181A
OFFICE
1W181
STORAGE
1W182B
COPY RM.
1W182A
GROUP RM.
1W182
OFFICE
1W146A
CORRIDOR
H106A
OFFICE
1W147
TOILET
1W147A
OFFICE
1W148
STORAGE
1W146B
TOILET
1W178A
OFFICE
1W178
REPORT RM.
1W177
TOILET
1W176A
LOUNGE
1W176
LINEN
1W176B
TOILET
1W174A
FILE RM.
1W174
TEST RM.
1W174B
OFFICE
1W171
CORRIDOR
H109
OFFICE
1W172
TOILET
1W173A
OFFICE
1W173
STORAGE
1W167
OFFICE
1W168
KITCHEN
1W149
TOILET, STAFF
1W150
MED RM.
1W152
LAUNDRY RM.
1W157
TOILET
1W160A
SHOWER
1W160
SOILED UTILITY
1W161
CORRIDOR
H107 NURSE STATION
1W159A
3 BED RM.
1W162
TOILET
1W162ATOILET
1W163A
2 BED PATIENT
RM.
1W163
2 BED PATIENT
RM.
1W164
TOILET
1W164A
WAITING RM.
1W155
MAIN LOBBY
1E101
384 SF
GROUP RM.
1E145
708 SF
TOILET, STAFF
1W177A
OFFICE
1W175
OBSERVATION
1W170
2 BED PATIENT
RM.
1W166
TOILET
1W166A
LOUNGE
1W169
STORAGE
1W151
HAC
1W158
CORRIDOR
H109
ENTRY FOYER
1E100
230 SF
2 BED PATIENT
RM.
1W165
2 BED PATIENT
RM.
1W156
TOILET
1W156A
TOILET
1W153A
SUPPLY RM.
1W155A
GROUP RM.
1E145
708 SF
ENTRY FOYER
1E100
230 SF
2.2
NEPE
QE
QE
RE
RE
SE
SE
3E3E
2E2E
1E1E
4E4E
10E10E
CCE
CCE
BBE
BBE
ZE
ZE
TE
TE
UE
UE
VE
VE
X.E
X.E
YE
YE
AAE
AAE
8E
6E
5E
7F
7G
7H
AREA B : SEE SHEET 51EP101d
AREA D
A R
E A
E
S E
E S
H E
E T
E
P e
A R
E A
D
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP101d
BLDG 51 - FLOOR 1 - AREA D -
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/8" = 1'-0"
1 BLDG 51 - FLOOR 1 - AREA D - ELECTRICAL PLAN 0' 4' 8' 16'
PROJECT
NORTH
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Revisions: Date:
T
J T
JT
JT
JT
JT
JT
JT
J T J T
JT
JT
JT
JT
SM
J T
J T
JT
JT
JT
JT
JT
JT
J T J T
JT
JT
JT
JT
SM
AREA E
PP3
EP3
EP2
PP2 - 2
LP2PP2 - 1
A R
E A
E
AREA E
AREA C: SEE SHEET 51EP101c
2.1
A AEBECEDEHEKELEMENEPE
10E
JE
9E
8E
6E
5E
7F
7G
7H
STAIRWELL NO.1
S101
CORRIDOR
H110
OFFICE
1E145D
STORAGE
1E145A
OFFICE
1E144
STORAGE
1E143
CORRIDOR
H105
CORRIDOR
H106
MAIN LOBBY
1E101
EXAM
1E134
TOILET
1E135B
TOILET
1E133A
TOILET
1E135D
LAUNDRY
1E135
STORAGE
1E137
TOILET
1E139
KITCHEN
1E140
STORAGE
1E129
TOILET
1E129A
LAUNDRY RM.
1E132
EXAM
1E133
CORRIDOR
H102
STORAGE
1E122
OFFICE, OPEN
1E120
CORRIDOR
H101
CORRIDOR
H103
HAC
1E104
STORAGE
1E105
OFFICE
1E107
OFFICE, OPEN
1E108
GROUP RM.
1E110
OI&T
1E109
LOCKER RM.
1E113
TOILET
1E113A
OFFICE
1E111
MED RM.
1E112
NURSE STATION
1E130
TOILET
1E127A
TOILET
1E126A
3 BED PATIENT
RM.
1E127
2 BED PATIENT
RM.
1E124
TOILET
1E124A
2 BED PATIENT
RM.
1E123
TOILET
1E123A
TOILET
1E141A
2 BED PATIENT
RM.
1E115
2 BED PATIENT
RM.
1E116
2 BED PATIENT
RM.
1E118
2 BED PATIENT
RM.
1E117
3 BED PATIENT
RM.
1E119
TOILET
1E114A
GROUP RM.
1E145 OFFICE
1E128
TOILET
1E110A
ELEVATOR NO.1
E-1
ENTRY FOYER
1E100
CHASE
CH-E-2
CHASE
CH-E-4
CHASE
CH-E-3
LINEN CHUTE
1E128A
2 BED PATIENT
ROOM
1E126
2 BED PATIENT
RM.
1E125
STAIRWELL NO.1
S101
CORRDIOR
H116
KITCHEN
1A172
CORRIDOR
H110
OFFICE
1E145D
KITCHEN
1E145C
F.A. PANELS
1E145B
STORAGE
1E145A
OFFICE
1E144
STORAGE
1E143
CORRIDOR
H105
CORRIDOR
H106
MAIN LOBBY
1E101
EXAM
1E134
TOILET
1E135B
LAUNDRY
1E135
STORAGE
1E137
TOILET
1E139
KITCHEN
1E140
STORAGE
1E129
TOILET
1E129A
HAC
1E131
LAUNDRY RM.
1E132
EXAM
1E133
CORRIDOR
H102
STORAGE
1E122
OFFICE, OPEN
1E120
CORRIDOR
H101
CORRIDOR
H103
TOILET, MALE
1E102
HAC
1E104
STORAGE
1E105
TOILET, FEMALE
1E103 OFFICE
1E107
OFFICE, OPEN
1E108
GROUP RM.
1E110
OI&T
1E109
LOCKER RM.
1E113
TOILET
1E113A
OFFICE
1E111
MED RM.
1E112
NURSE STATION
1E130
TOILET
1E127A
TOILET
1E126A
3 BED PATIENT
RM.
1E127
2 BED PATIENT
RM.
1E124
TOILET
1E124A
2 BED PATIENT
RM.
1E123
TOILET
1E123A
TOILET
1E141A
TOILET
1E115A
2 BED PATIENT
RM.
1E115
2 BED PATIENT
RM.
1E116
2 BED PATIENT
RM.
1E118
TOILET
1E117A
2 BED PATIENT
RM.
1E117
3 BED PATIENT
RM.
1E119
TOILET
1E114A
2 BED PATIENT
RM.
1E114
GROUP RM.
1E145
TOILET
1E119A
OFFICE
1E128
TOILET
1E110A
ELEVATOR NO.1
E-1
ENTRY FOYER
1E100
CHASE
CH-E-1
CHASE
CH-E-2
CHASE
CH-E-4
CHASE
CH-E-5
CHASE
CH-E-3
LINEN CHUTE
1E128A
2 BED PATIENT
ROOM
1E126
2 BED PATIENT
RM.
1E125
A R
E A
D
S E
E S
H E
E T
E
P d
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP101e
BLDG 51 - FLOOR 1 - AREA E -
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/8" = 1'-0"
1 BLDG 51 - FLOOR 1 - AREA E - ELECTRICAL PLAN 0' 4' 8' 16'
PROJECT
NORTH
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Revisions: Date:
UP
UPUP
DN
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
FEC
FEC
FEC
FEC
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
OFFICE
OFFICE
OFFICE
BREAK RM.
EXAM /
TREATMENT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE / EXAM
WORK RM.
WAITING RM.
TOILET, FEMALE
TOILET, MALE
HAC
CORRIDOR
C106
VESTIBULE
C101
CORRIDOR
C103
TR
CORRIDOR
C105
CORRIDOR
C102
CORRIDOR
C104
51TEP401
51TEP401
BLDG 51T
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51TEP101
BLDG 51T - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
51T
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/4" = 1'-0"
1 BLDG 51T - FLOOR 1 - ELECTRICAL PLAN
KEY PLAN
KEY NOTES
GENERAL NOTES
0' 2' 4' 8'
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
SPSPSPSP
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
P3 LO
CA
AAA
P - 1
P4 P4 - L
DP52CR
DP52LS
DP52EQ
"OLD MSB"
SPLICE BOX
U.7S.2
U
S
SQ
P.5
PNMK
11.9 11.9
12.8
8.7
3 3
M.1
J
H.2E.1
HGFEDCA
B.1
9.9
Z
4 4
52EP400
52EP400
B
52EP400
52-DP-TRA1
MECH. RM.
GS08
PHYSICAL
THERAPY
GN31
HAC
GS60
VAULT
GS61
HAC
GS57
HAC
GS58
HAC
GS59
MECH. RM.
GS08A
LINEN CHUTE
GS07
STORAGE
GS06A
UTILITY RM.,
SOILED
GS06B
FOYER
GS05STAIR 1
S001
DARK RM.
GS04
F.E. CLOSET
GS03
ENGINEERING
GS09A
MECH. RM.
GS09
WORK RM.
GS14
TOILET, MALE
GS18A
TOILET, FEMALE
GS18B
MECH. RM.
GS20A
ENGINEERING
GS20B
CORRIDOR
H004
TOILET
GS22F
OFFICE
GS22A
OFFICE
GS22B
OFFICE
GS22C
OFFICE
GS22D
OFFICE
GS22E
OFFICE
GS22
ELEVATOR
LOBBY
GS24
ELEV. NO. 3
E2
TOILET
GN27
CLOSET
GN27A
HAC
GN28
STORAGE
GN30OFFICE
GN32
WORK RM.
GN33
WORK RM.
GN34
TOILET
GN35
STORAGE
GN36
OFFICE
GN37
TOILET
GN38
MECH. RM.
GN39
P.T. STORAGE
GN43
WHEELCHAIRS
GN43A
OFFICE
GN44
FOYER
GN57
DRIVER'S
TRAINING
GN48
MECH. RM.
GN50
LINEN CHUTE
GN52
STORAGE
GN53
F.E. CLOSET
GN51
STAIR 3
S003
STORAGE
GN54
F.E. CLOSET
GN55
PIPE CHASE
Z004
PIPE CHASE
Z005
PIPE CHASE
Z001
PIPE CHASE
Z002
PIPE CHASE
Z003
ELEV. NO. 1
E1 STAIR 2
S002
OI&T
GS01A
WHEELCHAIR
STORAGE
GS01
HAC
GS02
F.E. CLOSET
GS23
ELEV. NO. 2
E3
CORRIDOR
H004A
CORRIDOR
H001
CORRIDOR
H002
CORRIDOR
H003
CORRIDOR
H005
CORRIDOR
H006
SHOP
GS58A
CHASE
CH-S-2
CHASE
CH-S-1
CHASE
CH-N-1
UPUP
UP
CHASE
CH-N-2
CHASE
CH-S-3CHASE
CH-N-4
CHASE
CH-N-3
OFFICE
GS14A
WORK RM.
GS14B
MECH. RM.
GS09B
FAP FAP FAPFAP
CHASE
CH-S-5
CHASE
CH-S-4
CLOSET
GN36A
101 SF
TR
GN29A
ATS-91-C
ATS-91-LS
91-LS-1
SB91-NORMAL
SB91-EMERGENCY
GENERATOR CONTROL
GENERATOR PANELGENERATOR
BUILDING 84
BUILDING 91ATS-91-EQ
250KW EMERGENCY GENERATOR
52EP400
52-DP-TRB1
BLDG 52
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
9. REFERENCE ONE-LINE DIAGRAM ON SHEET 52EP601 FOR CONDUIT AND WIRE
SIZING.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
52EP100
BLDG 52 - FLOOR 0 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1" = 20'-0"
1 BLDG 52 - FLOOR 0 - ELECTRICAL PLAN
KEY PLAN
KEY NOTES
GENERAL NOTES
Revisions: Date:
1 EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 52EP601
FOR ADDITIONAL INFORMATION.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET
52EP601 FOR ADDITIONAL INFORMATION.
0' 10' 20' 40'
PROJECT
NORTH
PROJECT
NORTH
SPSPSPSPSPSPSPSP
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
FA
F
EC
1LCB
1ELA
K
EA
E
EB
D
PA
DA
1LCA
YX
U.7S.2
U
S
SQ
P.5
PNM
L
L
11.9 11.9
12.8
8.7
3 3
M.1
J
H.2E.1
HGFEDCA
B.1
9.9
Z
4 4
19 52EP401a
52EP401a
52EP401b
52EP401b
B
52EP401a
52EP401a
52EP401b
52EP401b
STAFF LOUNGE
1N77
BED RM. - 1 BED
1N78
TOILET
1N79
BED RM. - 1 BED
1N80
LAUNDRY
1N81
TR
1N82ADAYROOM
1N82
CORRIDOR
H111
EQUIP. STORAGE
1N83
STORAGE
1N85
TOILET, STAFF
1N90B
HALLWAY
1N90
TOILET, STAFF
1N90A
UTILITY RM., SOILED
1N91
BED RM. - 1 BED
1N92
TOILET
1N92A STAIRWELL NO. 3
S103
KITCHEN
1N94
CHASE
CH-N-5
CORRIDOR
H108
NURSE STATION
1N73
PIPE CHASE
1N77A
DAYROOM
1N74
LINEN STORAGE
1N95
BED RM. - 2 BED
1N97
TOILET
1N98
BED RM. - 1 BED
1N99
TOILET
1N100A
BED RM. - 1 BED
1N100
BED RM. - 1 BED
1N101
TOILET
1N101A
BED RM. - 2 BED
1N102
BED RM. - 2 BED
1N103
CLEAN SUPPLY
1N104
MECH. RM.
1N105
STORAGE
1N106
TOILET
1N107
HAC
1N108
BED RM. - 2 BED
1N110
REHAB. APARTMENT
1N111
REHAB. APARTMENT
1N112A
HALLWAY
1N112
TOILET
1N114A
REHAB. APARTMENT
1N114
CHASE
CH-N-12
ELEVATOR NO. 1
E1
CORRIDOR
H107CONSULT RM.
1N115
OFFICE
1S02A
FOYER
1S01
TOILET, FEMALE
1S04
TOILET, MALE
1S07
BED RM.
1S09
TOILET
1S10A
TOILET
1S09A
CHASE
CH-S-4
BED RM.
1S10 MEDICATION RM.
1S11A
O2 TANK STORAGE
1S11
STORAGE
1S12
WHEELCHAIR STORAGE/ MECH RM.
1S15
HAC
1S13
KITCHEN
1S14
SUPPLY RM.
1S16
BED RM.
1S17
TOILET
1S17A
BED RM.
1S19
BED RM.
1S19A
BED RM.
1S20
TOILET
1S20A
TOILET
1S22A
BED RM.
1S22
SUPPLY RM.
1S23
CHASE
CH-S-6
NOURSH
1S25
TR
1S33A
EQUIP. STORAGE
1S34
PATIENT LAUNDRY
1S35
SECURE STORAGE
1S34A
BED RM.
1S38
F.E. CLOSET
1S40
BATH / SHOWER RM.
1S39
BED RM.
1S41
STAFF LOUNGE
1S42
NURSE STATION
1S43
CORRIDOR
H103A
PHYS. CHART
1S46
MED
1S47
TOILET
1S49
BED RM.
1S50
CORRIDOR
1H106
MECH. RM.
1S54
ELEVATOR NO. 2
E2
DINING RM.
1S57
ELEVATOR LOBBY
1S59
FAMILY/ ULTRASOUND
1S60
DINING RM.
1N61
KITCHEN SERVING
1N61B
KITCHEN PREP
1N61A
NURSE SUP. OFFICE
1N62
HAC
1N64
BED RM. - 2 BED
1N66
TOILET
1N68
MEDICATION PREP
1N72
TRANSCRIPTION
1N71
CORRIDOR
H109
DAYROOM
1S45
STORAGE
1S30A
BEDROOM
1S26STAIRWELL NO. 1
S101
TOILET
1S26A
SOIL UTILITY
1S28
TOILET
1S29 BEDROOM
1S30 EXAM
1S33
BLDG 52
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
52EP101
BLDG 52 - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1" = 20'-0"
1 BLDG 52 - FLOOR 1 - ELECTRICAL PLAN
GENERAL NOTES
KEY PLAN
BLDG 52
KEY NOTES
Revisions: Date:
0' 10' 20' 40'
PROJECT
NORTH
PROJECT
NORTH
File details come from the government source that posted it. Updated .