Attachment 25 - Drawings Part-24.pdf

PDF 14 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal contract solicitation to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The solicitation seeks a general contractor to upgrade electrical systems including panels and power, implement bonding and UPS improvements, integrate HVAC assessments and upgrades into an expanded and renovated Building Management System, renovate an existing data center involving piping and walls, upgrade communication infrastructure with new data outlets and cabling, implement physical security enhancements, assess and upgrade the fiber infrastructure backbone across campus buildings, and install a diversified path to the datacenter for WAN connectivity. The work involves buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75 and associated site work. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
FOLLOW-UP Technical Questions - St. Louis 4-6-23.pdf PDF
36C77623R0009 0005.pdf PDF
Technical Questions - FINAL - St. Louis 3-28-23.pdf PDF
657-21-701JB - Addendum 1_03_24_23.pdf PDF
329000-5 - Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-24-23.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 45 - Site Visit Instructions Updated 2-16-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Attachment 33 - Drawings Part-32.pdf PDF
Attachment 34 - Envr. Report - Narrative.pdf PDF
Attachment 37 - Envr. Report - Appendix C.pdf PDF
Attachment 40 - NARA RM Contract Language Clause.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 1-20-23.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

2 2

2 2

2 2

2 2

2 2 2 2

2 2

2 2

2 2

2 2

2 2

2 2

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

RAD

FECFAP

UPDN

DNDN

A B C C.1 D D.1 E E.1

2.2

8.7

7.9

2.7

2.9

3.4

5.6

5.4

5.9

6.5

7.1

M.1 N.1 N.6 PN.5N.3

M.2

N.8

P.1 P.2 Q R WV.2V.1VU.2U.1N N.2 N.4 N.7ML.1LK

E.2 H.2G.2F.3

J.1H.3 J

G.3F.2

H.1HF G G.1F.4F.1E.3 R.1 S S.1

S.2 T.10T.5T.2 T.6T.1 T.11

UT.8T.4TS.3 T.3 T.9T.7

ROOF BELOW

53ET402

53ET402

WAP 1

WAP 1

WAP 1

WAP 1 WAP 1

WAP 1

WAP 1

WAP 1

WAP 1 WAP 1

WAP 1

WAP 1

WAP 1 WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1 WAP 1

WAP 1

WAP 1

WAP 1 WAP 1

WAP 1 WAP 1

WAP 1

WAP 1

WAP 4

WAP 4

WAP 4

TR

2S001

OFFICE, OPEN

2N106

PT

2N096

WAITING RM.

2S003

OFFICE

2N104

HAC

2N103

EXAM

2N102

CHASE

CH-N-1

ELEC. CLOSET

2N101

EMG

2N100E

EXAM

2N100D

EXAM

2N100B

OFFICE, OPEN

2N100A

PT

2N100C

STAIRWELL NO. 3

S203

O.T. ADMIN.

2N092

O.T.

2N091

RECEPTION

2N089

STORAGE

2N091C

CORRIDOR

H207

WAITING RM.

2N088

WHEELCHAIR STORAGE

2N086

CORRIDOR

H204

CHASE

CH-N-2

LINEN CHUTE

2N105

OFFICE, OPEN

2S083

OFFICE

2S085

OFFICE

2S082

STORAGE

2S080

TOILET

2S079

LOCKER RM.

2S078

ELEVATOR NO. 2

E2

SERVICE LOBBY

2S081

CORRIDOR

H204

OFFICE, OPEN

2S004

CHASE

CH-S-2

STAIRWELL NO. 2

S202 ELEVATOR NO. 1

E1

TOILET, FEMALE

2S014ASTORAGE

2S06

TREAT. RM.

2S007

OFFICE, OPEN

2S008

EXAM

2S009

CORRIDOR

H206

OFFICE

2S10

OFFICE

2S011

OFFICE

2S012

OFFICE

2S013

EXAM

2S014

OFFICE

2S015

STORAGE

2S015A

CONFERENCE RM.

2S017

OFFICE

2S016

COPY RM.

2S018

OFFICE

2S018A

BATH / SHOWER RM.

2S024TOILET, MALE

2S020

BED RM. - 3 BED

2S025

CORRIDOR

H201

BED RM. - 3 BED

2S77

BED RM. - 3 BED

2S76

BATH / SHOWER RM.

2S074

BATH / SHOWER RM.

2S075

CHASE

CH-S-13

BED RM. - 2 BED

2S073

NURSE STATION

2S072

MEDICATION PREP.

2S069

KITCHEN

2S070

BREAK RM.

2S68

BATH / SHOWER RM.

2S067

PATIENT RM. - 1 BED

2S066

OFFICE

2S065

SOILED UTILITY

2S64

LINEN RM., CLEAN

2S063

UTILITY RM., CLEAN

2S062

BED RM. - 1 BED

2S061

TOILET

2S060

HAC

2S059

BED RM. - 1 BED

2S058 BED RM. - 3 BED

2S057

BATH / SHOWER RM.

2S055

TOILET

2S056

CHASE

CH-S-3

BED RM. - 3 BED

2S054

BED RM. - 2 BED

2S053

TOILET

2S050

TOILET

2S051

CHASE

CH-S-7

CHASE

CH-S-8

O2 STORAGE

2S052

BATH / SHOWER RM.

2S049

STAIRWELL NO. 1

S201

TOILET, STAFF

2S048

LINEN CHUTE

2S047

CHASE

CH-S-6

CHASE

CH-S-14

BATH / SHOWER RM.

2S045

BED RM. - 1 BED

2S044

BED RM. - 1 BED

2S043

TOILET

2S042

BED RM. - 2 BED

2S041

BED RM. - 2 BED

2S040

BATH / SHOWER RM.

2S039

BED RM. - 1 BED

2S038

BED RM. - 1 BED

2S037

BATH / SHOWER RM.

2S036

CHASE

CH-S-5

ELEC. CLOSET

2S035

CHASE

CH-S-4

DAY RM.

2S034

BATH / SHOWER RM.

2S032

BED RM.

2S030

ALCOVE

2S031

ANTE RM.

2S029

BED- R. - 2 BED

2S028

CHASE

CH-S-9

ELEC. RM.

2S026

TOILET

2S027

CHASE

CH-S-12

PT

2N094

EQUIP. STORAGE

2N095

53ET402

TYP

B-SIDE:

TO TR 2S001 FROM

GS10 TDU, FROM

FLR 01 TO 02

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATION ROOM 2S001.

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS

DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

2 2

2 2

TYP 2

BLDG 53

AREA OF WORK

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL

POWER AND SIGNAL DEVICES AND ASSSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS AND

CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO

THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF

THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE

RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A

PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING

CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT

QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM EACH

WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR

CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND CONDUIT PER

CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT

VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A

COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED TO SEGREGATE

SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE DIAGRAMMATICAL.

COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL FEATURES, MECHANICAL

DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

- 1/16" = 1'-0"

1 BLDG 53 - FLOOR 2 - TELECOMMUNICATIONS PLAN

GENERAL NOTES

KEY PLAN

0' 8' 16' 32'

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 53ET102

BLDG 53 - FLOOR 2 -

TELECOMMUNICATION PLAN 53

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

PROJECT

NORTH

PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING

TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET

FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.

EXISTING WIRELESS ACCESS POINT RE-FED WITH CAT6A CABLING.

REMOVE AND REPLACE EXISTING CABLE TRAY IN THE AREAS SHOWN AS REQUIRED; IF CABLE TRAY IS NON-EXISTENT, PROVIDE CABLE TRAY AS INDICATED. REFERENCE DETAIL '6' ON SHEET ET503 AND TELECOMMUNICATIONS WAO AND CABLE TRAY SCHEDULE ON SHEET ET701. WHERE WALL EXTENDS TO CEILING, CABLE TRAY SHALL STOP AND TRANSITION TO CONDUIT SLEEVES [(2) 4", MINIMUM] WITH APPROPRIATE FIRE-PROOFING AND CAULKING TO PASS THROUGH WALL. WHERE EXISTING CABLE TRAY AND/OR SLEEVES ARE DISCOVERED, EVALUATE CONDITION AND RACEWAY CAPACITY; IF CABLE TRAY

AND/OR SLEEVES APPEAR TO BE REUSABLE, NOTIFY COR FOR POSSIBLE REUSE.

FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO INSTALLATION.

UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED APPURTENANCES AS

REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS SECURITY TR

EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED TO PROVIDE A

COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY

EXACT HEAD END LOCATION AS REQUIRED.

PROJECT

NORTH

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

A B CC.1 D E

P Q R WV.2V.1VU.2U.1NMJH S UT

2.2

8.7

7.9

2.7

2.9

3.4

5.6

5.4

5.9

6.5

7.1

TYP

A B C C.1 D E

P Q R WV.2V.1VU.2U.1NMJH S UT

2.2

8.7

7.9

2.7

2.9

3.4

5.6

5.4

5.9

6.5

7.1

TYP

BLDG 53

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO

BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED

OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED

BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO

REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,

MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE

INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY

FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A

CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION

OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL

IN AND AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR

PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN

RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

AREA OF WORK

- 1/16" = 1'-0"

2 BLDG 53-PENTHOUSE 02 TELECOMMUNICATIONS PLAN

- 1/16" = 1'-0"

1 BLDG 53-PENTHOUSE 01 TELECOMMUNICATIONS PLAN 0' 8' 16' 32'

0' 8' 16' 32'

KEY PLAN

GENERAL NOTES

KEY NOTES

1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO

REPLACE EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT

SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL

'1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR ADDITIONAL

INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED

PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END

LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS

SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED.

COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY

EXACT HEAD END LOCATION AS REQUIRED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 53ET103

BLDG 53 - PENTHOUSE

TELECOMMUNICATION PLAN 53

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

53TET401

53TET401

OFFICE

OFFICE

OFFICE

53TET401

TR

OFFICE

OFFICE

OFFICE

CORRIDOR

C104

OFFICE

OFFICE

HAC

TOILET, MALE

TOILET, FEMALE

FOYER

C101

OFFICE

OFFICE

CONFERENCE

RM.

OFFICE

CORRIDOR

C105

OFFICE

CORRIDOR

C103 OFFICE

E F

A B C D G H I J

SIDE-B FIBER-OPTIC BACKBONE:

REFERENCE COMMUNICATION

SHEETS FOR ADDITIONAL

INFORMATION REGARDING

HANDHOLE, CONDUIT, BUILDING

PENETRATIONS, FIBER-OPTIC

CABLING, AND RACEWAY

INFORMATION

HANDHOLE

EXISTING SIDE-A FIBER-OPTIC BACKBONE BUILDING

ENTRY POINT (APPROXIMATE LOCATION). ROUTE FIBER-

OPTIC CABLES TO TRs AS INDICATED ON

COMMUNICATIONS DRAWINGS; REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC

CABLING, RACEWAY TYPES, SPECIFICATIONS, AND

RATINGS. REFERENCE KEY NOTES ON THIS SHEET

REGARDING CABLE TRAY AND VERTICAL/HORIZONTAL

ROUTING FOR ADDITIONAL FIBER BACKBONE CABLING

REQUIREMENTS.

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATION ROOM 109.

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL ENSURE A-SIDE

AND B-SIDE ROUTING IS AS DIVERSE AS PRACTICAL.

REFERENCE COMMUNICATIONS DRAWINGS FOR ALL

REQUIRED FIBER-OPTIC CABLING.

WAP 1

WAP 1WAP 1 2

TYP

BLDG 53T

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD

VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL

RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED

MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED

AT THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR

NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS

REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH

CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY

EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS TO EXTEND

TO ASSOCIATED TR AS REQUIRED.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO

REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,

MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE

INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY

FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING

FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT

RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF

HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND

AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES

AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT

VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH

VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT

NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED

THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS

ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED

WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS

AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER

OBSTRUCTIONS PRIOR TO INSTALLATION.

AREA OF WORK

- 1/4" = 1'-0"

1 BLDG 53T - FLOOR 1 - TELECOMMUNICATIONS PLAN

PROJECT

NORTH

KEY PLAN

KEY NOTES

GENERAL NOTES

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 53TET101

BLDG 53T - FLOOR 1 -

TELECOMMUNICATIONS PLAN 53T

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

0' 2' 4' 8'

PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE

EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND

BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND

THE GENERAL NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH

VA FOR EXACT OUTLET PLACEMENT.

EXISTING WIRELESS ACCESS POINT TO BE RE-FED WITH CAT 6A CABLING.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING

WHEREVER POSSIBLE. UTILIZED CABLE TRAY AS APPLICABLE.

PROVIDE CONDUIT SLEEVE WITH FIREPROOFING AS REQUIRED WHERE WALL

PENETRATIONS ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL

INFORMATION.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS

SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS

REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM.

PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA

PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD END LOCATION AS

REQUIRED.

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

STORAGE

BA102a

DATA

BA100

TECH

BA101

FUTURE

BOWLING ALLEY

SHELL - 4 LANE

BA102

LOUNGE

BB100

STORAGE,

GAME &

ACTIVITY

BB101b

COMBINED

BILLIARDS/GAME

& ACTIVITY

BB101

STUDENT

CUBICLES (4)

BB102a

RES. INTERN

CUBICLES (3)

BB102

CORRIDOR

CB-3

CORRIDOR

CB-4

STAIR

STAIR-1

CLASSROOM

BB104CLOSET

BB104a

ELEVATOR

MACHINE

BB108

STORAGE

BB106

ELEV

P-1

ELEV

P-2

CORRIDOR

CB-6

CORRIDOR

CB-5

CORRIDOR

CB-2

ELEVATOR

LOBBY

CB-1

OFFICE,

SHARED PSAs

BB103

OFFICE,

PROGRAM

MANAGER

BB105

OFFICE,

AMPUTEE

COORD.

BB107

OFFICE, PSA

BB111

OFFICE,

MOVE

COORD.

BB112

OFFICE, SWING /

COUNSELING

BB113

ELECTRICAL

ENTRANCE

BB114

TECH

ENTRANCE

BB115

HSKPG

BB120

ELEC

BB10

TLT - WOMEN

BB119

TOILET - MEN

BB118

STORAGE, GAME

& ACTIVITY

BB117

MECHANICAL

BB116

MOVE

CLASSROOM

BB110

VESTIBULE

BA 103

SANITIZER

ROOM

BA103b

WATER METER

BA103c

POOL

MECHANICAL

BA103a

STAIR

STAIR-2

CORRIDOR

CB-7

CORRIDOR

CB-10

EWC

CB-9 EXISTING SIDE-A FIBER-OPTIC BACKBONE BUILDING

ENTRY POINT (APPROXIMATE LOCATION). ROUTE FIBER-

OPTIC CABLES TO TRs AS INDICATED ON

COMMUNICATIONS DRAWINGS; REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC

CABLING, RACEWAY TYPES, SPECIFICATIONS, AND

RATINGS.REFERENCE KEY NOTES ON THIS SHEET

REGARDING CABLE TRAY AND VERTICAL/HORIZONTAL

ROUTING FOR ADDITIONAL FIBER BACKBONE CABLING

REQUIREMENTS.

TYP

B-SIDE:

TO TR BA100 FROM

1A133 TDU, FROM

FLR 01 TO 00

3 4 5 6 7 8 9

A

B

C

D

E

F

G

H

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS

AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

A-SIDE:

TO TR BA100 FROM

BLDG 1 GC12

EXISTING CABLE TRAY

THROUGHOUT CORRIDORS NOT

SHOWN FOR CLARITY. USE

EXISTING CABLE TRAY TO ROUTE

FIBER-OPTIC BACKBONE CABLING

AS REQUIRED.

PROJECT

NORTH

BLDG 54

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO

ASSOCIATED TR.

5. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

6. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

8. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

9. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ACRHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

54ET100

BLDG 54 - FLOOR 0 -

TELECOMMUNICATIONS PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

Revisions: Date:

GENERAL NOTES

- 3/32" = 1'-0"

1 BLDG 54 - FLOOR 0 - TELECOMMUNICATIONS PLAN

KEY PLAN

KEY NOTES

PROJECT

NORTH

8'0 16' 24'

1 FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO

INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL

REQUIRED APPERTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503

FOR ADDITIONAL INFORMATION.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP

CEILING WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE

CONDUIT SLEEVES WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS

ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL

INFORMATION.

TERMINATE B-SIDE FIBER-OPTIC CABLE TO EXISTING TR RACK AS REQUIRED.

CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY

WILL BE REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED

PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END

LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS

SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED.

COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY

EXACT HEAD END LOCATION AS REQUIRED.

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

OFFICE

SHARED

(NURSES)

1A123

OFFICE- OT

SUPER.

1A124

OFFICE VOC.

REHAB

1A126

OFFICE

SOCIAL

1A128

OFFICE

SOCIAL

1A129

OFFICE

NEURO-PSYCH

1A130

OFFICE PSYCH

1A131

CORRIDOR

C1-27

OFFICE SPEECH

PT

1A122

OFFICE

SHARED

(SPEECH))

1A119

OFFICE SPEECH

PT

1A120

COMPUTER

SPEECH

1A121

OFFICE

PHYSCIAN/

EXAM

1A125

OFFICE

PHYSICIAN

1A127

SECRETARY/

WAIT/ CLERICAL

1A111

OFFICE CHIEF

1A110

CONFERENCE

1A118

CORRIDOR

C1-26

TLT

1A112

TLT

1A113

ELECT.

1A114

CP OFFICE

1A116

CP OFFICE

1A117

PT STATION

1A107

OT STATION

1A108

OT STATION

1A109

RECEPTION

C1-9

ESCORT

C-10

TLT

1A100

TLT

1A101

PT/OT

WORKSTATIONS

1A106

VESTIBULE

C1-1

ADL

1A102

EXAM

TREATMENT

1A103

CORRIDOR

C1-12

STORAGE, W C

C1-8

ELEC

1A132

SOILED

1A104

HSKPG

1A105

DATA

1A133

TECH

1A134

CORRIDOR

C1-14

CORRIDOR

C1-13

OT/ PT OPEN

STATIONS

C1-15

GAIT LANE

C1-16

OPEN GYM

C1-17

MAT PLATFORM

AREA

C1-18

LINEN

C1-19

EQUIP.

C1-20

CHAPEL

1B100

WAITING

C1-6

CORRIDOR

C1-11

SECRETARY/

WAIT/ CLERICAL

C1-7

STAIR

STAIR 2HSKPG

1A149

POOL

MECHANICAL

1A148

STORAGE

1B125aDONATION

STAGING

1B126

LOUNGE

1B127

RECEPTION

1B128

CORRIDOR

C1-45

CORRIDOR

C1-46

VOL. SIGN-IN

1B122

COFFEE

1B123

OFFICE

1B124

MULTIPURPOSE/WORKROOM

1B125

CHAPLAIN

CHIEF

1B144EDUCATION/CONFERENCE

1B115

RECYCLING

1B121

TLT - MEN

1B120

TLT - WOMEN

1B119

ELEC

1B118

STUDENT

1B116

CHAPLAIN

1B113

CHAPLAIN

1B112

CORRIDOR

C1-47

CORRIDOR

C1-41

TOWELS/SWIMSUIT

1A147

STORAGE

1A146

CSI SUPPORT

1A145

MALE LOCKERS

1A142

CAREGIVER

1A143

CORRIDOR

C1-40

CORRIDOR

C1-39 FEMALE

LOCKERS

1A141

WORKSTATION

RT

1A140

WORKSTATION

RT

1A139AEROBICS

ROOM

1A137f

ELEC

1A137e

WEIGHT ROOM

1A137d

WORKSTATION

RT/STUDENT

1A144a

OFFICE CHIEF

1A138

THERAPEUTIC

POOL

1A144

KITCH.

C1-35

LOBBY

C1-2

GREETER

C1-3

STAIR

STAIR-1

CORRIDOR

C1-28

ELEVATOR

LOBBY

C1-29

QUIET

1B100A

MULTI-DENOM/

MD STOR.

1B100B

EUCHARIST

1B100C

SACRISTY

1B101

STORAGE

1B104

PRINT/COPY

C1-32

CORRIDOR

C1-33

WAITING

C1-30

SECRETARY

WAITING

C1-31

CHAPLAIN

1B102

CHAPLAIN

1B103

CHAPLAIN

1B105

CHAPLAIN

1B107

CHAPLAIN

1B109

CHAPLAIN

1B111

STORAGE

1B117

CARDIOPULMONARY

REHAB

C1-25

CORRIDOR

C1-21

EQUIP

C1-24

O2 STOR

C1-34

STRETCHER

C1-22

CRASH

C1-23

B-SIDE:

TO TR 2B100 FROM

1A133 TDU, FROM

FLR 01 TO 02

B-SIDE:

TO TR BA100 FROM

1A133 TDU, FROM

FLR 01 TO 00

3 TDU

TYP

HANDHOLE

SIDE-B FIBER-OPTIC BACKBONE:

REFERENCE COMMUNICATION SHEETS

FOR ADDITIONAL INFORMATION

REGARDING HANDHOLE, CONDUIT,

BUILDING PENETRATIONS, FIBER-OPTIC

CABLING, AND RACEWAY INFORMATION

3 4 5 6 7 8 9

B

C

D

E

F

G

H

1 2

L

I

K

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS

AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

A-SIDE:

TO TR 1A133 FROM

BLDG 1 GC12

EXISTING CABLE TRAY

THROUGHOUT CORRIDORS NOT

SHOWN FOR CLARITY. USE

EXISTING CABLE TRAY TO ROUTE

FIBER-OPTIC BACKBONE CABLING

AS REQUIRED.

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO

ASSOCIATED TR.

5. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

6. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

8. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

9. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ACRHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

PROJECT

NORTH

BLDG 54

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

54ET101

BLDG 54 - FLOOR 1 -

TELECOMMUNICATIONS PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

Revisions: Date:

- 1/16" = 1'-0"

1 BLDG 54 - FLOOR 1 - TELECOMMUNICATIONS PLAN

8'0 16' 32'

PROJECT

NORTH

GENERAL NOTES

KEY PLAN

KEY NOTES

1 FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO

INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL

REQUIRED APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503

FOR ADDITIONAL INFORMATION.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP

CEILING WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE

CONDUIT SLEEVES WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS

ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL

INFORMATION.

TUBE DISTRIBUTION UNIT (TDU). REFERENCE COMMUNICATION DRAWINGS FOR

ADDITIONAL INFORMATION.

TERMINATE A-SIDE AND B-SIDE FIBER-OPTIC CABLE TO EXISTING TR RACK AS

REQUIRED.

CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY

WILL BE REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED

PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END

LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS

SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED.

COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY

EXACT HEAD END LOCATION AS REQUIRED.

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

RD

OFD

ROOF OVERHANG

OPEN TO BELOW

DN

OPEN TO BELOW

F E

C

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO

ASSOCIATED TR.

5. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

6. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

8. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

9. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ACRHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

PROJECT

NORTH

BLDG 54

STAIR

STAIR-1

MECHANICAL

2B100

B-SIDE:

TO TR 2B100 FROM

1A133 TDU, FROM

FLR 01 TO 02

EXISTING WALL

MOUNT DATA RACK

3 4 5 6 7 8 9

A

B

C

D

E

F

G

H

1 2

L

I

K

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS

AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

54ET102

BLDG 54 - FLOOR 2 -

TELECOMMUNICATIONS PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

Revisions: Date:

GENERAL NOTES

KEY PLAN

KEY NOTES

- 1/16" = 1'-0"

1 BLDG 54 - FLOOR 2 - TELECOMMUNICATIONS PLAN

PROJECT

NORTH

8'0 16' 32'

1 FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO

INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL

REQUIRED APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503

FOR ADDITIONAL INFORMATION.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP

CEILING WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE

CONDUIT SLEEVE WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS

ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL

INFORMATION.

TERMINATE B-SIDE FIBER-OPTIC CABLE TO EXISTING WALL MOUNTED DATA RACK AS

REQUIRED.

UP

2 2

2 2

2 22

2 2

2 2 2

2 2

Tectonic Copyright 2007

T ectonic Cop yright 2007

Tectonic Copyright 2007

UP

UP

UP

DN

F E

C

FEC

FEC

FEC

F E

C

DATA

SYSTEMS

1C132

DATA

TECH

1C133

CORRIDOR

C1-57

BREAKDOWN,VERIFICATION

INVENTORY

1C135

55ET401a

55ET401a

B.4

C

D

F

H

E

G

J

D.4

876543 7.93.7

H.8

J.1

H.4

6.45.8

A

DATA OUTLETS AND DEVICES IN THIS

AREA SHALL BE SERVED FROM

TELECOMMUNICATION ROOM 1A129

DATA OUTLETS AND DEVICES IN THIS

AREA SHALL BE SERVED FROM

TELECOMMUNICATION ROOM 1B104

DATA OUTLETS AND DEVICES IN THIS

AREA SHALL BE SERVED FROM

TELECOMMUNICATION ROOM 1C132

A R

E A

R

E A

B

S E

E

S H

E E

T

E

T b

CORRIDOR

C1-4

DATA, SYSTEM

1A130

TR

1A129

CORE LAB AREA

1A126

55ET401a

TYP

Office (Disposition)

1B 103

Storage, Wheelchair & Stretcher

1B 106

Eyeglass Fitting & Display

1A 100c

House Keeping

1A 116

Staff Lounge

1A 115

Office (Disposition)

1B 101

Office (Disposition)

1B 103b

Elec.

1A 111

Agent Cashier

1B 105

Waiting

1A 100

Pat. Toilet

1A 100b

Visual Field

1A 101

Optometry Exam

1A 119

Optometry Exam

1A 118

Resident Exam

1A 117

Office, Eyecare Provider-L.V.

Multipurpose

1A 113

Exam- Low Vision

1A 112

Staff Toilet

1A 109

Tele- Retinal Reading

1A 108

Photography Room

1A 106

Pre- Testing 2

1A 104

Optometry Exam- Large

1A 114

Pre- Testing 1

1A 103

Open Office

1A 102

Staff Lounge/ Lockers

1A 133Path. Office

1A 135

Sup. Office

1A 134

Staff Toilet

1A 131

Microbiology

1A 127

Bulk Storage

1A 128

Lab Reception

1A 124a

Elec.

1A 123

Office

1A 140

Staff Lockers & Lounge

1A 139

Office

1A 141

Office

1A 142

Office

1A 143

Ultrasound Room

1A 148

Radiology Room 1

1A 153

Patient Toilet

1A 149

Dressing, ADA

1A 150

Sub- Waiting

C1-27

Mechanical

1M 1a

Blood Collection

1A 124

Radiology Room 2

1A 152

Clean Supply

1A 147

PACS/Digital Control/ Tele-Radiology

1A 144

Crash Cart

1A 147a

Staff Toilet

1A 138

Storage

1A 137

PAC Office

1A 136

Waiting

C1-24

House Keeping

1A 125

Equipment/ Clean Supply

1A 105

Training- Low Vision/ Poly Trauma

1A 110

Soiled Utility

1A 145

Specimen Toilet

1A 124b Specimen Toilet

1A 124c

Closet

1A 110a

Housekeeping

1A 146

Kiosk

C1-23

Dilation Waiting

C1-13

Public Toilet

1A 121

Public Toilet

1A 122

Mobile X-Ray

1A 137a

Staff Toilet

1A 132

Soiled Utility

1A 107

Corridor

C1-31

Corridor

C1-19

Corridor

C1-18a

Waiting

C1-21

Corridor

C1-25

Corridor

C1-29

Corridor

C1-33

Corridor

C1-11

Corridor

C1-12

Corridor

C1-17

Corridor

C1-15

Corridor

C1-14

Corridor

C1-30

Corridor

C1-32

IP Holding

C1-28

Corridor

C1-10

Crash Cart

C1-16

Pat. Toilet

1A 120

Print Alcove

C1-34

Pedestrian Access Corridor

C1-100

Waiting

C1-20

Stair #1-1

Stair #1

Control

1A 152a

Control

1A 153a

Corridor

C1-26

Corridor

C1-22

Corridor

C1-18

Radiology Reception

1A 151

132 SF

3 5

TYP

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS

AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

DATA OUTLETS AND DEVICES IN

THIS AREA SHALL BE SERVED

FROM TELECOMMUNICATION

ROOM 1B104

EXISTING CABLE TRAY THROUGHOUT CORRIDORS NOT

SHOWN FOR CLARITY. USE EXISTING CABLE TRAY TO

ROUTE FIBER-OPTIC BACKBONE CABLING AS

REQUIRED.

AREA A

AREA OF WORK

KEY PLAN

KEY NOTES

GENERAL NOTES

- 1" = 10'-0"

1 BLDG 55 - FLOOR 1 - AREA A - TELECOMMUNICATIONS PLAN

0' 5' 10' 20'

1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE

EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE

UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE

GENERAL NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR

EXACT OUTLET PLACEMENT.

ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING.

CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.

FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO

INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED

APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL

INFORMATION.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING

WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVES WITH

FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE

DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE

REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS

SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED

TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE

EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO

CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD END LOCATION AS REQUIRED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 55ET101a

BLDG 55 - FLOOR 1 - AREA A -

TELECOMMUNICATIONS PLAN 55

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY

ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS

AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED

MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT

THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW

FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A

PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING

CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR AS

REQUIRED.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH

THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM

EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF

HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND

CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL

HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT

VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA

AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT

LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH

CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED

THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE

SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED

TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL

FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS

PRIOR TO INSTALLATION.

2 2

2 2

2 2

2 2

Tectonic Copyright 2007

Tectonic Copyright 2007

F E

C F

E C

FEC

F E

C

F E

C

F E

C

F E

C

FEC

55ET401b

55ET401b

55ET401c

55ET401c

B.4

C

D

F

H

B

E

G

J

K

L

111098.2 8.8

D.3

K.8

K.4

K.6

8.3 8.5 8.7 8.9

K.3

D.4

9.8

A

A R

E A

A

S E

E

S H

E E

T

E

T a

R

E A

B

DATA OUTLETS AND DEVICES IN THIS

AREA SHALL BE SERVED FROM

TELECOMMUNICATION ROOM 1C132

TR

1C132

DATA TECH

1C133

CORRIDOR

C1-57

BREAKDOWN, VERIFICATION &

INVENTORY

1C135

TR

1B104

AGENT CASHIER WAITING

1B102

55ET401b

55ET401c

Recycling

1B 109 Radiology Data Room

1B 109a

TYP

Elevator Lobby

C1-8

Cache

1C 135

Lockers

1C 130a

Lounge

1C 130

OP (Shared) Storage - Med Supplies

1C 127a

OP (Shared) Storage Prepack. Meds

1C 127

Vault Controlled Sub.

1C 124b

IP Storage, Active

1C 122

Aseptic Transfer, IV Admixture

1C 126a

Anteroom, IV Admixture

1C 126

Cubicle, Inventory Clerk

C1-45

Cubicle, Swing

1C 125h

IV Admix Freezer

C1-55

Dispensing, Controlled Sub

1C 124a

Cubicle, IP Process

1C 125d

Cubicle, IP Process

1C 125b

Cubicle, IP Process

1C 125c

Cubicle, IP Process

1C 125a

Cubicle, OP Spec.

1C 125f

Cubicle, OP Spec.

1C 125e

Invest. Drug Work Area & Stor.

1C 129

Pharm Teach Lab / Conf

1C 114

Storage, Sterile Fluids and Admixture

1C 123

IP Freezer

C1-54

Consult

1C 100a Consult

1C 100b

Consult

1C 100c

Consult

1C 100d

OP Waiting

1C 100

Dispensing

C1-40

Dispensing

C1-39

Drug Information Area

C1-47

OP Refrigerator

C1-52

Storage - Cart

1C 120 Mail Out

1C 121

P.C.

C1-53

Elec.

1C 111

Clinical Pharm Teaching

1C 105

Cubicle, Resident

1C 110a

Cubicle, Phone

1C 119e

Cubicle, Phone

1C 119b

Cubicle, Phone

1C 119aCubicle, Pain

1C 118a

Cubicle, Phone & Telemed

1C 119f

Cubicle, Phone

1C 119c Cubicle, Phone

1C 119d

Office, Secretary / Wait

1C 109

Office, Assistant Chief

1C 107

Cubicle, Resident

1C 110b

Office, Pharmacist

1C 102 Office, Pharmacist

1C 101

Office, Pharmacist

1C 106

Office, Pharmacist

1C 104

Office, Chief

1C 108

Office, Pharmacist

1C 103

Storage (SEPS Server)

1C 113

Cubicle, Ancil.

1C 118e

Workstation, Tech- Lead

1C 125g

Workstation, Tech

C1-46

Mechanical

1M 2

Men's Toilet

1B 108

Electrical

1C 134

Staff Toilet

1C 128

Housekeeping Storage (Future Public Elev. #4)

1B 110

Stair #2-1

Stair #2

Service Elev. #3

S-1

Elevator Lobby

C1-3

Stair #3-1

Stair #3

Corridor

C1-7

Corridor

C1-9

Entry Vestibule

C1-1

Corridor

C1-5

Corridor

C1-35

Corridor

C1-36

Corridor

C1-38

Corridor

C1-51

Corridor

C1-50

Corridor

C1-56

Stat. Counter

C1-43

Med Assignment

C1-42 Repackaging, Extemp.

C1-44

Active Filling

C1-41

Prescription Filling and Assembly

C1-49

Gen Tech Work

C1-48

Staff Toilet

1C 117

H.K.

1C 116

Cubicle, Psych

1C 118d

Cubicle, LTC

1C 118c

Cubicle, LTC

1C 118b

Staff Toilet

1C 115

Corridor

C1-37

Corridor

C1-6

Copy Alcove

1C 112

Corridor

C1-58

Public Elev. #2

2C149 Public Elev. #1

2C156

Housekeeping Storage (Future Public Elev. #4)

1B 110

Elevator Lobby

C1-3

Entry Vestibule

C1-1

Corridor

C1-5

Housekeeping Storage (Future Public Elev. #4)

1B 110

Elevator Lobby

C1-3

Entry Vestibule

C1-1

Corridor

C1-5

Lobby

C1-2

Reception

1B 100

Housekeeping Storage (Future Public Elev. #4)

1B 110

Elevator Lobby

C1-3

Entry Vestibule

C1-1

Corridor

C1-5

Women's Toilet

1B 107

Housekeeping Storage (Future Public Elev. #4)

1B 110

Elevator Lobby

C1-3

Entry Vestibule

C1-1

Corridor

C1-5

EXISTING SIDE-A FIBER-OPTIC BACKBONE

BUILDING ENTRY POINT (APPROXIMATE LOCATION).

ROUTE FIBER-OPTIC CABLES TO TRs AS INDICATED

ON COMMUNICATIONS DRAWINGS; REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL FIBER-

OPTIC CABLING, RACEWAY TYPES,

SPECIFICATIONS, AND RATINGS. REFERENCE KEY

NOTES ON THIS SHEET REGARDING CABLE TRAY

AND VERTICAL/HORIZONTAL ROUTING FOR

ADDITIONAL FIBER BACKBONE CABLING

REQUIREMENTS.

HANDHOLE

SIDE-B FIBER-OPTIC

BACKBONE:

REFERENCE

COMMUNICATION

SHEETS FOR

ADDITIONAL

INFORMATION

REGARDING HANDHOLE,

CONDUIT, BUILDING

PENETRATIONS, FIBER-

OPTIC CABLING, AND

RACEWAY

INFORMATION

3 5

TYP

DATA OUTLETS AND DEVICES IN

THIS AREA SHALL BE SERVED

FROM TELECOMMUNICATION

ROOM 1B104

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS

AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

EXISTING CABLE TRAY

THROUGHOUT CORRIDORS

NOT SHOWN FOR CLARITY.

USE EXISTING CABLE TRAY TO

ROUTE FIBER-OPTIC

BACKBONE CABLING AS

REQUIRED.

AREA B

AREA OF WORK

- 1" = 10'-0"

1 BLDG 55 - FLOOR 1 - AREA B - TELECOMMUNICATIONS PLAN

0' 5' 10' 20'

KEY NOTES

KEY PLAN

GENERAL NOTES

PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING

TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED

TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL

NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT

OUTLET PLACEMENT.

ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING.

CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.

FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO

INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIREPROOFING AND ALL REQUIRED

APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL

INFORMATION.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING

WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVES WITH

FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE

DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE

REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS

SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED

TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE

EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO

CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD END LOCATION AS REQUIRED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 55ET101b

BLDG 55 - FLOOR 1 - AREA B -

TELECOMMUNICATIONS PLAN 55

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY

ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS

AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED

MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT

THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF REQUIRED.