Attachment 25 - Drawings Part-24.pdf
PDF 14 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This document provides details for a federal contract solicitation to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The solicitation seeks a general contractor to upgrade electrical systems including panels and power, implement bonding and UPS improvements, integrate HVAC assessments and upgrades into an expanded and renovated Building Management System, renovate an existing data center involving piping and walls, upgrade communication infrastructure with new data outlets and cabling, implement physical security enhancements, assess and upgrade the fiber infrastructure backbone across campus buildings, and install a diversified path to the datacenter for WAN connectivity. The work involves buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75 and associated site work. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
2 2
2 2
2 2
2 2
2 2 2 2
2 2
2 2
2 2
2 2
2 2
2 2
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
RAD
FECFAP
UPDN
DNDN
A B C C.1 D D.1 E E.1
2.2
8.7
7.9
2.7
2.9
3.4
5.6
5.4
5.9
6.5
7.1
M.1 N.1 N.6 PN.5N.3
M.2
N.8
P.1 P.2 Q R WV.2V.1VU.2U.1N N.2 N.4 N.7ML.1LK
E.2 H.2G.2F.3
J.1H.3 J
G.3F.2
H.1HF G G.1F.4F.1E.3 R.1 S S.1
S.2 T.10T.5T.2 T.6T.1 T.11
UT.8T.4TS.3 T.3 T.9T.7
ROOF BELOW
53ET402
53ET402
WAP 1
WAP 1
WAP 1
WAP 1 WAP 1
WAP 1
WAP 1
WAP 1
WAP 1 WAP 1
WAP 1
WAP 1
WAP 1 WAP 1
WAP 1
WAP 1
WAP 1
WAP 1
WAP 1
WAP 1
WAP 1 WAP 1
WAP 1
WAP 1
WAP 1 WAP 1
WAP 1 WAP 1
WAP 1
WAP 1
WAP 4
WAP 4
WAP 4
TR
2S001
OFFICE, OPEN
2N106
PT
2N096
WAITING RM.
2S003
OFFICE
2N104
HAC
2N103
EXAM
2N102
CHASE
CH-N-1
ELEC. CLOSET
2N101
EMG
2N100E
EXAM
2N100D
EXAM
2N100B
OFFICE, OPEN
2N100A
PT
2N100C
STAIRWELL NO. 3
S203
O.T. ADMIN.
2N092
O.T.
2N091
RECEPTION
2N089
STORAGE
2N091C
CORRIDOR
H207
WAITING RM.
2N088
WHEELCHAIR STORAGE
2N086
CORRIDOR
H204
CHASE
CH-N-2
LINEN CHUTE
2N105
OFFICE, OPEN
2S083
OFFICE
2S085
OFFICE
2S082
STORAGE
2S080
TOILET
2S079
LOCKER RM.
2S078
ELEVATOR NO. 2
E2
SERVICE LOBBY
2S081
CORRIDOR
H204
OFFICE, OPEN
2S004
CHASE
CH-S-2
STAIRWELL NO. 2
S202 ELEVATOR NO. 1
E1
TOILET, FEMALE
2S014ASTORAGE
2S06
TREAT. RM.
2S007
OFFICE, OPEN
2S008
EXAM
2S009
CORRIDOR
H206
OFFICE
2S10
OFFICE
2S011
OFFICE
2S012
OFFICE
2S013
EXAM
2S014
OFFICE
2S015
STORAGE
2S015A
CONFERENCE RM.
2S017
OFFICE
2S016
COPY RM.
2S018
OFFICE
2S018A
BATH / SHOWER RM.
2S024TOILET, MALE
2S020
BED RM. - 3 BED
2S025
CORRIDOR
H201
BED RM. - 3 BED
2S77
BED RM. - 3 BED
2S76
BATH / SHOWER RM.
2S074
BATH / SHOWER RM.
2S075
CHASE
CH-S-13
BED RM. - 2 BED
2S073
NURSE STATION
2S072
MEDICATION PREP.
2S069
KITCHEN
2S070
BREAK RM.
2S68
BATH / SHOWER RM.
2S067
PATIENT RM. - 1 BED
2S066
OFFICE
2S065
SOILED UTILITY
2S64
LINEN RM., CLEAN
2S063
UTILITY RM., CLEAN
2S062
BED RM. - 1 BED
2S061
TOILET
2S060
HAC
2S059
BED RM. - 1 BED
2S058 BED RM. - 3 BED
2S057
BATH / SHOWER RM.
2S055
TOILET
2S056
CHASE
CH-S-3
BED RM. - 3 BED
2S054
BED RM. - 2 BED
2S053
TOILET
2S050
TOILET
2S051
CHASE
CH-S-7
CHASE
CH-S-8
O2 STORAGE
2S052
BATH / SHOWER RM.
2S049
STAIRWELL NO. 1
S201
TOILET, STAFF
2S048
LINEN CHUTE
2S047
CHASE
CH-S-6
CHASE
CH-S-14
BATH / SHOWER RM.
2S045
BED RM. - 1 BED
2S044
BED RM. - 1 BED
2S043
TOILET
2S042
BED RM. - 2 BED
2S041
BED RM. - 2 BED
2S040
BATH / SHOWER RM.
2S039
BED RM. - 1 BED
2S038
BED RM. - 1 BED
2S037
BATH / SHOWER RM.
2S036
CHASE
CH-S-5
ELEC. CLOSET
2S035
CHASE
CH-S-4
DAY RM.
2S034
BATH / SHOWER RM.
2S032
BED RM.
2S030
ALCOVE
2S031
ANTE RM.
2S029
BED- R. - 2 BED
2S028
CHASE
CH-S-9
ELEC. RM.
2S026
TOILET
2S027
CHASE
CH-S-12
PT
2N094
EQUIP. STORAGE
2N095
53ET402
TYP
B-SIDE:
TO TR 2S001 FROM
GS10 TDU, FROM
FLR 01 TO 02
DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE
SERVED FROM TELECOMMUNICATION ROOM 2S001.
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS
DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS
DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.
2 2
2 2
TYP 2
BLDG 53
AREA OF WORK
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL
POWER AND SIGNAL DEVICES AND ASSSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS AND
CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO
THEIR SOURCE, UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF
THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE
RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING
CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT
QUANTITY INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM EACH
WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR
CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND CONDUIT PER
CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT
VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A
COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED TO SEGREGATE
SYSTEMS FROM ONE ANOTHER.
13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL FEATURES, MECHANICAL
DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
- 1/16" = 1'-0"
1 BLDG 53 - FLOOR 2 - TELECOMMUNICATIONS PLAN
GENERAL NOTES
KEY PLAN
0' 8' 16' 32'
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 53ET102
BLDG 53 - FLOOR 2 -
TELECOMMUNICATION PLAN 53
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
PROJECT
NORTH
PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING
TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET
FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.
EXISTING WIRELESS ACCESS POINT RE-FED WITH CAT6A CABLING.
REMOVE AND REPLACE EXISTING CABLE TRAY IN THE AREAS SHOWN AS REQUIRED; IF CABLE TRAY IS NON-EXISTENT, PROVIDE CABLE TRAY AS INDICATED. REFERENCE DETAIL '6' ON SHEET ET503 AND TELECOMMUNICATIONS WAO AND CABLE TRAY SCHEDULE ON SHEET ET701. WHERE WALL EXTENDS TO CEILING, CABLE TRAY SHALL STOP AND TRANSITION TO CONDUIT SLEEVES [(2) 4", MINIMUM] WITH APPROPRIATE FIRE-PROOFING AND CAULKING TO PASS THROUGH WALL. WHERE EXISTING CABLE TRAY AND/OR SLEEVES ARE DISCOVERED, EVALUATE CONDITION AND RACEWAY CAPACITY; IF CABLE TRAY
AND/OR SLEEVES APPEAR TO BE REUSABLE, NOTIFY COR FOR POSSIBLE REUSE.
FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO INSTALLATION.
UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED APPURTENANCES AS
REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS SECURITY TR
EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED TO PROVIDE A
COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY
EXACT HEAD END LOCATION AS REQUIRED.
PROJECT
NORTH
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
A B CC.1 D E
P Q R WV.2V.1VU.2U.1NMJH S UT
2.2
8.7
7.9
2.7
2.9
3.4
5.6
5.4
5.9
6.5
7.1
TYP
A B C C.1 D E
P Q R WV.2V.1VU.2U.1NMJH S UT
2.2
8.7
7.9
2.7
2.9
3.4
5.6
5.4
5.9
6.5
7.1
TYP
BLDG 53
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO
BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED
BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO
REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,
MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE
INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY
FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION
OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL
IN AND AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR
PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN
RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
AREA OF WORK
- 1/16" = 1'-0"
2 BLDG 53-PENTHOUSE 02 TELECOMMUNICATIONS PLAN
- 1/16" = 1'-0"
1 BLDG 53-PENTHOUSE 01 TELECOMMUNICATIONS PLAN 0' 8' 16' 32'
0' 8' 16' 32'
KEY PLAN
GENERAL NOTES
KEY NOTES
1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO
REPLACE EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT
SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL
'1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR ADDITIONAL
INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED
PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END
LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS
SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED.
COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY
EXACT HEAD END LOCATION AS REQUIRED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 53ET103
BLDG 53 - PENTHOUSE
TELECOMMUNICATION PLAN 53
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
53TET401
53TET401
OFFICE
OFFICE
OFFICE
53TET401
TR
OFFICE
OFFICE
OFFICE
CORRIDOR
C104
OFFICE
OFFICE
HAC
TOILET, MALE
TOILET, FEMALE
FOYER
C101
OFFICE
OFFICE
CONFERENCE
RM.
OFFICE
CORRIDOR
C105
OFFICE
CORRIDOR
C103 OFFICE
E F
A B C D G H I J
SIDE-B FIBER-OPTIC BACKBONE:
REFERENCE COMMUNICATION
SHEETS FOR ADDITIONAL
INFORMATION REGARDING
HANDHOLE, CONDUIT, BUILDING
PENETRATIONS, FIBER-OPTIC
CABLING, AND RACEWAY
INFORMATION
HANDHOLE
EXISTING SIDE-A FIBER-OPTIC BACKBONE BUILDING
ENTRY POINT (APPROXIMATE LOCATION). ROUTE FIBER-
OPTIC CABLES TO TRs AS INDICATED ON
COMMUNICATIONS DRAWINGS; REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC
CABLING, RACEWAY TYPES, SPECIFICATIONS, AND
RATINGS. REFERENCE KEY NOTES ON THIS SHEET
REGARDING CABLE TRAY AND VERTICAL/HORIZONTAL
ROUTING FOR ADDITIONAL FIBER BACKBONE CABLING
REQUIREMENTS.
DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE
SERVED FROM TELECOMMUNICATION ROOM 109.
ALL BACKBONE CABLING ROUTES ARE
DIAGRAMMATICAL; CONTRACTOR SHALL ENSURE A-SIDE
AND B-SIDE ROUTING IS AS DIVERSE AS PRACTICAL.
REFERENCE COMMUNICATIONS DRAWINGS FOR ALL
REQUIRED FIBER-OPTIC CABLING.
WAP 1
WAP 1WAP 1 2
TYP
BLDG 53T
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD
VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL
RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE
DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED
MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED
AT THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR
NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH
CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY
EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS TO EXTEND
TO ASSOCIATED TR AS REQUIRED.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO
REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,
MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE
INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY
FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING
FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT
RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF
HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND
AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES
AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT
VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH
VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT
NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED
THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS
ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED
WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS
AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER
OBSTRUCTIONS PRIOR TO INSTALLATION.
AREA OF WORK
- 1/4" = 1'-0"
1 BLDG 53T - FLOOR 1 - TELECOMMUNICATIONS PLAN
PROJECT
NORTH
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 53TET101
BLDG 53T - FLOOR 1 -
TELECOMMUNICATIONS PLAN 53T
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
0' 2' 4' 8'
PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE
EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND
BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND
THE GENERAL NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH
VA FOR EXACT OUTLET PLACEMENT.
EXISTING WIRELESS ACCESS POINT TO BE RE-FED WITH CAT 6A CABLING.
FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING
WHEREVER POSSIBLE. UTILIZED CABLE TRAY AS APPLICABLE.
PROVIDE CONDUIT SLEEVE WITH FIREPROOFING AS REQUIRED WHERE WALL
PENETRATIONS ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL
INFORMATION.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS
SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS
REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM.
PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA
PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD END LOCATION AS
REQUIRED.
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
STORAGE
BA102a
DATA
BA100
TECH
BA101
FUTURE
BOWLING ALLEY
SHELL - 4 LANE
BA102
LOUNGE
BB100
STORAGE,
GAME &
ACTIVITY
BB101b
COMBINED
BILLIARDS/GAME
& ACTIVITY
BB101
STUDENT
CUBICLES (4)
BB102a
RES. INTERN
CUBICLES (3)
BB102
CORRIDOR
CB-3
CORRIDOR
CB-4
STAIR
STAIR-1
CLASSROOM
BB104CLOSET
BB104a
ELEVATOR
MACHINE
BB108
STORAGE
BB106
ELEV
P-1
ELEV
P-2
CORRIDOR
CB-6
CORRIDOR
CB-5
CORRIDOR
CB-2
ELEVATOR
LOBBY
CB-1
OFFICE,
SHARED PSAs
BB103
OFFICE,
PROGRAM
MANAGER
BB105
OFFICE,
AMPUTEE
COORD.
BB107
OFFICE, PSA
BB111
OFFICE,
MOVE
COORD.
BB112
OFFICE, SWING /
COUNSELING
BB113
ELECTRICAL
ENTRANCE
BB114
TECH
ENTRANCE
BB115
HSKPG
BB120
ELEC
BB10
TLT - WOMEN
BB119
TOILET - MEN
BB118
STORAGE, GAME
& ACTIVITY
BB117
MECHANICAL
BB116
MOVE
CLASSROOM
BB110
VESTIBULE
BA 103
SANITIZER
ROOM
BA103b
WATER METER
BA103c
POOL
MECHANICAL
BA103a
STAIR
STAIR-2
CORRIDOR
CB-7
CORRIDOR
CB-10
EWC
CB-9 EXISTING SIDE-A FIBER-OPTIC BACKBONE BUILDING
ENTRY POINT (APPROXIMATE LOCATION). ROUTE FIBER-
OPTIC CABLES TO TRs AS INDICATED ON
COMMUNICATIONS DRAWINGS; REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC
CABLING, RACEWAY TYPES, SPECIFICATIONS, AND
RATINGS.REFERENCE KEY NOTES ON THIS SHEET
REGARDING CABLE TRAY AND VERTICAL/HORIZONTAL
ROUTING FOR ADDITIONAL FIBER BACKBONE CABLING
REQUIREMENTS.
TYP
B-SIDE:
TO TR BA100 FROM
1A133 TDU, FROM
FLR 01 TO 00
3 4 5 6 7 8 9
A
B
C
D
E
F
G
H
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS
DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.
A-SIDE:
TO TR BA100 FROM
BLDG 1 GC12
EXISTING CABLE TRAY
THROUGHOUT CORRIDORS NOT
SHOWN FOR CLARITY. USE
EXISTING CABLE TRAY TO ROUTE
FIBER-OPTIC BACKBONE CABLING
AS REQUIRED.
PROJECT
NORTH
BLDG 54
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO
ASSOCIATED TR.
5. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
6. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
8. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
9. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ACRHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
54ET100
BLDG 54 - FLOOR 0 -
TELECOMMUNICATIONS PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
Revisions: Date:
GENERAL NOTES
- 3/32" = 1'-0"
1 BLDG 54 - FLOOR 0 - TELECOMMUNICATIONS PLAN
KEY PLAN
KEY NOTES
PROJECT
NORTH
8'0 16' 24'
1 FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO
INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL
REQUIRED APPERTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503
FOR ADDITIONAL INFORMATION.
FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP
CEILING WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE
CONDUIT SLEEVES WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS
ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL
INFORMATION.
TERMINATE B-SIDE FIBER-OPTIC CABLE TO EXISTING TR RACK AS REQUIRED.
CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY
WILL BE REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED
PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END
LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS
SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED.
COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY
EXACT HEAD END LOCATION AS REQUIRED.
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
OFFICE
SHARED
(NURSES)
1A123
OFFICE- OT
SUPER.
1A124
OFFICE VOC.
REHAB
1A126
OFFICE
SOCIAL
1A128
OFFICE
SOCIAL
1A129
OFFICE
NEURO-PSYCH
1A130
OFFICE PSYCH
1A131
CORRIDOR
C1-27
OFFICE SPEECH
PT
1A122
OFFICE
SHARED
(SPEECH))
1A119
OFFICE SPEECH
PT
1A120
COMPUTER
SPEECH
1A121
OFFICE
PHYSCIAN/
EXAM
1A125
OFFICE
PHYSICIAN
1A127
SECRETARY/
WAIT/ CLERICAL
1A111
OFFICE CHIEF
1A110
CONFERENCE
1A118
CORRIDOR
C1-26
TLT
1A112
TLT
1A113
ELECT.
1A114
CP OFFICE
1A116
CP OFFICE
1A117
PT STATION
1A107
OT STATION
1A108
OT STATION
1A109
RECEPTION
C1-9
ESCORT
C-10
TLT
1A100
TLT
1A101
PT/OT
WORKSTATIONS
1A106
VESTIBULE
C1-1
ADL
1A102
EXAM
TREATMENT
1A103
CORRIDOR
C1-12
STORAGE, W C
C1-8
ELEC
1A132
SOILED
1A104
HSKPG
1A105
DATA
1A133
TECH
1A134
CORRIDOR
C1-14
CORRIDOR
C1-13
OT/ PT OPEN
STATIONS
C1-15
GAIT LANE
C1-16
OPEN GYM
C1-17
MAT PLATFORM
AREA
C1-18
LINEN
C1-19
EQUIP.
C1-20
CHAPEL
1B100
WAITING
C1-6
CORRIDOR
C1-11
SECRETARY/
WAIT/ CLERICAL
C1-7
STAIR
STAIR 2HSKPG
1A149
POOL
MECHANICAL
1A148
STORAGE
1B125aDONATION
STAGING
1B126
LOUNGE
1B127
RECEPTION
1B128
CORRIDOR
C1-45
CORRIDOR
C1-46
VOL. SIGN-IN
1B122
COFFEE
1B123
OFFICE
1B124
MULTIPURPOSE/WORKROOM
1B125
CHAPLAIN
CHIEF
1B144EDUCATION/CONFERENCE
1B115
RECYCLING
1B121
TLT - MEN
1B120
TLT - WOMEN
1B119
ELEC
1B118
STUDENT
1B116
CHAPLAIN
1B113
CHAPLAIN
1B112
CORRIDOR
C1-47
CORRIDOR
C1-41
TOWELS/SWIMSUIT
1A147
STORAGE
1A146
CSI SUPPORT
1A145
MALE LOCKERS
1A142
CAREGIVER
1A143
CORRIDOR
C1-40
CORRIDOR
C1-39 FEMALE
LOCKERS
1A141
WORKSTATION
RT
1A140
WORKSTATION
RT
1A139AEROBICS
ROOM
1A137f
ELEC
1A137e
WEIGHT ROOM
1A137d
WORKSTATION
RT/STUDENT
1A144a
OFFICE CHIEF
1A138
THERAPEUTIC
POOL
1A144
KITCH.
C1-35
LOBBY
C1-2
GREETER
C1-3
STAIR
STAIR-1
CORRIDOR
C1-28
ELEVATOR
LOBBY
C1-29
QUIET
1B100A
MULTI-DENOM/
MD STOR.
1B100B
EUCHARIST
1B100C
SACRISTY
1B101
STORAGE
1B104
PRINT/COPY
C1-32
CORRIDOR
C1-33
WAITING
C1-30
SECRETARY
WAITING
C1-31
CHAPLAIN
1B102
CHAPLAIN
1B103
CHAPLAIN
1B105
CHAPLAIN
1B107
CHAPLAIN
1B109
CHAPLAIN
1B111
STORAGE
1B117
CARDIOPULMONARY
REHAB
C1-25
CORRIDOR
C1-21
EQUIP
C1-24
O2 STOR
C1-34
STRETCHER
C1-22
CRASH
C1-23
B-SIDE:
TO TR 2B100 FROM
1A133 TDU, FROM
FLR 01 TO 02
B-SIDE:
TO TR BA100 FROM
1A133 TDU, FROM
FLR 01 TO 00
3 TDU
TYP
HANDHOLE
SIDE-B FIBER-OPTIC BACKBONE:
REFERENCE COMMUNICATION SHEETS
FOR ADDITIONAL INFORMATION
REGARDING HANDHOLE, CONDUIT,
BUILDING PENETRATIONS, FIBER-OPTIC
CABLING, AND RACEWAY INFORMATION
3 4 5 6 7 8 9
B
C
D
E
F
G
H
1 2
L
I
K
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS
DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.
A-SIDE:
TO TR 1A133 FROM
BLDG 1 GC12
EXISTING CABLE TRAY
THROUGHOUT CORRIDORS NOT
SHOWN FOR CLARITY. USE
EXISTING CABLE TRAY TO ROUTE
FIBER-OPTIC BACKBONE CABLING
AS REQUIRED.
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO
ASSOCIATED TR.
5. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
6. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
8. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
9. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ACRHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
PROJECT
NORTH
BLDG 54
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
54ET101
BLDG 54 - FLOOR 1 -
TELECOMMUNICATIONS PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
Revisions: Date:
- 1/16" = 1'-0"
1 BLDG 54 - FLOOR 1 - TELECOMMUNICATIONS PLAN
8'0 16' 32'
PROJECT
NORTH
GENERAL NOTES
KEY PLAN
KEY NOTES
1 FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO
INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL
REQUIRED APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503
FOR ADDITIONAL INFORMATION.
FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP
CEILING WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE
CONDUIT SLEEVES WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS
ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL
INFORMATION.
TUBE DISTRIBUTION UNIT (TDU). REFERENCE COMMUNICATION DRAWINGS FOR
ADDITIONAL INFORMATION.
TERMINATE A-SIDE AND B-SIDE FIBER-OPTIC CABLE TO EXISTING TR RACK AS
REQUIRED.
CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY
WILL BE REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED
PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END
LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS
SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED.
COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY
EXACT HEAD END LOCATION AS REQUIRED.
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
RD
OFD
ROOF OVERHANG
OPEN TO BELOW
DN
OPEN TO BELOW
F E
C
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO
ASSOCIATED TR.
5. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
6. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
8. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
9. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ACRHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
PROJECT
NORTH
BLDG 54
STAIR
STAIR-1
MECHANICAL
2B100
B-SIDE:
TO TR 2B100 FROM
1A133 TDU, FROM
FLR 01 TO 02
EXISTING WALL
MOUNT DATA RACK
3 4 5 6 7 8 9
A
B
C
D
E
F
G
H
1 2
L
I
K
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS
DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
54ET102
BLDG 54 - FLOOR 2 -
TELECOMMUNICATIONS PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
Revisions: Date:
GENERAL NOTES
KEY PLAN
KEY NOTES
- 1/16" = 1'-0"
1 BLDG 54 - FLOOR 2 - TELECOMMUNICATIONS PLAN
PROJECT
NORTH
8'0 16' 32'
1 FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO
INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL
REQUIRED APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503
FOR ADDITIONAL INFORMATION.
FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP
CEILING WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE
CONDUIT SLEEVE WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS
ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL
INFORMATION.
TERMINATE B-SIDE FIBER-OPTIC CABLE TO EXISTING WALL MOUNTED DATA RACK AS
REQUIRED.
UP
2 2
2 2
2 22
2 2
2 2 2
2 2
Tectonic Copyright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
UP
UP
UP
DN
F E
C
FEC
FEC
FEC
F E
C
DATA
SYSTEMS
1C132
DATA
TECH
1C133
CORRIDOR
C1-57
BREAKDOWN,VERIFICATION
INVENTORY
1C135
55ET401a
55ET401a
B.4
C
D
F
H
E
G
J
D.4
876543 7.93.7
H.8
J.1
H.4
6.45.8
A
DATA OUTLETS AND DEVICES IN THIS
AREA SHALL BE SERVED FROM
TELECOMMUNICATION ROOM 1A129
DATA OUTLETS AND DEVICES IN THIS
AREA SHALL BE SERVED FROM
TELECOMMUNICATION ROOM 1B104
DATA OUTLETS AND DEVICES IN THIS
AREA SHALL BE SERVED FROM
TELECOMMUNICATION ROOM 1C132
A R
E A
R
E A
B
S E
E
S H
E E
T
E
T b
CORRIDOR
C1-4
DATA, SYSTEM
1A130
TR
1A129
CORE LAB AREA
1A126
55ET401a
TYP
Office (Disposition)
1B 103
Storage, Wheelchair & Stretcher
1B 106
Eyeglass Fitting & Display
1A 100c
House Keeping
1A 116
Staff Lounge
1A 115
Office (Disposition)
1B 101
Office (Disposition)
1B 103b
Elec.
1A 111
Agent Cashier
1B 105
Waiting
1A 100
Pat. Toilet
1A 100b
Visual Field
1A 101
Optometry Exam
1A 119
Optometry Exam
1A 118
Resident Exam
1A 117
Office, Eyecare Provider-L.V.
Multipurpose
1A 113
Exam- Low Vision
1A 112
Staff Toilet
1A 109
Tele- Retinal Reading
1A 108
Photography Room
1A 106
Pre- Testing 2
1A 104
Optometry Exam- Large
1A 114
Pre- Testing 1
1A 103
Open Office
1A 102
Staff Lounge/ Lockers
1A 133Path. Office
1A 135
Sup. Office
1A 134
Staff Toilet
1A 131
Microbiology
1A 127
Bulk Storage
1A 128
Lab Reception
1A 124a
Elec.
1A 123
Office
1A 140
Staff Lockers & Lounge
1A 139
Office
1A 141
Office
1A 142
Office
1A 143
Ultrasound Room
1A 148
Radiology Room 1
1A 153
Patient Toilet
1A 149
Dressing, ADA
1A 150
Sub- Waiting
C1-27
Mechanical
1M 1a
Blood Collection
1A 124
Radiology Room 2
1A 152
Clean Supply
1A 147
PACS/Digital Control/ Tele-Radiology
1A 144
Crash Cart
1A 147a
Staff Toilet
1A 138
Storage
1A 137
PAC Office
1A 136
Waiting
C1-24
House Keeping
1A 125
Equipment/ Clean Supply
1A 105
Training- Low Vision/ Poly Trauma
1A 110
Soiled Utility
1A 145
Specimen Toilet
1A 124b Specimen Toilet
1A 124c
Closet
1A 110a
Housekeeping
1A 146
Kiosk
C1-23
Dilation Waiting
C1-13
Public Toilet
1A 121
Public Toilet
1A 122
Mobile X-Ray
1A 137a
Staff Toilet
1A 132
Soiled Utility
1A 107
Corridor
C1-31
Corridor
C1-19
Corridor
C1-18a
Waiting
C1-21
Corridor
C1-25
Corridor
C1-29
Corridor
C1-33
Corridor
C1-11
Corridor
C1-12
Corridor
C1-17
Corridor
C1-15
Corridor
C1-14
Corridor
C1-30
Corridor
C1-32
IP Holding
C1-28
Corridor
C1-10
Crash Cart
C1-16
Pat. Toilet
1A 120
Print Alcove
C1-34
Pedestrian Access Corridor
C1-100
Waiting
C1-20
Stair #1-1
Stair #1
Control
1A 152a
Control
1A 153a
Corridor
C1-26
Corridor
C1-22
Corridor
C1-18
Radiology Reception
1A 151
132 SF
3 5
TYP
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS
DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.
DATA OUTLETS AND DEVICES IN
THIS AREA SHALL BE SERVED
FROM TELECOMMUNICATION
ROOM 1B104
EXISTING CABLE TRAY THROUGHOUT CORRIDORS NOT
SHOWN FOR CLARITY. USE EXISTING CABLE TRAY TO
ROUTE FIBER-OPTIC BACKBONE CABLING AS
REQUIRED.
AREA A
AREA OF WORK
KEY PLAN
KEY NOTES
GENERAL NOTES
- 1" = 10'-0"
1 BLDG 55 - FLOOR 1 - AREA A - TELECOMMUNICATIONS PLAN
0' 5' 10' 20'
1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE
EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE
UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE
GENERAL NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR
EXACT OUTLET PLACEMENT.
ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING.
CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.
FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO
INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED
APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL
INFORMATION.
FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING
WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVES WITH
FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE
DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE
REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS
SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED
TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE
EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD END LOCATION AS REQUIRED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55ET101a
BLDG 55 - FLOOR 1 - AREA A -
TELECOMMUNICATIONS PLAN 55
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY
ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS
AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED
BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED
MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT
THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW
FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING
CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR AS
REQUIRED.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH
THE PORT QUANTITY INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM
EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF
HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND
CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL
HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT
VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA
AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT
LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH
CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED
THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE
SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED
TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL
FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS
PRIOR TO INSTALLATION.
2 2
2 2
2 2
2 2
Tectonic Copyright 2007
Tectonic Copyright 2007
F E
C F
E C
FEC
F E
C
F E
C
F E
C
F E
C
FEC
55ET401b
55ET401b
55ET401c
55ET401c
B.4
C
D
F
H
B
E
G
J
K
L
111098.2 8.8
D.3
K.8
K.4
K.6
8.3 8.5 8.7 8.9
K.3
D.4
9.8
A
A R
E A
A
S E
E
S H
E E
T
E
T a
R
E A
B
DATA OUTLETS AND DEVICES IN THIS
AREA SHALL BE SERVED FROM
TELECOMMUNICATION ROOM 1C132
TR
1C132
DATA TECH
1C133
CORRIDOR
C1-57
BREAKDOWN, VERIFICATION &
INVENTORY
1C135
TR
1B104
AGENT CASHIER WAITING
1B102
55ET401b
55ET401c
Recycling
1B 109 Radiology Data Room
1B 109a
TYP
Elevator Lobby
C1-8
Cache
1C 135
Lockers
1C 130a
Lounge
1C 130
OP (Shared) Storage - Med Supplies
1C 127a
OP (Shared) Storage Prepack. Meds
1C 127
Vault Controlled Sub.
1C 124b
IP Storage, Active
1C 122
Aseptic Transfer, IV Admixture
1C 126a
Anteroom, IV Admixture
1C 126
Cubicle, Inventory Clerk
C1-45
Cubicle, Swing
1C 125h
IV Admix Freezer
C1-55
Dispensing, Controlled Sub
1C 124a
Cubicle, IP Process
1C 125d
Cubicle, IP Process
1C 125b
Cubicle, IP Process
1C 125c
Cubicle, IP Process
1C 125a
Cubicle, OP Spec.
1C 125f
Cubicle, OP Spec.
1C 125e
Invest. Drug Work Area & Stor.
1C 129
Pharm Teach Lab / Conf
1C 114
Storage, Sterile Fluids and Admixture
1C 123
IP Freezer
C1-54
Consult
1C 100a Consult
1C 100b
Consult
1C 100c
Consult
1C 100d
OP Waiting
1C 100
Dispensing
C1-40
Dispensing
C1-39
Drug Information Area
C1-47
OP Refrigerator
C1-52
Storage - Cart
1C 120 Mail Out
1C 121
P.C.
C1-53
Elec.
1C 111
Clinical Pharm Teaching
1C 105
Cubicle, Resident
1C 110a
Cubicle, Phone
1C 119e
Cubicle, Phone
1C 119b
Cubicle, Phone
1C 119aCubicle, Pain
1C 118a
Cubicle, Phone & Telemed
1C 119f
Cubicle, Phone
1C 119c Cubicle, Phone
1C 119d
Office, Secretary / Wait
1C 109
Office, Assistant Chief
1C 107
Cubicle, Resident
1C 110b
Office, Pharmacist
1C 102 Office, Pharmacist
1C 101
Office, Pharmacist
1C 106
Office, Pharmacist
1C 104
Office, Chief
1C 108
Office, Pharmacist
1C 103
Storage (SEPS Server)
1C 113
Cubicle, Ancil.
1C 118e
Workstation, Tech- Lead
1C 125g
Workstation, Tech
C1-46
Mechanical
1M 2
Men's Toilet
1B 108
Electrical
1C 134
Staff Toilet
1C 128
Housekeeping Storage (Future Public Elev. #4)
1B 110
Stair #2-1
Stair #2
Service Elev. #3
S-1
Elevator Lobby
C1-3
Stair #3-1
Stair #3
Corridor
C1-7
Corridor
C1-9
Entry Vestibule
C1-1
Corridor
C1-5
Corridor
C1-35
Corridor
C1-36
Corridor
C1-38
Corridor
C1-51
Corridor
C1-50
Corridor
C1-56
Stat. Counter
C1-43
Med Assignment
C1-42 Repackaging, Extemp.
C1-44
Active Filling
C1-41
Prescription Filling and Assembly
C1-49
Gen Tech Work
C1-48
Staff Toilet
1C 117
H.K.
1C 116
Cubicle, Psych
1C 118d
Cubicle, LTC
1C 118c
Cubicle, LTC
1C 118b
Staff Toilet
1C 115
Corridor
C1-37
Corridor
C1-6
Copy Alcove
1C 112
Corridor
C1-58
Public Elev. #2
2C149 Public Elev. #1
2C156
Housekeeping Storage (Future Public Elev. #4)
1B 110
Elevator Lobby
C1-3
Entry Vestibule
C1-1
Corridor
C1-5
Housekeeping Storage (Future Public Elev. #4)
1B 110
Elevator Lobby
C1-3
Entry Vestibule
C1-1
Corridor
C1-5
Lobby
C1-2
Reception
1B 100
Housekeeping Storage (Future Public Elev. #4)
1B 110
Elevator Lobby
C1-3
Entry Vestibule
C1-1
Corridor
C1-5
Women's Toilet
1B 107
Housekeeping Storage (Future Public Elev. #4)
1B 110
Elevator Lobby
C1-3
Entry Vestibule
C1-1
Corridor
C1-5
EXISTING SIDE-A FIBER-OPTIC BACKBONE
BUILDING ENTRY POINT (APPROXIMATE LOCATION).
ROUTE FIBER-OPTIC CABLES TO TRs AS INDICATED
ON COMMUNICATIONS DRAWINGS; REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL FIBER-
OPTIC CABLING, RACEWAY TYPES,
SPECIFICATIONS, AND RATINGS. REFERENCE KEY
NOTES ON THIS SHEET REGARDING CABLE TRAY
AND VERTICAL/HORIZONTAL ROUTING FOR
ADDITIONAL FIBER BACKBONE CABLING
REQUIREMENTS.
HANDHOLE
SIDE-B FIBER-OPTIC
BACKBONE:
REFERENCE
COMMUNICATION
SHEETS FOR
ADDITIONAL
INFORMATION
REGARDING HANDHOLE,
CONDUIT, BUILDING
PENETRATIONS, FIBER-
OPTIC CABLING, AND
RACEWAY
INFORMATION
3 5
TYP
DATA OUTLETS AND DEVICES IN
THIS AREA SHALL BE SERVED
FROM TELECOMMUNICATION
ROOM 1B104
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS
DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.
EXISTING CABLE TRAY
THROUGHOUT CORRIDORS
NOT SHOWN FOR CLARITY.
USE EXISTING CABLE TRAY TO
ROUTE FIBER-OPTIC
BACKBONE CABLING AS
REQUIRED.
AREA B
AREA OF WORK
- 1" = 10'-0"
1 BLDG 55 - FLOOR 1 - AREA B - TELECOMMUNICATIONS PLAN
0' 5' 10' 20'
KEY NOTES
KEY PLAN
GENERAL NOTES
PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING
TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED
TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL
NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT
OUTLET PLACEMENT.
ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING.
CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.
FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO
INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIREPROOFING AND ALL REQUIRED
APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL
INFORMATION.
FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING
WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVES WITH
FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE
DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE
REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS
SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED
TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE
EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD END LOCATION AS REQUIRED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55ET101b
BLDG 55 - FLOOR 1 - AREA B -
TELECOMMUNICATIONS PLAN 55
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY
ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS
AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED
BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED
MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT
THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF REQUIRED.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .