Attachment 8 - Drawings Part-7.pdf

PDF 15 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation seeks a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, facility renovation and construction projects, data center renovations, communication and fiber infrastructure installation and upgrades across multiple campus buildings, physical security improvements, and hazardous material abatement. The contractor will furnish all labor, materials, equipment and supervision for projects in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75 and related site work. The Department of Veterans Affairs Technology Acquisition Center located in Austin is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
FOLLOW-UP Technical Questions - St. Louis 4-6-23.pdf PDF
36C77623R0009 0005.pdf PDF
Technical Questions - FINAL - St. Louis 3-28-23.pdf PDF
657-21-701JB - Addendum 1_03_24_23.pdf PDF
329000-5 - Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-24-23.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
Attachment 45 - Site Visit Instructions Updated 2-16-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Attachment 33 - Drawings Part-32.pdf PDF
Attachment 34 - Envr. Report - Narrative.pdf PDF
Attachment 37 - Envr. Report - Appendix C.pdf PDF
Attachment 40 - NARA RM Contract Language Clause.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 1-20-23.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

J

I

H

F

G

D

E

C

B

A

261 2 3 4 5 6 7 8 9 10 11 1312 1514 16 17 18 19 2120 22 2423 25

RF - 1

CONDENSING UNIT

ELEVATOR

A

SF - 1

E1

DS2

LP1

18EP400

18EP400

18EP400

18EP400

PIPE CHASE

Z001

MECH. RM.

CORRIDOR

H001

CORRIDOR

H002

ELEVATOR

MACHINE RM.

STAIRWELL NO. 2

S002

TOILET, UNISEX

TOILET, FEMALE

HAC

BREAK RM.

OFFICE

OFFICE

VENDING

H003

OFFICE

MECH. RM.

003A

MECH. RM.

OI&T

003B

ELEVATOR

LOBBY

CHASE

CH-1-B

CHASE

CH-2-B

CHASE

CH-3-B

CHASE

CH-4-B

ELEVATOR

E1

TR

011A

OFFICE

OFFICE

BLDG 18

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

- 1/8" = 1'-0"

1 BLDG 18 - FLOOR 0 - ELECTRICAL PLAN

KEY PLAN

GENERAL NOTES

0' 4' 8' 16'

KEY NOTES

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 18EP100

BLDG 18 - FLOOR 0 - ELECTRICAL

PLAN 18

LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

03/31/2022

NON SPRINKLERED

PROJECT

NORTH

Revisions: Date:

LRL/WNM LLT/JPS

UP

UP

UP

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

J

I

H

F

G

D

E

C

B

A

18EP401

18EP401

DN

18-CU-3-119

18-CU-3-213

18-CU-2-312

18-CU-3-011A

18-119A-6,8

18-213A-6,8

18-312A-6,8

18-011A-6,8

18EP401

18EP401

OFFICE

OFFICE

OFFICE

FILE RM.

OFFICE

OFFICE

WORK RM.

STORAGE

TOILET, MALE

ELEVATOR

LOBBY

TOILET, FEMALE

STAIRWELL NO. 2

S102

CORRIDOR

H102

CORRIDOR

H103

TR

PIV BADGE

OFFICE

CORRIDOR

H101

RECEPTION

STAIRWELL NO. 1

S101

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

H104

CONFERENCE

RM.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

114 OFFICE

114A

OFFICE

BREAK RM.

115A

OFFICE, OPEN

OFFICE

OFFICE, CHIEF

113A

OFFICE

OFFICE

OFFICE

CORRIDOR

H105

CLOSET

115CCLOSET

115B

ELEVATOR

E1

CHASE

CH-1-1

STAIRWELL NO. 3

S103

TYP.

BLDG 18

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 18EP101

BLDG 18 - FLOOR 1 - ELECTRICAL

PLAN 18

LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

03/31/2022

- 1/8" = 1'-0"

1 BLDG 18 - FLOOR 1 - ELECTRICAL PLAN

KEY PLAN

GENERAL NOTES

0' 4' 8' 16'

KEY NOTES

PROJECT

NORTH

NON SPRINKLERED

Revisions: Date:

1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS

REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

PROJECT

NORTH

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

OFFICE

217C

OFFICE

217D

OFFICE

217E

OFFICE, SUPV.

HAC

OFFICE

215A

OFFICE

OFFICE

OFFICE

217A

OFFICE

217B

STAIRWELL NO.

S201

OFFICE

OFFICE

OFFICE

OFFICE

TR

ELEC. CLOSET

TOILET, MALE

TOILET, FEMALE

STAIRWELL NO.

S202

OFFICE

OFFICE

OFFICE, SUPV.

OFFICE, CHIEF

CORRIDOR

H203

CORRIDOR

H202

ELEVATOR

LOBBY

CORRIDOR

H204

OFFICE

207A

OFFICE

207B

OFFICE

OFFICE

210B

OFFICE

210A

OFFICE

205A

CORRIDOR

H201

CHASE

CH-2-1

DN

ELEVATOR

E1

KITCHENETTE

212A

J

I

H

F

G

D

E

C

B

A

261 2 3 4 5 6 7 8 9 10 11 1312 1514 16 17 18 19 2120 22 2423 25

18EP402

18EP402

18EP402

18EP402

18EP402

18EP402

BLDG 18

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 18EP102

BLDG 18 - FLOOR 2 - ELECTRICAL

PLAN 18

LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

03/31/2022

- 1/8" = 1'-0"

1 BLDG 18 - FLOOR 2 - ELECTRICAL PLAN

KEY PLAN

GENERAL NOTES

0' 4' 8' 16'

KEY NOTES

PROJECT

NORTH

NON SPRINKLERED

Revisions: Date:

PROJECT

NORTH

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

STAIRWELL NO.

S301

CREDENTIALS

OFFICE

TELEHEALTH

SUPERVISOR

TELEHEALTH

WORKROOM

KITCHEN

HAC

CORRIDOR

H302

CORRIDOR

H303

TOILET, MALE

ELEVATOR

LOBBY

TOILET, FEMALE

STAIRWELL NO.

S302

TR

ELEC. CLOSET

CORRIDOR

H304

OFFICE

305A

OFFICE

CONFERENCE

RM.

OFFICE

OFFICE

306A

OFFICE

OFFICE

BREAK RM.

OFFICE

OFFICE

311A

OFFICE

311E

OFFICE

OFFICE

311D

OFFICE

311B

OFFICE

311C

RAD

RADRAD

RADRADRADRAD

RAD

RAD

RADRADRADRADRADRADRADRADRAD

RAD

RAD

RAD RAD

RAD

RAD RAD RAD RAD

RAD

RAD

RAD

RADRAD

RAD

RAD

RAD

STAIRWELL NO.

S303

CHASE

CH-3-1

DN

ELEVATOR

E1

RAD

RAD RAD RAD RAD

RAD

CREDENTIALS

SUPPLIES

CORRIDOR

H301A

CORRIDOR

H301

TELEHEALTH

SUPPLIES

CREDENTIALS

SUPERVISOR

RAD

J

I

H

F

G

D

E

C

B

A

261 2 3 4 5 6 7 8 9 10 11 1312 1514 16 17 18 19 2120 22 2423 25

18EP403

18EP403

18EP403

18EP403

BLDG 18

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 18EP103

BLDG 18 - FLOOR 3 - ELECTRICAL

PLAN 18

LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

03/31/2022

- 1/8" = 1'-0"

1 BLDG 18 - FLOOR 3 - ELECTRICAL PLAN

KEY PLAN

GENERAL NOTES

0' 4' 8' 16'

KEY NOTES

PROJECT

NORTH

NON SPRINKLERED

Revisions: Date:

PROJECT

NORTH

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

UP

UP

DN

BLDG 23

Floor 3"

Floor 5"

B

C

D

E

F

G

A

B.2

B.8

C.6

D.4

E.2

E.8

1 2 3 4 5 6 7 83.4

E.5

D.5

C.5

B.5

E.6 G - 13C

P1 - L

P1 - R B C

A

CARP SHOP (CR)

1EL1 PE

L

MSB - 23

23EP400

TR

G09B

LOCK SHOP

G09

23EP400

23EP400

23EP400

BREAK RM. /

STORAGE

G23

CARPENTER

SHOP

G26

CARPENTER

SHOP OFFICE/

KEY PICK-UP

G25

LOCKER, MALE

G15

TOILET / SHOWER

G16

STORAGE

G14

STAIRWELL NO. 1

S1

CORRIDOR

H001

TOILET, MEN

G12

STORAGE

G13

LOCKER, MALE

G11

CARPENTER

STORAGE

G10

CHARGING

STATION

G07

STORAGE

G08

KEY SHOP

G09A

BREAK RM.

G04

STORAGE

G05

OFFICE

G01A

ELEC RM.

G01

MECH. RM.

G02

ELEC RM.

G03

CORRIDOR

H002

CORRIDOR

H003

BATTERY

STORAGE

G13C

TRASH RM.

G13B

WASH RM.

G13A

STAIRWELL NO. 2

S2

MECH. RM.

G17

CORRIDOR

H000

ELEVATOR

E-1

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

0' 2' 4' 8'

PROJECT

NORTH

- 3/16" = 1'-0"

1 BLDG 23 - FLOOR 0 - ELECTRICAL PLAN

KEY PLAN

KEY NOTES

GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

23EP100

BLDG 23 - FLOOR 0 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

1 EXISTING SWITCHBOARD TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON

SHEET 23EP601 FOR ADDITIONAL INFORMATION.

NON SPRINKLER

Revisions: Date:

PROJECT

NORTH

DN

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

B

C

D

E

F

G

A

B.2

B.8

C.6

D.4

E.2

E.8

1 2 3 4 5 6 7 83.4

E.5

D.5

C.5

B.5

E.6

CP

LP - L

LP - R

P1 - 1

C1 - 1

23EP401

23EP401

23EP401

23EP401

CONFERENCE

RM.

PROSTHETICS

RESTORATION

PROSTHETICS

RESTORATION

OFFICE

LAB DUSTER

115A

OI&T

115B

CORRIDOR

C119

MAIL

STAFF LOUNGE

HAC

TOILET

CORRIDOR

C128

ORTH LAB

SUPPLIES

ORTH LAB

SUPPLIES

AMPUTEE CLINIC

OFFICE

OFFICE

OFFICE

EXAM 1

CORRIDOR

C118

CORRIDOR

C102

EXAM 2

FIT 2

FIT 1

OFFICE

CLEAN SUPPLY

ORTH

LAB/OFFICE

SEWING

STORAGE

TOILET, STAFF

CAD CAM

CAST RM.

LAB WORK

CORRIDOR

C110

LAB

FUME/STORAGE

OVEN

114A

ALCOVE

122A

DME SUPPLY /

DISTRIBUTION

PROSTHETICS

SERVICE

CHECK-IN

TOILET

RECEPTION

PURCHASING

AGENTS

PROGRAM

SUPPORT

ASSISTANT

OFFICE

OFFICE

CORRIDOR

CORRIDOR

C102A

STAIR 1

S1

CORRIDOR

C102B

ELEVATOR

E-1

WORK

129A

WORK

129B

OFFICE

97D

OFFICE

97A

HALLWAY

96A

OFFICE

97B

OFFICE

97E

OFFICE

97C

OFFICE

97F

OFFICE

114B

TR

121A

PROSTHETICS

RESTORATION

BLDG 23

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

23EP101

BLDG 23 - FLOOR 1 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 3/16" = 1'-0"

1 BLDG 23 - FLOOR 1 - ELECTRICAL PLAN

PROJECT

NORTH

KEY PLAN

KEY NOTES

GENERAL NOTES

0' 2' 4' 8'

Revisions: Date:

PROJECT

NORTH

DN

UP

UP

UP

DN

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

B1

B

24MR

24ML

D

P2

A

0 2' 4' 8'

24EP400a

24EP400a

A

3 3

B C D F J QPMH R S T

PROJECT

NORTH

24-DP-TRAB 1

24EP400a

24EP400a

24EP400b

24EP400b

RETAIL STORE

G04

TR

G02A

OFFICE

G02

OI&T

G02B

KITCHEN

STORAGE

G06

KITCHEN

G05

KITCHEN

G07

HAC

G08

MECHANICAL RM.

G15

STORAGE

G100A

DISH WASH

G09

VESTIBULE

G11

TOILET, FEMALE

G12

TOILET, MALE

G13

VESTIBULE

G14

STAIRWELL NO. 1

S001

DINING AREA

G01

DINING AREA

G01

RETAIL STORE

G03

STORAGE

G03A

CORRIDOR

H001

STORAGE

G010

ELEVATOR

E-1

STAIRWELL NO. 2

S002

BLDG 24

PROJECT

NORTH

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND LIGHTING CIRCUITRY AS REQUIRED. ALL

RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

9. REFERENCE ONE-LINE DIAGRAM ON SHEET 24EP601 FOR CONDUIT AND WIRE

SIZING.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

24EP100

BLDG 24 - FLOOR 0 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 3/16" = 1'-0"

1 BLDG 24 - FLOOR 0 - ELECTRICAL PLAN

KEY PLAN

KEY NOTES

GENERAL NOTES

Revisions: Date:

EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 24EP601

FOR ADDITIONAL INFORMATION.

DN

DN

UP

DN

UP

DN

DN

DN

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

STAGE PANEL

24EP401

24EP401

A

12 12

3 3

B C D F J QPMH R S T

6 6

24-G02AA-6,8

24-114BA-6,8

24-205AA-6,8

24EP401

24EP401

RETAIL STORE

G04

24-CU-3-205A24-CU-3-114B

24-CU-3-G02A1

TYP.

KITCHEN

TOILET

105A

FIRE APPARATUS

114A

OFFICE

STORAGE

104A

STAIRWELL NO. 3

S103

OI&T

114C

TR

114B

LIBRARY

MEDICAL

LIBRARY

STAIRWELL NO. 1

S101

STORAGE

101B

STORAGE

101C

ENTRY

BREAK RM.

101A

ELEVATOR

E-1STAGE LEFT

TOILET, FEMALE

TOILET, MALE

107A

VESTIBULE

110A

STAGE RIGHT

STORAGE

107B

STAGE

AUDITORIUM

STORAGE

OFFICE

G02

OI&T

G02B

KITCHEN

STORAGE

G06

KITCHEN

G05

KITCHEN

G07

HAC

G08

MECHANICAL RM.

G15

STORAGE

G100A

VESTIBULE

G11

TOILET, FEMALE

G12

TOILET, MALE

G13

VESTIBULE

G14

STAIRWELL NO. 1

S001

DINING AREA

G01

RETAIL STORE

G03

STORAGE

G03A

CORRIDOR

H001

STORAGE

G010

STAIRWELL NO. 2

S002

BLDG 24

PROJECT

NORTH

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND LIGHTING CIRCUITRY AS REQUIRED. ALL

RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

24EP101

BLDG 24 - FLOOR 1 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 3/16" = 1'-0"

1 BLDG 24 - FLOOR 1 - ELECTRICAL PLAN

0 2' 4' 8'

KEY PLAN

KEY NOTES

GENERAL NOTES

Revisions: Date:

PROJECT

NORTH

1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS

REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

DN

UP

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

PLUG - FUSE PANEL

C

24EP402

24EP402

A

B C D F J QPMH R S T

24EP402

24EP402

STAGE

OFFICE

201A

OFFICE

STAIR 5

S205

HAC

TOILET

MULTIPURPOSE

RM.

STORAGE

OFFICE

STORAGE

206A

STAIR 3

S203

STAIR 4

S204

OI&T

205C

SHARED OFFICE

WORK RM.

OFFICE

STORAGE

TOILET

STORAGE

STORAGE

VESTIBULE

STORAGE

STORAGE

216A

VACANT

210A

STORAGE

TR

205A

TOILET

215A

VESTIBULE

211A

CORRIDOR

204B

BLDG 24

PROJECT

NORTH

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND LIGHTING CIRCUITRY AS REQUIRED. ALL

RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

24EP102

BLDG 24 - FLOOR 2 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JBB/JPS

CONSTRUCTION

DOCUMENTS

- 3/16" = 1'-0"

1 BUILDING 24 - FLOOR 2 - ELECTRICAL PLAN

0 2' 4' 8'

KEY PLAN

KEY NOTES

GENERAL NOTES

Revisions: Date:

PROJECT

NORTH

J

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

TUNNEL TO BUILDING 1

CLOSED TO PEDESTRIAN

TRAFFIC

A B C D E

F G H I

J K L M N

EDP - 25

25DP1

JUNCTION BOX

DISCONNECT

25-DP-TRA

DISC-EDP25

PIPE BASEMENT

Z002

PIPE BASEMENT

Z001

PIPE BASEMENT

Z003

CORRIDOR

H002

PIPE BASEMENT

Z004

MECH. RM.

Z005

VESTIBULE

H001

ELEVATOR NO. 1

E-1

STAIRWELL NO. 2

S002

MACHINE RM.

PH-1

BLDG 25

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

9. REFERENCE ONE-LINE DIAGRAM ON SHEET 25EP601 FOR CONDUIT AND WIRE

SIZING.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

25EP100

BLDG 25 - FLOOR 0 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LTT

CONSTRUCTION

DOCUMENTS

KEY PLAN

GENERAL NOTES

PROJECT

NORTH

KEY NOTES

- 3/16" = 1'-0"

1 BLDG 25 - FLOOR 0 - ELECTRICAL PLAN

Revisions: Date:

EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET

25EP601 FOR ADDITIONAL INFORMATION.

EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 25EP601

FOR ADDITIONAL INFORMATION.

PROJECT

NORTH

0' 2' 4' 8'

SPSPSPSP

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

A B C D E G H I JF

25 - E1

25L - 01A

25L - 01B

25EP401

25EP401

25-DP-TRAB

25-CU-3-117A

25-CU-3-204B 25-CU-2-313A

25-117AA-6,8

25-204BA-6,8 25-313AA-6,8

25EP401

25EP401

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STAIRWELL NO. 2

S102

OFFICE

OFFICE

OFFICE

OFFICE

118A

TR

117A

OFFICE

OFFICE

OFFICE

CORRIDOR

H103A

CORRIDOR

H103

OFFICE

MECH. RM.

MECH. RM.

108A

VESTIBULE

OFFICE

FIRE ALARM CL.

CORRIDOR

H104

RECEPTION

CORRIDOR

H102

CORRIDOR

H101

HAC

STAIRWELL NO. 1

S101

STORAGE

S101B

TOILET, MALE

TOILET, FEMALE

ELEVATOR NO. 1

E-1

STORAGE

107A

OFFICE

TYP.

OFFICE

BLDG 25

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

25EP101

BLDG 25 - FLOOR 1 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LTT

CONSTRUCTION

DOCUMENTS

- 3/16" = 1'-0"

1 BLDG 25 - FLOOR 1 - ELECTRICAL PLAN

PROJECT

NORTH

0' 2' 4' 8'

KEY PLAN

GENERAL NOTES

PROJECT

NORTH

Revisions: Date:

KEY NOTES

PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS

REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

UP

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

A B C D E G H I JF

25L - 1A 25L - 1B

25EP402

25EP402

25EP402

25EP402

OFFICE

209C

OFFICE, CHIEF

209D

MECH. RM.

OFFICE

CORRIDOR

H203

OFFICE

OFFICE

212A

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

213A

STAIRWELL NO. 2

S202

CONFERENCE

RM.

STORAGE

201A

OFFICE, CHIEF

OFFICE

OFFICE

204C

TR

204B

TOILET, FEMALE

TOILET, MALE

ELEC. CL.

208A

OFFICE

CORRIDOR

H202

OFFICE

204A

STAIRWELL NO. 1

S201

TOILET

209B

KITCHEN

209A

OFFICE

HAC

ELEVATOR NO. 1

E-1

OFFICE

H003

CORRIDOR

H201

CHASE

CH-2-1

OFFICE

BLDG 25

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 25EP102

BLDG 25 - FLOOR 2 - ELECTRICAL

PLAN 25

LRL/WNM JPS/LTT

CONSTRUCTION

DOCUMENTS

03/31/2022

- 3/16" = 1'-0"

1 BLDG 25 - FLOOR 2 - ELECTRICAL PLAN PROJECT

NORTH

0' 2' 4' 8'

KEY PLAN

GENERAL NOTES

PROJECT

NORTH

KEY NOTES

NON SPRINKLERED

Revisions: Date:

File details come from the government source that posted it. Updated .