This solicitation seeks a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, facility renovation and construction projects, data center renovations, communication and fiber infrastructure installation and upgrades across multiple campus buildings, physical security improvements, and hazardous material abatement. The contractor will furnish all labor, materials, equipment and supervision for projects in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75 and related site work. The Department of Veterans Affairs Technology Acquisition Center located in Austin is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
J
I
H
F
G
D
E
C
B
A
261 2 3 4 5 6 7 8 9 10 11 1312 1514 16 17 18 19 2120 22 2423 25
RF - 1
CONDENSING UNIT
ELEVATOR
A
SF - 1
E1
DS2
LP1
18EP400
18EP400
18EP400
18EP400
PIPE CHASE
Z001
MECH. RM.
CORRIDOR
H001
CORRIDOR
H002
ELEVATOR
MACHINE RM.
STAIRWELL NO. 2
S002
TOILET, UNISEX
TOILET, FEMALE
HAC
BREAK RM.
OFFICE
OFFICE
VENDING
H003
OFFICE
MECH. RM.
003A
MECH. RM.
OI&T
003B
ELEVATOR
LOBBY
CHASE
CH-1-B
CHASE
CH-2-B
CHASE
CH-3-B
CHASE
CH-4-B
ELEVATOR
E1
TR
011A
OFFICE
OFFICE
BLDG 18
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
- 1/8" = 1'-0"
1 BLDG 18 - FLOOR 0 - ELECTRICAL PLAN
KEY PLAN
GENERAL NOTES
0' 4' 8' 16'
KEY NOTES
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 18EP100
BLDG 18 - FLOOR 0 - ELECTRICAL
PLAN 18
LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
03/31/2022
NON SPRINKLERED
PROJECT
NORTH
Revisions: Date:
LRL/WNM LLT/JPS
UP
UP
UP
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
J
I
H
F
G
D
E
C
B
A
18EP401
18EP401
DN
18-CU-3-119
18-CU-3-213
18-CU-2-312
18-CU-3-011A
18-119A-6,8
18-213A-6,8
18-312A-6,8
18-011A-6,8
18EP401
18EP401
OFFICE
OFFICE
OFFICE
FILE RM.
OFFICE
OFFICE
WORK RM.
STORAGE
TOILET, MALE
ELEVATOR
LOBBY
TOILET, FEMALE
STAIRWELL NO. 2
S102
CORRIDOR
H102
CORRIDOR
H103
TR
PIV BADGE
OFFICE
CORRIDOR
H101
RECEPTION
STAIRWELL NO. 1
S101
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
H104
CONFERENCE
RM.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
114 OFFICE
114A
OFFICE
BREAK RM.
115A
OFFICE, OPEN
OFFICE
OFFICE, CHIEF
113A
OFFICE
OFFICE
OFFICE
CORRIDOR
H105
CLOSET
115CCLOSET
115B
ELEVATOR
E1
CHASE
CH-1-1
STAIRWELL NO. 3
S103
TYP.
BLDG 18
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 18EP101
BLDG 18 - FLOOR 1 - ELECTRICAL
PLAN 18
LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
03/31/2022
- 1/8" = 1'-0"
1 BLDG 18 - FLOOR 1 - ELECTRICAL PLAN
KEY PLAN
GENERAL NOTES
0' 4' 8' 16'
KEY NOTES
PROJECT
NORTH
NON SPRINKLERED
Revisions: Date:
1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
PROJECT
NORTH
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
OFFICE
217C
OFFICE
217D
OFFICE
217E
OFFICE, SUPV.
HAC
OFFICE
215A
OFFICE
OFFICE
OFFICE
217A
OFFICE
217B
STAIRWELL NO.
S201
OFFICE
OFFICE
OFFICE
OFFICE
TR
ELEC. CLOSET
TOILET, MALE
TOILET, FEMALE
STAIRWELL NO.
S202
OFFICE
OFFICE
OFFICE, SUPV.
OFFICE, CHIEF
CORRIDOR
H203
CORRIDOR
H202
ELEVATOR
LOBBY
CORRIDOR
H204
OFFICE
207A
OFFICE
207B
OFFICE
OFFICE
210B
OFFICE
210A
OFFICE
205A
CORRIDOR
H201
CHASE
CH-2-1
DN
ELEVATOR
E1
KITCHENETTE
212A
J
I
H
F
G
D
E
C
B
A
261 2 3 4 5 6 7 8 9 10 11 1312 1514 16 17 18 19 2120 22 2423 25
18EP402
18EP402
18EP402
18EP402
18EP402
18EP402
BLDG 18
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 18EP102
BLDG 18 - FLOOR 2 - ELECTRICAL
PLAN 18
LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
03/31/2022
- 1/8" = 1'-0"
1 BLDG 18 - FLOOR 2 - ELECTRICAL PLAN
KEY PLAN
GENERAL NOTES
0' 4' 8' 16'
KEY NOTES
PROJECT
NORTH
NON SPRINKLERED
Revisions: Date:
PROJECT
NORTH
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
STAIRWELL NO.
S301
CREDENTIALS
OFFICE
TELEHEALTH
SUPERVISOR
TELEHEALTH
WORKROOM
KITCHEN
HAC
CORRIDOR
H302
CORRIDOR
H303
TOILET, MALE
ELEVATOR
LOBBY
TOILET, FEMALE
STAIRWELL NO.
S302
TR
ELEC. CLOSET
CORRIDOR
H304
OFFICE
305A
OFFICE
CONFERENCE
RM.
OFFICE
OFFICE
306A
OFFICE
OFFICE
BREAK RM.
OFFICE
OFFICE
311A
OFFICE
311E
OFFICE
OFFICE
311D
OFFICE
311B
OFFICE
311C
RAD
RADRAD
RADRADRADRAD
RAD
RAD
RADRADRADRADRADRADRADRADRAD
RAD
RAD
RAD RAD
RAD
RAD RAD RAD RAD
RAD
RAD
RAD
RADRAD
RAD
RAD
RAD
STAIRWELL NO.
S303
CHASE
CH-3-1
DN
ELEVATOR
E1
RAD
RAD RAD RAD RAD
RAD
CREDENTIALS
SUPPLIES
CORRIDOR
H301A
CORRIDOR
H301
TELEHEALTH
SUPPLIES
CREDENTIALS
SUPERVISOR
RAD
J
I
H
F
G
D
E
C
B
A
261 2 3 4 5 6 7 8 9 10 11 1312 1514 16 17 18 19 2120 22 2423 25
18EP403
18EP403
18EP403
18EP403
BLDG 18
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 18EP103
BLDG 18 - FLOOR 3 - ELECTRICAL
PLAN 18
LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
03/31/2022
- 1/8" = 1'-0"
1 BLDG 18 - FLOOR 3 - ELECTRICAL PLAN
KEY PLAN
GENERAL NOTES
0' 4' 8' 16'
KEY NOTES
PROJECT
NORTH
NON SPRINKLERED
Revisions: Date:
PROJECT
NORTH
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
UP
UP
DN
BLDG 23
Floor 3"
Floor 5"
B
C
D
E
F
G
A
B.2
B.8
C.6
D.4
E.2
E.8
1 2 3 4 5 6 7 83.4
E.5
D.5
C.5
B.5
E.6 G - 13C
P1 - L
P1 - R B C
A
CARP SHOP (CR)
1EL1 PE
L
MSB - 23
23EP400
TR
G09B
LOCK SHOP
G09
23EP400
23EP400
23EP400
BREAK RM. /
STORAGE
G23
CARPENTER
SHOP
G26
CARPENTER
SHOP OFFICE/
KEY PICK-UP
G25
LOCKER, MALE
G15
TOILET / SHOWER
G16
STORAGE
G14
STAIRWELL NO. 1
S1
CORRIDOR
H001
TOILET, MEN
G12
STORAGE
G13
LOCKER, MALE
G11
CARPENTER
STORAGE
G10
CHARGING
STATION
G07
STORAGE
G08
KEY SHOP
G09A
BREAK RM.
G04
STORAGE
G05
OFFICE
G01A
ELEC RM.
G01
MECH. RM.
G02
ELEC RM.
G03
CORRIDOR
H002
CORRIDOR
H003
BATTERY
STORAGE
G13C
TRASH RM.
G13B
WASH RM.
G13A
STAIRWELL NO. 2
S2
MECH. RM.
G17
CORRIDOR
H000
ELEVATOR
E-1
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
0' 2' 4' 8'
PROJECT
NORTH
- 3/16" = 1'-0"
1 BLDG 23 - FLOOR 0 - ELECTRICAL PLAN
KEY PLAN
KEY NOTES
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
23EP100
BLDG 23 - FLOOR 0 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
1 EXISTING SWITCHBOARD TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON
SHEET 23EP601 FOR ADDITIONAL INFORMATION.
NON SPRINKLER
Revisions: Date:
PROJECT
NORTH
DN
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
B
C
D
E
F
G
A
B.2
B.8
C.6
D.4
E.2
E.8
1 2 3 4 5 6 7 83.4
E.5
D.5
C.5
B.5
E.6
CP
LP - L
LP - R
P1 - 1
C1 - 1
23EP401
23EP401
23EP401
23EP401
CONFERENCE
RM.
PROSTHETICS
RESTORATION
PROSTHETICS
RESTORATION
OFFICE
LAB DUSTER
115A
OI&T
115B
CORRIDOR
C119
STAFF LOUNGE
HAC
TOILET
CORRIDOR
C128
ORTH LAB
SUPPLIES
ORTH LAB
SUPPLIES
AMPUTEE CLINIC
OFFICE
OFFICE
OFFICE
EXAM 1
CORRIDOR
C118
CORRIDOR
C102
EXAM 2
FIT 2
FIT 1
OFFICE
CLEAN SUPPLY
ORTH
LAB/OFFICE
SEWING
STORAGE
TOILET, STAFF
CAD CAM
CAST RM.
LAB WORK
CORRIDOR
C110
LAB
FUME/STORAGE
OVEN
114A
ALCOVE
122A
DME SUPPLY /
DISTRIBUTION
PROSTHETICS
SERVICE
CHECK-IN
TOILET
RECEPTION
PURCHASING
AGENTS
PROGRAM
SUPPORT
ASSISTANT
OFFICE
OFFICE
CORRIDOR
CORRIDOR
C102A
STAIR 1
S1
CORRIDOR
C102B
ELEVATOR
E-1
WORK
129A
WORK
129B
OFFICE
97D
OFFICE
97A
HALLWAY
96A
OFFICE
97B
OFFICE
97E
OFFICE
97C
OFFICE
97F
OFFICE
114B
TR
121A
PROSTHETICS
RESTORATION
BLDG 23
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
23EP101
BLDG 23 - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 3/16" = 1'-0"
1 BLDG 23 - FLOOR 1 - ELECTRICAL PLAN
PROJECT
NORTH
KEY PLAN
KEY NOTES
GENERAL NOTES
0' 2' 4' 8'
Revisions: Date:
PROJECT
NORTH
DN
UP
UP
UP
DN
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
B1
B
24MR
24ML
D
P2
A
0 2' 4' 8'
24EP400a
24EP400a
A
3 3
B C D F J QPMH R S T
PROJECT
NORTH
24-DP-TRAB 1
24EP400a
24EP400a
24EP400b
24EP400b
RETAIL STORE
G04
TR
G02A
OFFICE
G02
OI&T
G02B
KITCHEN
STORAGE
G06
KITCHEN
G05
KITCHEN
G07
HAC
G08
MECHANICAL RM.
G15
STORAGE
G100A
DISH WASH
G09
VESTIBULE
G11
TOILET, FEMALE
G12
TOILET, MALE
G13
VESTIBULE
G14
STAIRWELL NO. 1
S001
DINING AREA
G01
DINING AREA
G01
RETAIL STORE
G03
STORAGE
G03A
CORRIDOR
H001
STORAGE
G010
ELEVATOR
E-1
STAIRWELL NO. 2
S002
BLDG 24
PROJECT
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND LIGHTING CIRCUITRY AS REQUIRED. ALL
RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
9. REFERENCE ONE-LINE DIAGRAM ON SHEET 24EP601 FOR CONDUIT AND WIRE
SIZING.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
24EP100
BLDG 24 - FLOOR 0 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 3/16" = 1'-0"
1 BLDG 24 - FLOOR 0 - ELECTRICAL PLAN
KEY PLAN
KEY NOTES
GENERAL NOTES
Revisions: Date:
EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 24EP601
FOR ADDITIONAL INFORMATION.
DN
DN
UP
DN
UP
DN
DN
DN
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
STAGE PANEL
24EP401
24EP401
A
12 12
3 3
B C D F J QPMH R S T
6 6
24-G02AA-6,8
24-114BA-6,8
24-205AA-6,8
24EP401
24EP401
RETAIL STORE
G04
24-CU-3-205A24-CU-3-114B
24-CU-3-G02A1
TYP.
KITCHEN
TOILET
105A
FIRE APPARATUS
114A
OFFICE
STORAGE
104A
STAIRWELL NO. 3
S103
OI&T
114C
TR
114B
LIBRARY
MEDICAL
LIBRARY
STAIRWELL NO. 1
S101
STORAGE
101B
STORAGE
101C
ENTRY
BREAK RM.
101A
ELEVATOR
E-1STAGE LEFT
TOILET, FEMALE
TOILET, MALE
107A
VESTIBULE
110A
STAGE RIGHT
STORAGE
107B
STAGE
AUDITORIUM
STORAGE
OFFICE
G02
OI&T
G02B
KITCHEN
STORAGE
G06
KITCHEN
G05
KITCHEN
G07
HAC
G08
MECHANICAL RM.
G15
STORAGE
G100A
VESTIBULE
G11
TOILET, FEMALE
G12
TOILET, MALE
G13
VESTIBULE
G14
STAIRWELL NO. 1
S001
DINING AREA
G01
RETAIL STORE
G03
STORAGE
G03A
CORRIDOR
H001
STORAGE
G010
STAIRWELL NO. 2
S002
BLDG 24
PROJECT
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND LIGHTING CIRCUITRY AS REQUIRED. ALL
RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
24EP101
BLDG 24 - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 3/16" = 1'-0"
1 BLDG 24 - FLOOR 1 - ELECTRICAL PLAN
0 2' 4' 8'
KEY PLAN
KEY NOTES
GENERAL NOTES
Revisions: Date:
PROJECT
NORTH
1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
DN
UP
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
PLUG - FUSE PANEL
C
24EP402
24EP402
A
B C D F J QPMH R S T
24EP402
24EP402
STAGE
OFFICE
201A
OFFICE
STAIR 5
S205
HAC
TOILET
MULTIPURPOSE
RM.
STORAGE
OFFICE
STORAGE
206A
STAIR 3
S203
STAIR 4
S204
OI&T
205C
SHARED OFFICE
WORK RM.
OFFICE
STORAGE
TOILET
STORAGE
STORAGE
VESTIBULE
STORAGE
STORAGE
216A
VACANT
210A
STORAGE
TR
205A
TOILET
215A
VESTIBULE
211A
CORRIDOR
204B
BLDG 24
PROJECT
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND LIGHTING CIRCUITRY AS REQUIRED. ALL
RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
24EP102
BLDG 24 - FLOOR 2 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JBB/JPS
CONSTRUCTION
DOCUMENTS
- 3/16" = 1'-0"
1 BUILDING 24 - FLOOR 2 - ELECTRICAL PLAN
0 2' 4' 8'
KEY PLAN
KEY NOTES
GENERAL NOTES
Revisions: Date:
PROJECT
NORTH
J
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
TUNNEL TO BUILDING 1
CLOSED TO PEDESTRIAN
TRAFFIC
A B C D E
F G H I
J K L M N
EDP - 25
25DP1
JUNCTION BOX
DISCONNECT
25-DP-TRA
DISC-EDP25
PIPE BASEMENT
Z002
PIPE BASEMENT
Z001
PIPE BASEMENT
Z003
CORRIDOR
H002
PIPE BASEMENT
Z004
MECH. RM.
Z005
VESTIBULE
H001
ELEVATOR NO. 1
E-1
STAIRWELL NO. 2
S002
MACHINE RM.
PH-1
BLDG 25
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
9. REFERENCE ONE-LINE DIAGRAM ON SHEET 25EP601 FOR CONDUIT AND WIRE
SIZING.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
25EP100
BLDG 25 - FLOOR 0 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LTT
CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
PROJECT
NORTH
KEY NOTES
- 3/16" = 1'-0"
1 BLDG 25 - FLOOR 0 - ELECTRICAL PLAN
Revisions: Date:
EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET
25EP601 FOR ADDITIONAL INFORMATION.
EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 25EP601
FOR ADDITIONAL INFORMATION.
PROJECT
NORTH
0' 2' 4' 8'
SPSPSPSP
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
A B C D E G H I JF
25 - E1
25L - 01A
25L - 01B
25EP401
25EP401
25-DP-TRAB
25-CU-3-117A
25-CU-3-204B 25-CU-2-313A
25-117AA-6,8
25-204BA-6,8 25-313AA-6,8
25EP401
25EP401
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STAIRWELL NO. 2
S102
OFFICE
OFFICE
OFFICE
OFFICE
118A
TR
117A
OFFICE
OFFICE
OFFICE
CORRIDOR
H103A
CORRIDOR
H103
OFFICE
MECH. RM.
MECH. RM.
108A
VESTIBULE
OFFICE
FIRE ALARM CL.
CORRIDOR
H104
RECEPTION
CORRIDOR
H102
CORRIDOR
H101
HAC
STAIRWELL NO. 1
S101
STORAGE
S101B
TOILET, MALE
TOILET, FEMALE
ELEVATOR NO. 1
E-1
STORAGE
107A
OFFICE
TYP.
OFFICE
BLDG 25
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
25EP101
BLDG 25 - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LTT
CONSTRUCTION
DOCUMENTS
- 3/16" = 1'-0"
1 BLDG 25 - FLOOR 1 - ELECTRICAL PLAN
PROJECT
NORTH
0' 2' 4' 8'
KEY PLAN
GENERAL NOTES
PROJECT
NORTH
Revisions: Date:
KEY NOTES
PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
UP
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
A B C D E G H I JF
25L - 1A 25L - 1B
25EP402
25EP402
25EP402
25EP402
OFFICE
209C
OFFICE, CHIEF
209D
MECH. RM.
OFFICE
CORRIDOR
H203
OFFICE
OFFICE
212A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
213A
STAIRWELL NO. 2
S202
CONFERENCE
RM.
STORAGE
201A
OFFICE, CHIEF
OFFICE
OFFICE
204C
TR
204B
TOILET, FEMALE
TOILET, MALE
ELEC. CL.
208A
OFFICE
CORRIDOR
H202
OFFICE
204A
STAIRWELL NO. 1
S201
TOILET
209B
KITCHEN
209A
OFFICE
HAC
ELEVATOR NO. 1
E-1
OFFICE
H003
CORRIDOR
H201
CHASE
CH-2-1
OFFICE
BLDG 25
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 25EP102
BLDG 25 - FLOOR 2 - ELECTRICAL
PLAN 25
LRL/WNM JPS/LTT
CONSTRUCTION
DOCUMENTS
03/31/2022
- 3/16" = 1'-0"
1 BLDG 25 - FLOOR 2 - ELECTRICAL PLAN PROJECT
NORTH
0' 2' 4' 8'
KEY PLAN
GENERAL NOTES
PROJECT
NORTH
KEY NOTES
NON SPRINKLERED