Attachment 3 - Drawings Part-2.pdf

PDF 15 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, facility renovations including demolition, construction and finishes, data center renovations, physical security improvements, fiber optic infrastructure assessment and upgrades, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. The project locations encompass buildings 1 through 3, 3T, 18, 23 through 25, 51 through 53, 53T, and 55 through 61, as well as 75 on the campus site. The soliciting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0003.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

WSP USA Inc.

Suite 300

Federal Way, WA 98003-2600

TEL: (206) 431-2300

FAX: (206) 431-2250

33301 9th Avenue South

A/E:

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

C-504

COMMUNICATIONS DETAILS

Checker Author

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

DIELECTRIC TUBE CABLE SERIES DETAILF4

C-504 SCALE: NTS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

WSP USA Inc.

Suite 300

Federal Way, WA 98003-2600

TEL: (206) 431-2300

FAX: (206) 431-2250

33301 9th Avenue South

A/E:

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

C-505

COMMUNICATIONS DETAILS

Checker Author

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

TUBE CABLE LABELING LOCATIONS IN PHHsF2

C-505 SCALE: NTS

TDU LABELING SCHEME EXAMPLEC2

C-505 SCALE: NTS

1 2

9 10

12 11

12 TUBE

4" CONDUIT

19 TUBE

19 TUBE

MAX FILL RATIO FOR 4" CONDUITB8

C-505 SCALE: NTS

EXAMPLE - TR CONTAINING A TWO

TUBE CABLE WITH 24-STRAND OS2 ABFB5

C-505 SCALE: NTS

2 TUBE ABF

ONE TUBE TO TR 1B139

ONE TUBE TO TR 1B120

TUBE DISTRUBUTION UNIT (TDU) EXAMPLE

PROVIDE TUBE CONNECTORS

PROVIDE MINIMUM 10' SERVICE LOOP

LEAVE SPARE TUBES, CAPPED, IN TDU

TUBE CABLE B1 (FOUR TUBE CABLE) EXAMPLE

TUBE B1-FTC19A FROM OSP BLDG 56 ROOM BA105

HDPE CENTRAL

MEMBER

(NOT FOR PULLING)

4-TUBE

L A

B

E

L

H

E

R

E

L

A

B

E

L

H

E

R

E

MINIMUM ONE

OPEN TUBE IN

EACH TR FOR

FUTURE USE

LABEL WHERE

TUBE ENTERS TR

LABEL CABLE

TUBE PRIOR TO

ENTERING

SPLICE CASE

COLOR CODE PER

TIA STANDARDS

FIBER CASSETTE WITH LC

CONNECTION - TYPICAL.

LABER PER VA STANDARDS

24-STRAND OS2

ABF - EXAMPLE

BB102

TR

NO INTERMEDIATE CROSS

CONNECTS PERMITTED

ANYWHERE

TYPICAL BUILDING A

TR TR

TYPICAL BUILDING B

USING A BUILDING AS A

PASS THROUGH IS NOT

PERMITTED

BUILDING 56

BUILDING TO BUILDING FIBER - TYPICALE5

C-505 SCALE: NTS

FEEDING FLOORS MINIMUM

TWO TUBE CABLE - LEAVE

ONE TUBE OPEN IN RACK

FOR FUTURE - TYP.

FEEDING BUILDINGS

MINIMUM FOUR TUBE

CABLE - LEAVE THREE

TUBES OPEN IN TDU

FOR FUTURE - TYP.

MINIMUM ONE 2"

GALVANIZED STEEL

CONDUIT FROM

LAST PHH - TYP.

MINIMUM 4" SCHEDULE

40 CONCRETE

ENCASED - TYP.

PHYSICAL

HAND HOLE

(PHH) - TYP.

TR

TR TR

MINIMUM TWO TUBE

CABLE WITH MINIMUM

12-STRANDS OS2 IN

ONE TUBE - TYP.

EQUIPMENT

RACK - TYP.

MINIMUM

12-STRAND

TERMINATED

PER TR - TYP.

TUBE

DISTRIBUTION

UNIT (TDU) -

TYP.

METAL LABELING MATERIALS EXAMPLEE2

C-505 SCALE: NTS

METAL CABLE

TIE - 4" LONG

MINIMUM

ROUND EDGES PER

MANUFACTURER

INSTRUCTIONS

SECURE LABELS PER

MANUFACTURER

INSTRUCTIONS

TDU LOCATION

TO BUILDING

FROM TR

FROM BUILDING

TO TR

TO TR

TO TR

TO TR

SAMPLE - TWO

2-TUBE CABLES

B1-FTC19A-056.BB102-057.1B139

C1-FT19.2-056.BB102-57.1B139

C1-FT19.1-056.BB102-057.1B139

C2-FT19.2-056.BB102-057.1B120

C2-FT19.1-056.BB102-057.1B120

NOTE:

1. LABEL EACH TUBE CABLE IN EACH HAND HOLE AT ENTRY AND EXIT.

2. DO NOT BLOCK OTHER LABLES.

3. STAGER LABLES WHERE MULTIPLE CABLES ARE PRESENT.

4. USE ONLY EMBOSSED METAL LABLES PER S 27 05 53

1"

1 1/4”

1 1/4”

1 1/4”

PLASTIC INNERDUCT

1.049" I.D.

30.40%

PLASTIC INNERDUCT

1.250" I.D.

32.12%

TYPICAL 4" CONDUIT

SERVICE PROVIDER ENTRY CONDUIT INNERDUCTB8

C-505 SCALE: NTS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

WSP USA Inc.

Suite 300

Federal Way, WA 98003-2600

TEL: (206) 431-2300

FAX: (206) 431-2250

33301 9th Avenue South

A/E:

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

C-506

COMMUNICATIONS DETAILS

Checker Author

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

PIPE PENETRATION THROUGH

WALLS BELOW GRADE - TYPICALC4

C-506 SCALE: NTS

MODULAR TYPE WALL PENETRATION SEAL

LS MODEL (C, L, S-316, O, OS-316, T)

CONTRACTOR CORE DRILLED HOLE

INTERIOR SIDE OF CONCRETE WALL

EXTERIOR SIDE OF CONCRETE WALL

STAINLESS STEEL BOLTS,

NUTS, AND WASHERS

PIPE CENTERED

IN SLEEVE

RESILIENT

WATERPROOF

CAULKING

BUILDING ENTRY DETAIL - TYPICALC1

C-506 SCALE: NTS

CEILING SPACE

INTERIOR SIDE OF

BUILDING WALL

EXTERIOR SIDE OF

BUILDING WALL

BUILDING SLAB

1. SCHEDULE 40 CONCRETE ENCASED CONDUIT

2. BUILDING FEEDING HAND HOLE (PHH)

3. PHH COVER MARKED “COMMUNICATIONS”

4. GALVANIZED 4" CONDUIT

5. ALUMINUM NEMA 4X ENCLOSURE

6. GALVANIZED CONDUIT – SIZED PER S 27 05 33

7. MINIMUM 40" FACTORY LONG SWEEPS

EXISTING GROUND LEVEL

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

WSP USA Inc.

Suite 300

Federal Way, WA 98003-2600

TEL: (206) 431-2300

FAX: (206) 431-2250

33301 9th Avenue South

A/E:

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

C-600

FIBER DISTRIBUTION SCHEDULE

SIDE A

Checker Author

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date: 20 OF 435

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

WSP USA Inc.

Suite 300

Federal Way, WA 98003-2600

TEL: (206) 431-2300

FAX: (206) 431-2250

33301 9th Avenue South

A/E:

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

C-601

TUBE CABLE AND FIBER

DISTRIBUTION SCHEDULES SIDE B

Checker Author

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date: 21 OF 435

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

WSP USA Inc.

Suite 300

Federal Way, WA 98003-2600

TEL: (206) 431-2300

FAX: (206) 431-2250

33301 9th Avenue South

A/E:

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

C-700

FIBER TOPOLOGIES

Checker Author

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

SIDE-A TOPOLOGY

ALL EXISTING SIDE-A OS1 OPTICAL FIBER SHALL BE REPLACED WITH INDOOR/OUTDOOR (TO

THE BUILDING) AND RISER-RATED (PLENUM AS REQUIRED) MINIMUM 12-STRAND OS2 FIBER,

ALONG THE EXISTING PATHWAYS IN A MANNER THAT CREATES A POINT-TO-POINT

CONNECTION FROM THE BUILDING 1 MCR (NEW EQUIPMENT RACK) TO EACH CAMPUS

BUILDING TR (TELECOMMUNICATION ROOM). NO PART OF THIS NEW NETWORK SHALL BE

CROSS CONNECTED. THE PATHWAY FOR THE RISER CABLES TO THE TRS SHALL NOT BE

THE SAME AS THE PATHWAY OF THE REDUNDANT SIDE-B FIBER NETWORK. SEPARATION

SHALL BE MAINTAINED UNTIL THE FIBER TERMINATES ON THE EQUIPMENT RACKS WITHIN

THE TRS. THE MEANS AND METHOD OF THIS DISCRETE PATHWAY SHALL BE PLACED ON THE

CONTRACTOR. AS MUCH INFORMATION ABOUT THE EXISTING/LEGACY SIDE-A PATHWAYS

THAT COULD BE GLEANED ARE PART OF THIS DESIGN PACKAGE. WHERE PATHWAYS TO

BUILDINGS COULD NOT BE CONFIRMED, KEY NOTES WERE USED TO INDICATE THIS LACK OF

KNOWLEDGE ON THE DRAWINGS.

TO CREATE THIS POINT-TO-POINT TOPOLOGY, HIGH-STRAND COUNT FIBERS SHALL BE

PLACED FROM THE MCR (BUILDING 1) TO THE DISCRETE BUILDING TRS AS INDICATED ON

THE DRAWINGS/SCHEDULES. WITHIN THIS FIRST TR, THE FIBERS SHALL BE SPLICED WITHIN

A SHELF ON THE EQUIPMENT RACK. ANY FIBERS REQUIRED FOR THAT TR SHALL BE

TERMINATED THERE. TO CONNECT THE 'NEXT' TR WITHIN THIS SAME BUILDING, SPLICE

FROM THIS RACK-MOUNTED CASE ONTO A RISER-RATED (PLENUM AS REQUIRED) AND RUN

THE BUNDLE (QUANTITY PER DRAWINGS AND SCHEDULES) TO THAT NEXT TR. IN THIS

MANNER, EACH TR SHALL BE AN UNBROKEN POINT-TO-POINT CONNECTION TO THE MCR.

EXTRA STRANDS SHALL BE SPOOLED WITHIN THE SPLICE CASE FOR FUTURE USE (DARK

FIBER). THESE EXTRA STRANDS WERE DESIGNED INTO THE PROJECT TO ALLOW THE VA TO

SPLICE THEM ANYWHERE WITHIN THE BUILDING SHOULD FUTURE REQUIREMENTS ARISE.

NO BUILDING SHALL CONNECT TO OTHER BUILDINGS. NO HIERARCHICAL STAR TOPOLOGIES

ARE ALLOWED, AND NO CROSS CONNECTS WILL BE PERMITTED. SEE EXAMPLE, THIS

SHEET.

SIDE-B TOPOLOGY

THE SIDE-B NEW REDUNDANT FIBER PLANT WILL USE AN AIR BLOWN FIBER METHOD. FROM

BUILDING 56, EMPTY CABLE TUBES WILL BE PLACED IN UNDERGROUND SCHEDULE-40

CONCRETE ENCASED CONDUITS, PER DRAWINGS AND SCHEDULES, TO EACH DISCRETE

BUILDING TR. ONCE THESE TUBES ARE PLACED, A MINIMUM OF 12 STRANDS OF AIR BLOWN

OS2 FIBER SHALL BE BLOWN FROM BUILDING 56 TO THE TRS.

TO CREATE THIS POINT-TO-POINT TOPOLOGY, HIGH-STRAND COUNT FIBERS SHALL BE

PLACED FROM BUILDING 56 TO THE DISCRETE BUILDING TUBE DISTRIBUTION UNITS (TDUs)

(NEMA-1 ENCLOSURES) AS INDICATED ON THE DRAWINGS/SCHEDULES. WITHIN THESE

TDUs, THE FIBERS SHALL BE SPLICED WITHIN ON TRAYS MOUNTED IN SPLICE CASES, WHICH

ARE INSTALLED WITHIN THE TDUs. ANY FIBERS REQUIRED FOR THAT TR SHALL BE

TERMINATED THERE. TO CONNECT THE 'NEXT' TR WITHIN THIS SAME BUILDING, SPLICE

FROM THIS TDU AND PLACE RISER-RATED (PLENUM AS REQUIRED) FIBER INTO THE TUBE

AND BLOW THE FIBER TO THE NEXT TR. IN THIS MANNER, EACH TR SHALL BE AN UNBROKEN

POINT-TO-POINT CONNECTION TO BUILDING 56. EXTRA STRANDS SHALL BE COILED WITHIN

THE TDU FOR FUTURE USE (DARK FIBER). EXTRA TUBES TO THE HAND HOLES, THE TDUs, AND THE TRS HAS BEEN DESIGNED INTO THE PROJECT TO LESSEN THE COST OF ADDING

ADDITIONAL/UPGRADED FIBER IN THE FUTURE. NO BUILDING SHALL CONNECT TO OTHER

BUILDINGS. NO HIERARCHICAL STAR TOPOLOGIES AND NO CROSS CONNECTS SHALL BE

PERMITTED. SEE EXAMPLE, THIS SHEET.

FUTURE TOPOLOGIES / OPPORTUNITIES

THE DESIGN PLACES AN ADDITIONAL 288 STRANDS OF OS2 FIBER BETWEEN BUILDING 1

MCR AND BUILDING 56. THIS FIBER IS INTENDED TO BE USED AS A BRIDGE FOR MOVING THE

CORE-B, THEN CORE-A FROM BUILDING 1 TO BUILDING 56 (NOT IN THIS PROJECT SCOPE).

ULTIMATELY, ALL OF THE NEW SIDE-A OS2 FIBER CONNECTING ALL CAMPUS BUILDING TRS

TO BUILDING 1 COULD BE SPLICED ONTO THIS 288 STRAND FIBER, THERE-BY ELIMINATING

THE NEED TO RUN NEW FIBER IN THE FUTURE, AND BY SPLICING, REMOVES THE NEED FOR

CROSS-CONNECT.

AB

ABA

AC(T)

ACM

ACW

ADA

ADJ

A/E

AF

AFF

AGG

ALT

ALUM

APPROX

ARCH

ASPH

A/V

BARR

BATH

BB

BLDG

BLK

BLKG

BLW

BM

BMTU

BO

BOC

BOS

BRC

BRKT

BRNG

BTM

BTWN

CAB

CC

CD

CJ

CLG

CLR

CMU

CO

COL

COMP

CONC

CONN

CONST

CONT

COORD

COR

CORR

CS

CT

CTR

CV

AND

ANGLE

AT

CENTERLINE

DEGREES

NUMBER

ANCHOR BOLT

ARCHITECTURAL BARRIERS ACT

ACOUSTICAL CEILING (TILE)

ASBESTOS CONTAINING MATERIAL

ACOUSTICAL WALL

AMERICANS W/ DISABILITIES ACT

ADJACENT

ARCHITECT/ENGINEER

ACCESS FLOOR

ABOVE FINISH FLOOR

AGGREGATE

ALTERNATE

ALUMINUM

APPROXIMATELY

ARCHITECT(URAL)

ASPHALT

AUDIO / VIDEO

BARRIER

BATHROOM

BACKER BOARD

BUILDING

BLOCK

BLOCKING

BELOW

BEAM

BONE MARROW TRANSPLANT UNIT

BOTTOM OF

BOTTOM OF CURB

BOTTOM OF SLAB

BRACE, BRACING

BRACKET

BEARING

BOTTOM

BETWEEN

CABINET

CONTRACTOR FURN, CONTRACTOR INST

CONSTRUCTION/CONTRACT DOCUMENTS

CONTROL JOINT

CEILING

CLEAR(ANCE)

CONCRETE MASONRY UNIT

CONTRACTING OFFICER

COLUMN

COMPOSITION

CONCRETE

CONNECTION

CONSTRUCTION

CONTINUOUS

COORDINATE

CONTRACTING OFFICER REPRESENTATIVE

CORRIDOR

CONCRETE SEALER

CERAMIC TILE

CENTER

CONTRACTOR FURNISHED, VA INSTALLED

HDR

HDWE

HM

HORZ

HPDL

HR

HT

HVAC

ICRA

ID

ILSM

INCL

INST

INSUL

INT

JT

KV

LAM

LAV

LCM

LT

MAT

MAX

MDF

MECH

MEP

MFR

MIN

MISC

MOD

MTL

N N/A

NEG

NO.

NOM

NTS

O.C.

OPNG

OPP

OPT

OVHD

P

PCONC

PCRA

PL

PLAM

PLY(WD)

PNL

PR

PRFB

PS

PT

PTN(S)

PVMT

QTY

HEADER

HARDWARE

HOLLOW METAL

HORIZONTAL

HIGH PRESSURE DECORATIVE LAM

HOUR

HEIGHT

HEATING, VENTILATION & AIR CONDITIONING

INFECTIOUS CONTROL RISK ASSESSMENT

INSIDE DIAMETER OR DIM

INTERIM LIFE SAFETY MEASURES

INCLUDE(D,ING)

INSTALL

INSULATION

INTERIOR

JOINT

KILOVOLT

LAMINATE(D)

LAVATORY

LEAD CONTAINING MATERIAL(S)

LIGHT

MATERIAL(S)

MAXIMUM

MEDIUM-DENSITY FIBREBOARD

MECHANIC(AL)

MECHANICAL, ELECTRICAL, PLUMBING

MANUFACTURE(R)

MINIMUM

MISCELLANEOUS

MODIFIED

METAL

NORTH

NOT APPLICABLE

NEGATIVE

NUMBER

NOMINAL

NOT TO SCALE

ON CENTER(S)

OPENING

OPPOSITE

OPTION(AL)

OVERHEAD

PAINT

PRECAST CONCRETE

PRE-CONSTRUCTION RISK ASSESSMENT

PLATE

PLASTIC LAMINATE

PLYWOOD

PANEL

PAIR

PREFABRICATED

PLASTIC

PRESSURE TREATED

PARTITION(S)

PAVEMENT

QUANTITY

RAD

RCP

REF

REINF

REP

REQ(s,(')D)

RESIL

REV

RF

RM

RMV

RO

S

SCHED

SD

SECT

SF

SFRM

SHG

SHT(G)

SIM

SM

SOW

SPEC

SQ

SS

ST

STDG

STL

STOR

STRUCT

SUSP

SV

SYS

TEMP

T&G

THK

THRESH

TOC

TOS

TPH

TRANS

TS

TYP

UON

VA

VAR

VB

VC

VERT

VIF

VV

W W/

WD

WDW

WGHT

W/O

WP

WR

RADIUS

REFLECTED CEILING PLAN

REFERENCE

REINFORCE(D,ING)

REPRESENTATIVE

REQUIRE(D,S,MENT(S))

RESILIENT

REVERSE

RADIO FREQUENCY / ROOF

ROOM

REMOVE

ROUGH OPENING

SOUTH

SCHEDULE

SCHEMATIC DESIGN

SECTION

SQUARE FEET

SPRAY APPLIED FIRE-RESISTIVE MATERIAL

SHINGLES

SHEET (SHEATHING)

SIMILAR

SEAM

SCOPE OF WORK

SPECIFICATION

SQUARE

STAINLESS STEEL

STAIN

STANDING

STEEL

STORAGE

STRUCTURAL

SUSPENDED

SHEET VINYL

SYSTEM

TEMPORARY

TONGUE AND GROOVE

THICK(NESS)

THRESHOLD

TABLE OF CONTENTS

TOP OF SLAB

TOILET PAPER HOLDER

TRANSITION

TUBE STEEL

TYPICAL

UNLESS OTHERWISE NOTED

VETERANS AFFAIRS

VARIES

VAPOR BARRIER

VA FURNISHED, CONTRACTOR INSTALLED

VERTICAL

VERIFY IN FIELD

VA FURNISHED, VA INSTALLED

WEST

WITH

WOOD

WINDOW

WEIGHT

WITHOUT

WATERPROOF(ING)

WATER RESISTANT

DBL

DC

DD

DEMO

DEPT

DG

DIA

DIM

DWN

DR

DTL

DWG

E

EA

EJ

ELEC

ELEV

ENG

EOC

EOP

EPDM

EQ

EQUIP

ES

ETS

EX(IST)

EXP

EXT

FA

FD

FE(C)

FF

FFB

FFL

FIN

FLASH

FLR

FLRSNT

FNDN

FOC

FOF

FOS

FP

FR

FRM

FT

FTG

FUR

FURN

GA

GALV

GE

G(W)B

GC

GL

GLB

GMU

GOV(T)

GYP

DOUBLE

DIRECT CURRENT

DESIGN DEVELOPMENT

DEMOLISH(ION)

DEPARTMENT

DESIGN GUIDE

DIAMETER

DIMENSION

DOWN

DOOR

DETAIL

DRAWING(S)

EAST

EACH

EXPANSION JOINT

ELECTRIC(AL)

ELEVATION OR ELEVATOR

ENGINEER(ING)

EDGE OF CURB

EDGE OF PAVEMENT

ETHYLENE PROPYLENE DIENE TERPOLYMER

EQUAL

EQUIPMENT

EACH SIDE

EXPOSED TO STRUCTURE

EXISTING

EXPANSION

EXTERIOR

FIRE ALARM

FLOOR DRAIN

FIRE EXTINGUISHER (CABINET)

FACTORY FINISH

FINISH FLOOR BREAK

FINISH FLOOR LINE

FINISH(ED)

FLASHING

FLOOR(ING)

FLORESCENT

FOUNDATION

FACE OF CONCRETE

FACE OF FINISH

FACE OF STUDS

FIRE PROOF

FIRE RATED

FRAME

FOOT, FEET

FOOTING

FURRING

FURNISHED

GAGE, GAUGE

GALVANIZED

GENERAL ELECTRIC

GYPSUM (WALL) BOARD

GENERAL CONTRACTOR

GRID LINE

GLUE LAMINATED BEAM

GLASS MASONRY UNIT

GOVERNMENT

GYPSUM BOARD

A101

1 TYP

101.1

A-101

SIM

EXTERIOR ELEVATION

INTERIOR ELEVATION

BUILDING SECTION FLAG

WALL SECTION FLAG

CALLOUT FLAG

VERTICAL GRID LINE

HORIZONTAL GRID LINE

TRUE NORTH ARROW

PROJECT NORTH ARROW

(TRUE NORTH DASHED)

ELEVATION MARKER

KEY NOTE

ROOM TAG (SF OPTIONAL)

CEILING HEIGHT TAG

ROOM NAME

150 SF

A

A-101

SIM

01A

TRUE

NORTH

W1

A-101

PROJECT

NORTH

WALL TAG

FLOOR TAG

ROOF TAG

DOOR TAG

WINDOW TAG

SPECIALTY EQUIPMENT TAG

SIGNAGE TAG

SIGNAGE KEY NOTE

(AW SHEETS ONLY)

SIGNAGE MATERIAL TAG

(AW SHEETS ONLY)

EXISTING TO REMAIN

NEW CONSTRUCTION

TO DEMOLISH

HIDDEN ABOVE OR BELOW

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

SMOKE ZONE

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE RATED WALL

SMOKE & 1 HR FIRE RATED WALL

PATIENT NON-SLEEPING SUITE

AREA OF WORK / AREA SHOWN

CONSTRUCTION ZONE, ( - - )

PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

PATH OF TRAVEL

EMERGENCY EGRESS PATHWAY

SEISMIC JOINT

BATT INSULATION

RIGID INSULATION

GYPSUM BOARD, TYPE X

ACOUSTICAL CEILING TILE, 2' x 2'

CONCRETE

STEEL

PLYWOOD, FIRE RATED

EARTH

SUPPLY GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

RETURN GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

LIGHTING PER ELECTRICAL

(SIZE & PROPORTIONS MAY VARY)

FIRE EXTINGUISHER CABINET

A-101

A01

D88

A5175SOAP DISH

IN-04.02-01

AFF

GYP ON MTL STUD

9' - 0"

FEC

F-1

R-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

A-001

ARCHITECTURAL SYMBOLS &

ABBREVIATIONSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 EM AJ

CONSTRUCTION

DOCUMENTS

SYMBOLS ABBREVIATIONS

GENERAL NOTES

APPLICABLE PUBLICATIONS

1. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE AT ALL TIMES.

2. DO NOT SCALE DRAWINGS.

3. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL

INDUSTRY STANDARD TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS

INDICATED.

4. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE FULL SPACE INDICATED WITHOUT

ENCROACHMENTS.

5. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH THE CONTRACT DOCUMENTS.

6. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR ELEVATION, UON.

7. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE BLOCKING IN WALL BEHIND, THIS

INCLUDES BACKING FOR WALL MOUNTED DOOR STOPS. ENSURE THAT ALL REQUIRED

BACKING IS INSTALLED IN WALLS PRIOR TO INSTALLING DRYWALL.

8. IN TOILET ROOMS PROVIDE STAINLESS STEEL FILLER BEHIND ANY MIRRORS AND OTHER

WALL MOUNTED ACCESSORIES WHEN ITEM IS INSTALLED PARTIALLY OVER CERAMIC TILE.

9. CONTRACTOR SHALL INSTALL FASCIA COVERS FOR HEADWALLS.

10. SEGREGATE ALL NURSE CALL, FIRE ALARM AND SECURITY SYSTEM ALARM WIRES FROM

THE DATA CABLES WHEN THEY ARE INTERMIXED. CONTRACTOR SHOULD EXPECT WIRES

TO BE INTERMIXED IN CERTAIN AREAS OF THE FACILITY TO INCLUDE BUT NOT LIMITED TO

CABLE TRAYS, J-HOOKS AND IN OPENINGS.

11. MOVE AND STORE ALL FURNITURE, FIXTURES, AND EQUIPMENT (FFE) AS NEEDED. FFE WILL

BE COVERED WITH PLASTIC BEFORE BEING MOVED. FFE WILL BE MOVED BACK TO THE SAME

LOCATION IT WAS ORIGINALLY LOCATED WHEN CONTRACTORS WORK IS COMPLETE. IF

EQUIPMENT NEEDS TO BE MOVED OUTSIDE THE ROOM IT IS THE CONTRACTOR'S

RESPONSIBILITY TO COVER ALL COSTS ASSOCIATED WITH MOVING, STORING, AND

REINSTALLING FFE.

12. WHEN THE CONTRACTOR MOVES FFE, THE CONTRACTOR IS RESPONSIBLE FOR UNPLUGGING

ALL EQUIPMENT FROM WALLS APPROPRIATELY. DURING REINSTALLATION OF FFE, IT IS THE

CONTRACTOR'S RESPONSIBILITY TO RECONNECT POWER PLUGS. THE VA WILL RECONNECT

ALL DATA TO THE NEW CAT 6A DATA PORTS.

APPLICABLE PUBLICATIONS GENERAL NOTES

AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS

OF CODE ENFORCEMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS,

FEES, ETC). THE VA SHALL FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ).

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD

APPLICATION GUIDE AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL).

INTERNATIONAL BUILDING CODE (IBC) 2018.

INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018.

NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES

PRECEDENCE OVER IBC.

NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8.

NATIONAL ELECTRICAL CODE (NEC).

INTERNATIONAL PLUMBING CODE (IPC).

SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAL SOCIETY OF MECHANICAL

ENGINEERS (ASME) A 17.1.

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT

BARRIER FREE DESIGN GUIDE (PG-18-3)

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE

AND COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR

STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPACT)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL

AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RESE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433,434 AND 435.

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND

TRANSPORTATION MANAGEMENT.

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL

REQUIREMENTS SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2004.

SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD 15 - 2007.

VAMC APPROVED HARDWARE LOCKING STANDARDS

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM)

FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND

STANDARDS FOR TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION

ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA)

INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE)

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND

INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI)

JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),

ENVIRONMENT OF CARE GUIDELINES AND STANDARDS

FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE

DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES

THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL

ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS ENCOURAGING

“ENVIRONMENTALLY RESPONSIBLE DESIGN”

Revisions: Date:

13. REMOVAL OF EXISTING CEILING AND TURNING UPRIGHT EXISTING SPRINKLER HEADS NEED

TO BE COORDINATED TO HAPPEN CONCURRENTLY.

14. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.

15. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE

WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRE STOPPING

COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE

PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

16. CONTRACTOR TO REPLACE EXISTING FIRE EXTINGUISHER WITHIN 75' WITH A CLEAN AGENT

FIRE EXTINGUISHER IN ACCORDANCE TO THE FIRE PROTECTION MANUAL AT ALL TELECOM

ROOMS.

anaj Image

File details come from the government source that posted it. Updated .