FOLLOW-UP Technical Questions - St. Louis 4-6-23.pdf

PDF 101 KB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document contains follow-up technical questions and answers regarding Solicitation 36C77623R0009 for infrastructure upgrades at the St. Louis Jefferson Barracks VAMC. The solicitation seeks a general contractor to provide electrical panel upgrades, power systems work, bonding and grounding, building management systems integration, HVAC assessments and work, space renovations including demolition, new construction and finishes, data center renovations, communication infrastructure upgrades including new data outlets and fiber backbone work, physical security upgrades, and hazardous material abatement across multiple buildings. Specific questions and answers addressed working hours for interior and non-cabling work, availability of electrical power in a laydown area, expectations around below-grade utility information, assumptions regarding wall construction types in demolition areas, and contractor responsibilities for removing and storing existing furniture and equipment.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
Technical Questions - FINAL - St. Louis 3-28-23.pdf PDF
657-21-701JB - Addendum 1_03_24_23.pdf PDF
329000-5 - Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-24-23.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 45 - Site Visit Instructions Updated 2-16-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Attachment 33 - Drawings Part-32.pdf PDF
Attachment 34 - Envr. Report - Narrative.pdf PDF
Attachment 37 - Envr. Report - Appendix C.pdf PDF
Attachment 40 - NARA RM Contract Language Clause.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 1-20-23.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 36C77623R0009 EHRM Infrastructure Upgrades - St. Louis - FOLLOW-UP Technical Questions

4/6/2023

1. Regarding item 14 of the technical questions. Seems they made a design change with no supporting information. Current drawings and specifications do not call out blown in fiber for side A. We need supporting documents if this is being changed.

a. See specification 27 13 23, 2.2, A. A side fiber does not call out for blown in.

b. See drawings C-600 and C-601. Tube counts are called out for B side but not for A.

c. See building drawings throughout where the TDU is called out for B side but not for A.

ANSWER: I believe this is a misunderstanding. A side fiber replacement will be traditional fiber optic cable.

2. Question #31- Can the contractor be assured normal working hours for interior work on TR Rooms, site improvements for telecom duct bank, and non-cabling work activities?

ANSWER: NO.

3. Question #46 - Is there electrical power in the Laydown are noted in this response?

ANSWER: Power for lights is present in the 255 lot. Nearest power for trailer hookup is Building 18.

4. Questions #85/86 - This question was submitted with expectation of receiving below grade site utilities for a general baseline understanding of what below grade utility locations are present at this campus to ensure contractors have accounted for possible impacts/interferences with excavation for telecom ductbank installations. This information prepares the contractor for potential cost impacts for execution of this work. Can the government provide a site utility plan allowing contractors to determine impacts for excavation?

ANSWER: As I stated, this is delegated to the contractor for gpr confirmation.

5. Question #95 - Can the contractor assume all walls to be removed in the demolition phase are constructed as metal stud framing with drywall as noted in this response for replacement?

ANSWER: Yes

6. Question #100 - If the contractor is to remove FF&E as noted, where are we to place these items, dispose items or place in storage? If storage, where is the storage location?

ANSWER: Contractor is to provide storage for Furniture. Example: A box truck.