Attachment 4 - Drawings Part-3.pdf
PDF 15 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, building renovation including demolition, construction and finishes, data center renovation, physical security enhancements, fiber infrastructure assessment and upgrades between buildings, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. The project involves improvements to Buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75 and associated site work. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. PROJECT SHALL COMPLY WITH CLASS, I, II, III & IV ICRA
REQUIREMENTS.
2. COMPLY WITH ALL REQS LISTED IN THE INFECTION
CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY
REQUIREMENTS.
3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
ALL ICRA REQS. AT ANY TIME, THE COR MAY HALT WORK
UNTIL ALL REQS ARE MET.
4. REMOVE OR ISOLATE (E) HVAC SYSTEMS WITHIN
CONSTRUCTION AREA TO PREVENT DUST
CONTAMINATION.
5. CONTAIN ALL CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS. WHEN
POSSIBLE, REMOVE CONSTRUCTION DEBRIS WHEN AREA
IS IN ACTIVE ISOLATION.
6. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE
LOCKED AT ALL TIMES UNLESS IN USE BY THE
CONTRACTOR. WHEN IN USE, ACCESS WILL BE
CONTROLLED AND MONITORED BY THE CONTRACTOR.
7. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED
AT ALL CONSTRUCTION ZONE AND ANTE ROOM
ENTRANCES AND EXITS.
8. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED
ONCE GIVEN FINAL APPROVAL BY THE VA COR.
9. SEAL OFF ANY EXISTING, UNUSED DOORS WITH TAPE
DURING CONSTRUCTION, TYP.
EXIST SUSPENDED CLG
TO REMAIN ON CORRIDOR
SIDE
EXISTING
WALLS TO
REMAIN
EXISTING
WALLS TO
REMAIN
EXISTING DOOR BEHIND
VISQUEEN BARRIER
NON-SKID PLATE JACK
SCREWED FROM END OF
POLE TO TOP OF CEILING,
TYP
FIRE RESISTANT PLASTIC
DUST BARRIER
SURROUNDING DOOR, TYP
EXTENSION POLES, TYP
NON-SKID PLATE JACK
SCREWED FROM END OF
POLE TO BOTTOM OF
FLOOR, TYP
BOTTOM OF CEILING
ZIPPER OPENING, TYP
STICKY TACKY MATT
INFRONT OF VISQUEEN
BARRIER
TAPE TOP OF
CONSTRUCTION BARRIER
TO BOTTOM OF CEILING
CONSTRUCTION BARRIER
SURROUNDING EXIST
DOOR, TYP
TAPE BOTTOM OF CONSTRUCTIONB
BARRIER TO FLOOR SURFACE, TYP
STICKY MATT IN FRONT OF FIRE
RESISTANT PLASTIC BARRIER, TYP
NEG AIR MACHINE, TYP
(INSTALL AT ICRA BARRIER
IF EXTERIOR WINDOW IS
NOTAVAILABLE).
TEMPORARY FIRE
RATED DOOR, TYP
PATCH, REPAIT AND PAINT GWB WHERE ICRA
BARRIERS CONSTRUCTED AND REMOVED.
PATCH AND REPAIR CEILINGS AND FLOORS AS
REQUIRED QHERE ICRA BARRIERS
CONSTRUCTED AND REMOVED.
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
AS101
ICRA DETAILS
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 EM AJ
CONSTRUCTION
DOCUMENTS
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
1/2" = 1'-0"
ICRA CLASS I DETAIL
1/2" = 1'-0"
ICRA CLASS II DETAIL
1/2" = 1'-0"
ICRA CLASS III DETAIL
1/2" = 1'-0"
TYPICAL ICRA CLASS II BARRIER - PLAN VIEW
1/2" = 1'-0"
TYPICAL ICRA CLASS III BARRIER - PLAN VIEW
INSTALL TEMPORARY CONSTRUCTION ICRA BARRIER TO
SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
INSTALL TEMPORARY PLASTIC FIRE RESISTANT, DUST
BARRIER. MAY ONLY BE DURING NON FUNCTIONAL
MEDICAL CENTER HOURS.
INSTALL FIRE RESISTANT TEMPORARY DOOR AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYP.
PLACE TACKY CONSTRUCTION WALK-OFF MATS AT
ENTRANCE AND EXIT SIDE OF CONSTRUCTION ACTIVITY
AREAS, TYP.
FOR CLASS III, NEG AIR MACHINE IS REQUIRED AND SHALL
BE LOCATED EITHER AT THE ICRA BARRIER OR AT AN
EXTERIOR WINDOW. COORDINATE WITH VA INFECTIOUS
PREVENTION TEAM AND COR.
Revisions: Date:
CLASS I ICRA REQUIREMENTS
A. DURING CONSTRUCTION WORK:
1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
3. CEILING TILES: IMMEDIATELY REPLACE A CEILING TILES DISPLACED FOR VISUAL INSPECTION.
B. UPON COMPLETION:
1. CLEAN WORK AREA UPON COMPLETION OF TASK.
2. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
CLASS II ICRA REQUIREMENTS
A. DURING CONSTRUCTION WORK:
1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE. SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS WHERE
POSSIBLE.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
B. UPON COMPLETION:
1. WIPE WORK SURFACES WITH CLEANER/DESINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK
AREA.
4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
5. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
CLASS III ICRA REQUIREMENTS
A. DURING CONSTRUCTION WORK:
1. OBTAIN PERMIT FROM THE CONTRACTING OFFICER REPRESENTATIVE.
2. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS.
4. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED
WITH A DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE
CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND
MONITORED BY THE CONTRACTOR.
5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
6. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
B. UPON COMPLETION:
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE AND THROROUGHLY
CLEANED BY THE VA ENVIRONMENTAL SERVICES DEPARTMENT.
2. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO
MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION,
OUTSIDE OF NORMAL WORK HOURS.
3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
4. WET MOP AREA WITH CLEANER/DESINFECTANT.
5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
6. RETURN PERMIT TO THE CONTRACTING OFFICER REPRESENTATIVE.
anaj Image
T D
PF TD
TD
TD
DN
HG
" 6
/4
H
H
TR
C102D
116 SF
C D
COMMUNITY
BREAK ROOM
1W32
739 SF
FES UTILITY
C101
109 SF
MVP
C102A
276 SF
CORRIDOR
H111
317 SF
7N E
W
F L O
O R
IN
G
E X
IS
T
F
L O
O R
IN
G
H
EXPOSED
TR
C102D
116 SF
CORRIDOR
H111
317 SF
COMMUNITY
BREAK ROOM
1W32
739 SF
MVP
C102A
276 SF
FES UTILITY
C101
109 SF
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
EXISTING LIGHTS TO DEMOLISH
FES UTILITY
C101B
109 SF
DATA CLOSET
C102D
116 SF
COMMUNITY
BREAK ROOM
C102C
739 SF
MVP
C102A
276 SF
CORRIDOR
H111
317 SF
C102D
FES UTILITY
C101B
109 SF
COMMUNITY
BREAK ROOM
C102C
739 SF
MVP
C102A
276 SF
CORRIDOR
H111
317 SF
DATA CLOSET
C102D
116 SF
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 01A-101a
BLDG 01 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 01
EM AJ/ST/MA
CONSTRUCTION
DOCUMENTS
03/31/2022
KEY PLAN
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
LEGEND
1/4" = 1'-0"
RM C102D - DEMO FLOOR PLAN
1/4" = 1'-0"
RM C102D - DEMO RCP
1/4" = 1'-0"
RM C102D - FLOOR PLAN
1/4" = 1'-0"
RM C102D - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIR CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.
5. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
6. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
KEYNOTES
DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSED UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILINGS REMOVED.
DEMO EXISTING DOOR/FRAME, PREP FOR NEW DOOR/FRAME.
INSTALL NEW DOOR/FRAME.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE21.
SEE DETAIL 5/A-603 FOR EXTENDING WALLS UP TO STRUCTURE ABOVE.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.
REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRUP AT EXISTING FLOORING TRANSITION.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
ICRA LEGEND
DN
T
V
U
S
3' - 0"
R.8
V
U
TR
1E15
203 SF
1E19
CORRIDOR
EXIST.
FLOORING
NEW
FLOORING
V
U
EXPOSED
EXISTING EXPOSED
STRUCTURE TO REMAIN,
NO WORK
V
U
EXPOSED
TR
1E15
203 SF
1E15
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
EXISTING LIGHTS TO DEMOLISH
2 HR FIRE RATED WALL
OIT
1E19
203 SF
CORRIDOR
STAIRWELL NO. 1
S101
STORAGE
1E01
STORAGE
1E14
OIT
1E19
203 SF
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 01A-101b
BLDG 01 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 01
EM AJ/ST/MA
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
1/4" = 1'-0"
RM 1E19 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 1E15 - FLOOR PLAN
1/4" = 1'-0"
RM 1E19 - DEMO RCP
1/4" = 1'-0"
RM 1E15 - RCP
KEY PLAN
PROJECT
NORTH
GENERAL NOTES
LEGEND
PROJECT
NORTH
KEYNOTES
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMO EXISTING DOOR/FRAME, PREP FOR NEW DOOR/FRAME.
INSTALL NEW DOOR/FRAME.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.
REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRUP AT EXISTING FLOORING TRANSITION.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIR CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.
5. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
6. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
ICRA LEGEND
ROOF BELOW
ROOF BELOW
DNUP
DN
UP
DN UP
DN UP
SH RE D
RE F
1 2
RE F
MI CR O
2C10
2C10A
M
K
CORRIDOR
H204
563 SF
9' - 3"
R.8
M
K
CHASE
CH-C-3
24 SF
CORRIDOR
H204
563 SF
UNDER
CONSTRUCTION
2C09
341 SF
EXAM
2C11
211 SF
9' - 3"
2C10A
TR
2C10A
179 SF
LAB.
2C10
287 SF
PATCH AND REPAIR WALLS
WHERE OIT ROOM WALLS
REMOVED.
01a
R.8
NEW
FLOORING
EXIST.
FLOORING12
M
K
M
K
EXPOSED
UNDER
CONSTRUCTION
2C09
341 SF
CHASE
CH-C-3
24 SF
EXAM
2C11
211 SF
EXISTING BEAM, NO WORK
EXISTING BEAM, NO WORK
TR
2C10A
179 SF
LAB.
2C10
287 SF
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
EXISTING LIGHTS TO DEMOLISH
LAB.
2C10
398 SF
SERVER RM.
2C10B
43 SF
OI&T
2C10A
20 SF
CHASE
CH-C-3
24 SF
UNDER
CONSTRUCTION
2C09
341 SFEXAM
2C11
211 SF
LAB.
2C10
398 SF
SERVER RM.
2C10B
43 SF
OI&T
2C10A
20 SF
CHASE
CH-C-3
24 SF
UNDER
CONSTRUCTION
2C09
341 SF
EXAM
2C11
211 SF
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 01A-102
BLDG 01 - FLOOR 2 - DEMO,
FLOOR PLANS & RCPS 01
EM AJ/ST/MA
CONSTRUCTION
DOCUMENTS
03/31/2022
KEY PLAN
PROJECT
NORTH
KEYNOTES
LEGEND
1/4" = 1'-0"
RM 2C10 & 2C10A - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 2C10A & 2C10 - FLOOR PLAN
1/4" = 1'-0"
RM 2C10 & 2C10A - DEMO RCP
1/4" = 1'-0"
RM 2C10 & 2C10A - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
GENERAL NOTES
1 DEMO WALLS AND DOOR/FRAME.
INSTALL NEW DOOR/FRAME.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.
REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILINGS REMOVED.
CONSTRUCT NEW WALL, PAINT TO MATCH EXISTING ON ROOM 2C10.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING WINDOW.
REFERENCE DETAIL 4/A-603.
SEE DETAIL 5/A-603 FOR EXTENDING WALLS TO STRUCTURE ABOVE.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL
LOCATIONS.
3. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALL
INSTALLED.
4. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
5. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
6. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
7. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
ICRA LEGEND
RAD RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RADRADRADRADRADRADRADRADRAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RADRAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
SP
UP
DNDN
DN
UP
DN
FAP
FAP
FAP
FAP
FAP
FE
FE
FE
FECFEC
FE
FE
FE
FEC
FE
3C13, 3C14
E303
K
/4
K
TR
3C13
276 SF
3 3 C
1' - 7" 1' - 10" 3' - 4" 4' - 6 1/2"
LAB.
3C12
LAB.
3C15
STERILIZATION
RM.
3C16
CORRIDOR
H304
01b
01b
01b
01b
E X
IS
T
F
L O
O R
IN
G
N
O
O R
IN
G
K 9
K
TR
3C13
276 SF
EXPOSED
LAB.
3C15
305 SF
LAB.
3C12
383 SF
STERILIZATION
RM.
3C16
55 SF
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
EXISTING LIGHTS TO DEMOLISH
LAB.
3C14
251 SF
LAB.
3C12
STERILIZATION
3C13
22 SF
LAB.
3C15
STERILIZATION
RM.
3C16
CORRIDOR
H304
T V
US
T V
US
EXISTING ACT CEILING AND LIGHTS
TO REMAIN, NO WORK.
PATCH CEILING
WHERE WALLS ARE
REMOVED.
T V
US
TR
E303
541 SF
STORAGE
E303A
CORRIDOR
H302 OFFICE
E304OFFICE, OPEN
E302
T V
US
TR
E303
OFFICE
E304
OFFICE, OPEN
E302
STORAGE
E303A
IT ROOM
E303B
45 SF
COMPUTER RM.
E303
490 SF
STORAGE
E303A
OFFICE
E304
CORRIDOR
H302
CORRIDOR
H302
IT ROOM
E303B
45 SF
COMPUTER RM.
E303
490 SF
STORAGE
E303A
116 SF
OFFICE
E304
166 SF
CORRIDOR
H302
1621 SF
CORRIDOR
H302
1621 SF
LAB.
3C14
251 SF
LAB.
3C12
STERILIZATION
3C13
22 SF
LAB.
3C15
STERILIZATION
RM.
3C16
CORRIDOR
H304
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 01A-103
BLDG 01 - FLOOR 3 - DEMO,
FLOOR PLANS & RCPS 01
EM AJ/ST/MA
CONSTRUCTION
DOCUMENTS
03/31/2022
KEY PLAN
PROJECT
NORTH
GENERAL NOTES
LEGEND
1/4" = 1'-0"
RM 3C13 & 3C14 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 3C13 - FLOOR PLAN
1/4" = 1'-0"
RM 3C13 &3C14 - DEMO RCP
1/4" = 1'-0"
RM 3C13 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL
LOCATIONS.
3. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
4. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
5. PATCH AND REPAIR CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.
6. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
7. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
KEYNOTES
1 DEMO EXISTING DOOR/FRAME AS NECESSARY TO INSTALL NEW DOOR/FRAME.
DEMO DOOR/FRAME.
INFILL WALL AND PATCH/PAINT TO MATCH EXISTING, BASE TO MATCH EXISTING,
ON CORRIDOR SIDE.
INSTALL NEW DOOR/FRAME.
DEMO EXISTING CABINETRY AND SINK.
DEMO EXISTING WALLS.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.
REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
DEMO EXISTING CEILING COMPLETELY INCLUDING ALL GRID, SUPPORTING
WIRES, CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE
OF STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.
REPAINT WALL TO THE NEXT NATURAL BREAK WHERE DOOR/FRAME ARE TO BE
INSTALLED, TYP. PAINT TO MATCH EXISTING.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
PATCH AND REPAIR WALLS WHERE DEMO OCCURS.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING WINDOW.
REFERENCE DETAIL 4/A-603.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
1/4" = 1'-0"
RM E303 & E303B - DEMO FLOOR PLAN
1/4" = 1'-0"
RM E303 & E303B- DEMO RCP
1/4" = 1'-0"
RM E303 - FLOOR PLAN
1/4" = 1'-0"
RM E303 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
ICRA LEGEND
UNEXCAVATED UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
SM
8' - 0"
UP
A
B
5 76
+ 2
4' - 0"
A
B
5 76
59 SF
TR
G04
123 SF
STORAGE
G03
7 SF
CHASE
CH-0-1
1110 SF
STORAGE
G02CORRIDOR
H001
A
B
5 76
EXISTING EXPOSED
STRUCTURE TO REMAIN,
NO WORK
A
B
5 76
59 SF
TR
G04
123 SF
STORAGE
G03
EXPOSED
1110 SF
STORAGE
G02
CORRIDOR
H001
59 SF
OIT
G04
123 SF
STORAGE
G03
125 SF
CORRIDOR
H001
1110 SF
STORAGE
G02
STORAGE
G05
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
TO DEMOLISH
2 HR FIRE RATED WALL
EXISTING LIGHTS TO DEMOLISH
59 SF
OIT
G04
123 SF
STORAGE
G03
125 SF
CORRIDOR
H001
1110 SF
STORAGE
G02
G04
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 02A-100
BLDG 02 - FLOOR 0 - DEMO,
FLOOR PLANS & RCPS 02
EM AJ/ST/PKQ
CONSTRUCTION
DOCUMENTS
03/31/2022
1/4" = 1'-0"
ROOM G04 - DEMO FLOOR PLAN
1/4" = 1'-0"
ROOM G04 - FLOOR PLAN
1/4" = 1'-0"
ROOM G04- DEMO RCP
1/4" = 1'-0"
ROOM G04 - RCP
LEGEND
GENERAL NOTES
KEY PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
1 NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
KEYNOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
ICRA LEGEND
UP
DN
FAP FAP
FAP
FEC
UP
UP
UP
UP
UP
UP
UP
A
B
C
5 76
217 SF
OFFICE
158 SF
OFFICE
11093 SF
MECH. RM.
122 SF
CORRIDOR
H103
330 SF
CORRIDOR
H102
A
B
A
B
5 76
217 SF
TR
3' - 4" 0' - 11 3/4"
MECH. RM.
OFFICE
CORRIDOR
H103
OFFICE
E X
IS
T
F
L O
O R
IN
G
N E
W F
L O
O R
IN
G 9
A
B
EXPOSED
217 SF
TR
158 SF
OFFICE
122 SF
CORRIDOR
H103
93 SF
MECH. RM.
330 SF
CORRIDOR
H102
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
TO DEMOLISH
2 HR FIRE RATED WALL
EXISTING LIGHTS TO DEMOLISH
217 SF
OFFICE
158 SF
OFFICE
93 SF
MECH. RM.
122 SF
CORRIDOR
H103
330 SF
CORRIDOR
H102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 02A-101
BLDG 02 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 02
EM AJ/ST/PKQ
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
1/4" = 1'-0"
RM 111 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 111 - DEMO RCP
1/4" = 1'-0"
RM 111 - FLOOR PLAN
1/4" = 1'-0"
RM 111 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
LEGEND
GENERAL NOTES
KEY PLAN
PROJECT
NORTH
DEMO EXISTING DOOR/FRAME AS NECESSARY TO INSTALL NEW DOOR/FRAME.
INSTALL NEW DOOR/FRAME.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.
REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
DEMO EXISTING GWB COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING
WINDOW. REFERENCE DETAIL 4/A-603.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
KEYNOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
5. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
6. ICRA BARRIERS NOT SHOWN COORDINATE DIRECTLY WITH COR & SAFETY TO
MEET ICRA REQUIREMENTS.
ROOF BELOW
FAP
FAP
RAD
RAD
FEC
FEC
FE
UP
UP
A
B
RAD
3' - 4" 2' - 6" 0' - 6"
DOOR TO REMAIN CLOSED AND
SEALED DURING ENTIRETY OF
CONSTRUCTION PHASE.
CONFIRM WITH DOOR
MANUFACTURER, TYP
A
B
8' - 0"
7' - 10" 7' - 10"
9' - 6"
9' - 8"
8' - 2"
A
B
99 SF
TR
633 SF
CORRIDOR
H202
78 SF
HAC
144 SF
TOILET, MALE
2' - 6" 3' - 4" 0' - 6"
01b12
E X
IS
T
F
L O
O R
IN
G
N
O
O R
IN
G15
A
B
99 SF
TR
144 SF
TOILET, MALE
8' - 0"
9' - 6"
5 SF
CHASE
CH-2-4
78 SF
HAC
99 SF
VENDING
633 SF
CORRIDOR
H202
78 SF
HAC
144 SF
TOILET, MALE
99 SF
VENDING
633 SF
CORRIDOR
H202
78 SF
HAC
144 SF
TOILET, MALE
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 02A-102
BLDG 02 - FLOOR 2 - DEMO,
FLOOR PLANS & RCPS 02
EM AJ/ST/PKQ
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
LEGEND
GENERAL NOTES
KEY PLAN
PROJECT
NORTH
1 DEMO EXISTING DOOR/FRAME AS NECESSARY TO INSTALL NEW DOOR/FRAME.
INSTALL NEW DOOR/FRAME.
DEMO EXISTING CABINETRY, SINK, AND WALLS.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.
REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
DEMO EXISTING ACT AND GWB COMPLETELY INCLUDING ALL GRID, SUPPORTING
WIRES, CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE
OF STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.
INFILL WALL TO MATCH EXISTING.
DEMO EXISTING WALL, PREP FOR NEW DOOR/FRAME.
PATCH AND REPAINT WALL AS NECESSARY TO MATCH EXISTING ON CORRIDOR
SIDE.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING
WINDOW. REFERENCE DETAIL 4/A-603.
REFER TO DETAIL 5/A-603 FOR EXTENDING WALLS UP TO STRUCTURE ABOVE.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
KEYNOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
5. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
6. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL
LOCATIONS.
1/4" = 1'-0"
RM 209 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 209 - DEMO RCP
1/4" = 1'-0"
RM 209 - FLOOR PLAN
1/4" = 1'-0"
RM 209 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
ICRA LEGEND
DN
RAD
AP FEC
AP
FAP
FAP
FAP
UP
A
B
7 86
4' - 2 3/4" 3' - 4"
PATCH AND REPAIR WALLS
WHERE DEMO OCCURS.
CONFIRM WITH DOOR
MANUFACTURER, TYP
A
B
7' - 0"
8' - 0"
7' - 0"
PATCH GRID TOGETHER
WHEN WALL IS REMOVED.
A
B
7 86
129 SF
TR
205 SF
OFFICE
307A
307A
7' - 7 1/2"
5' - 8"
01a
01b
E X
IS
T
F
L O
O R
IN
G
N
O
O R
IN
G
A
B
EXPOSED
129 SF
TR
205 SF
OFFICE
307A
218 SF
OFFICE
114 SF
OFFICE
307A
114 SF
OFFICE
30792 SF
MECH. RM.
653 SF
CORRIDOR
H302
117 SF
OFFICE
218 SF
OFFICE
114 SF
OFFICE
307A
114 SF
OFFICE
30792 SF
MECH. RM.
653 SF
CORRIDOR
H302
DEMO EXISTING EXTINGUISHER CABINET
EXISTING RESILIENT BASE:
CUT AS REQUIRED FOR NEW
DOOR AND PATCH CLEANLY TO
NEW FRAME.
SALVAGE VA SIGNAGE
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 02A-103
BLDG 02 - FLOOR 3 - DEMO,
FLOOR PLANS & RCPS 02
EM AJ/ST/PKQ
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
LEGEND
GENERAL NOTES
KEY PLAN
PROJECT
NORTH
1 DEMO EXISTING DOOR/FRAME.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.
REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.
INSTALL NEW DOOR/FRAME
PATCH AND REPAINT WALL AS NECESSARY TO MATCH EXISTING.
DEMO EXISTING WALL.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING
WINDOW. REFERENCE DETAIL 4/A-603.
INFILL WALL TO MATCH EXISTING.
CONSTRUCT NEW WALL, PAINT TO MATCH EXISTING ON ROOM 307A.
DEMO EXISTING FIRE EXTINGUISHER CABINET.
INSTALL NEW FIRE EXTINGUISHER CABINET. MATCH EXISTING COLOR AND
STYLE.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
KEYNOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALLS
INSTALLED.
3. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
4. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
5. PATCH AND REPAIR CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.
6. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
7. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
8. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL
LOCATIONS.
9. ICRA BARRIERS NOT SHOWN. COORDINATE DIRECTLY WITH COR & SAFETYTO
MEET ICRA REQUIREMENTS.
1/4" = 1'-0"
RM 308 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 308 - DEMO RCP
1/4" = 1'-0"
RM 308 - FLOOR PLAN
1/4" = 1'-0"
RM 308 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
RM 308 - CORRIDOR
UNEX. UNEX.
UNEX. UNEX.
RA D
FE
AP
FEC
FEC
AP
FEC
FAP
FAP
FAP
STAIRWELL NO.
B001
GROUP RM.
B002
STORAGE
B003
GROUP
B004
ACTIVITY
B006
STORAGE
B008
MECH. RM.
B013
CLEAN
STORAGE
B010
CORRIDOR
B011
STORAGE
B005
MECH. RM.
B009
ELEVATOR
MACHINE RM.
B017
CORRIDOR
B015
SERVICE
B014
STORAGE
B024
MECH. RM.
B026
STORAGE
B027
MECH. RM.
B029
STAIRWELL NO.
B028
TOILET
B023
CLOSET
B022
CORRIDOR
B030
LAUNDRY
B021
STAIRWELL NO.
B019
VENDING
B020
CORRIDOR
B012
CLOSET
B018
ENTRY
B016
OI&T
B002A
OI&T
B007
ELEVATOR
B031
DN
UP
UP
UP
UP
B025
K L M
3' - 4"3' - 9"
3' - 4" 2' - 8 1/2"
/4
CONFIRM WITH DOOR
MANUFACTURER, TYP
53.94 SF
TR
B025A
B A
K L M
3' - 4" 2' - 8 1/2"
/4
B
200.14 SF
VACANT
B025
3' - 9" 3' - 4"
01a
01a
9' - 3 3/4"
INSTALL NEW HEADER, SEE
DETAIL 2/03A-100
E X
IS
T
F
L O
O R
IN
G
N
O
O R
IN
G
WG
K L M
DEMO EXISTING LIGHT
EXISTING STRUCTURAL BEAM, NO WORK
53.94 SF
TR
B025A
WG
K L M
VACANT
B025
259.91 SF
VACANT
B025
128.02 SF
STORAGE
B027
CORRIDOR
B030
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
259.91 SF
VACANT
B025
128.02 SF
STORAGE
B027
333.04 SF
CORRIDOR
B030
L M
WHERE NEW DOOR OCCURS: CAREFULLY CUT
EXISTING RAILING. SALVAGE END CAPS FOR
REUSE. REINSTALL RAILING AND INSTALL
SALVAGED END CAPS. PROVIDE ADDITIONAL
BLOCKING AND SUPPORTS FOR NEW END OF
RAILING AS NEEDED.
EXISTING RESILIENT BASE:
CUT AS REQUIRED FOR
NEW DOOR AND PATCH
CLEANLY TO NEW FRAME.
C6X7
2' - 0" TYP.
(6)-3/4" DIA THRD ROD EMBEDDED
INTO (E) CMU 6 1/2" W/ SIMPSON SET-XP
ER-265. @ 16' OC HORZ. DO NOT INSTALL
WITHIN 1/2" OF HEAD JOINT. DO NOT DAMAGE
EXISTING REINF. TYP
NEW OPENING IN EXISTING CMU WALL
(PREDRILL CORNERS TO AVOID
CUTTING CORNERS)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 03A-100
BLDG 03 - FLOOR 0 - DEMO,
FLOOR PLANS & RCPS 03
EM AJ/ST
CONSTRUCTION
DOCUMENTS
03/31/2022
KEY PLAN
PROJECT
NORTH
KEYNOTES
LEGEND
1/4" = 1'-0"
RM B025 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM B025 - FLOOR PLAN
1/4" = 1'-0"
RM B025 - DEMO RCP
1/4" = 1'-0"
RM B025 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
GENERAL NOTES
DEMO EXISTING DOOR/FRAME AS NECESSARY TO INSTALL NEW DOOR/FRAME.
INSTALL NEW DOOR/FRAME.
SAWCUT AND DEMO CMU WALL AND RAILING. PREP FOR NEW DOOR/FRAME.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
PATCH AND REPAINT WALL AS NECESSARY TO MATCH EXISTING ON CORRIDOR
SIDE.
CONSTRUCT NEW WALL. PAINT TO MATCH EXISTING ON ROOM B025.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALL
INSTALLED.
3. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL
LOCATIONS.
3. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
4. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
6. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
7. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
8. ICRA BARRIERS NOT SHOWN. COORDINATE DIRECTLY WITH COR & SAFETY TO
MEET ICRA REQUIREMENTS.
1/2" = 1'-0"
RM B025 - CORRIDOR INTERIOR ELEVATION
1/2" = 1'-0"
DOOR HEADER DETAIL
DN
-3'-8" FLOOR
ELEVATION
DN
UP
FEC
FE
RA D
RA D
RA D
RA D
FAP
FAP
FAP
FAP
PATIENT RM.
TOILET
103A
HAC
PATIENT RM.
TOILET, MALE
TOILET
TOILET
PATIENT RM.
STAIRWELL NO.
OFFICE
OFFICE
SHOWER
TOILET
PATIENT RM.
PATIENT RM.
STAIRWELL NO.
PATIENT RM.
PATIENT RM.
PATIENT RM.
KITCHEN
RECEPTION
PATIENT ADA
PATIENT RM.
PATIENT RM.
PATIENT RM.
PATIENT RM.
CLOSET
PATIENT RM.
TOILET
102A
STAIRWELL NO.
S101
CORRIDOR
101A
CORRIDOR
ELEVATOR
LOBBY
PATIENT
LOUNGE
ELEVATOR
LOBBY
VESTIBULE
ELEVATOR
E1
CORRIDOR
116 S M
SM
UP
UP
SM
UP
138.12 SF
TR
169.11 SF
STAIRWELL NO. 2
161.46 SF
OFFICE
7.59 SF
TR
117A
DN
G H I
+ 6
138.12 SF
TR
169.11 SF
STAIRWELL NO. 2
7.59 SF
TR
117A
DN
G H
/4
9' - 1"
E X
IS
T
F
L O
O R
IN
G
N
O
O R
IN
G
138.12 SF
TR
7.59 SF
TR
117A
7' - 5"
7' - 10"
8' - 8"
G H
138.12 SF
TR
7.59 SF
TR
117A
7' - 10"
G H
EXPOSED
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
TO DEMOLISH
2 HR FIRE RATED WALL
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 03A-101
BLDG 03 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 03
EM AJ/ST
CONSTRUCTION
DOCUMENTS
03/31/2022
KEY PLAN
PROJECT
NORTH
LEGEND
1/4" = 1'-0"
RM 117 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 117 - FLOOR PLAN
1/4" = 1'-0"
RM 117 - DEMO RCP
1/4" = 1'-0"
RM 117 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
KEYNOTES
GENERAL NOTES
DEMO EXISTING DOOR/FRAME AS NECESSARY TO INSTALL NEW DOOR/FRAME.
INSTALL NEW DOOR/FRAME.
DEMO EXISTING GWB COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.
REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
5. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
ICRA LEGEND
DN
RA D
RA DRA D
RA D
FAP
FAP
FE
FEC
PATIENT RM.
PATIENT RM.
PATIENT RM.
PATIENT RM.
TOILET
PATIENT RM.
CLOSET
203A
CLOSET
205A
CLOSET
207A
CLOSET
209A
CLOSET
215A
CLOSET
FIRE
SPRINKLER
CLOSET
220A
STAIRWELL NO.
PATIENT RM.
PATIENT RM.
CLOSET
PATIENT RM.
CLOSET
229A
TOILET
PATIENT RM.
CLOSET
233B
CLOSET
233A
MECH. RM.
STAIRWELL NO.
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
STAIRWELL NO.
PATIENT RM.
PATIENT RM.
PATIENT RM.
PATIENT RM.
PATIENT RM.
QUIET RM.
CLEAN LINEN
KITCHEN
TOILET
OFFICE
PATIENT RM.
PATIENT RM.
CLOSET
232A
CLOSET
230A
CLOSET
228A
HAC
CLOSET
210A
CLOSET
208A
CLOSET
206A
CLOSET
204A
CLOSET
202A
ELEVATOR
LOBBY
PATIENT RM.
ELEVATOR
E2
I J K
3' - 4"
0' - 9 1/2"
/2
2' - 9 3/4"
CONFIRM WITH DOOR
MANUFACTURER, TYP
123.32 SF
TR
224A140.33 SF
LOUNGE
ALIGN
I J K
A
3' - 4" 0' - 9 1/2"
9' - 2 3/4"
CORRIDOR
PATIENT RM.
01a
N
O
O R
IN
G
E X
IS
T
F
L O
O R
IN
G
WG
8' - 7"
7' - 8"
I J K
123.32 SF
TR
224A
WG
7' - 8"
123.32 SF
TR
224A
EXPOSED
I J K
140.33 SF
LOUNGE
268.09 SF
LOUNGE
CORRIDOR
PATIENT RM.
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
268.09 SF
LOUNGE
JK
WHERE NEW DOOR OCCURS: CAREFULLY
CUT EXISTING RAILING. SALVAGE END CAPS
FOR REUSE. REINSTALL RAILING AND INSTALL
SALVAGED END CAPS. PROVIDE ADDITIONAL
BLOCKING AND SUPPORTS FOR NEW END OF
RAILING AS NEEDED.
EXISTING RESILIENT BASE:
CUT AS REQUIRED FOR
NEW DOOR AND PATCH
CLEANLY TO NEW FRAME.
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 03A-102
BLDG 03 - FLOOR 2 - DEMO,
FLOOR PLANS & RCPS 03
EM AJ/ST
CONSTRUCTION
DOCUMENTS
03/31/2022
KEY PLAN
PROJECT
NORTH
LEGEND
1/4" = 1'-0"
RM 224 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 224 - FLOOR PLAN
1/4" = 1'-0"
RM 224 - DEMO RCP
1/4" = 1'-0"
RM 224 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
KEYNOTES
GENERAL NOTES
INSTALL NEW DOOR/FRAME.
CONSTRUCT NEW WALL, PATCH AND PAINT TO MATCH EXISTING.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH. REMOVE
EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.
DEMO EXISTING WALL AND RAILING, PREP FOR NEW DOOR/FRAME.
PATCH AND REPAINT WALL AS NECESSARY TO MATCH EXISTING ON CORRIDOR
SIDE.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING WINDOW.
REFERENCE DETAIL 4/A-603.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIR CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.
5. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
6. PROTECT FINISHES IN ROOMS ADJACENT TO TELECOMMUNICATION ROOMS AND
AREAS NOT SCHEDULED FOR NEW WORK.
7. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL
LOCATIONS.
1/2" = 1'-0"
RM 224 - CORRIDOR INTERIOR ELEVATION
ICRA LEGEND
UP
UP
3005 SF
PIPE CHASE
Z001
433 SF
MECH. RM.
002 272 SF
CORRIDOR
H001
543 SF
CORRIDOR
H002
126 SF
ELEVATOR
MACHINE RM.
182 SF
STAIRWELL NO.
S002
130 SF
TOILET, UNISEX
119 SF
TOILET, FEMALE
24 SF
HAC
192 SF
BREAK RM.
372 SF
OFFICE
424 SF
OFFICE
235 SF
OFFICE
012126 SF
VENDING
H003
313 SF
OFFICE
523 SF
MECH. RM.
003A
787 SF
MECH. RM.
10 SF
OI&T
003B
58 SF
ELEVATOR
LOBBY
12 SF
CHASE
CH-1-B
10 SF
CHASE
CH-2-B
5 SF
CHASE
CH-3-B
11 SF
CHASE
CH-4-B
56 SF
ELEVATOR
E1
PROJECT
NORTH
577 SF
CORRIDOR
H002
157 SF
OFFICE
OFFICE
3' - 4"
23 24 25
B
C
D
E
F
G
OFFICE
CONFIRM WITH DOOR
MANUFACTURER, TYP
577 SF
CORRIDOR
H002
123 SF
TR
011A
157 SF
OFFICE
391 SF
OFFICE
A
ALIGN
9' - 2"
0' - 6"
3' - 4"
23 24 25
B
C
D
E
F
G
01a
01a
E X
IS
T
F
L O
O R
IN
G
N E
W F
L O
O R
IN
G
9' - 6"
8' - 0"
8' - 0"
9' - 0"
157 SF
OFFICE
391 SF
OFFICE
577 SF
CORRIDOR
H002
23 24 25
B
C
D
E
F
G
9' - 6"
8' - 0"
8' - 0"
9' - 0"
157 SF
OFFICE
391 SF
OFFICE
577 SF
CORRIDOR
H002
EXPOSED
123 SF
TR
011A
23 24 25
B
C
D
E
F
G
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
EXISTING LIGHTS TO DEMOLISH
EXISTING RESILIENT BASE:
CUT AS REQUIRED FOR NEW
DOOR AND PATCH CLEANLY TO
NEW FRAME.
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 18A-100
BLDG 18 - FLOOR 0 - DEMO,
FLOOR PLANS & RCPS 18
EM AJ/ST/PKQ
CONSTRUCTION
DOCUMENTS
03/31/2022
KEY PLAN
LEGEND
1/4" = 1'-0"
RM 011 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 011 & RM 011A - FLOOR PLAN
1/4" = 1'-0"
RM 011 - DEMO RCP
1/4" = 1'-0"
RM 011 & RM 011A - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALL
INSTALLED.
3. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL
LOCATIONS.
3. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
4. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
6. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
7. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
KEYNOTES
1 DEMO WALL FOR NEW DOOR/FRAME.
DEMO EXISTING WALL AND EXISTING DOOR/FRAME TO BE RELOCATED.
CONSTRUCT NEW WALL, PATCH AND PAINT TO MATCH EXISTING.
INSTALL NEW DOOR/FRAME.
CONSTRUCT NEW WALL AND INSTALL EXISTING DOOR.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH. REMOVE
EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.
PATCH AND REPAINT WALL AS NECESSARY TO MATCH EXISTING ON CORRIDOR
SIDE.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING WINDOW.
REFERENCE DETAIL 4/A-603.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
DEMO EXISING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
Revisions: Date:
1/2" = 1'-0"
RM 011 - CORRIDOR
ICRA LEGEND
ORIGINAL DRAWINGS SHOW 37'-10"
R AD
R AD
R AD
R ADR AD
R ADR AD
R ADR ADR AD
R AD
R AD
R ADR AD
R AD
R ADR ADR AD
R AD
R ADR AD
R AD
R AD
R AD R AD
R AD
R AD R AD
R AD
R AD R AD
R AD
R AD
R AD
R AD
R AD
FAP
FAP
FAP
FAP
AP
FEC
FEC FEC
OFFICE
OFFICE
OFFICE
FILE RM.
OFFICE
OFFICE
WORK RM.
STORAGE
TOILET, MALE
ELEVATOR
LOBBY
TOILET, FEMALE
STAIRWELL NO.
S102
CORRIDOR
H102
CORRIDOR
H103
PIV BADGE
OFFICE
CORRIDOR
H101
RECEPTION
STAIRWELL NO.
S101
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
H104
CONFERENCE
RM.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
112 OFFICE
OFFICE
114A
OFFICE
BREAK RM.
115AOFFICE, OPEN
OFFICE
OFFICE, CHIEF
113A
OFFICE
OFFICE
OFFICE
CORRIDOR
H105
CLOSET
115C
CLOSET
115B
ELEVATOR
E1
CHASE
CH-1-1
STAIRWELL NO.
S103
UP
UP
UP
UP
UP
UP
37'-0 1/2"
15'-3 1/4" 10'-4 3/4" 10'-4 3/4"
PROJECT
NORTH
10 11 12 13
B
C
D
E
F
G
7' - 11"
CHASE
11 12 13
B
C
D
E
PATCH AND REPAIR CEILING
GRID AND TILES AT NEW WALLS.
7' - 11"
141 SF
TR
10 11 12 13
B
C
D
E
73 SF
CORRIDOR
H102
343 SF
CORRIDOR
H103
141 SF
TR
CHASE
CH-1-1
ALIGN
0'
3/
4"
0'
3/
4"
10 11 12 13
B
C
D
E
01b
01b
01b
01b
EXIST.
FLOORING
NEW
FLOORING
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
EXISTING LIGHTS TO DEMOLISH
84 SF
OI&T
621 SF
CORRIDOR
H101
92 SF
CORRIDOR
H102
347 SF
CORRIDOR
H103
48 SF
CHASE
CH-1-1
84 SF
OI&T
621 SF
CORRIDOR
H101
92 SF
CORRIDOR
H102
347 SF
CORRIDOR
H103
48 SF
CHASE
CH-1-1
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 18A-101
BLDG 18 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 18
EM AJ/ST/PKQ
CONSTRUCTION
DOCUMENTS
03/31/2022
KEY PLAN
LEGEND
1/4" = 1'-0"
RM 119 - DEMO FLOOR PLAN
PROJECT
NORTH
1/4" = 1'-0"
RM 119 - DEMO RCP
PROJECT
NORTH
1/4" = 1'-0"
RM 119 - RCP
1/4" = 1'-0"
RM 119 - FLOOR PLAN
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALLS
INSTALLED.
5. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
6. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL
LOCATIONS.
7. ICRA BARRIERS NOT SHOWN. COORDINATE DIRECTLY WITH COR & SAFETY TO
MEET ICRA REQUIREMENTS.
KEYNOTES
CONSTRUCT NEW WALL. PATCH/PAINT AS NECESSARY TO MATCH EXISTING ON
CORRIDOR SIDE.
DEMO EXISTING WALLS.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.
REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.
PATCH AND REPAIR WALLS WHERE OI&T ROOM WALLS WERE REMOVED.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
DEMO EXISING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
Revisions: Date:
ICRA LEGEND
10 11 12 13
B
C
D
E
F
G 8' - 1"
115 SF
TR
287 SF
CORRIDOR
H203
163 SF
CORRIDOR
H202
49 SF
CHASE
CH-2-1
32 SF
ELEC. CLOSET
4 213
ALIGN
10 11 12 13
C
D
E
F
G
01b
01a
01b
EXIST.
FLOORING
NEW
FLOORING
10' - 3"
7' - 9 1/2"
9' - 9"
7' - 9 1/2"
10 11 12 13
C
D
E
F
7' - 9 1/2"
WG
7' - 9 1/2"
115 SF
TR
10 11 12 13
C
D
E
F
G
EXPOSED
PROJECT
NORTH
212A
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
EXISTING LIGHTS TO DEMOLISH
36 SF
OI&T
32 SF
ELEC. CLOSET
49 SF
CHASE
CH-2-1
49 SF
KITCHENETTE
212A
193 SF
CORRIDOR
H202
549 SF
CORRIDOR
H201
287 SF
CORRIDOR
H203
OFFICE
HAC
OFFICE, SUPV.
TOILET, MALE
OFFICE
36 SF
OI&T
32 SF
ELEC. CLOSET
49 SF
CHASE
CH-2-1
49 SF
KITCHENETTE
212A
193 SF
CORRIDOR
H202
549 SF
CORRIDOR
H201
287 SF
CORRIDOR
H203
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 18A-102
BLDG 18 - FLOOR 2 - DEMO,
FLOOR PLANS & RCPS 18
EM AJ/ST/PKQ
CONSTRUCTION
DOCUMENTS
03/31/2022
KEY PLAN
KEYNOTES
LEGEND
1/4" = 1'-0"
RM 213 & 212A - DEMO FLOOR PLAN
PROJECT
NORTH
1/4" = 1'-0"
RM 213 - FLOOR PLAN
1/4" = 1'-0"
RM 213 & 212A - DEMO RCP
1/4" = 1'-0"
RM 213 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALLS
INSTALLED.
5. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
6. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
7. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL
LOCATIONS.
8. ICRA BARRIERS NOT SHOWN. COORDINATE DIRECTLY WITH COR & SAFETY TO
MEET ICRA REQUIREMENTS.
CO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .