Attachment 4 - Drawings Part-3.pdf

PDF 15 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, building renovation including demolition, construction and finishes, data center renovation, physical security enhancements, fiber infrastructure assessment and upgrades between buildings, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. The project involves improvements to Buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75 and associated site work. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
FOLLOW-UP Technical Questions - St. Louis 4-6-23.pdf PDF
Technical Questions - FINAL - St. Louis 3-28-23.pdf PDF
657-21-701JB - Addendum 1_03_24_23.pdf PDF
329000-5 - Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-24-23.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
Attachment 45 - Site Visit Instructions Updated 2-16-23.pdf PDF
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Attachment 33 - Drawings Part-32.pdf PDF
Attachment 34 - Envr. Report - Narrative.pdf PDF
Attachment 37 - Envr. Report - Appendix C.pdf PDF
Attachment 40 - NARA RM Contract Language Clause.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 1-20-23.pdf PDF
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. PROJECT SHALL COMPLY WITH CLASS, I, II, III & IV ICRA

REQUIREMENTS.

2. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING

ALL ICRA REQS. AT ANY TIME, THE COR MAY HALT WORK

UNTIL ALL REQS ARE MET.

4. REMOVE OR ISOLATE (E) HVAC SYSTEMS WITHIN

CONSTRUCTION AREA TO PREVENT DUST

CONTAMINATION.

5. CONTAIN ALL CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS. WHEN

POSSIBLE, REMOVE CONSTRUCTION DEBRIS WHEN AREA

IS IN ACTIVE ISOLATION.

6. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

7. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

8. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED

ONCE GIVEN FINAL APPROVAL BY THE VA COR.

9. SEAL OFF ANY EXISTING, UNUSED DOORS WITH TAPE

DURING CONSTRUCTION, TYP.

EXIST SUSPENDED CLG

TO REMAIN ON CORRIDOR

SIDE

EXISTING

WALLS TO

REMAIN

EXISTING

WALLS TO

REMAIN

EXISTING DOOR BEHIND

VISQUEEN BARRIER

NON-SKID PLATE JACK

SCREWED FROM END OF

POLE TO TOP OF CEILING,

TYP

FIRE RESISTANT PLASTIC

DUST BARRIER

SURROUNDING DOOR, TYP

EXTENSION POLES, TYP

NON-SKID PLATE JACK

SCREWED FROM END OF

POLE TO BOTTOM OF

FLOOR, TYP

BOTTOM OF CEILING

ZIPPER OPENING, TYP

STICKY TACKY MATT

INFRONT OF VISQUEEN

BARRIER

TAPE TOP OF

CONSTRUCTION BARRIER

TO BOTTOM OF CEILING

CONSTRUCTION BARRIER

SURROUNDING EXIST

DOOR, TYP

TAPE BOTTOM OF CONSTRUCTIONB

BARRIER TO FLOOR SURFACE, TYP

STICKY MATT IN FRONT OF FIRE

RESISTANT PLASTIC BARRIER, TYP

NEG AIR MACHINE, TYP

(INSTALL AT ICRA BARRIER

IF EXTERIOR WINDOW IS

NOTAVAILABLE).

TEMPORARY FIRE

RATED DOOR, TYP

PATCH, REPAIT AND PAINT GWB WHERE ICRA

BARRIERS CONSTRUCTED AND REMOVED.

PATCH AND REPAIR CEILINGS AND FLOORS AS

REQUIRED QHERE ICRA BARRIERS

CONSTRUCTED AND REMOVED.

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

AS101

ICRA DETAILS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 EM AJ

CONSTRUCTION

DOCUMENTS

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

1/2" = 1'-0"

ICRA CLASS I DETAIL

1/2" = 1'-0"

ICRA CLASS II DETAIL

1/2" = 1'-0"

ICRA CLASS III DETAIL

1/2" = 1'-0"

TYPICAL ICRA CLASS II BARRIER - PLAN VIEW

1/2" = 1'-0"

TYPICAL ICRA CLASS III BARRIER - PLAN VIEW

INSTALL TEMPORARY CONSTRUCTION ICRA BARRIER TO

SEPARATE CONSTRUCTION AREA FROM OCCUPIED

SPACE.

INSTALL TEMPORARY PLASTIC FIRE RESISTANT, DUST

BARRIER. MAY ONLY BE DURING NON FUNCTIONAL

MEDICAL CENTER HOURS.

INSTALL FIRE RESISTANT TEMPORARY DOOR AT OPENING

AND MATCH RATING OF ICRA BARRIER, TYP.

PLACE TACKY CONSTRUCTION WALK-OFF MATS AT

ENTRANCE AND EXIT SIDE OF CONSTRUCTION ACTIVITY

AREAS, TYP.

FOR CLASS III, NEG AIR MACHINE IS REQUIRED AND SHALL

BE LOCATED EITHER AT THE ICRA BARRIER OR AT AN

EXTERIOR WINDOW. COORDINATE WITH VA INFECTIOUS

PREVENTION TEAM AND COR.

Revisions: Date:

CLASS I ICRA REQUIREMENTS

A. DURING CONSTRUCTION WORK:

1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

3. CEILING TILES: IMMEDIATELY REPLACE A CEILING TILES DISPLACED FOR VISUAL INSPECTION.

B. UPON COMPLETION:

1. CLEAN WORK AREA UPON COMPLETION OF TASK.

2. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

CLASS II ICRA REQUIREMENTS

A. DURING CONSTRUCTION WORK:

1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE. SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS WHERE

POSSIBLE.

3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

4. SEAL UNUSED DOORS WITH DUCT TAPE.

5. BLOCK OFF AND SEAL AIR VENTS.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

B. UPON COMPLETION:

1. WIPE WORK SURFACES WITH CLEANER/DESINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK

AREA.

4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

5. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

CLASS III ICRA REQUIREMENTS

A. DURING CONSTRUCTION WORK:

1. OBTAIN PERMIT FROM THE CONTRACTING OFFICER REPRESENTATIVE.

2. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO

PREVENT CONTAMINATION OF THE DUCT SYSTEM.

3. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS.

4. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED

WITH A DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE

CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND

MONITORED BY THE CONTRACTOR.

5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

6. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

B. UPON COMPLETION:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE AND THROROUGHLY

CLEANED BY THE VA ENVIRONMENTAL SERVICES DEPARTMENT.

2. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO

MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION,

OUTSIDE OF NORMAL WORK HOURS.

3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

4. WET MOP AREA WITH CLEANER/DESINFECTANT.

5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

6. RETURN PERMIT TO THE CONTRACTING OFFICER REPRESENTATIVE.

anaj Image

T D

PF TD

TD

TD

DN

HG

" 6

/4

H

H

TR

C102D

116 SF

C D

COMMUNITY

BREAK ROOM

1W32

739 SF

FES UTILITY

C101

109 SF

MVP

C102A

276 SF

CORRIDOR

H111

317 SF

7N E

W

F L O

O R

IN

G

E X

IS

T

F

L O

O R

IN

G

H

EXPOSED

TR

C102D

116 SF

CORRIDOR

H111

317 SF

COMMUNITY

BREAK ROOM

1W32

739 SF

MVP

C102A

276 SF

FES UTILITY

C101

109 SF

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

EXISTING LIGHTS TO DEMOLISH

FES UTILITY

C101B

109 SF

DATA CLOSET

C102D

116 SF

COMMUNITY

BREAK ROOM

C102C

739 SF

MVP

C102A

276 SF

CORRIDOR

H111

317 SF

C102D

FES UTILITY

C101B

109 SF

COMMUNITY

BREAK ROOM

C102C

739 SF

MVP

C102A

276 SF

CORRIDOR

H111

317 SF

DATA CLOSET

C102D

116 SF

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 01A-101a

BLDG 01 - FLOOR 1 - DEMO,

FLOOR PLANS & RCPS 01

EM AJ/ST/MA

CONSTRUCTION

DOCUMENTS

03/31/2022

KEY PLAN

PROJECT

NORTH

PROJECT

NORTH

GENERAL NOTES

LEGEND

1/4" = 1'-0"

RM C102D - DEMO FLOOR PLAN

1/4" = 1'-0"

RM C102D - DEMO RCP

1/4" = 1'-0"

RM C102D - FLOOR PLAN

1/4" = 1'-0"

RM C102D - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

4. PATCH AND REPAIR CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.

5. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

6. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

KEYNOTES

DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,

CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSED UNDERSIDE OF

STRUCTURE ABOVE. PATCH WALLS WHERE CEILINGS REMOVED.

DEMO EXISTING DOOR/FRAME, PREP FOR NEW DOOR/FRAME.

INSTALL NEW DOOR/FRAME.

NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE21.

SEE DETAIL 5/A-603 FOR EXTENDING WALLS UP TO STRUCTURE ABOVE.

DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.

REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRUP AT EXISTING FLOORING TRANSITION.

PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF

CONSTRUCTION AREA, TYP.

DEMO EXISTING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

ICRA LEGEND

DN

T

V

U

S

3' - 0"

R.8

V

U

TR

1E15

203 SF

1E19

CORRIDOR

EXIST.

FLOORING

NEW

FLOORING

V

U

EXPOSED

EXISTING EXPOSED

STRUCTURE TO REMAIN,

NO WORK

V

U

EXPOSED

TR

1E15

203 SF

1E15

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

EXISTING LIGHTS TO DEMOLISH

2 HR FIRE RATED WALL

OIT

1E19

203 SF

CORRIDOR

STAIRWELL NO. 1

S101

STORAGE

1E01

STORAGE

1E14

OIT

1E19

203 SF

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 01A-101b

BLDG 01 - FLOOR 1 - DEMO,

FLOOR PLANS & RCPS 01

EM AJ/ST/MA

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

1/4" = 1'-0"

RM 1E19 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 1E15 - FLOOR PLAN

1/4" = 1'-0"

RM 1E19 - DEMO RCP

1/4" = 1'-0"

RM 1E15 - RCP

KEY PLAN

PROJECT

NORTH

GENERAL NOTES

LEGEND

PROJECT

NORTH

KEYNOTES

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

DEMO EXISTING DOOR/FRAME, PREP FOR NEW DOOR/FRAME.

INSTALL NEW DOOR/FRAME.

NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.

DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.

REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRUP AT EXISTING FLOORING TRANSITION.

PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF

CONSTRUCTION AREA, TYP.

DEMO EXISTING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

4. PATCH AND REPAIR CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.

5. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

6. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

ICRA LEGEND

ROOF BELOW

ROOF BELOW

DNUP

DN

UP

DN UP

DN UP

SH RE D

RE F

1 2

RE F

MI CR O

2C10

2C10A

M

K

CORRIDOR

H204

563 SF

9' - 3"

R.8

M

K

CHASE

CH-C-3

24 SF

CORRIDOR

H204

563 SF

UNDER

CONSTRUCTION

2C09

341 SF

EXAM

2C11

211 SF

9' - 3"

2C10A

TR

2C10A

179 SF

LAB.

2C10

287 SF

PATCH AND REPAIR WALLS

WHERE OIT ROOM WALLS

REMOVED.

01a

R.8

NEW

FLOORING

EXIST.

FLOORING12

M

K

M

K

EXPOSED

UNDER

CONSTRUCTION

2C09

341 SF

CHASE

CH-C-3

24 SF

EXAM

2C11

211 SF

EXISTING BEAM, NO WORK

EXISTING BEAM, NO WORK

TR

2C10A

179 SF

LAB.

2C10

287 SF

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

EXISTING LIGHTS TO DEMOLISH

LAB.

2C10

398 SF

SERVER RM.

2C10B

43 SF

OI&T

2C10A

20 SF

CHASE

CH-C-3

24 SF

UNDER

CONSTRUCTION

2C09

341 SFEXAM

2C11

211 SF

LAB.

2C10

398 SF

SERVER RM.

2C10B

43 SF

OI&T

2C10A

20 SF

CHASE

CH-C-3

24 SF

UNDER

CONSTRUCTION

2C09

341 SF

EXAM

2C11

211 SF

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 01A-102

BLDG 01 - FLOOR 2 - DEMO,

FLOOR PLANS & RCPS 01

EM AJ/ST/MA

CONSTRUCTION

DOCUMENTS

03/31/2022

KEY PLAN

PROJECT

NORTH

KEYNOTES

LEGEND

1/4" = 1'-0"

RM 2C10 & 2C10A - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 2C10A & 2C10 - FLOOR PLAN

1/4" = 1'-0"

RM 2C10 & 2C10A - DEMO RCP

1/4" = 1'-0"

RM 2C10 & 2C10A - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

GENERAL NOTES

1 DEMO WALLS AND DOOR/FRAME.

INSTALL NEW DOOR/FRAME.

DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.

REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRIP AT EXISTING FLOORING TRANSITION.

DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,

CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF

STRUCTURE ABOVE. PATCH WALLS WHERE CEILINGS REMOVED.

CONSTRUCT NEW WALL, PAINT TO MATCH EXISTING ON ROOM 2C10.

NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.

INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING WINDOW.

REFERENCE DETAIL 4/A-603.

SEE DETAIL 5/A-603 FOR EXTENDING WALLS TO STRUCTURE ABOVE.

PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF

CONSTRUCTION AREA, TYP.

DEMO EXISTING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL

LOCATIONS.

3. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALL

INSTALLED.

4. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

5. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

6. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

7. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

ICRA LEGEND

RAD RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RADRADRADRADRADRADRADRADRAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RADRAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

SP

UP

DNDN

DN

UP

DN

FAP

FAP

FAP

FAP

FAP

FE

FE

FE

FECFEC

FE

FE

FE

FEC

FE

3C13, 3C14

E303

K

/4

K

TR

3C13

276 SF

3 3 C

1' - 7" 1' - 10" 3' - 4" 4' - 6 1/2"

LAB.

3C12

LAB.

3C15

STERILIZATION

RM.

3C16

CORRIDOR

H304

01b

01b

01b

01b

E X

IS

T

F

L O

O R

IN

G

N

O

O R

IN

G

K 9

K

TR

3C13

276 SF

EXPOSED

LAB.

3C15

305 SF

LAB.

3C12

383 SF

STERILIZATION

RM.

3C16

55 SF

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

EXISTING LIGHTS TO DEMOLISH

LAB.

3C14

251 SF

LAB.

3C12

STERILIZATION

3C13

22 SF

LAB.

3C15

STERILIZATION

RM.

3C16

CORRIDOR

H304

T V

US

T V

US

EXISTING ACT CEILING AND LIGHTS

TO REMAIN, NO WORK.

PATCH CEILING

WHERE WALLS ARE

REMOVED.

T V

US

TR

E303

541 SF

STORAGE

E303A

CORRIDOR

H302 OFFICE

E304OFFICE, OPEN

E302

T V

US

TR

E303

OFFICE

E304

OFFICE, OPEN

E302

STORAGE

E303A

IT ROOM

E303B

45 SF

COMPUTER RM.

E303

490 SF

STORAGE

E303A

OFFICE

E304

CORRIDOR

H302

CORRIDOR

H302

IT ROOM

E303B

45 SF

COMPUTER RM.

E303

490 SF

STORAGE

E303A

116 SF

OFFICE

E304

166 SF

CORRIDOR

H302

1621 SF

CORRIDOR

H302

1621 SF

LAB.

3C14

251 SF

LAB.

3C12

STERILIZATION

3C13

22 SF

LAB.

3C15

STERILIZATION

RM.

3C16

CORRIDOR

H304

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 01A-103

BLDG 01 - FLOOR 3 - DEMO,

FLOOR PLANS & RCPS 01

EM AJ/ST/MA

CONSTRUCTION

DOCUMENTS

03/31/2022

KEY PLAN

PROJECT

NORTH

GENERAL NOTES

LEGEND

1/4" = 1'-0"

RM 3C13 & 3C14 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 3C13 - FLOOR PLAN

1/4" = 1'-0"

RM 3C13 &3C14 - DEMO RCP

1/4" = 1'-0"

RM 3C13 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL

LOCATIONS.

3. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

4. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

5. PATCH AND REPAIR CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.

6. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

7. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

KEYNOTES

1 DEMO EXISTING DOOR/FRAME AS NECESSARY TO INSTALL NEW DOOR/FRAME.

DEMO DOOR/FRAME.

INFILL WALL AND PATCH/PAINT TO MATCH EXISTING, BASE TO MATCH EXISTING,

ON CORRIDOR SIDE.

INSTALL NEW DOOR/FRAME.

DEMO EXISTING CABINETRY AND SINK.

DEMO EXISTING WALLS.

DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.

REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRIP AT EXISTING FLOORING TRANSITION.

DEMO EXISTING CEILING COMPLETELY INCLUDING ALL GRID, SUPPORTING

WIRES, CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE

OF STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.

REPAINT WALL TO THE NEXT NATURAL BREAK WHERE DOOR/FRAME ARE TO BE

INSTALLED, TYP. PAINT TO MATCH EXISTING.

NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.

PATCH AND REPAIR WALLS WHERE DEMO OCCURS.

PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF

CONSTRUCTION AREA, TYP.

INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING WINDOW.

REFERENCE DETAIL 4/A-603.

DEMO EXISTING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

1/4" = 1'-0"

RM E303 & E303B - DEMO FLOOR PLAN

1/4" = 1'-0"

RM E303 & E303B- DEMO RCP

1/4" = 1'-0"

RM E303 - FLOOR PLAN

1/4" = 1'-0"

RM E303 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

ICRA LEGEND

UNEXCAVATED UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

SM

8' - 0"

UP

A

B

5 76

+ 2

4' - 0"

A

B

5 76

59 SF

TR

G04

123 SF

STORAGE

G03

7 SF

CHASE

CH-0-1

1110 SF

STORAGE

G02CORRIDOR

H001

A

B

5 76

EXISTING EXPOSED

STRUCTURE TO REMAIN,

NO WORK

A

B

5 76

59 SF

TR

G04

123 SF

STORAGE

G03

EXPOSED

1110 SF

STORAGE

G02

CORRIDOR

H001

59 SF

OIT

G04

123 SF

STORAGE

G03

125 SF

CORRIDOR

H001

1110 SF

STORAGE

G02

STORAGE

G05

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

TO DEMOLISH

2 HR FIRE RATED WALL

EXISTING LIGHTS TO DEMOLISH

59 SF

OIT

G04

123 SF

STORAGE

G03

125 SF

CORRIDOR

H001

1110 SF

STORAGE

G02

G04

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 02A-100

BLDG 02 - FLOOR 0 - DEMO,

FLOOR PLANS & RCPS 02

EM AJ/ST/PKQ

CONSTRUCTION

DOCUMENTS

03/31/2022

1/4" = 1'-0"

ROOM G04 - DEMO FLOOR PLAN

1/4" = 1'-0"

ROOM G04 - FLOOR PLAN

1/4" = 1'-0"

ROOM G04- DEMO RCP

1/4" = 1'-0"

ROOM G04 - RCP

LEGEND

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

1 NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.

PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF

CONSTRUCTION AREA, TYP.

DEMO EXISTING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

KEYNOTES

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

ICRA LEGEND

UP

DN

FAP FAP

FAP

FEC

UP

UP

UP

UP

UP

UP

UP

A

B

C

5 76

217 SF

OFFICE

158 SF

OFFICE

11093 SF

MECH. RM.

122 SF

CORRIDOR

H103

330 SF

CORRIDOR

H102

A

B

A

B

5 76

217 SF

TR

3' - 4" 0' - 11 3/4"

MECH. RM.

OFFICE

CORRIDOR

H103

OFFICE

E X

IS

T

F

L O

O R

IN

G

N E

W F

L O

O R

IN

G 9

A

B

EXPOSED

217 SF

TR

158 SF

OFFICE

122 SF

CORRIDOR

H103

93 SF

MECH. RM.

330 SF

CORRIDOR

H102

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

TO DEMOLISH

2 HR FIRE RATED WALL

EXISTING LIGHTS TO DEMOLISH

217 SF

OFFICE

158 SF

OFFICE

93 SF

MECH. RM.

122 SF

CORRIDOR

H103

330 SF

CORRIDOR

H102

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 02A-101

BLDG 02 - FLOOR 1 - DEMO,

FLOOR PLANS & RCPS 02

EM AJ/ST/PKQ

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

1/4" = 1'-0"

RM 111 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 111 - DEMO RCP

1/4" = 1'-0"

RM 111 - FLOOR PLAN

1/4" = 1'-0"

RM 111 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

LEGEND

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

DEMO EXISTING DOOR/FRAME AS NECESSARY TO INSTALL NEW DOOR/FRAME.

INSTALL NEW DOOR/FRAME.

DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.

REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRIP AT EXISTING FLOORING TRANSITION.

DEMO EXISTING GWB COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,

CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF

STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.

NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.

INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING

WINDOW. REFERENCE DETAIL 4/A-603.

DEMO EXISTING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

KEYNOTES

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

4. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

5. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

6. ICRA BARRIERS NOT SHOWN COORDINATE DIRECTLY WITH COR & SAFETY TO

MEET ICRA REQUIREMENTS.

ROOF BELOW

FAP

FAP

RAD

RAD

FEC

FEC

FE

UP

UP

A

B

RAD

3' - 4" 2' - 6" 0' - 6"

DOOR TO REMAIN CLOSED AND

SEALED DURING ENTIRETY OF

CONSTRUCTION PHASE.

CONFIRM WITH DOOR

MANUFACTURER, TYP

A

B

8' - 0"

7' - 10" 7' - 10"

9' - 6"

9' - 8"

8' - 2"

A

B

99 SF

TR

633 SF

CORRIDOR

H202

78 SF

HAC

144 SF

TOILET, MALE

2' - 6" 3' - 4" 0' - 6"

01b12

E X

IS

T

F

L O

O R

IN

G

N

O

O R

IN

G15

A

B

99 SF

TR

144 SF

TOILET, MALE

8' - 0"

9' - 6"

5 SF

CHASE

CH-2-4

78 SF

HAC

99 SF

VENDING

633 SF

CORRIDOR

H202

78 SF

HAC

144 SF

TOILET, MALE

99 SF

VENDING

633 SF

CORRIDOR

H202

78 SF

HAC

144 SF

TOILET, MALE

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 02A-102

BLDG 02 - FLOOR 2 - DEMO,

FLOOR PLANS & RCPS 02

EM AJ/ST/PKQ

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

LEGEND

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

1 DEMO EXISTING DOOR/FRAME AS NECESSARY TO INSTALL NEW DOOR/FRAME.

INSTALL NEW DOOR/FRAME.

DEMO EXISTING CABINETRY, SINK, AND WALLS.

DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.

REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRIP AT EXISTING FLOORING TRANSITION.

DEMO EXISTING ACT AND GWB COMPLETELY INCLUDING ALL GRID, SUPPORTING

WIRES, CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE

OF STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.

INFILL WALL TO MATCH EXISTING.

DEMO EXISTING WALL, PREP FOR NEW DOOR/FRAME.

PATCH AND REPAINT WALL AS NECESSARY TO MATCH EXISTING ON CORRIDOR

SIDE.

NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.

INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING

WINDOW. REFERENCE DETAIL 4/A-603.

REFER TO DETAIL 5/A-603 FOR EXTENDING WALLS UP TO STRUCTURE ABOVE.

PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF

CONSTRUCTION AREA, TYP.

DEMO EXISTING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

KEYNOTES

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

4. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

5. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

6. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL

LOCATIONS.

1/4" = 1'-0"

RM 209 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 209 - DEMO RCP

1/4" = 1'-0"

RM 209 - FLOOR PLAN

1/4" = 1'-0"

RM 209 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

ICRA LEGEND

DN

RAD

AP FEC

AP

FAP

FAP

FAP

UP

A

B

7 86

4' - 2 3/4" 3' - 4"

PATCH AND REPAIR WALLS

WHERE DEMO OCCURS.

CONFIRM WITH DOOR

MANUFACTURER, TYP

A

B

7' - 0"

8' - 0"

7' - 0"

PATCH GRID TOGETHER

WHEN WALL IS REMOVED.

A

B

7 86

129 SF

TR

205 SF

OFFICE

307A

307A

7' - 7 1/2"

5' - 8"

01a

01b

E X

IS

T

F

L O

O R

IN

G

N

O

O R

IN

G

A

B

EXPOSED

129 SF

TR

205 SF

OFFICE

307A

218 SF

OFFICE

114 SF

OFFICE

307A

114 SF

OFFICE

30792 SF

MECH. RM.

653 SF

CORRIDOR

H302

117 SF

OFFICE

218 SF

OFFICE

114 SF

OFFICE

307A

114 SF

OFFICE

30792 SF

MECH. RM.

653 SF

CORRIDOR

H302

DEMO EXISTING EXTINGUISHER CABINET

EXISTING RESILIENT BASE:

CUT AS REQUIRED FOR NEW

DOOR AND PATCH CLEANLY TO

NEW FRAME.

SALVAGE VA SIGNAGE

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 02A-103

BLDG 02 - FLOOR 3 - DEMO,

FLOOR PLANS & RCPS 02

EM AJ/ST/PKQ

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

LEGEND

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

1 DEMO EXISTING DOOR/FRAME.

DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.

REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRIP AT EXISTING FLOORING TRANSITION.

DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,

CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF

STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.

INSTALL NEW DOOR/FRAME

PATCH AND REPAINT WALL AS NECESSARY TO MATCH EXISTING.

DEMO EXISTING WALL.

NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.

INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING

WINDOW. REFERENCE DETAIL 4/A-603.

INFILL WALL TO MATCH EXISTING.

CONSTRUCT NEW WALL, PAINT TO MATCH EXISTING ON ROOM 307A.

DEMO EXISTING FIRE EXTINGUISHER CABINET.

INSTALL NEW FIRE EXTINGUISHER CABINET. MATCH EXISTING COLOR AND

STYLE.

DEMO EXISTING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

KEYNOTES

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALLS

INSTALLED.

3. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

4. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

5. PATCH AND REPAIR CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.

6. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

7. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

8. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL

LOCATIONS.

9. ICRA BARRIERS NOT SHOWN. COORDINATE DIRECTLY WITH COR & SAFETYTO

MEET ICRA REQUIREMENTS.

1/4" = 1'-0"

RM 308 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 308 - DEMO RCP

1/4" = 1'-0"

RM 308 - FLOOR PLAN

1/4" = 1'-0"

RM 308 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

RM 308 - CORRIDOR

UNEX. UNEX.

UNEX. UNEX.

RA D

FE

AP

FEC

FEC

AP

FEC

FAP

FAP

FAP

STAIRWELL NO.

B001

GROUP RM.

B002

STORAGE

B003

GROUP

B004

ACTIVITY

B006

STORAGE

B008

MECH. RM.

B013

CLEAN

STORAGE

B010

CORRIDOR

B011

STORAGE

B005

MECH. RM.

B009

ELEVATOR

MACHINE RM.

B017

CORRIDOR

B015

SERVICE

B014

STORAGE

B024

MECH. RM.

B026

STORAGE

B027

MECH. RM.

B029

STAIRWELL NO.

B028

TOILET

B023

CLOSET

B022

CORRIDOR

B030

LAUNDRY

B021

STAIRWELL NO.

B019

VENDING

B020

CORRIDOR

B012

CLOSET

B018

ENTRY

B016

OI&T

B002A

OI&T

B007

ELEVATOR

B031

DN

UP

UP

UP

UP

B025

K L M

3' - 4"3' - 9"

3' - 4" 2' - 8 1/2"

/4

CONFIRM WITH DOOR

MANUFACTURER, TYP

53.94 SF

TR

B025A

B A

K L M

3' - 4" 2' - 8 1/2"

/4

B

200.14 SF

VACANT

B025

3' - 9" 3' - 4"

01a

01a

9' - 3 3/4"

INSTALL NEW HEADER, SEE

DETAIL 2/03A-100

E X

IS

T

F

L O

O R

IN

G

N

O

O R

IN

G

WG

K L M

DEMO EXISTING LIGHT

EXISTING STRUCTURAL BEAM, NO WORK

53.94 SF

TR

B025A

WG

K L M

VACANT

B025

259.91 SF

VACANT

B025

128.02 SF

STORAGE

B027

CORRIDOR

B030

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

259.91 SF

VACANT

B025

128.02 SF

STORAGE

B027

333.04 SF

CORRIDOR

B030

L M

WHERE NEW DOOR OCCURS: CAREFULLY CUT

EXISTING RAILING. SALVAGE END CAPS FOR

REUSE. REINSTALL RAILING AND INSTALL

SALVAGED END CAPS. PROVIDE ADDITIONAL

BLOCKING AND SUPPORTS FOR NEW END OF

RAILING AS NEEDED.

EXISTING RESILIENT BASE:

CUT AS REQUIRED FOR

NEW DOOR AND PATCH

CLEANLY TO NEW FRAME.

C6X7

2' - 0" TYP.

(6)-3/4" DIA THRD ROD EMBEDDED

INTO (E) CMU 6 1/2" W/ SIMPSON SET-XP

ER-265. @ 16' OC HORZ. DO NOT INSTALL

WITHIN 1/2" OF HEAD JOINT. DO NOT DAMAGE

EXISTING REINF. TYP

NEW OPENING IN EXISTING CMU WALL

(PREDRILL CORNERS TO AVOID

CUTTING CORNERS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 03A-100

BLDG 03 - FLOOR 0 - DEMO,

FLOOR PLANS & RCPS 03

EM AJ/ST

CONSTRUCTION

DOCUMENTS

03/31/2022

KEY PLAN

PROJECT

NORTH

KEYNOTES

LEGEND

1/4" = 1'-0"

RM B025 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM B025 - FLOOR PLAN

1/4" = 1'-0"

RM B025 - DEMO RCP

1/4" = 1'-0"

RM B025 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

GENERAL NOTES

DEMO EXISTING DOOR/FRAME AS NECESSARY TO INSTALL NEW DOOR/FRAME.

INSTALL NEW DOOR/FRAME.

SAWCUT AND DEMO CMU WALL AND RAILING. PREP FOR NEW DOOR/FRAME.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRIP AT EXISTING FLOORING TRANSITION.

PATCH AND REPAINT WALL AS NECESSARY TO MATCH EXISTING ON CORRIDOR

SIDE.

CONSTRUCT NEW WALL. PAINT TO MATCH EXISTING ON ROOM B025.

NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.

DEMO EXISTING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALL

INSTALLED.

3. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL

LOCATIONS.

3. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

4. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

6. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

7. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

8. ICRA BARRIERS NOT SHOWN. COORDINATE DIRECTLY WITH COR & SAFETY TO

MEET ICRA REQUIREMENTS.

1/2" = 1'-0"

RM B025 - CORRIDOR INTERIOR ELEVATION

1/2" = 1'-0"

DOOR HEADER DETAIL

DN

-3'-8" FLOOR

ELEVATION

DN

UP

FEC

FE

RA D

RA D

RA D

RA D

FAP

FAP

FAP

FAP

PATIENT RM.

TOILET

103A

HAC

PATIENT RM.

TOILET, MALE

TOILET

TOILET

PATIENT RM.

STAIRWELL NO.

OFFICE

OFFICE

SHOWER

TOILET

PATIENT RM.

PATIENT RM.

STAIRWELL NO.

PATIENT RM.

PATIENT RM.

PATIENT RM.

KITCHEN

RECEPTION

PATIENT ADA

PATIENT RM.

PATIENT RM.

PATIENT RM.

PATIENT RM.

CLOSET

PATIENT RM.

TOILET

102A

STAIRWELL NO.

S101

CORRIDOR

101A

CORRIDOR

ELEVATOR

LOBBY

PATIENT

LOUNGE

ELEVATOR

LOBBY

VESTIBULE

ELEVATOR

E1

CORRIDOR

116 S M

SM

UP

UP

SM

UP

138.12 SF

TR

169.11 SF

STAIRWELL NO. 2

161.46 SF

OFFICE

7.59 SF

TR

117A

DN

G H I

+ 6

138.12 SF

TR

169.11 SF

STAIRWELL NO. 2

7.59 SF

TR

117A

DN

G H

/4

9' - 1"

E X

IS

T

F

L O

O R

IN

G

N

O

O R

IN

G

138.12 SF

TR

7.59 SF

TR

117A

7' - 5"

7' - 10"

8' - 8"

G H

138.12 SF

TR

7.59 SF

TR

117A

7' - 10"

G H

EXPOSED

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

TO DEMOLISH

2 HR FIRE RATED WALL

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 03A-101

BLDG 03 - FLOOR 1 - DEMO,

FLOOR PLANS & RCPS 03

EM AJ/ST

CONSTRUCTION

DOCUMENTS

03/31/2022

KEY PLAN

PROJECT

NORTH

LEGEND

1/4" = 1'-0"

RM 117 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 117 - FLOOR PLAN

1/4" = 1'-0"

RM 117 - DEMO RCP

1/4" = 1'-0"

RM 117 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

KEYNOTES

GENERAL NOTES

DEMO EXISTING DOOR/FRAME AS NECESSARY TO INSTALL NEW DOOR/FRAME.

INSTALL NEW DOOR/FRAME.

DEMO EXISTING GWB COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,

CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF

STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRIP AT EXISTING FLOORING TRANSITION.

DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.

REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.

PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF

CONSTRUCTION AREA, TYP.

DEMO EXISTING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING AND ELECTRICAL

ITEMS DEMO'D.

3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

4. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

5. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

ICRA LEGEND

DN

RA D

RA DRA D

RA D

FAP

FAP

FE

FEC

PATIENT RM.

PATIENT RM.

PATIENT RM.

PATIENT RM.

TOILET

PATIENT RM.

CLOSET

203A

CLOSET

205A

CLOSET

207A

CLOSET

209A

CLOSET

215A

CLOSET

FIRE

SPRINKLER

CLOSET

220A

STAIRWELL NO.

PATIENT RM.

PATIENT RM.

CLOSET

PATIENT RM.

CLOSET

229A

TOILET

PATIENT RM.

CLOSET

233B

CLOSET

233A

MECH. RM.

STAIRWELL NO.

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

STAIRWELL NO.

PATIENT RM.

PATIENT RM.

PATIENT RM.

PATIENT RM.

PATIENT RM.

QUIET RM.

CLEAN LINEN

KITCHEN

TOILET

OFFICE

PATIENT RM.

PATIENT RM.

CLOSET

232A

CLOSET

230A

CLOSET

228A

HAC

CLOSET

210A

CLOSET

208A

CLOSET

206A

CLOSET

204A

CLOSET

202A

ELEVATOR

LOBBY

PATIENT RM.

ELEVATOR

E2

I J K

3' - 4"

0' - 9 1/2"

/2

2' - 9 3/4"

CONFIRM WITH DOOR

MANUFACTURER, TYP

123.32 SF

TR

224A140.33 SF

LOUNGE

ALIGN

I J K

A

3' - 4" 0' - 9 1/2"

9' - 2 3/4"

CORRIDOR

PATIENT RM.

01a

N

O

O R

IN

G

E X

IS

T

F

L O

O R

IN

G

WG

8' - 7"

7' - 8"

I J K

123.32 SF

TR

224A

WG

7' - 8"

123.32 SF

TR

224A

EXPOSED

I J K

140.33 SF

LOUNGE

268.09 SF

LOUNGE

CORRIDOR

PATIENT RM.

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

268.09 SF

LOUNGE

JK

WHERE NEW DOOR OCCURS: CAREFULLY

CUT EXISTING RAILING. SALVAGE END CAPS

FOR REUSE. REINSTALL RAILING AND INSTALL

SALVAGED END CAPS. PROVIDE ADDITIONAL

BLOCKING AND SUPPORTS FOR NEW END OF

RAILING AS NEEDED.

EXISTING RESILIENT BASE:

CUT AS REQUIRED FOR

NEW DOOR AND PATCH

CLEANLY TO NEW FRAME.

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 03A-102

BLDG 03 - FLOOR 2 - DEMO,

FLOOR PLANS & RCPS 03

EM AJ/ST

CONSTRUCTION

DOCUMENTS

03/31/2022

KEY PLAN

PROJECT

NORTH

LEGEND

1/4" = 1'-0"

RM 224 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 224 - FLOOR PLAN

1/4" = 1'-0"

RM 224 - DEMO RCP

1/4" = 1'-0"

RM 224 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

KEYNOTES

GENERAL NOTES

INSTALL NEW DOOR/FRAME.

CONSTRUCT NEW WALL, PATCH AND PAINT TO MATCH EXISTING.

DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH. REMOVE

EXISTING ADHESIVE AND PREP FOR NEW FLOORING.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRIP AT EXISTING FLOORING TRANSITION.

DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,

CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF

STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.

DEMO EXISTING WALL AND RAILING, PREP FOR NEW DOOR/FRAME.

PATCH AND REPAINT WALL AS NECESSARY TO MATCH EXISTING ON CORRIDOR

SIDE.

NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.

INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING WINDOW.

REFERENCE DETAIL 4/A-603.

PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF

CONSTRUCTION AREA, TYP.

DEMO EXISTING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

4. PATCH AND REPAIR CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.

5. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

6. PROTECT FINISHES IN ROOMS ADJACENT TO TELECOMMUNICATION ROOMS AND

AREAS NOT SCHEDULED FOR NEW WORK.

7. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL

LOCATIONS.

1/2" = 1'-0"

RM 224 - CORRIDOR INTERIOR ELEVATION

ICRA LEGEND

UP

UP

3005 SF

PIPE CHASE

Z001

433 SF

MECH. RM.

002 272 SF

CORRIDOR

H001

543 SF

CORRIDOR

H002

126 SF

ELEVATOR

MACHINE RM.

182 SF

STAIRWELL NO.

S002

130 SF

TOILET, UNISEX

119 SF

TOILET, FEMALE

24 SF

HAC

192 SF

BREAK RM.

372 SF

OFFICE

424 SF

OFFICE

235 SF

OFFICE

012126 SF

VENDING

H003

313 SF

OFFICE

523 SF

MECH. RM.

003A

787 SF

MECH. RM.

10 SF

OI&T

003B

58 SF

ELEVATOR

LOBBY

12 SF

CHASE

CH-1-B

10 SF

CHASE

CH-2-B

5 SF

CHASE

CH-3-B

11 SF

CHASE

CH-4-B

56 SF

ELEVATOR

E1

PROJECT

NORTH

577 SF

CORRIDOR

H002

157 SF

OFFICE

OFFICE

3' - 4"

23 24 25

B

C

D

E

F

G

OFFICE

CONFIRM WITH DOOR

MANUFACTURER, TYP

577 SF

CORRIDOR

H002

123 SF

TR

011A

157 SF

OFFICE

391 SF

OFFICE

A

ALIGN

9' - 2"

0' - 6"

3' - 4"

23 24 25

B

C

D

E

F

G

01a

01a

E X

IS

T

F

L O

O R

IN

G

N E

W F

L O

O R

IN

G

9' - 6"

8' - 0"

8' - 0"

9' - 0"

157 SF

OFFICE

391 SF

OFFICE

577 SF

CORRIDOR

H002

23 24 25

B

C

D

E

F

G

9' - 6"

8' - 0"

8' - 0"

9' - 0"

157 SF

OFFICE

391 SF

OFFICE

577 SF

CORRIDOR

H002

EXPOSED

123 SF

TR

011A

23 24 25

B

C

D

E

F

G

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

EXISTING LIGHTS TO DEMOLISH

EXISTING RESILIENT BASE:

CUT AS REQUIRED FOR NEW

DOOR AND PATCH CLEANLY TO

NEW FRAME.

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 18A-100

BLDG 18 - FLOOR 0 - DEMO,

FLOOR PLANS & RCPS 18

EM AJ/ST/PKQ

CONSTRUCTION

DOCUMENTS

03/31/2022

KEY PLAN

LEGEND

1/4" = 1'-0"

RM 011 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 011 & RM 011A - FLOOR PLAN

1/4" = 1'-0"

RM 011 - DEMO RCP

1/4" = 1'-0"

RM 011 & RM 011A - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

GENERAL NOTES

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALL

INSTALLED.

3. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL

LOCATIONS.

3. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

4. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

6. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

7. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

KEYNOTES

1 DEMO WALL FOR NEW DOOR/FRAME.

DEMO EXISTING WALL AND EXISTING DOOR/FRAME TO BE RELOCATED.

CONSTRUCT NEW WALL, PATCH AND PAINT TO MATCH EXISTING.

INSTALL NEW DOOR/FRAME.

CONSTRUCT NEW WALL AND INSTALL EXISTING DOOR.

DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH. REMOVE

EXISTING ADHESIVE AND PREP FOR NEW FLOORING.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRIP AT EXISTING FLOORING TRANSITION.

DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,

CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF

STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.

PATCH AND REPAINT WALL AS NECESSARY TO MATCH EXISTING ON CORRIDOR

SIDE.

NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.

INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING WINDOW.

REFERENCE DETAIL 4/A-603.

PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF

CONSTRUCTION AREA, TYP.

DEMO EXISING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

Revisions: Date:

1/2" = 1'-0"

RM 011 - CORRIDOR

ICRA LEGEND

ORIGINAL DRAWINGS SHOW 37'-10"

R AD

R AD

R AD

R ADR AD

R ADR AD

R ADR ADR AD

R AD

R AD

R ADR AD

R AD

R ADR ADR AD

R AD

R ADR AD

R AD

R AD

R AD R AD

R AD

R AD R AD

R AD

R AD R AD

R AD

R AD

R AD

R AD

R AD

FAP

FAP

FAP

FAP

AP

FEC

FEC FEC

OFFICE

OFFICE

OFFICE

FILE RM.

OFFICE

OFFICE

WORK RM.

STORAGE

TOILET, MALE

ELEVATOR

LOBBY

TOILET, FEMALE

STAIRWELL NO.

S102

CORRIDOR

H102

CORRIDOR

H103

PIV BADGE

OFFICE

CORRIDOR

H101

RECEPTION

STAIRWELL NO.

S101

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

H104

CONFERENCE

RM.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

112 OFFICE

OFFICE

114A

OFFICE

BREAK RM.

115AOFFICE, OPEN

OFFICE

OFFICE, CHIEF

113A

OFFICE

OFFICE

OFFICE

CORRIDOR

H105

CLOSET

115C

CLOSET

115B

ELEVATOR

E1

CHASE

CH-1-1

STAIRWELL NO.

S103

UP

UP

UP

UP

UP

UP

37'-0 1/2"

15'-3 1/4" 10'-4 3/4" 10'-4 3/4"

PROJECT

NORTH

10 11 12 13

B

C

D

E

F

G

7' - 11"

CHASE

11 12 13

B

C

D

E

PATCH AND REPAIR CEILING

GRID AND TILES AT NEW WALLS.

7' - 11"

141 SF

TR

10 11 12 13

B

C

D

E

73 SF

CORRIDOR

H102

343 SF

CORRIDOR

H103

141 SF

TR

CHASE

CH-1-1

ALIGN

0'

3/

4"

0'

3/

4"

10 11 12 13

B

C

D

E

01b

01b

01b

01b

EXIST.

FLOORING

NEW

FLOORING

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

EXISTING LIGHTS TO DEMOLISH

84 SF

OI&T

621 SF

CORRIDOR

H101

92 SF

CORRIDOR

H102

347 SF

CORRIDOR

H103

48 SF

CHASE

CH-1-1

84 SF

OI&T

621 SF

CORRIDOR

H101

92 SF

CORRIDOR

H102

347 SF

CORRIDOR

H103

48 SF

CHASE

CH-1-1

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 18A-101

BLDG 18 - FLOOR 1 - DEMO,

FLOOR PLANS & RCPS 18

EM AJ/ST/PKQ

CONSTRUCTION

DOCUMENTS

03/31/2022

KEY PLAN

LEGEND

1/4" = 1'-0"

RM 119 - DEMO FLOOR PLAN

PROJECT

NORTH

1/4" = 1'-0"

RM 119 - DEMO RCP

PROJECT

NORTH

1/4" = 1'-0"

RM 119 - RCP

1/4" = 1'-0"

RM 119 - FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

GENERAL NOTES

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

4. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALLS

INSTALLED.

5. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

6. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL

LOCATIONS.

7. ICRA BARRIERS NOT SHOWN. COORDINATE DIRECTLY WITH COR & SAFETY TO

MEET ICRA REQUIREMENTS.

KEYNOTES

CONSTRUCT NEW WALL. PATCH/PAINT AS NECESSARY TO MATCH EXISTING ON

CORRIDOR SIDE.

DEMO EXISTING WALLS.

DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.

REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.

APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL

REDUCER STRIP AT EXISTING FLOORING TRANSITION.

DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,

CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF

STRUCTURE ABOVE. PATCH WALLS WHERE CEILING IS REMOVED.

PATCH AND REPAIR WALLS WHERE OI&T ROOM WALLS WERE REMOVED.

NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.

DEMO EXISING BASE, PREP FOR NEW BASE.

INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.

Revisions: Date:

ICRA LEGEND

10 11 12 13

B

C

D

E

F

G 8' - 1"

115 SF

TR

287 SF

CORRIDOR

H203

163 SF

CORRIDOR

H202

49 SF

CHASE

CH-2-1

32 SF

ELEC. CLOSET

4 213

ALIGN

10 11 12 13

C

D

E

F

G

01b

01a

01b

EXIST.

FLOORING

NEW

FLOORING

10' - 3"

7' - 9 1/2"

9' - 9"

7' - 9 1/2"

10 11 12 13

C

D

E

F

7' - 9 1/2"

WG

7' - 9 1/2"

115 SF

TR

10 11 12 13

C

D

E

F

G

EXPOSED

PROJECT

NORTH

212A

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)

EXISTING LIGHTS TO DEMOLISH

36 SF

OI&T

32 SF

ELEC. CLOSET

49 SF

CHASE

CH-2-1

49 SF

KITCHENETTE

212A

193 SF

CORRIDOR

H202

549 SF

CORRIDOR

H201

287 SF

CORRIDOR

H203

OFFICE

HAC

OFFICE, SUPV.

TOILET, MALE

OFFICE

36 SF

OI&T

32 SF

ELEC. CLOSET

49 SF

CHASE

CH-2-1

49 SF

KITCHENETTE

212A

193 SF

CORRIDOR

H202

549 SF

CORRIDOR

H201

287 SF

CORRIDOR

H203

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 18A-102

BLDG 18 - FLOOR 2 - DEMO,

FLOOR PLANS & RCPS 18

EM AJ/ST/PKQ

CONSTRUCTION

DOCUMENTS

03/31/2022

KEY PLAN

KEYNOTES

LEGEND

1/4" = 1'-0"

RM 213 & 212A - DEMO FLOOR PLAN

PROJECT

NORTH

1/4" = 1'-0"

RM 213 - FLOOR PLAN

1/4" = 1'-0"

RM 213 & 212A - DEMO RCP

1/4" = 1'-0"

RM 213 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

GENERAL NOTES

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT

EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL

ITEMS DEMO'D.

3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.

4. PATCH AND REPAIR EXISTING CEILING GRID AND TILES WHERE NEW WALLS

INSTALLED.

5. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE

INSTALLED.

6. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS

AND AREAS NOT SCHEDULED FOR NEW WORK.

7. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL

LOCATIONS.

8. ICRA BARRIERS NOT SHOWN. COORDINATE DIRECTLY WITH COR & SAFETY TO

MEET ICRA REQUIREMENTS.