Attachment 32 - Drawings Part-31.pdf

PDF 13 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation seeks a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, facility renovation and construction, data center upgrades, communication infrastructure installation, physical security improvements, fiber optic network assessments and upgrades across multiple campus buildings. The opportunity is identified as solicitation number 36C77623R0009 issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. Services required include electrical, HVAC, construction, communications and security systems at various medical center buildings.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
FOLLOW-UP Technical Questions - St. Louis 4-6-23.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
Technical Questions - FINAL - St. Louis 3-28-23.pdf PDF
657-21-701JB - Addendum 1_03_24_23.pdf PDF
329000-5 - Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-24-23.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0003.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 45 - Site Visit Instructions Updated 2-16-23.pdf PDF
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Attachment 33 - Drawings Part-32.pdf PDF
Attachment 34 - Envr. Report - Narrative.pdf PDF
Attachment 37 - Envr. Report - Appendix C.pdf PDF
Attachment 40 - NARA RM Contract Language Clause.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 1-20-23.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W W

C

5.5

E

TR

1A 109

78 SF

TELEPHONE

TERMINAL

BOARD

TYP.

5.5

E

DATA RACK, TYP.

5.5

E

TR

1A 109

78 SF

TELEPHONE

TERMINAL

BOARD

5.5

E

DATA

RACK,

TYP.ET502

B-SIDE:

TO TRs 1A109, 2A122, AND 3A122

FROM MCR BB102,

FROM FLR 00 TO 01

B-SIDE:

CONTINUE TO TR 2A122;

SEE SHEET 56ET101

A-SIDE:

TO TR 1A109

FROM BLDG

56 BB 102

1A 109

TR

1A 109

78 SF

TYP

5.5

E

DATA

RACK,

TYP.ET502

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS

NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO

ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED

TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL

LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED

FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION

OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY

INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A

CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED

PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE

DRAWINGS AS REQUIRED.

14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

AREA OF WORK

KEY PLAN

1/4" = 1'-0"56ET101

1 RM 1A109 - DEMOLITION FLOOR PLAN

1/4" = 1'-0"56ET101

2 RM 1A109 - TELECOMMUNICATIONS PLAN

0' 2' 4' 8' 0' 2' 4' 8'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 56ET401

BLDG 56 - FLOOR 1 - ENLARGED

TELECOMMUNICATIONS PLANS 56

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

GENERAL NOTES

KEY NOTES

1/4" = 1'-0"56ET101

3 RM 1A109 - OVERHEAD PLAN LEVEL 1

0' 2' 4' 8'

4 NOT USED

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING

SHALL BE DEMOLISHED BACK TO SOURCE.

PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES

SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE

DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL ENSURE

A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS

PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC

CABLING.

W

C

W

2A 122

5.5

F

TR

2A 122

76 SF

DATA RACK

TYP.

TELEPHONE

TERMINAL

BOARD

5.5

TYP

F

5.5

F

TR

2A 122

76 SF

TELEPHONE

TERMINAL

BOARD

5.5

DATA

TACK,

TYP.

ET502

B-SIDE:

CONTINUE TO MCR

BB102; SEE SHEET

56ET102

F

A-SIDE:

TO TR 2A122 FROM

BLDG 56 BB 102

5.5

F

5.2

TR

2A 122

76 SF

TYP

5.5

DATA

TACK,

TYP.

ET502

F

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS

NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO

ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED

TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL

LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED

FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION

OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY

INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A

CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED

PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE

DRAWINGS AS REQUIRED.

14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

AREA OF WORK

1/4" = 1'-0"56ET102

1 RM 2A122 - DEMOLITION FLOOR PLAN

1/4" = 1'-0"56ET102

2 RM 2A122 - TELECOMMUNICATIONS PLAN

0' 2' 4' 8' 0' 2' 4' 8'

KEY PLAN

GENERAL NOTES

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 56ET402

BLDG 56 - FLOOR 2 - ENLARGED

TELECOMMUNICATIONS PLANS 56

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

1/4" = 1'-0"56ET102

3 RM 2A122 - OVERHEAD PLAN LEVEL 1

0' 2' 4' 8'

4 NOT USED

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL ENSURE

A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS

PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC

CABLING.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING

SHALL BE DEMOLISHED BACK TO SOURCE.

PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES

SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE

DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.

W W

C

5.5

E

TR

3A 122

76 SF

COMBINER & SPLITTER

FIBER OPTIC

5.5

E

DATA RACK, TYP.

TYP

TELEPHONE

TERMINAL

BOARD

5.5

E

TR

3A 122

76 SF

COMBINER & SPLITTER

FIBER OPTIC

5.5

E

TELEPHONE

TERMINAL

BOARD

DATA

RACK,

TYP.ET502

A-SIDE:

TO TR 3A122 FROM

BLDG 56 BB102

B-SIDE:

TO TR 3A122 FROM

MCR BB102, FROM

FLR 02 TO 03

2A 122

TR

3A 122

76 SF

TYP

5.5

E

DATA

RACK,

TYP.ET502

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS

NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO

ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED

TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL

LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED

FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION

OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY

INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A

CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED

PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE

DRAWINGS AS REQUIRED.

14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

AREA OF WORK

1/4" = 1'-0"56ET103

1 RM 3A122 - DEMOLITION FLOOR PLAN

1/4" = 1'-0"56ET103

2 RM 3A122 - TELECOMMUNICATIONS PLAN

0' 2' 4' 8'

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 56ET403

BLDG 56 - FLOOR 3 - ENLARGED

TELECOMMUNICATIONS PLANS 56

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

GENERAL NOTES

KEY NOTES

1/4" = 1'-0"56ET103

3 RM 3A122 - OVERHEAD PLAN LEVEL 1

0' 2' 4' 8'

0' 2' 4' 8'

4 NOT USED

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING

SHALL BE DEMOLISHED BACK TO SOURCE.

PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES

SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE

DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL ENSURE

A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS

PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC

CABLING.

F E

C F

E C

FEC

FECFEC

FECFEC

FEC

F E

C F

E C

F E

C F

E C

FECFEC

FECFEC

F E

C F

E C

F E

C F

E C

FEC

FECFEC

F E

C F

E C

F E

C F

E C

FEC

FECFEC

FEC

F E

C F

E C

FEC

GFI

GFI

AE721B2

AE721

C7

F7

4 4 4

CR

W

0°180°

W

C

1B120

6 6.1

D.4

TYP

TELEPHONE

TERMINAL

BOARD

DATA RACK, TYP.

PANEL BOARD

TR

1B 120

81 SF

6 6.1

D.4

DATA

RACK,

TYP.

TR

1B 120

81 SF

TELEPHONE

TERMINAL

BOARD

PANEL BOARD

ET502

B-SIDE:

CONTINUE TO

SHEET 57ET101

A-SIDE:

TO TR 1B120 FROM

BLDG 01 GC12

6 6.1

D.4

TR

1B 120

81 SF

TYP

DATA

RACK,

TYP.

ET502

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 5E AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS

NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO

ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED

TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL

LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED

FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION

OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY

INDICATED.

7. PROVIDE 1" CONDUIT FROM NEW BACKBOX TO ACCESSIBLE CEILING SPACE FOR

ALL OUTLETS IDENTIFIED AS NEW.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IF FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED

PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE

DRAWINGS AS REQUIRED.

14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

AREA OF WORK

3/8" = 1'-0"57ET101

1 RM 1B120 - DEMOLITION FLOOR PLAN

3/8" = 1'-0"57ET101

2 RM 1B120 - TELECOMMUNICATIONS PLAN

KEY PLAN

GENERAL NOTES

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 57ET401a

BLDG 57 - FLOOR 1 - ENLARGED

TELECOMMUNICATION PLANS 57

LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

3/8" = 1'-0"57ET101

3 RM 1B120 - OVERHEAD PLAN LEVEL 1

0' 2' 4' 8'

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND

CABLING SHALL BE DEMOLISHED BACK TO SOURCE.

PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES

SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE

DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.

0' 2' 4' 8'

0' 2' 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

4 NOT USED

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL

ENSURE A-SIDE AND B-SIDE ROUTING IS

AS DIVERSE AS PRACTICAL. REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL

REQUIRED FIBER-OPTIC CABLING.

W

W W

W

C

180° W

W W

W

AE721B2

AE721

C7

F7

8.4

H

TR

1B 139

85 SF

TYP

DATA

RACK,

TYP.

ET502

8.4

H

TYP

TR

1B 139

85 SF

DATA

RACK,

TYP.

COMBINER &

SPLITTER FIBER

OPTIC

PANEL BOARD

TELEPHONE TERMINAL BOARD

8.4

H

TR

1B 139

85 SF

DATA

RACK,

TYP.

COMBINER &

SPLITTER FIBER

OPTIC

PANEL BOARD

TELEPHONE TERMINAL BOARD

ET502

SIDE B:

CONTINUE TO

SHEET 57ET101

A-SIDE:

TO TR 1B139 FROM

BLDG 01 GC12

1B139

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 5E AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS

NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO

ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED

TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL

LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED

FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION

OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY

INDICATED.

7. PROVIDE 1" CONDUIT FROM NEW BACKBOX TO ACCESSIBLE CEILING SPACE FOR

ALL OUTLETS IDENTIFIED AS NEW.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IF FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED

PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE

DRAWINGS AS REQUIRED.

14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 57ET401b

BLDG 57 - FLOOR 1 - ENLARGED

TELECOMMUNICATION PLANS 57

LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

3/8" = 1'-0"57ET101

3 RM 1B139 - OVERHEAD PLAN LEVEL 1

0' 2' 4' 8'

KEY PLAN

GENERAL NOTES

KEY NOTES

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND

CABLING SHALL BE DEMOLISHED BACK TO SOURCE.

PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED.

SLEEVES SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL.

REFERENCE DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.

3/8" = 1'-0"57ET101

1 RM 1B139 - DEMOLITION FLOOR PLAN

3/8" = 1'-0"57ET101

2 RM 1B139 - TELECOMMUNICATIONS PLAN

0' 2' 4' 8'

0' 2' 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

4 NOT USED

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL

ENSURE A-SIDE AND B-SIDE ROUTING IS

AS DIVERSE AS PRACTICAL. REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL

C

W

180°

RM 104

DC1

TR

117 SF

TYP

DC1

TR

117 SF

DATA RACK.

TYP. ET502

SIDE B:

CONTINUE TO

SHEET 58ET101

A-SIDE:

TO TR 104 FROM

BLDG 1 GC12

DC1

TR

117 SF

TYP

DATA RACK.

TYP. ET502

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS

NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO

ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED

TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL

LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED

FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION

OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY

INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A

CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED

PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE

DRAWINGS AS REQUIRED.

14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

- AREA OF WORK

0' 1' 2' 4'

0' 1' 2' 4'

1/2" = 1'-0"58ET101

1 RM 104 - DEMOLITION FLOOR PLAN

1/2" = 1'-0"58ET101

2 RM 104 - TELECOMMUNICATIONS PLAN

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 58ET401a

BLDG 58 - FLOOR 1 - ENLARGED

TELECOMMUNICATIONS PLANS 58

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

1/2" = 1'-0"58ET101

3 RM 104 - OVERHEAD PLAN LEVEL 1

0' 1' 2' 4'

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

KEY NOTES

GENERAL NOTES

1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING

SHALL BE DEMOLISHED BACK TO SOURCE.

PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES

SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE

DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.

4 NOT USED

PROJECT

NORTH

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL

ENSURE A-SIDE AND B-SIDE ROUTING IS AS

DIVERSE AS PRACTICAL. REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

C1

TYP

DATA RACK, TYP1

TELECOM

ENTRANCE

TERMINAL

PANEL

TELEPHONE

TERMINAL

BOARD

TELECOM

PANEL

C1

TELECOM

66 SF

ENTRANCE

TERMINAL

PANEL

TELECOM

PANEL

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS

NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO

ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED

TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL

LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED

FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION

OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY

INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A

CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED

PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE

DRAWINGS AS REQUIRED.

14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

- AREA OF WORK

RM 149

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 58ET401b

BLDG 58 - FLOOR 1 - ENLARGED

TELECOMMUNICATIONS PLANS 58

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

1/2" = 1'-0"58ET101

1 RM 149 - DEMOLITION FLOOR PLAN

Revisions: Date:

1/2" = 1'-0"58ET101

2 RM 149 - TELECOMMUNICATIONS PLAN

0' 1' 2' 4'

PROJECT

NORTH

0' 1' 2' 4'

PROJECT

NORTH

KEY PLAN

KEY NOTES

GENERAL NOTES

1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING

SHALL BE DEMOLISHED BACK TO SOURCE.

PROJECT

NORTH

W

C

180°

W

GG

OI&T

101A

7 SF

WALL MOUNTED

DATA RACK

DOOR ACCESS PANEL

TELEPHONE

TERMINAL

BOARD

H

21.5

TR

54 SF

TELEPHONE

TERMINAL

BOARD

ACCESS DOOR

CONTROLLER

ACCESS POWER

CONTROLLER PANEL

FIBER OPTIC

PATCH PANEL

DATA RACK1

TR

54 SF

H

21.5

TELEPHONE

TERMINAL

BOARD

ACCESS DOOR

CONTROLLER

FABRIC OPTIC

PATCH PANEL

DATA

RACK ET502

SIDE B:

CONTINUE TO

SHEET 58ET101

A-SIDE:

TO TR 102 FROM

BLDG 1 GC12

- AREA OF WORK

101A

H

21.5

TYP

TR

54 SF

DATA

RACK ET502

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 5E AND BELOW SHALL BE UPGRADED

WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED

BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO

REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,

MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE

INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY

FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. PROVIDE 1" CONDUIT FROM NEW BACKBOX TO ACCESSIBLE CEILING SPACE FOR ALL

OUTLETS IDENTIFIED AS NEW.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF

HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN

AND AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR

PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IF FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE

WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS.

WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY.

WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE

TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY, CABLE

TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED TO SEGREGATE

SYSTEMS FROM ONE ANOTHER.

13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED PLYWOOD

BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE DRAWINGS AS

REQUIRED.

14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY

OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

0' 1' 2' 4'0' 1' 2' 4'

1/2" = 1'-0"60ET101

1 RM 101A - DEMOLITION FLOOR PLAN

KEY PLAN

GENERAL NOTES

KEY NOTES

EXISTING EQUIPMENT TO BE DEMOLISHED ASSOCIATED RACEWAYS AND CABLING

SHALL BE DEMOLISHED BACK TO SOURCE.

PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES

SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL.

REFERENCE DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED

PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END

LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS

SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED.

COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY

EXACT HEAD END LOCATION AS REQUIRED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 60ET401

BLDG 60 - FLOOR 1 - ENLARGED

TELECOMMUNICATIONS PLANS 60

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

1/2" = 1'-0"60ET101

2 RM 102 - DEMOLITION FLOOR PLAN

1/2" = 1'-0"60ET101

3 RM 102 - TELECOMMUNICATION PLAN

0' 1' 2' 4'

1/2" = 1'-0"60ET101

4 RM 102 - OVERHEAD PLAN LEVEL 1

0' 1' 2' 4'

5 NOT USED

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR

SHALL ENSURE A-SIDE AND B-SIDE

ROUTING IS AS DIVERSE AS

PRACTICAL. REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL

REQUIRED FIBER-OPTIC CABLING.

W

C

W

- AREA OF WORK

TR

31 SF

WALL MOUNTED

DATA RACK

TYP TELEPHONE TERMINAL

BOARD

TELECOM

PANEL

FIRE

ALARM

PANEL

MDP - 60T

ACCESS POWER

CONTROLLER

PANEL

TR

31 SF

FIRE

ALARM

PANEL

TELECOM

PANEL

WALL MOUNTED

DATA RACK

TELEPHONE TERMINAL

BOARD

MDP - 60T

SIDE B:

CONTINUE TO

SHEET 60TET101

A-SIDE :

TO TR 3A122 FROM

BLDG 01 GC12

ACCESS POWER

CONTROLLER PANEL

TR

31 SF

TYP

WALL MOUNTED

DATA RACK

TELEPHONE

TERMINAL

BOARD

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS

NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO

ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED

TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL

LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED

FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION

OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY

INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A

CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED

PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE

DRAWINGS AS REQUIRED.

14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

0' 1' 2' 4' 0' 1' 2' 4'1/2" = 1'-0"60TET101

1 RM 108 - DEMOLITION FLOOR PLAN

1/2" = 1'-0"60TET101

2 RM 108 - TELECOMMUNICATIONS PLAN

KEY PLAN

GENERAL NOTES

PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO

REPLACE EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT

SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL

'1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR ADDITIONAL

INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.

PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES

SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE

DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.

REPLACE EXISTING FIBER DISTRIBUTION CABINET WITH NEW FIBER DISTRIBUTION

CABINET AND CASSETES AS REQUIRED. LEVITON ANGLED OPT-X UHDX WITH HDX

ENTERPRISES MTP CASSETTES, OR EQUAL.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED

PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END

LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR

PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS

REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL

VERIFY EXACT HEAD END LOCATION AS REQUIRED.

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 60TET401

BLDG 60T - FLOOR 1 - ENLARGED

TELECOMMUNICATIONS PLANS 60T

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

1/2" = 1'-0"60TET101

3 RM 108 - OVERHEAD PLAN LEVEL 1

0' 1' 2' 4'

4 NOT USED

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL

ENSURE A-SIDE AND B-SIDE ROUTING IS AS

DIVERSE AS PRACTICAL. REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL

REQUIRED FIBER-OPTIC CABLING.

S

180°

W W

C

180°

1B105

- AREA OF WORK

54.5

TYP

DATA RACK, TYP 1

TR

1B 105

108 SF

FIRE ALARM

SPEAKER

TELEPHONE

TERMINAL BOARD

FD

54.5

DATA

RACK,

TYP.

ET502

1 TELEPHONE

TERMINAL BOARDTR

1B 105

108 SF

SIDE B:

CONTINUE

TO SHEET

75ET101

A-SIDE:

TO TR 1B105 FROM

BLDG 01 GC12

54.5

TR

1B 105

108 SF

TYP

DATA RACK,

TYP. ET502

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 5E AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS

NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL

RACEWAYS TO EXTEND TO ASSOCIATED TR AS REQUIRED.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED

TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL

LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED

FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION

OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY

INDICATED.

7. PROVIDE 1" CONDUIT FROM NEW BACKBOX TO ACCESSIBLE CEILING SPACE FOR

ALL OUTLETS IDENTIFIED AS NEW.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND

INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP

MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IF FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED

PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE

DRAWINGS AS REQUIRED.

14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ACRHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

1/4" = 1'-0"75ET101

1 RM 1B105 - DEMOLITION FLOOR PLAN

1/4" = 1'-0"75ET101

2 RM 1B105 - TELECOMMUNICATIONS PLAN

KEY PLAN

GENERAL NOTES

KEY NOTES

1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING

SHALL BE DEMOLISHED BACK TO SOURCE.

PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES

SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE DETAIL

'2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 75ET401

BLDG 75 - FLOOR 1 - ENLARGED

TELECOMMUNICATIONS PLANS 75

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

0' 2' 4' 8'

1/4" = 1'-0"75ET101

3 RM 1B105 -OVERHEAD PLAN LEVEL 1

0' 2' 4' 8'

0' 2' 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

4 NOT USED

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL

ENSURE A-SIDE AND B-SIDE ROUTING IS

AS DIVERSE AS PRACTICAL. REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL

TELECOMMUNICATIONS

EQUIPMENT BONDING

CONDUCTOR (TEBC) AWG

IRREVERSIBLE CRIMP

CONNECTOR, TYP.

CABLE TRAY BONDING

CONDUCTOR. TYPICAL AT

EACH SECTION

CONNECTION POINT

TO PRIMARY OR SECONDARY

BONDING BUSBAR

IRREVERSIBLE

COMPRESSION

CONNECTION

RACK BONDING

CONDUCTOR

(6 AWG)

TEBC

(TELECOMMUNICATIONS

EQUIPMENT BONDING

CONDUCTOR - 4 AWG)

RACK BONDING CONDUCTOR (6 AWG)

UNIT BONDING CONDUCTOR (6 AWG)

TOP-MOUNTED

RACK BONDING

BUSBAR

IRREVERSIBLE CRIMP

CONNECTOR, TYP.

GROUND TO PRIMARY

BONDING BUSBAR.

COORDINATE WITH VA

FOR EXACT

CONDUCTOR ROUTING

TWO-HOLE COMPRESSION LUGS (RACKS SHALL NOT

BE MODIFIED IF ONLY ONE-HOLE IS PROVIDED; USE

ONE-HOLE COMPRESSION LUGS IN THIS CASE)

TWO-HOLE

COMPRESSION LUGS (RACKS

SHALL NOT BE MODIFIED IF

ONLY ONE-HOLE IS PROVIDED;

USE ONE-HOLE COMPRESSION

LUGS IN THIS CASE)

RACK ISOLATION PADS

CABLE FROM SP AND CABLE

TO OTHER CAMPUS BUILDINGS

HOOK AND LOOP STRAPS

EVERY 12 INCHES.

CABLE TO WORK AREA OUTLETS (WAOs)

24-STRAND OM4 (A SIDE)

1 RU CABLE MANAGER

RESERVED FOR SERVICE

PROVIDER, DVRs, AND OTHER

TELECOMMUNICATIONS

EQUIPMENT.

CUBE - iT WALL MOUNT CABINET;

GEN 3; 48"H x 24"W x 30"D (1220 mm x 610 mm X 760 mm) ;

26U; #12 - 24 TAPPED RAILS;

TEMPERED GLASS DOOR;

GLACIER WHITE OR EQUIVALENT

FIBER PATCH PANEL FOR INCOMING

CIRCUITS

IF ISP: 24-STRAND OM4 PER SIDE

12-STRAND OS1 PER SIDE

IF OSP: 24-STRAND OS2 PER SIDE

ANALOG TELEPHONY PATCH

PANEL (IF REQUIRED)

PATCH PANELS TO WORK AREAS

PATCH PANELS TO WORK AREAS

(MAX 96 POSITIONS)

VA LAN SWITCH

VA LAN SWITCH

VA ROUTER (FOR NCA MDA ONLY)

SHELF FOR NON- RACKMOUNT EQUIPMENT

RACK MOUNT PDU. L5- 30 INPUT. NEMA 5-20

OUTPUT. 1 RU. TWO PER ENCLOSURE. ONE ENERGIZED

BY UPS. ONE ENERGIZED BY WALL OUTLET. (SHOWN

HERE FRONT FACING, BUT ARE TO BE INSTALLED ON

THE BACK RAIL.)

RACK MOUNT UPS. L5-30 INPUT.

L5-30 OUTPUT. CAPACITY NTE 2880 VA. 2 RU.

METERED. (APC SMX3000RMLV2U OR EQUIVALENT)

O U

T

IN

O

CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

12-STRAND OS1 (A SIDE)

UTP SURGE PROTECTOR

(IF REQUIRED)

2 RU CABLE MANAGER

2 RU CABLE MANAGER

2 RU CABLE MANAGER

1 RU CABLE MANAGER

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

24-STRAND OM4 (B-SIDE)

12-STRAND OS1 (B-SIDE)

BONDING CONDUCTOR TO

PANEL BOARD GROUND LUG (ACEG)

USE TWO-HOLE LUGS FOR

BONDING CONNECTOR

TELECOMMUNICATIONS

BONDING BUSBAR

BOND RBB TO CABINET LUG. AWG #6

BOND RBB TO EACH SWITCH

AND ROUTER CHASIS

BOND RBB TO TELECOMMUNICATIONS BONDING BUSBAR. AWG #6

RACK BONDING BUSBAR (RBB)

OTHER CONNECTIONS

AS REQUIRED

(BONDING CONDUIT,

CABLE TRAYS,

BUILDING STEEL, TO

THE PBB OR SBB,

ETC.)

CHATSWORTH PRODUCTS

#40158-012, OR APPROVED

EQUAL

MOUNTING BRACKETS

1/4" THICK

L= 12"

D

INSULATOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .